Construction progress monitoring device

By designing multiple driving devices and transmission mechanisms, the multi-angle and multi-position adjustment of the construction progress monitoring device is realized, which solves the problems of fixed monitoring angle and narrow range of traditional monitoring devices, and improves the comprehensiveness and detail of monitoring.

CN221828967UActive Publication Date: 2024-10-11SHAANXI TRAFFIC CONTROL MUNICIPAL TRANSPORTATION COMPREHENSIVE DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420265463.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-03
Publication Date
2024-10-11
Estimated Expiration
2034-02-03

AI Technical Summary

Technical Problem

The monitoring angle of traditional construction progress monitoring devices is fixed and the monitoring range is narrow, resulting in incomplete monitoring of the construction site and the existence of blind spots.

Method used

A construction progress monitoring device including an outer rod, an inner rod and multiple driving devices is designed. The first driving device realizes the up and down movement of the inner rod, the second driving device realizes the horizontal rotation of the camera, and the third driving device realizes the camera Vertical rotation, combined with worm gear and gear transmission, the camera can be adjusted at multiple angles and positions.

Benefits of technology

It achieves the breadth and expansion of the monitoring angle, enables more comprehensive and detailed monitoring of the construction progress, is easy to operate, and can quickly adjust the position of the monitoring device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221828967U_ABST
    Figure CN221828967U_ABST
Patent Text Reader

Abstract

A construction progress monitoring device comprises an outer rod, an inner rod is slidably arranged in the outer rod, a first driving device is arranged at the bottom of the inner rod and can drive the inner rod to move up and down along the outer rod, a second driving device is arranged at the top of the inner rod, and a third driving device is fixedly connected to the second driving device. A camera is arranged on the third driving device, the second driving device can drive the third driving device and the camera to rotate in the horizontal direction, and the third driving device can drive the camera to rotate in the vertical direction. According to the construction progress monitoring device, the first driving device, the second driving device and the third driving device can be used for adjusting the height, the angle position in the horizontal direction and the angle position in the vertical direction of the camera respectively, the monitoring device can monitor the construction progress in a multi-angle and multi-position mode, the monitoring angle is wide, the monitoring range is large, and the monitoring efficiency is improved. The practicability is high, and the construction progress condition can be tracked and known more comprehensively and detailedly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of engineering supervision, and in particular relates to a construction progress monitoring device. Background Art

[0002] During the construction process of a building project, a monitor is often needed to monitor the construction progress of the construction site. However, the monitoring angles of traditional monitors are mostly fixed. The monitoring device can only monitor in one direction, and the monitoring range is relatively narrow. When monitoring the construction site, blind spots are prone to occur, resulting in incomplete monitoring of the on-site construction progress. In order to solve the above problems, a construction project construction progress monitoring device is proposed. Utility Model Content

[0003] The utility model aims to provide a construction progress monitoring device to solve the technical problem of how to make the construction progress monitoring device have a large monitoring angle, a wide range, and convenient direction adjustment.

[0004] In order to achieve the above-mentioned purpose, the specific technical scheme of a construction progress monitoring device of the utility model is as follows:

[0005] A construction progress monitoring device comprises an outer rod, an inner rod is slidably arranged inside the outer rod, a first driving device is arranged at the bottom of the inner rod, the first driving device can drive the inner rod to move up and down along the outer rod, a second driving device is arranged at the top of the inner rod, a third driving device is fixedly connected to the second driving device, a camera is arranged on the third driving device, wherein the second driving device can drive the third driving device and the camera to rotate horizontally, and the third driving device can drive the camera to rotate vertically.

[0006] Furthermore, the first driving device is arranged in the hollow cavity of the outer rod, and specifically, a connecting plate is arranged at the lower part of the inner cavity of the outer rod, and the lower part of the connecting plate is fixedly connected to the first motor of the first driving device, and the output end of the first motor is fixedly connected to the lead screw through the connecting plate, and the inner rod is arranged inside the outer rod, and the bottom of the inner rod is fixedly connected to a moving block, the lead screw extends upward through the moving block and the bottom plate of the inner rod, and is threadedly connected to the moving block, a protruding slider is arranged on the outer side of the inner rod, and a slide groove is correspondingly arranged on the inside of the inner rod, and the sliding connection between the inner rod and the outer rod is realized by the cooperation of the slider and the slide groove.

[0007] Furthermore, the second driving device is arranged at the top of the inner rod, wherein the second driving device includes a worm wheel rotatably arranged at the top of the inner rod, and a worm matched with the worm wheel, one end of the worm wheel is fixedly connected to a second motor, and the second motor drives the worm to drive the rotation of the worm wheel, and a support rod is arranged at the top of the inner rod, a limit ring is arranged on the outer side of the support rod, a bearing is arranged between the limit ring and the support rod, the height of the bearing is higher than the height of the limit ring, a worm wheel is arranged on the bearing, the bottom surface of the worm wheel is in contact with the upper side surface of the bearing, and the center hole of the worm wheel is sleeved on the support rod, thereby realizing the rotation connection between the worm wheel and the top of the inner rod.

[0008] Furthermore, the third driving device includes a vertical plate arranged on the top of the worm gear, and there are two vertical plates, which are arranged in parallel and opposite to each other, and a driving gear and a passive gear are respectively arranged between the two vertical plates, and the driving gear and the passive gear are meshed with each other. A third motor is arranged on the outside of the vertical plate on one side, and the third motor is fixedly connected to the vertical plate. The output end of the third motor passes through the vertical plate and is fixedly connected to the driving gear. A rotating member is rotatably connected to the upper part of the vertical plate, and a camera is fixedly arranged on the top of the rotating member. The driven gear is fixedly connected to the rotating member, and the rotating member is rotatably connected to the vertical plates on both sides through a rotating shaft. Under the action of the third motor, the driving gear and the driven gear are transmitted to realize the rotation adjustment of the rotating member and the camera in the vertical direction.

[0009] Furthermore, a control box is provided on one side of the outer rod, and the control box is electrically connected to the camera, the first motor, the second motor, and the third motor respectively. The control box is also connected to an external power supply. Four groups of control buttons are provided on the control box, one group of buttons is used to control the connection and shutdown of the power supply of the entire monitoring device, one group is used to control the forward and reverse rotation of the first motor, one group is used to control the forward and reverse rotation of the second motor, and one group is used to control the forward and reverse rotation of the third motor.

[0010] A construction progress monitoring device of the utility model has the following advantages: the construction progress monitoring device of the present application can be used to adjust the height, horizontal angle position and vertical angle position of the camera respectively through the first drive device, the second drive device and the third drive device, so that the monitoring device can monitor the construction progress from multiple angles and multiple positions, the monitoring angle is wide, the range is large, and the practicality is strong, and the construction progress can be tracked and understood more comprehensively and in detail. In addition, the control and adjustment of the monitoring device can be directly realized through the control box arranged on the outer rod, the operation is more convenient and quick, and the position adjustment of the monitoring device can be quickly realized. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a structural schematic diagram of the inner rod raising of the construction progress monitoring device of the utility model;

[0012] Figure 2It is a structural schematic diagram of the inner rod falling of the construction progress monitoring device of the utility model;

[0013] Figure 3 It is a cross-sectional view of the first driving device of the utility model connected with the inner rod and the outer rod;

[0014] Figure 4 It is a top cross-sectional view of the sliding fit between the inner rod and the outer rod of the utility model;

[0015] Figure 5 for Figure 2 The enlarged view of point A in the middle;

[0016] Figure 6 It is a structural schematic diagram of the second driving device of the utility model;

[0017] Figure 7 It is a cross-sectional view of the worm wheel of the utility model being rotatably connected to the top of the inner rod;

[0018] Explanation of marks in the figure: 1. outer rod; 11. slide groove; 2. inner rod; 21. slider; 22. support rod; 3. first driving device; 31. first motor; 32. lead screw; 33. moving block; 4. second driving device; 41. second motor; 42. worm; 43. worm wheel; 44. bearing; 5. third driving device; 51. third motor; 52. driving gear; 53. driven gear; 54. rotating part; 6. camera; 7. control box. DETAILED DESCRIPTION

[0019] In order to better understand the purpose, structure and function of the utility model, the following is a further detailed description of a construction progress monitoring device of the utility model in conjunction with the accompanying drawings.

[0020] like Figure 1-7 As shown, a construction progress monitoring device of the utility model comprises an outer rod 1, an inner rod 2 is slidably provided inside the outer rod 1, a first driving device 3 is provided at the bottom of the inner rod 2, the first driving device 3 can drive the inner rod 2 to move up and down along the outer rod 1, a second driving device 4 is provided on the top of the inner rod 2, a third driving device 5 is fixedly connected to the second driving device 4, a camera 6 is provided on the third driving device 5, the camera 6 can collect image information of the construction process to realize the monitoring of the construction progress, wherein the second driving device 4 can drive the third driving device 5 and the camera 6 to rotate horizontally, and the third driving device 5 can drive the camera 6 to rotate vertically, the construction progress monitoring device can realize the height adjustment, horizontal angle adjustment and vertical angle adjustment of the camera 6 through the first driving device 3, the second driving device 4 and the third driving device 5, thereby realizing multi-angle and multi-directional monitoring, and can track and understand the construction progress in a more comprehensive and detailed manner.

[0021] Specifically, Figure 3-4 As shown, the outer rod 1 is hollow, and the first driving device 3 is arranged in the hollow cavity of the outer rod 1. Specifically, a connecting plate is arranged at the lower part of the inner cavity of the outer rod 1, and the lower part of the connecting plate is fixedly connected to the first motor 31 of the first driving device 3, and the output end of the first motor 31 is fixedly connected to the screw rod 32 through the connecting plate, and the inner rod 2 is arranged inside the outer rod 1, and the bottom of the inner rod 2 is fixedly connected to a moving block 33, and the screw rod 32 extends upward through the moving block 33 and the bottom plate of the inner rod 2 and is threadedly connected to the moving block 33, and a protruding slider 21 is arranged on the outer side of the inner rod 2, and a slide groove 11 is correspondingly arranged inside the inner rod 2, and the sliding connection between the inner rod 2 and the outer rod 1 is realized by the cooperation of the slider 21 and the slide groove 11. Under the drive of the first motor 31, the screw rod 32 is driven to rotate, and the rotation of the screw rod 32 drives the moving block 33 and the inner rod 2 to move up and down along the screw rod 32, thereby realizing the adjustment of the height of the inner rod 2, and similarly realizing the height adjustment of the camera 6.

[0022] like Figure 5-7 As shown, the second driving device 4 is arranged at the top of the inner rod 2, wherein the second driving device 4 includes a worm wheel 43 rotatably arranged at the top of the inner rod 2, and a worm 42 matched with the worm wheel 43, one end of the worm 42 is fixedly connected to a second motor 41, and the second motor 41 drives the worm 42 to drive the rotation of the worm wheel 43, thereby realizing the horizontal rotation of the camera 6, and a third driving device 5 is arranged on the top of the worm wheel 43, and the third driving device 5 includes a vertical plate arranged on the top of the worm wheel 43, and the vertical plates are provided with two, and the two vertical plates are arranged in parallel and opposite, and a driving gear 52 and a passive gear are respectively arranged between the two vertical plates. The driving gear 52 and the driven gear are meshed with each other, and a third motor 51 is arranged on the outside of the vertical plate on one side, and the third motor 51 is fixedly connected to the vertical plate, and the output end of the third motor 51 passes through the vertical plate and is fixedly connected to the driving gear 52, and the upper part of the vertical plate is rotatably connected with a rotating member 54, and a camera 6 is fixedly arranged on the top of the rotating member 54, and the driven gear 53 is fixedly connected to the rotating member 54, and the rotating member 54 is rotatably connected to the vertical plates on both sides through a rotating shaft. Under the action of the third motor 51, the driving gear 52 and the driven gear 53 are transmitted to realize the rotation adjustment of the rotating member 54 and the camera 6 in the vertical direction.

[0023] Specifically, a support rod 22 is provided at the top of the inner rod 2, and a circular limiting ring is provided on the outer side of the support rod 22. A bearing 44 is provided between the limiting ring and the support rod 22. The height of the bearing 44 is higher than that of the limiting ring. A worm gear 43 is provided on the bearing 44. The bottom surface of the worm gear 43 contacts the upper side surface of the bearing 44. The center hole of the worm gear 43 is sleeved on the support rod 22, thereby realizing the rotation connection between the worm gear 43 and the top of the inner rod 2. A bearing 44 is provided at the bottom of the worm gear 43, so that the rotation of the worm gear 43 is more labor-saving and smooth.

[0024] In addition, in order to facilitate the adjustment of the height, horizontal angle and vertical angle of the camera 6, a control box 7 is provided on one side of the outer rod 1. The control box 7 is electrically connected to the camera 6, the first motor 31, the second motor 41 and the third motor 51 respectively. The control box 7 is also connected to an external power supply. Four groups of control buttons are provided on the control box 7, one group of which is used to control the connection and shutdown of the power supply of the entire monitoring device, one group is used to control the forward and reverse rotation of the first motor 31, one group is used to control the forward and reverse rotation of the second motor 41, and one group is used to control the forward and reverse rotation of the third motor 51. The monitoring device can be directly adjusted through the control box 7, which is convenient and easy to use.

[0025] The construction progress monitoring device of the present application can be used to adjust the height, horizontal angle position and vertical angle position of the camera 6 respectively through the first drive device 3, the second drive device 4 and the third drive device 5, so that the monitoring device can monitor the construction progress from multiple angles and multiple positions. The monitoring angle is wide, the range is large, and the practicability is strong. The construction progress can be tracked and understood in a more comprehensive and detailed manner. In addition, the control and adjustment of the monitoring device can be directly achieved through the control box 7 set on the outer rod 1. The operation is more convenient and quick, and the position adjustment of the monitoring device can be quickly achieved.

[0026] It is understood that the present invention is described by some embodiments, and those skilled in the art are aware that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. In addition, under the teachings of the present invention, these features and embodiments may be modified to adapt to specific circumstances and materials without departing from the spirit and scope of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of this application are within the scope of protection of the present invention.

Claims

1. A construction progress monitoring device, characterized in that: The invention comprises an outer rod (1), an inner rod (2) is slidably arranged inside the outer rod (1), a first driving device (3) is arranged at the bottom of the inner rod (2), the first driving device (3) can drive the inner rod (2) to move up and down along the outer rod (1), a second driving device (4) is arranged at the top of the inner rod (2), a third driving device (5) is fixedly connected to the second driving device (4), and a camera (6) is arranged on the third driving device (5), wherein the second driving device (4) can drive the third driving device (5) and the camera (6) to rotate in a horizontal direction, and the third driving device (5) can drive the camera (6) to rotate in a vertical direction.

2. A construction progress monitoring device according to claim 1, characterized in that: The first driving device (3) is arranged in the hollow cavity of the outer rod (1). Specifically, a connecting plate is arranged at the lower part of the inner cavity of the outer rod (1). The lower part of the connecting plate is fixedly connected to the first motor (31) of the first driving device (3). The output end of the first motor (31) passes through the connecting plate and is fixedly connected to the lead screw (32). The inner rod (2) is arranged inside the outer rod (1). The bottom of the inner rod (2) is fixedly connected to a moving block (33). The lead screw (32) passes through the moving block (33) and the bottom plate of the inner rod (2) and extends upward and is threadedly connected to the moving block (33). A protruding slider (21) is arranged on the outer side of the inner rod (2). A slide groove (11) is correspondingly arranged inside the inner rod (2). The sliding connection between the inner rod (2) and the outer rod (1) is achieved by the cooperation of the slider (21) and the slide groove (11).

3. A construction progress monitoring device according to claim 2, characterized in that: The second driving device (4) is arranged at the top of the inner rod (2), wherein the second driving device (4) comprises a worm wheel (43) rotatably arranged at the top of the inner rod (2), and a worm (42) cooperating with the worm wheel (43), one end of the worm (42) is fixedly connected to a second motor (41), and the second motor (41) drives the worm (42) to drive the worm wheel (43) to rotate.

4. A construction progress monitoring device according to claim 3, characterized in that: The third driving device (5) comprises a vertical plate arranged on the top of the worm gear (43), wherein two vertical plates are provided, and the two vertical plates are arranged in parallel and opposite to each other, and a driving gear (52) and a driven gear are respectively arranged between the two vertical plates, and the driving gear (52) and the driven gear are meshed with each other, and a third motor (51) is arranged outside the vertical plate on one side, and the third motor (51) is fixedly connected to the vertical plate, and the output end of the third motor (51) passes through the vertical plate and is fixedly connected to the driving gear (52), and a rotating member (54) is rotatably connected to the upper part of the vertical plate, and a camera (6) is fixedly arranged on the top of the rotating member (54), and a driven gear (53) is fixedly connected to the rotating member (54), and the rotating member (54) is rotatably connected to the vertical plates on both sides through a rotating shaft, and under the action of the third motor (51), the driving gear (52) and the driven gear (53) are driven to realize the rotation adjustment of the rotating member (54) and the camera (6) in the vertical direction.

5. A construction progress monitoring device according to claim 3, characterized in that: A support rod (22) is arranged at the top of the inner rod (2), a limiting ring is arranged on the outer side of the support rod (22), a bearing (44) is arranged between the limiting ring and the support rod (22), the height of the bearing (44) is higher than the height of the limiting ring, a worm gear (43) is arranged on the bearing (44), the bottom surface of the worm gear (43) is in contact with the upper side surface of the bearing (44), and the center hole of the worm gear (43) is sleeved on the support rod (22), thereby realizing the rotation connection between the worm gear (43) and the top of the inner rod (2).

6. A construction progress monitoring device according to claim 1, characterized in that: A control box (7) is provided on one side of the outer rod (1). The control box (7) is electrically connected to the camera (6), the first motor (31), the second motor (41), and the third motor (51) respectively. The control box (7) is also connected to an external power source. Four groups of control buttons are provided on the control box (7), one group of which is used to control the connection and disconnection of the power supply of the entire monitoring device, one group of which is used to control the forward and reverse rotation of the first motor (31), one group of which is used to control the forward and reverse rotation of the second motor (41), and one group of which is used to control the forward and reverse rotation of the third motor (51).