Pavement coring hole filling and compacting device capable of measuring compacting work
By using quantitative markers and pressure converters in the pavement core hole filling device, the compaction work of the weight is decomposed into vertical and horizontal forces, which solves the problem that the compaction work in the existing technology cannot be quantitatively controlled and improves the filling efficiency. Effective and enhanced protection against rainwater leakage.
Patent Information
- Application Number
- CN202420172360.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-24
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2034-01-24
AI Technical Summary
The existing pavement core hole filling device cannot quantitatively control the compaction work, resulting in poor bonding effect of the filler, difficulty in ensuring the tightness between the filler and the hole wall, and prone to water seepage problems.
A filling and compaction device including a standpipe and a weight that moves along the length of the standpipe is designed. The weight exerts work when moving on the standpipe. The size of the compaction work is marked by a quantitative mark, and the pressure is decomposed through the pressure conversion part. Vertical and horizontal forces ensure that the filling material is effectively squeezed into the hole wall.
Through the design of quantitative marking and pressure conversion parts, precise control of compaction work is achieved, the filling effect is improved, and the protection ability against rainwater leakage is enhanced.
Smart Images

Figure CN221837381U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of engineering construction, and more specifically, to a road surface core hole filling and compacting device capable of measuring compaction work. Background Art
[0002] In order to inspect the quality of cement-stabilized gravel and asphalt pavements in transportation or municipal engineering projects, it is often necessary to drill holes and take cores from the finished pavement, and then test, inspect and analyze the pavement quality based on the core samples and hole wall conditions. The core holes left over from coring need to be filled in time to prevent rainwater from entering and damaging the pavement and affecting traffic safety.
[0003] Since the core hole diameter is generally only 10 cm, simple compaction equipment or tools such as ready-made hammer heads or steel rods are often used for on-site filling, which will result in low compaction degree.
[0004] A Chinese patent with publication number CN216739180U discloses a road pothole filling and compacting device, the technical key points of which are: it includes a vertical guide rod and a gravity hammer mounted on the guide rod, a pressure-bearing part is installed at the lower end of the guide rod, and an extrusion plate is detachably installed at the lower end of the pressure-bearing part. The size of the extrusion plate matches the size of the pothole to be filled, and the gravity hammer can slide freely downward along the guide rod to impact the pressure-bearing part, and the pressure-bearing part can transmit the impact force to the extrusion plate.
[0005] Although the above scheme improves the compaction degree, there is no reference for the distance that the gravity hammer slides freely, and the compaction work cannot be quantified and controlled. It is impossible to make appropriate changes to the filling of the core holes according to the construction conditions and road conditions. Therefore, the bonding effect of the filling material cannot be guaranteed. At the same time, since the shape of the extrusion plate only produces downward pressure, and does not directly produce lateral extrusion force on the hole wall, it is difficult to ensure the density between the filler and the hole wall, which will lead to water seepage problems and cause problems with the road quality.
[0006] Therefore, a new solution needs to be proposed to solve this problem. Utility Model Content
[0007] The technical problem to be solved by the utility model is to provide a road surface core hole filling and compaction device capable of measuring compaction work.
[0008] The utility model is a road surface core hole filling and compaction device capable of measuring compaction work, which is realized through the following technical scheme, and includes a vertical tube and a weight moving along the length direction of the vertical tube, the bottom of the vertical tube is fixedly connected with a pressure plate, and the weight approaches the pressure plate along the vertical tube after being subjected to an external force and applies work to the pressure plate, the external force at least includes the gravity of the weight itself, and the external force can also be an elastic force, and the outer surface of the vertical tube is provided with a quantitative mark, and the quantitative mark is provided along the extension direction of the length of the vertical tube.
[0009] As a further improvement of the present invention, the quantitative mark includes a plurality of scales.
[0010] By adopting the above technical solution, the size of the compaction work is marked with a scale, which makes it convenient for operators to measure the size of the compaction work.
[0011] As a further improvement of the present invention, some of the scales are scale lines or scale grooves parallel to each other.
[0012] By adopting the above technical solution, production is facilitated and measurement is further facilitated for operators.
[0013] As a further improvement of the present invention, the sizes of some of the scale markings are positively correlated with the distances of the scales away from the pressure plate.
[0014] By adopting the above technical solution, the marking of the scale is more in line with the usage habits of ordinary people, which further facilitates the work of operators.
[0015] As a further improvement of the utility model, the pressure plate includes a pressure conversion part, which is arranged on the side of the pressure plate away from the weight. After the pressure conversion part is subjected to force, it squeezes the filling material so that the filling material tends to move toward the wall of the core hole.
[0016] By adopting the above technical solution, the direction of pressure is decomposed and converted to the core hole wall.
[0017] As a further improvement of the utility model, the pressure conversion part includes at least one pressure conversion surface inclined with the ground, and the pressure conversion surface decomposes the pressure brought by the weight into component forces acting toward the bottom side and the circumferential direction.
[0018] By adopting the above technical solution, the pressure is decomposed and the direction is converted through the pressure conversion surface. When the compaction work is quantified, the work decomposed to the core hole wall direction can be further quantified through the inclination angle of the pressure conversion surface.
[0019] As a further improvement of the utility model, the outer surface of the vertical tube is provided with at least one strip-shaped notch extending along the length direction of the vertical tube.
[0020] By adopting the above technical solution, the strip-shaped groove leaves installation space for the connecting piece.
[0021] As a further improvement of the present invention, a connecting piece is provided on the weight, and the connecting piece enters the strip-shaped slot and limits the moving trajectory of the weight.
[0022] By adopting the above technical solution, the strip-shaped notch and the connecting piece cooperate to facilitate the operator to lift the heavy hammer.
[0023] As a further improvement of the utility model, the strip-shaped slot runs through the inner and outer surfaces of the vertical pipe, and the connecting piece passes through the strip-shaped slot.
[0024] By adopting the above technical solution, the matching effect of the connecting piece and the strip groove is strengthened to control the lifting of the heavy hammer more smoothly, and also facilitate the free fall of the heavy hammer along the vertical pipe.
[0025] As a further improvement of the present invention, the connecting piece is fixedly connected with a draw cord.
[0026] By adopting the above technical solution, it is convenient for the operator to lift the heavy hammer by stretching the control connecting piece and the heavy hammer.
[0027] The beneficial effect of the utility model is that the utility model further improves the compaction effect by quantifying the compaction work of the heavy hammer through calibration, and decomposes the force into vertical downward pressure and horizontal pressure toward the hole wall through the inclined shape of the bottom surface of the pressure plate, thereby compacting the filling material in the hole and squeezing the hole wall with the filling material, thereby enhancing the protection effect against rainwater leakage. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] The following is a detailed description of the preferred implementation examples of the present invention with reference to the accompanying drawings to help understand the purpose and advantages of the present invention, wherein:
[0029] Figure 1 It is a structural schematic diagram of the utility model;
[0030] Figure 2 This is a schematic diagram of the structure of the medium pressure plate of the utility model;
[0031] Figure 3 It is a structural schematic diagram of the vertical pipe in the utility model;
[0032] Figure 4 It is a schematic diagram of the structure of the heavy hammer in the utility model;
[0033] Figure 5 It is a schematic diagram of the structure of the pull rope and the handle in the utility model.
[0034] In the figure: 1, pressure plate; 11, threaded hole; 12, pressure conversion part; 121, pressure conversion surface; 2, vertical pipe; 21, strip groove; 22, quantitative mark; 23, thread; 3, weight; 31, connector; 32, positioning hole; 33, chamfer; 4, pull rope; 41, ring; 42, handle. DETAILED DESCRIPTION
[0035] The utility model is further described in detail below based on the accompanying drawings and implementation cases.
[0036] The directional terms such as up, down, left, right, front, back, front, back, top, bottom, etc. mentioned or may be mentioned in this specification are defined relative to the structures shown in the drawings. The words "inside" and "outside" refer to the direction toward or away from the geometric center of a specific component, respectively. They are relative concepts, and therefore may change accordingly according to different locations and different usage conditions. Therefore, these or other directional terms should not be interpreted as restrictive terms.
[0037] Example
[0038] A pavement core hole filling and compaction device capable of measuring compaction work, such as Figure 1 As shown, it includes a vertical tube 2 and a weight 3 moving along the length direction of the vertical tube 2. In this embodiment, the cross-sections of the vertical tube 2 and the weight 3 in the direction of movement of the weight 3 are both in the shape of a circular ring 41. The weight 3 is hollow in the middle in the height direction and is annular as a whole. The diameter of the weight 3 is slightly larger than the outer diameter of the vertical tube 2. The weight 3 is arranged around the vertical tube 2 but does not contact the vertical tube 2, that is, the inner diameter of the weight 3 is larger than the outer diameter of the vertical tube 2. The top of the weight 3 is provided with a chamfer 33. The chamfer 33 reduces the collision of the weight with the wall of the coring hole during the pulling process. The bottom of the vertical tube 2 is fixedly connected with a pressing plate 1. The bottom of the vertical tube 2 is provided with a thread 23. The top center of the pressing plate 1 is provided with a thread 23. The thread 23 cooperates with the thread 23 hole 11 to connect the vertical tube 2 and the pressing plate 1. Under the action of external force, the weight 3 approaches the pressing plate 1 along the vertical tube 2 and applies work to the pressing plate 1. The outer surface of the tube 2 is provided with a quantitative mark 22. The quantitative mark 22 moves along the vertical tube 2. The length extension direction of the tube 2 is evenly arranged, so as to achieve the effect of quantifying the compaction work of the weight 3. In this embodiment, the quantification mark 22 includes a plurality of height quantification scales integrally formed with the outer surface of the vertical tube 2. The height quantification scales are parallel to each other. The marking size of the height quantification scale is positively correlated with the distance of the height quantification scale from the pressure plate 1. The unit of the height quantification scale adopts the national standard length unit. In this embodiment, centimeters are used as the unit. The marking area of the height quantification scale on the vertical tube 2 is larger than the movement area of the weight 3, that is, the marking range of the height quantification scale on the vertical tube 2 is larger than the movement range of the top of the weight 3 when the weight 3 is pulled up or relaxed. In this embodiment, the height quantification scale is arranged around the vertical tube 2. When the weight of the weight can be controlled, according to the work calculation formula, the potential energy of the weight 3 being pulled up, that is, the product of the height of the weight 3 being pulled up and the weight of the weight 3, is converted into the kinetic energy of the impact of the weight 3.
[0039] The external force provided to the weight 3 includes at least gravity. A first implementation method is provided. The force driving the weight 3 to fall is an external force, which makes the fall of the weight 3 a free fall. The distance moved by the weight is read according to the scale, and the compaction work of the weight is calculated in conjunction with the weight of the weight, so as to facilitate the control and measurement of the compaction work. Another implementation method is provided. The external force is in the form of the combined action of gravity and elastic force. The elastic force is provided by a spring fixed on the top surface of the weight 3. The other end of the spring is fixedly connected to the side of the vertical pipe 2 near the top. The elastic force direction of the spring is consistent with the gravity direction. When the weight 3 is released from the pressure plate 1, the deformation of the spring is zero, that is, the deformation of the spring is consistent with the movement of the weight 3. Therefore, the deformation of the spring can be read according to the scale. The operator calculates the work done by the elastic force according to the elastic coefficient of the spring and the deformation distance of the spring, and calculates the compaction work according to the sum of the work done by the elastic force and the work done by gravity.
[0040] Preferably, the outer surface of the vertical tube 2 is provided with a strip groove 21 extending along the length direction of the vertical tube 2, the strip groove 21 penetrates the inner and outer surfaces of the vertical tube 2, the inner wall of the weight hammer 3 is fixedly connected with a connecting piece 31, the connecting piece 31 passes through the vertical tube 2 through the strip groove 21, and the connecting piece 31 is fixedly connected with a pull rope 4. The extension line of the pull rope 4 when it is in a stressed and straightened state passes through the center of gravity of the weight hammer 3, thereby improving the stability of the weight hammer 3 during the pulling process, and the end of the pull rope 4 away from the pressure plate 1 is fixedly connected to a handle 42. The arrangement of the pull rope 4 and the handle 42 facilitates the operator to lift the weight hammer 3. In this embodiment, the connecting piece 31 is a positioning pin, and the curved surface of the weight hammer 3 is provided with a positioning hole 32 that passes through its inner and outer surfaces. The positioning pin cooperates with the positioning hole 32, the positioning pin passes through the strip groove, and the bottom of the pull rope 4 is wrapped around to form a circular ring 41, which is sleeved on the outer surface of the positioning pin. The connection between the positioning pin and the positioning hole 32 is simple and reliable, and can adapt to the environment of the construction site.
[0041] Preferably, the pressing plate 1 includes a pressure conversion part 12, which is arranged on the side of the pressing plate away from the weight. After the pressure conversion part 12 is subjected to force, it squeezes the filling material so that the filling material tends to move toward the hole wall of the coring hole. The pressure conversion part 12 includes at least one pressure conversion surface 121 inclined to the ground. The pressure conversion surface 121 decomposes the pressure brought by the weight 3 into components acting toward the bottom side and the circumferential direction. In this embodiment, the pressing plate 1 includes a cylindrical section and a conical section as the pressure conversion part 12. The diameter of the cylindrical section is greater than the outer diameter of the weight 3, which enables the pressing plate 1 to better withstand the weight 3. The cone section is integrally formed at the bottom of the cylindrical section, and the pressure conversion surface 121 includes the curved surface of the cone section. The arrangement of the cone section and the curved surface enables the pressure plate 1 to decompose the impact force of the heavy hammer 3 on the top surface into vertical and horizontal forces, thereby improving the compaction effect between the filling material and the hole wall. At the same time, by controlling the inclination angle of the pressure conversion surface 121, when the quantitative mark 22 has quantified the impact force of the heavy hammer 3, the compaction effect between the filling material and the hole wall can also be quantified by calculating the decomposition of the force, thereby further improving the operator's grasp of the compaction effect.
[0042] The working conditions of this embodiment in the actual use environment are as follows. The operator first fills a suitable amount of filling material into the core hole and level it, then puts the embodiment into the core hole. The operator holds the upper end of the vertical tube 2 with one hand and pulls the handle 42 upward with the other hand. The heavy hammer 3 is pulled up along the vertical tube 2 until the upper surface of the heavy hammer 3 is flush with the appropriate scale position. Then the operator relaxes the handle 42 and lets the heavy hammer 3 fall freely to hammer the pressure plate 1. The pressure plate 1 changes the direction of the impact force to strengthen the effect of compacting the filling material. This is repeated many times until the filling material is compacted. The operator lifts the embodiment out of the core hole and pushes the filling material in again. The core hole is leveled, and the steps of pulling up the heavy hammer 3 and releasing it are repeated until the filling material is filled layer by layer to the core hole mouth, and finally the vacant space of the cone of the pressure plate 1 is filled and compacted to complete the filling and compaction process of the pavement core hole. During work, this embodiment calculates and quantifies the compaction effect according to the moving height of the heavy hammer 3, thereby improving the operator's grasp of the compaction effect. At the same time, the conical inclined surface at the bottom end of the pressure plate 1 decomposes the hammer force into vertical downward pressure and horizontal pressure toward the hole wall. On the basis of strengthening the filling effect of the filling material in the compacted hole, the effect of the filling material on the hole wall is enhanced, thereby improving the protection against rainwater infiltration.
[0043] Finally, it should be noted that the above implementation cases are only used to illustrate the technical solutions of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the above implementation cases, ordinary technicians in this field should understand that they can still modify the technical solutions recorded in the above implementation cases, or replace some of the technical features therein with equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the implementation cases of the utility model.
Claims
1. A road surface coring hole filling and compacting device capable of measuring compaction work, comprising a vertical pipe (2) and a weight (3) moving along the length direction of the vertical pipe (2), characterized in that: The bottom of the vertical tube (2) is fixedly connected to a pressure plate (1), and the weight (3) moves toward the pressure plate (1) along the vertical tube (2) and applies work to the pressure plate (1) after being subjected to an external force, wherein the external force at least includes the weight of the weight itself, and the outer surface of the vertical tube (2) is provided with a quantitative mark (22), and the quantitative mark (22) is provided along the length extension direction of the vertical tube (2); The pressure plate (1) comprises a pressure conversion part (12), wherein the pressure conversion part (12) is arranged on a side of the pressure plate away from the weight, and when the pressure conversion part (12) is subjected to force, it squeezes the filling material so that the filling material has a tendency to move toward the wall of the core hole; The pressure conversion portion (12) comprises at least one pressure conversion surface (121) inclined with respect to the ground, and the pressure conversion surface (121) decomposes the pressure brought by the weight (3) into components acting toward the bottom side and in the circumferential direction.
2. A road surface coring hole filling and compacting device capable of measuring compaction work according to claim 1, characterized in that: The quantitative mark (22) includes a plurality of scales.
3. A road surface coring hole filling and compacting device capable of measuring compaction work according to claim 2, characterized in that: The plurality of scales are scale lines or scale grooves parallel to each other.
4. A road surface coring hole filling and compacting device capable of measuring compaction work according to claim 2, characterized in that: The marking sizes of the plurality of scales are positively correlated with the distance of the scales from the pressure plate (1).
5. The road surface coring hole filling and compacting device capable of measuring compaction work according to claim 1, characterized in that: The outer surface of the vertical tube (2) is provided with at least one strip-shaped notch (21) extending along the length direction of the vertical tube (2).
6. A road surface coring hole filling and compacting device capable of measuring compaction work according to claim 5, characterized in that: The weight (3) is provided with a connecting piece (31), and the connecting piece (31) enters the strip-shaped slot (21) and limits the moving track of the weight (3).
7. A road surface coring hole filling and compacting device capable of measuring compaction work according to claim 6, characterized in that: The strip-shaped slot (21) penetrates the inner and outer surfaces of the vertical pipe (2), and the connecting piece (31) passes through the strip-shaped slot (21).