Fabricated highway greening isolation structure

By introducing the design of a permeable layer and water-absorbing rope into the highway greening isolation structure, the problem of frequent watering of the planting slots in the traditional highway isolation structure is solved, efficient management of water resources and continuous moistening of the soil are achieved, and manual watering is reduced. Water frequency is reduced, human resources are saved, and the stability of the structure and flexibility of use are enhanced.

CN221837448UActive Publication Date: 2024-10-15SICHUAN DEMA ENG DESIGN CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323669700.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-10-15
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

While traditional highway isolation structures prevent vehicles from crossing each other, they also require frequent watering of the plants in the planting slots, which wastes human resources and makes it difficult to effectively manage water, leading to waterlogging or dryness.

Method used

A prefabricated highway greening isolation structure is designed, including the main body of the pier, a permeable layer and a water-absorbing rope. The permeable layer is equipped with a water collection cavity and a planting trough. The water-absorbing rope connects the water collection cavity and the planting trough. The permeable layer is used after watering. Excess water seeps out, and the water-absorbing rope supplies the water in the water collection cavity to the planting groove, reducing the number of manual waterings.

Benefits of technology

Through the design of the water collection cavity and water-absorbing rope, water is effectively collected and redistributed, reducing the number of manual waterings, saving human resources, avoiding waste of water resources, and improving the moistening effect of the soil, enhancing the stability and stability of the structure. Use flexibility.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221837448U_ABST
    Figure CN221837448U_ABST
Patent Text Reader

Abstract

The utility model discloses an assembly type road greening isolation structure which comprises pier main bodies and a permeable layer, a plurality of forklift grooves are formed in the bottoms of the pier main bodies at intervals, the tops of the pier main bodies are shelled, the number of the pier main bodies is multiple, the adjacent pier main bodies are mutually connected left and right through connecting devices, and the permeable layer is arranged in the pier main bodies in the transverse direction. The water permeable layer is used for bearing soil and green plants, a water collection cavity is defined by the pier body side wall, the pier body bottom wall and the bottom of the water permeable layer, a planting groove is defined by the pier body side wall and the top of the water permeable layer, and a water absorption rope is arranged in the planting groove and penetrates through the water permeable layer to extend into the water collection cavity. Through the arrangement, the water collecting cavity is formed in the pier body to collect redundant water, water resource waste is avoided, meanwhile, the water absorbing rope is used for communicating the water collecting cavity with the planting groove, water in the water collecting cavity is continuously supplied to soil in the planting groove, the number of times of manual regular watering is reduced, and manpower resources are saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of highway isolation facilities, and in particular relates to an assembled highway greening isolation structure. Background Art

[0002] At present, many two-way highways have their two-way lanes built together. In order to prevent vehicles from crossing each other and reduce the occurrence of traffic accidents, highway isolation structures are often continuously set along the highway dividing line on the highway surface. However, traditional highway isolation structures only have the function of separating vehicles traveling in both directions, and their functions are relatively simple.

[0003] A Chinese patent with publication number CN214737628U discloses an isolation pier suitable for urban road greening. The solution includes an isolation pier, a planting trough and a drain outlet. The above solution uses a planting trough to be recessed on the top of the isolation pier, and plants are planted and nurtured in the planting trough in advance. The isolation pier is then transported to the site and connected to the left and right to form an isolation belt. This solution not only has the function of separating vehicles traveling in both directions, but also has the effect of beautifying the road environment.

[0004] In order to prevent the plants in the planting trough from being waterlogged, the above scheme provides drainage holes on the side walls of the isolation pier for directly draining excess water. However, during use, the water in the planting trough will be lost due to plant intake and dry weather, requiring maintenance personnel to frequently water the planting trough, wasting human resources. Utility Model Content

[0005] The utility model aims to provide an assembled highway greening isolation structure to solve the problem of the above-mentioned solution that maintenance personnel need to frequently water the planting troughs, wasting human resources.

[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0007] A prefabricated highway greening isolation structure comprises a pier body and a permeable layer, wherein a plurality of forklift grooves are arranged at intervals at the bottom of the pier body, the top of the pier body is drawn out, the pier body is provided with a plurality of pier bodies, adjacent pier bodies are mutually connected to the left and right by a connecting device, the permeable layer is arranged laterally in the pier body, the permeable layer is used to carry soil and green plants, the side walls of the pier body, the bottom wall of the pier body and the bottom of the permeable layer form a water collecting cavity, the side walls of the pier body and the top of the permeable layer form a planting trough, a water absorption rope is arranged in the planting trough, and the water absorption rope passes through the permeable layer and extends into the water collecting cavity.

[0008] The principle and effect of this technical solution:

[0009] Insert the fork of the forklift into the forklift slot, lift the pier body, transfer the pier body to the predetermined position and place the pier body on the road surface, repeat this operation, connect multiple pier bodies left and right in turn through the connecting device, place the soil and green plants in the planting slot, and water them. After the soil is completely soaked, the excess water seeps downward from the permeable layer and accumulates in the water collecting cavity. When the water in the planting slot is lost, the accumulated water in the water collecting cavity flows into the planting slot along the water absorption rope and moistens the soil in the planting slot.

[0010] Through the above arrangement, a water collection chamber is set up in the pier body to collect excess water and avoid wasting water resources. At the same time, a water absorption rope is used to connect the water collection chamber and the planting trough, so that the water in the water collection chamber is continuously supplied to the soil in the planting trough, reducing the number of manual regular watering times and saving human resources.

[0011] In the utility model, the upper edge height of the water permeable layer is lower than the upper edge height of the forklift groove, the water absorption rope is wound around the top of the forklift groove, and the two ends of the water absorption rope are respectively located in the water collecting cavity. Through the above arrangement, the water absorption rope is wound around the top of the forklift groove, and the top of the forklift groove is used to provide support for the water absorption rope, which can prevent the water absorption rope from slipping out of the planting groove. At the same time, the upper edge height of the water permeable layer is set to be lower than the upper edge height of the forklift groove, which can increase the length of the water absorption rope in the planting groove and improve the wetting effect on the soil in the planting groove.

[0012] In the utility model, the side wall of the pier body is fixedly provided with a plurality of storage blocks, and the permeable layer is detachably placed on the top of the storage block. Through the above arrangement, when the permeable layer is damaged due to long-term use, it is convenient for the staff to replace the permeable layer, avoiding the need to replace the entire assembled highway greening isolation structure, thereby achieving the purpose of cost saving.

[0013] In the utility model, the side wall of the pier body is provided with a plurality of drainage holes above the permeable layer. Through the above arrangement, when the accumulated water flows out from the drainage holes, the staff can be prompted to stop watering in time, so as to prevent the green plants in the planting trough from being waterlogged and to avoid wasting water resources due to excessive watering.

[0014] In the utility model, the side wall of the pier body is fixedly provided with a filter screen at a plurality of drainage holes near one end of the planting trough. Through the above arrangement, it is possible to prevent the soil in the planting trough from flowing out of the drainage holes and polluting the road.

[0015] In the utility model, the connecting device includes a socket and a plug. The socket is arranged on the left side of the top of the pier body, and a first through hole is arranged at the bottom of the socket. The plug is fixedly arranged on the right side of the top of the pier body, and a second through hole is fixedly arranged at the top of the plug. A first pin rod is passed through the first through hole and the second through hole.

[0016] The principle and effect of this technical solution:

[0017] The pier body is moved horizontally, and the socket of the pier body is horizontally inserted into the socket of the adjacent pier body, so that the first through hole is aligned with the second through hole, and then the first pin rod is penetrated in the first through hole and the second through hole.

[0018] Through the above arrangement, a plurality of pier bodies can be connected left and right in sequence, thereby enhancing the stability of the utility model.

[0019] In the utility model, a limit handle is fixedly arranged on the top of the first pin rod, and a groove matching the limit handle is recessed on the top of the second through hole, and the height of the limit handle is less than or equal to the depth of the groove. Through the above arrangement, the limit handle can be prevented from protruding from the top of the pier body, which is convenient for workers to maintain green plants, weed, etc.

[0020] In the utility model, the tops of the side walls on the left and right sides of the groove are provided with notches. Through the above arrangement, it is possible to provide operating space for the staff to place and take out the first pin rod in the groove, making it convenient for the staff to work.

[0021] In the utility model, the connecting device includes a limit groove and a connecting rod. There are two limit grooves, which are symmetrically arranged on the left and right sides of the top of the pier body. A connecting groove is recessed on the side of the top of the pier body away from the two limit grooves. The connecting groove connects the limit groove and the outer wall of the pier body. A third through hole is arranged at the bottom of the limit groove. Limit blocks matching the limit groove are fixedly arranged at both ends of the connecting rod, and second pins matching the third through hole are fixedly arranged at the bottom of the two limit blocks. The connecting rod is embedded in the connecting groove, and the second pin is passed through the third through hole.

[0022] The principle and effect of this technical solution:

[0023] Move two adjacent pier bodies to a predetermined position, place the limit blocks at both ends of the connecting rod into the limit grooves of the two adjacent pier bodies respectively, and make the second pins at the bottom of the two limit blocks pass through the third through holes matched therewith respectively.

[0024] Through the above arrangement, a plurality of pier bodies can be connected left and right in sequence, thereby enhancing the stability of the utility model.

[0025] In the present invention, the limit groove and the third through hole are both set to be circular, and the width of the connection groove is greater than the width of the connection rod. Through the above arrangement, two adjacent pier bodies can be connected left and right while being inclined to each other on the horizontal plane, so that the present invention can be applied to curved sections, broadening the application scenarios of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 This is an axonometric diagram of the first embodiment of the utility model;

[0027] Figure 2 for Figure 1 Enlarged view of point A in the middle;

[0028] Figure 3 It is a front cross-sectional view of the first embodiment of the utility model;

[0029] Figure 4 It is a right side cross-sectional view of the first embodiment of the utility model;

[0030] Figure 5 This is an axonometric view of the second embodiment of the utility model. DETAILED DESCRIPTION

[0031] The utility model is further described in detail below in conjunction with the accompanying drawings and implementation methods: the figure numerals in the drawings of the specification include: 10, pier body; 11, forklift slot; 12, storage block; 13, drainage hole; 14, filter screen; 20, permeable layer; 30, water collecting chamber; 40, planting trough; 50, water absorption rope; 61, socket; 611, first through hole; 62, socket; 621, second through hole; 622, groove; 623, notch; 63, first pin rod; 631, limit handle; 71, limit groove; 711, third through hole; 72, connecting rod; 721, limit block; 722, second pin rod; 73, connecting groove.

[0032] First embodiment:

[0033] As attached Figure 1-4 As shown, the utility model discloses an assembled highway greening isolation structure, including a pier body 10 and a permeable layer 20, the bottom of the pier body 10 is provided with a plurality of forklift grooves 11 at intervals, the top of the pier body 10 is shelled, the pier body 10 is provided with a plurality of pier bodies, adjacent pier bodies 10 are connected to each other left and right through a connecting device, the permeable layer 20 is transversely arranged in the pier body 10, the permeable layer 20 is used to carry soil and green plants, the side walls of the pier body 10, the bottom wall of the pier body 10 and the bottom of the permeable layer 20 form a water collecting cavity 30, the side walls of the pier body 10 and the top of the permeable layer 20 form a planting trough 40, a water absorbing rope 50 is arranged in the planting trough 40, and the water absorbing rope 50 passes through the permeable layer 20 and extends into the water collecting cavity 30.

[0034] In this embodiment, the upper edge height of the water permeable layer 20 is lower than the upper edge height of the forklift groove 11 , the water absorbing rope 50 is wound around the top of the forklift groove 11 , and both ends of the water absorbing rope 50 are respectively located in the water collecting chamber 30 .

[0035] In this embodiment, a plurality of placement blocks 12 are fixedly disposed on the side wall of the pier body 10 , and the water-permeable layer 20 is detachably placed on the top of the placement blocks 12 .

[0036] In this embodiment, a plurality of drainage holes 13 are disposed on the side wall of the pier body 10 above the water-permeable layer 20 .

[0037] In this embodiment, a filter screen 14 is fixedly provided at one end of the plurality of drainage holes 13 on the side wall of the pier body 10 close to the planting groove 40 , and the filter screen 14 can prevent soil from passing through.

[0038] In this embodiment, the connecting device includes a socket 61 and a plug 62. The socket 61 is arranged on the left side of the top of the pier body 10, and a first through hole 611 is arranged at the bottom of the socket 61. The plug 62 is fixedly arranged on the right side of the top of the pier body 10, and a second through hole 621 is fixedly arranged on the top of the plug 62. A first pin rod 63 is passed through the first through hole 611 and the second through hole 621.

[0039] In this embodiment, a limiting handle 631 is fixedly provided on the top of the first pin rod 63 , and a groove 622 matching with the limiting handle 631 is recessed on the top of the second through hole 621 of the socket 62 , and the height of the limiting handle 631 is less than or equal to the depth of the groove 622 .

[0040] In this embodiment, notches 623 are provided at the tops of the side walls on the left and right sides of the groove 622 .

[0041] The specific implementation process is as follows:

[0042] Insert the fork of the forklift into the forklift slot 11, lift the pier body 10, and after transferring the pier body 10 to the predetermined position, place the pier body 10 on the road surface, repeat this operation, so that multiple pier bodies 10 are connected left and right in sequence through the connecting device, place the soil and green plants in the planting groove 40, and water them. After the soil is completely soaked, the excess water seeps downward from the permeable layer 20 and accumulates in the water collecting chamber 30. When the water in the planting groove 40 is lost, the accumulated water in the water collecting chamber 30 flows into the planting groove 40 along the water absorption rope 50 and moistens the soil in the planting groove 40.

[0043] The pier body 10 is moved horizontally, and the socket 62 of the pier body 10 is horizontally inserted into the socket 61 of the adjacent pier body 10 to align the first through hole 611 with the second through hole 621 , and then the first pin 63 is inserted into the first through hole 611 and the second through hole 621 .

[0044] Second embodiment:

[0045] As attached Figure 5As shown, compared with the first embodiment, the difference of this embodiment is that: in this embodiment, the connecting device includes a limiting groove 71 and a connecting rod 72, and the limiting groove 71 is provided with two, and the two limiting grooves 71 are symmetrically arranged on the left and right sides of the top of the pier body 10, and a connecting groove 73 is recessed on the side of the top of the pier body 10 away from the two limiting grooves 71. The connecting groove 73 connects the limiting groove 71 and the outer wall of the pier body 10, and a third through hole 711 is provided at the bottom of the limiting groove 71. Limiting blocks 721 cooperating with the limiting groove 71 are fixedly provided at both ends of the connecting rod 72, and second pins 722 cooperating with the third through hole 711 are fixedly provided at the bottom of the two limiting blocks 721. The connecting rod 72 is embedded in the connecting groove 73, and the second pin 722 is penetrated through the third through hole 711.

[0046] In this embodiment, the limiting groove 71 and the third through hole 711 are both configured to be circular, and the width of the connecting groove 73 is greater than the width of the connecting rod 72 .

[0047] The specific implementation process is as follows:

[0048] Move two adjacent pier bodies 10 to a predetermined position, place the limit blocks 721 at both ends of the connecting rod 72 into the limit grooves 71 of the two adjacent pier bodies 10 respectively, and make the second pins 722 at the bottom of the two limit blocks 721 pass through the third through holes 711 matched therewith respectively.

[0049] The above is only an embodiment of the utility model, and the common knowledge such as the known specific technical scheme or characteristics in the scheme is not described in detail here. It should be pointed out that for those skilled in the art, several deformations and improvements can be made without departing from the technical scheme of the utility model, which should also be regarded as the protection scope of the utility model, and these will not affect the effect of the implementation of the utility model and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.

Claims

1. An assembled highway greening isolation structure, It is characterized in that include: A pier body, wherein a plurality of forklift slots are arranged at intervals at the bottom of the pier body, a shell is drawn at the top of the pier body, and the pier body is provided with a plurality of pier bodies, and adjacent pier bodies are connected to each other left and right through a connecting device; A water-permeable layer is arranged transversely in the pier body, and is used to carry soil and green plants. The side walls of the pier body, the bottom wall of the pier body and the bottom of the water-permeable layer form a water collecting cavity. The side walls of the pier body and the top of the water-permeable layer form a planting trough. A water-absorbing rope is arranged in the planting trough, and the water-absorbing rope passes through the water-permeable layer and extends into the water collecting cavity.

2. The assembled highway greening isolation structure according to claim 1, Features: The height of the upper edge of the water-permeable layer is lower than the height of the upper edge of the forklift groove. The water-absorbing rope is wound around the top of the forklift groove, and both ends of the water-absorbing rope are respectively located in the water collecting cavity.

3. The assembled highway greening isolation structure according to claim 2, Features: A plurality of storage blocks are fixedly arranged on the side wall of the pier body, and the water-permeable layer is detachably placed on the top of the storage blocks.

4. The assembled highway greening isolation structure according to claim 3, Features: The side wall of the pier body is provided with a plurality of drainage holes above the water-permeable layer.

5. The assembled highway greening isolation structure according to claim 4, Features: A filter screen is fixedly arranged on the side wall of the pier body at a plurality of drainage holes near one end of the planting groove.

6. The assembled highway greening isolation structure according to any one of claims 1 to 5, Features: The connecting device includes a socket and a plug. The socket is arranged on the left side of the top of the pier body, and a first through hole is arranged at the bottom of the socket. The plug is fixedly arranged on the right side of the top of the pier body, and a second through hole is fixedly arranged at the top of the plug. A first pin rod is passed through the first through hole and the second through hole.

7. The assembled highway greening isolation structure according to claim 6, Features: A limiting handle is fixedly provided on the top of the first pin rod, and a groove matching with the limiting handle is recessed on the top of the second through hole of the socket, and the height of the limiting handle is less than or equal to the depth of the groove.

8. The assembled highway greening isolation structure according to claim 7, Features: Notches are arranged on the tops of the side walls on the left and right sides of the groove.

9. The assembled highway greening isolation structure according to any one of claims 1 to 5, Features: The connecting device includes a limit groove and a connecting rod. There are two limit grooves, which are symmetrically arranged on the left and right sides of the top of the pier body. A connecting groove is recessed on the side of the top of the pier body away from the two limit grooves. The connecting groove connects the limit groove and the outer wall of the pier body. A third through hole is arranged at the bottom of the limit groove. Limit blocks matching the limit groove are fixedly arranged at both ends of the connecting rod, and second pins matching the third through hole are fixedly arranged at the bottom of the two limit blocks. The connecting rod is embedded in the connecting groove, and the second pin is passed through the third through hole.

10. The assembled highway greening isolation structure according to claim 9, Features: The limiting groove and the third through hole are both arranged in a circular shape, and the width of the connecting groove is greater than the width of the connecting rod.