Building pile for constructional engineering

By arranging stress-bearing plates and compression bars on the outer walls of building piles, and pouring reinforced mud inside, the problem of poor stability of existing building piles is solved, the stress-bearing area and load-resisting capacity of the piles are increased, and the pile body is ensured Stability and fixation deep into the soil.

CN221837575UActive Publication Date: 2024-10-15SHANDONG GUOTAI HONGRUN NEW MATERIALS TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323328962.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-07
Publication Date
2024-10-15
Estimated Expiration
2033-12-07

AI Technical Summary

Technical Problem

The existing construction piles have smooth surfaces, poor firmness when mortar is injected into the interior, and lack of horizontal force during installation, resulting in poor stability of the pile body and affecting the use effect.

Method used

Stress-bearing plates and compression bars are installed on the outer walls of building piles. Through the cooperation of compression bars and hardened keels, the stress-bearing area and stability of the pile body when entering the soil are increased, and reinforced mud is poured into the pile body to enhance fixation. Effect.

Benefits of technology

By increasing the stress area and stability of the pile body, it prevents the stress plate from being unable to penetrate deep into the soil due to soil resistance, improves the fixing depth and load resistance capacity of the pile body, and avoids later migration and loosening.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221837575U_ABST
    Figure CN221837575U_ABST
Patent Text Reader

Abstract

The utility model discloses a building pile for constructional engineering, particularly relates to the technical field of constructional engineering supplies, and comprises a pile body, the outer wall of the pile body is fixedly connected with a connecting piece, the outer wall of the connecting piece is fixedly connected with a pressing rib, the outer wall of the pressing rib is wound with a pressing rib ring, and the inner wall of the pressing rib ring is fixedly connected with a hardened keel. A movable groove is formed in the pile body. The stress plate on the outer wall of the pile body makes contact with the soil layer, the overall stress area of the pile body is increased, meanwhile, the abutting ribs are arranged between the connecting pieces and the stress plate, when the whole pile body enters the soil, the abutting ribs overall support the stress plate, and therefore the stress area of the whole pile body is increased. And meanwhile, the abutting rib ring on the outer wall of the abutting rib and the hardened keel abut between the connecting piece and the stress plate, so that when the equipment knocks the knocking seat to enable the whole pile body to enter the soil, the situation that the whole stress plate cannot enter the soil by a fixed depth along with the pile body due to the resistance of soil contact is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering supplies, and more specifically, to a construction pile for construction engineering. Background Art

[0002] A building pile is a long structure driven or poured into the soil to increase the bearing capacity, stability and earthquake resistance of the foundation. In construction engineering, building piles are widely used in foundation engineering of various buildings and infrastructure. The main function of building piles is to transfer the load of the building to a deeper soil or rock layer to ensure the stability of the foundation. This is especially important for construction projects in weak soil areas or that need to withstand large loads. Pile foundation engineering can be divided into many types, including sinking piles, static pressure piles, jet grouting piles, bored piles, etc., each type is suitable for different geological conditions and construction requirements. The selection and design of building piles need to consider multiple factors, including geological conditions, building structure, load requirements and environmental impacts. Through pile foundation engineering, the bearing capacity of the foundation soil layer can be improved, the earthquake resistance of the building can be improved, and the risk of foundation settlement can be reduced. In addition, building piles can also be used in infrastructure projects such as bridges, tunnels, and docks to increase the stability and durability of the structure. The implementation of pile foundation engineering usually requires professional engineers and equipment, including pile drivers, vibrating hammers, etc., to ensure that the piles are properly installed and meet the design requirements. Building piles play a key role in construction projects. By enhancing the supporting capacity of the foundation, they provide reliable basic support for buildings and ensure the safety and stability of the project.

[0003] The surface of existing construction piles is relatively smooth. The method of injecting mortar into the interior during use has poor firmness for the pile body and poor use effect. Moreover, when installing, most construction piles are like nails driven into wood. They rely on the squeezing effect of the surrounding soil and are only subject to friction resistance in the vertical direction. They lack horizontal force, resulting in poor stability of the pile body, affecting the use of the pile body and bringing great inconvenience. Utility Model Content

[0004] In order to overcome the above-mentioned defects of the prior art, an embodiment of the utility model provides a construction pile for construction engineering, in which the load-bearing plate on the outer wall of the pile body contacts the soil layer, thereby increasing the overall load-bearing area of ​​the pile body, and at the same time, a compression rib is arranged between the connecting piece and the load-bearing plate, so that when the pile body as a whole enters the soil, the compression rib as a whole supports the load-bearing plate, and at the same time, the compression rib ring on the outer wall of the compression rib and the hardened keel are pressed between the connecting piece and the load-bearing plate, so that when the equipment strikes the striking seat to make the pile body as a whole enter the soil, the load-bearing plate as a whole will not be unable to follow the pile body into the fixed depth of the soil due to the resistance of the soil contact, so as to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction pile for construction engineering, comprising a pile body, the outer wall of the pile body is fixedly connected with a connecting piece, the outer wall of the connecting piece is fixedly connected with a pressure rib, the outer wall of the pressure rib is wrapped with a pressure rib ring, the inner wall of the pressure rib ring is fixedly connected with a hardened keel, a movable groove is opened inside the pile body, the interior of the movable groove is fixedly connected with a load-bearing ring, the outer wall of the load-bearing ring is fixedly connected with a force plate, and the bottom of the pressure rib is fixedly connected to the top of the force plate, and a striking seat is clamped on the top of the pile body.

[0006] In a preferred embodiment, the number of the load-bearing plates is multiple, and the multiple groups of load-bearing plates are arranged in a ring array state with respect to the outer wall of the pile body.

[0007] In a preferred embodiment, a positioning ring is fixedly connected to the outer wall of the pile body, a positioning arm is fixedly connected to the outer wall of the positioning ring, a soil contact ring is fixedly connected to the outer wall of the positioning arm, and a positioning seat is fixedly connected to the top of the positioning arm.

[0008] In a preferred embodiment, the number of the positioning arms is multiple groups, and the multiple groups of positioning arms are arranged in a circular array state with respect to the outer wall of the positioning ring.

[0009] In a preferred embodiment, an inner fixed ring is fixedly connected to the inner wall of the striking seat, a pressing sleeve is fixedly connected to the inner wall of the inner fixed ring, and a pressing ring is clamped inside the pressing sleeve.

[0010] In a preferred embodiment, the inner wall of the pressure ring is fixedly connected to a connecting rod, the interior of the inner fixed ring is fixedly connected to a sleeve, and one end of the connecting rod is arranged inside the sleeve, the outer wall of the connecting rod is fixedly connected to a positioning pin, and the positioning pin is arranged inside the sleeve, a pressure spring is provided inside the sleeve, and one end of the pressure spring presses against the outer wall of the positioning pin.

[0011] Technical effects and advantages of the utility model:

[0012] 1. When the pile body contacts the ground as a whole, the load-bearing plate on the outer wall of the pile body contacts the soil layer, increasing the load-bearing area of ​​the pile body as a whole. At the same time, a compression rib is set between the connecting piece and the load-bearing plate, so that when the pile body as a whole enters the soil, the compression rib supports the load-bearing plate as a whole. At the same time, the compression rib ring on the outer wall of the compression rib and the hardened keel are pressed between the connecting piece and the load-bearing plate, so that when the equipment strikes the striking seat to make the pile body as a whole enter the soil, the load-bearing plate as a whole will not be unable to follow the pile body into the soil to a fixed depth due to the resistance of contact with the soil;

[0013] 2. By pouring steel bar mud into the interior of the pile body, the bearing capacity of the entire pile body is increased. By arranging an inner fixed ring mud pipe on the inner wall of the striking seat and inserting it into the striking seat, the positioning pin on the outer wall of the connecting rod is pressed by the pressure spring inside the casing, so that the connecting rod as a whole presses against the pressure ring, and the pressure ring on the outer wall of the inner fixed ring is clamped and fixed by the mud pipe. At the same time, a small amount of mud penetrates into the outside of the pile body through the load-bearing ring inside the pile body, and the force plate around the outer wall of the pile body is solidified again through mud solidification, so that the overall orientation of the pile body is fixed to a certain extent, preventing the pile body from deviating and loosening when it bears excessive weight of the building in the later stage. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a front view of the utility model.

[0015] Figure 2 It is a schematic front section view of the local structure of the pile body of the utility model.

[0016] Figure 3 For this utility model Figure 2 A-section structure enlarged view.

[0017] Figure 4 For this utility model Figure 2 Enlarged view of the structure of part B.

[0018] The accompanying drawings are marked as follows: (1) pile body, (2) connecting piece, (3) pressure ribs, (4) pressure rib rings, (5) hardened keels, (6) movable grooves, (7) load-bearing rings, (8) force plates, (9) positioning rings, (10) positioning arms, (11) soil contact rings, (12) positioning seats, (13) striking seats, (14) inner fixing rings, (15) pressure sleeves, (16) pressure rings, (17) connecting rods, (18) sleeves, (19) positioning pins, and (20) pressure springs. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] Refer to the instruction manual Figure 1-3A construction pile for construction engineering according to an embodiment of the utility model may include a pile body 1, an outer wall of the pile body 1 is fixedly connected with a connecting piece 2, an outer wall of the connecting piece 2 is fixedly connected with a pressure rib 3, an outer wall of the pressure rib 3 is wound with a pressure rib ring 4, an inner wall of the pressure rib ring 4 is fixedly connected with a hardened keel 5, an interior of the pile body 1 is provided with a movable groove 6, an interior of the movable groove 6 is fixedly connected with a load-bearing ring 7, an outer wall of the load-bearing ring 7 is fixedly connected with a force plate 8, and the bottom of the pressure rib 3 is fixedly connected to the top of the force plate 8, the number of the force plates 8 is multiple groups, and the multiple groups of force plates 8 are arranged in a circular array state with respect to the outer wall of the pile body 1. During use, the pile body 1 is pre-buried as a whole in a desired position, and a striking seat 13 on the top of the pile body 1 is hammered by equipment so that the pile body 1 as a whole goes deep into the ground, and a striking seat 13 on the outer wall of the pile body 1 is arranged A connecting piece 2 is arranged, and a movable groove 6 is arranged inside the pile body 1, and the force plate 8 is integrally hinged in the load-bearing ring 7 inside the movable groove 6, so that the force plate 8 is integrally fixed to the outer wall of the pile body 1. At the same time, when the pile body 1 is in contact with the ground as a whole, the force plate 8 on the outer wall of the pile body 1 is in contact with the soil layer, thereby increasing the force-bearing area of ​​the pile body 1 as a whole. At the same time, a pressure rib 3 is arranged between the connecting piece 2 and the force plate 8, so that when the pile body 1 as a whole enters the soil, the pressure rib 3 as a whole supports the force plate 8, and at the same time, the pressure rib ring 4 on the outer wall of the pressure rib 3 and the hardened keel 5 are pressed between the connecting piece 2 and the force plate 8, so that when the equipment knocks the knocking seat 13 so that the pile body 1 as a whole enters the soil, the force plate 8 as a whole will not be unable to follow the pile body 1 into the soil to a fixed depth due to the resistance of the soil contact;

[0021] The outer wall of the pile body 1 is fixedly connected with a positioning ring 9, and the outer wall of the positioning ring 9 is fixedly connected with a positioning arm 10. There are multiple groups of positioning arms 10, and the multiple groups of positioning arms 10 are arranged in a circular array state with respect to the outer wall of the positioning ring 9. The outer wall of the positioning arm 10 is fixedly connected with a soil contact ring 11, and the top of the positioning arm 10 is fixedly connected with a positioning seat 12. The positioning ring 9 is arranged on the outer wall of the pile body 1, and multiple positioning arms 10 are arranged on the outer wall of the positioning ring 9. After the pile body 1 enters the soil as a whole, the positioning arm 10 is in contact and fixed with the soil around the pile body 1. At the same time, a soil contact ring 11 is arranged on the outer wall of the positioning arm 10, so that when the positioning arm 10 enters the soil, a certain distance is maintained. A positioning seat 12 is arranged on the top of the positioning arm 10, so that the user can check the overall pre-buried orientation of the pile body 1 after the pile body 1 is pre-buried as a whole, so as to prevent the pile body 1 from being offset in orientation during the pre-buried process, which affects the positioning work of the subsequent building;

[0022] A striking seat 13 is clamped on the top of the pile body 1, an inner fixing ring 14 is fixedly connected to the inner wall of the striking seat 13, a pressing sleeve 15 is fixedly connected to the inner wall of the inner fixing ring 14, a pressing ring 16 is clamped inside the pressing sleeve 15, a connecting rod 17 is fixedly connected to the inner wall of the pressing ring 16, a sleeve 18 is fixedly connected to the inner part of the inner fixing ring 14, and one end of the connecting rod 17 is arranged inside the sleeve 18, a positioning pin 19 is fixedly connected to the outer wall of the connecting rod 17, and the positioning pin 19 is arranged inside the sleeve 18, a pressing spring 20 is arranged inside the sleeve 18, and one end of the pressing spring 20 presses against the outer wall of the positioning pin 19, and the reinforcement slurry is poured into the interior of the pile body 1 to increase the pile body 1. The bearing capacity of the pile body 1 as a whole is improved by arranging an inner fixing ring 14 on the inner wall of the striking seat 13. When the mud pipe is inserted into the striking seat 13, the positioning pin 19 on the outer wall of the connecting rod 17 is pressed by the pressing spring 20 inside the sleeve 18, so that the connecting rod 17 as a whole presses against the pressing ring 16, so that the pressing ring 16 on the outer wall of the inner fixing ring 14 is clamped and fixed by the mud pipe. At the same time, a small amount of mud penetrates into the outside of the pile body 1 through the load-bearing ring 7 inside the pile body 1, and the force-bearing plate 8 around the outer wall of the pile body 1 is solidified again through mud solidification, so that the overall orientation of the pile body 1 is fixed to a certain extent, preventing the pile body 1 from being offset and loosened when it bears excessive weight of the building in the later stage.

[0023] Working principle: During use, the equipment as a whole pre-buries the pile body 1 as a whole at the required position, and the equipment hammers the hammering seat 13 on the top of the pile body 1, so that the pile body 1 as a whole goes deep into the ground. A connecting piece 2 is set on the outer wall of the pile body 1, and a movable groove 6 is set inside the pile body 1. The force plate 8 is hinged in the bearing ring 7 inside the movable groove 6, so that the force plate 8 is fixed to the outer wall of the pile body 1 as a whole. At the same time, when the pile body 1 as a whole contacts the ground, the force plate 8 on the outer wall of the pile body 1 contacts the soil layer, increasing the overall force surface of the pile body 1 At the same time, a compression rib 3 is arranged between the connecting piece 2 and the load-bearing plate 8, so that when the pile body 1 enters the soil as a whole, the compression rib 3 supports the load-bearing plate 8 as a whole, and at the same time, the compression rib ring 4 on the outer wall of the compression rib 3 and the hardened keel 5 are pressed between the connecting piece 2 and the load-bearing plate 8, so that when the equipment knocks the knocking seat 13 so that the pile body 1 enters the soil as a whole, the load-bearing plate 8 as a whole will not be unable to follow the pile body 1 into the soil to a fixed depth due to the resistance of contact with the soil. A positioning ring 9 is arranged on the outer wall of the pile body 1, and a positioning ring 9 is arranged on the positioning ring 9. A plurality of positioning arms 10 are arranged on the outer wall of the pile body 1, so that after the pile body 1 enters the soil as a whole, the positioning arms 10 are in contact and fixed with the soil around the pile body 1. At the same time, a soil contact circle 11 is arranged on the outer wall of the positioning arm 10, so that when the positioning arms 10 enter the soil, a certain distance is maintained. A positioning seat 12 is arranged on the top of the positioning arm 10, so that the user can check the position of the pile body 1 as a whole after the pile body 1 is pre-buried, so as to prevent the pile body 1 from being offset in position during the pre-buried process and affecting the positioning work of the subsequent building. After the pile body 1 is installed, the bearing strength of the pile body 1 as a whole is increased by pouring steel bar slurry into the interior of the pile body 1. When the mud pipe is inserted into the knocking seat 13 and the inner wall of the knocking seat 13 is provided with an inner fixing ring 14, the positioning pin 19 on the outer wall of the connecting rod 17 is pressed by the pressure spring 20 inside the sleeve 18, so that the connecting rod 17 as a whole presses the pressure ring 16, so that the pressure ring 16 on the outer wall of the inner fixing ring 14 is clamped and fixed by the mud pipe, and at the same time, a small amount of mud penetrates into the outside of the pile body 1 through the load-bearing ring 7 inside the pile body 1, and the force-bearing plate 8 around the outer wall of the pile body 1 is solidified again through mud solidification, so that the overall orientation of the pile body 1 is fixed to a certain extent, preventing the pile body 1 from being offset and loosened when it bears excessive weight of the building in the later stage.

[0024] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, which may refer to mechanical connection or electrical connection, or internal communication between two components, or direct connection. "upper", "lower", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may change;

[0025] Secondly: In the drawings of the embodiments disclosed in the present utility model, only the structures related to the embodiments disclosed in the present utility model are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present utility model can be combined with each other;

[0026] Finally: The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model should be included in the protection scope of the present utility model.

Claims

1. A construction pile for construction engineering, comprising a pile body (1), wherein an outer wall of the pile body (1) is fixedly connected to a connecting piece (2), characterized in that: The outer wall of the connecting member (2) is fixedly connected to a pressure rib (3), the outer wall of the pressure rib (3) is wound with a pressure rib ring (4), the inner wall of the pressure rib ring (4) is fixedly connected to a hardened keel (5), a movable groove (6) is provided inside the pile body (1), a load-bearing ring (7) is fixedly connected inside the movable groove (6), a load-bearing plate (8) is fixedly connected to the outer wall of the load-bearing ring (7), and the bottom of the pressure rib (3) is fixedly connected to the top of the load-bearing plate (8), and a striking seat (13) is clamped on the top of the pile body (1).

2. A construction pile for construction engineering according to claim 1, characterized in that: The number of the force-bearing plates (8) is multiple groups, and the multiple groups of force-bearing plates (8) are arranged in a ring array state with respect to the outer wall of the pile body (1).

3. A construction pile for construction engineering according to claim 1, characterized in that: The outer wall of the pile body (1) is fixedly connected to a positioning ring (9), the outer wall of the positioning ring (9) is fixedly connected to a positioning arm (10), the outer wall of the positioning arm (10) is fixedly connected to a soil contact ring (11), and the top of the positioning arm (10) is fixedly connected to a positioning seat (12).

4. A construction pile for construction engineering according to claim 3, characterized in that: The number of the positioning arms (10) is multiple groups, and the multiple groups of positioning arms (10) are arranged in a ring array state with respect to the outer wall of the positioning ring (9).

5. The construction pile for construction engineering according to claim 1, characterized in that: An inner fixed ring (14) is fixedly connected to the inner wall of the striking seat (13), a pressing sleeve (15) is fixedly connected to the inner wall of the inner fixed ring (14), and a pressing ring (16) is clamped inside the pressing sleeve (15).

6. A construction pile for construction engineering according to claim 5, characterized in that: The inner wall of the pressing ring (16) is fixedly connected to a connecting rod (17), the interior of the inner fixing ring (14) is fixedly connected to a sleeve (18), and one end of the connecting rod (17) is arranged inside the sleeve (18). The outer wall of the connecting rod (17) is fixedly connected to a positioning pin (19), and the positioning pin (19) is arranged inside the sleeve (18). A pressing spring (20) is arranged inside the sleeve (18), and one end of the pressing spring (20) presses against the outer wall of the positioning pin (19).