Rapid pit filling equipment for water conservancy project
By introducing filling components and suppressing components into the pit filling equipment of water conservancy projects, the problem of insufficient filling of existing equipment is solved, efficient filling and compaction of the inside of the pit is achieved, rework is avoided, and pit filling efficiency is improved. quality.
Patent Information
- Application Number
- CN202420328422.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-22
- Publication Date
- 2024-10-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing pit filling equipment for water conservancy projects has the problem of large filling gaps, insufficient filling of the gaps inside the pit, and the need for multiple reworks to fill.
A rapid pit filling equipment for water conservancy projects is designed, including a filling component and a suppressing component. The filling component enters the pit through a telescopic tube to fill the soil from bottom to top. The suppressing component uses a reciprocating suppressing column to fill the soil with the soil. Compact to ensure full filling.
It achieves comprehensive filling of soil inside the pit, reduces filling gaps, avoids later rework, and improves filling efficiency and quality.
Smart Images

Figure CN221837644U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy project pit filling, in particular to a quick pit filling device for water conservancy projects. Background Art
[0002] Water conservancy projects are projects built to control and allocate natural surface water and groundwater to achieve the purpose of eliminating harm and promoting benefits. They are also called water projects. Water is a valuable resource indispensable to human production and life, but its natural state does not fully meet human needs. Only by building water conservancy projects can we control water flows, prevent floods and waterlogging disasters, and regulate and distribute water to meet people's needs for water resources in life and production. Water conservancy projects require the construction of different types of hydraulic structures such as dams, dikes, spillways, sluices, water inlets, channels, ferries, rafts, fishways, etc. to achieve their goals.
[0003] The existing patent number is: CN215253088U. A pit filling equipment used in water conservancy project construction is equipped with a loosening wheel, loosening pieces, a pit filling cover and a pressing wheel. When the loosening wheel rotates, the loosening pieces on its outer side will rotate along with it, thereby loosening the soil layers on both sides of the pit. The loosened soil is pushed into the pit under the action of the pit filling cover as the pit filling cover moves. Then, the loose soil is compacted by the pressing wheel following the pit filling cover, thereby achieving the integrated effect of loosening, filling and pressing. The device performs pit landfill work by pushing and filling from top to bottom. There are problems such as large filling gaps, inadequate filling of gaps inside the pit, and multiple reworks are required for filling in the later stage.
[0004] Therefore, those skilled in the art provide a rapid pit filling device for water conservancy projects to solve the problems raised in the above background technology. Utility Model Content
[0005] The purpose of the utility model is to provide a rapid pit filling device for water conservancy projects to solve the problems raised in the above background technology.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] A rapid pit filling device for water conservancy projects comprises a support frame, a movable roller is installed at the lower end of the support frame, a soil filling component is installed on the support frame, a suppression component is installed inside the support frame, and an operation controller is installed on the support frame.
[0008] As a further solution of the utility model, the filling assembly includes: a soil feeder, a through hole, a discharge pipe, a first electric hydraulic cylinder and a second electric hydraulic cylinder, the upper end of the discharge pipe is installed at the lower end of the soil feeder, the lower end of the discharge pipe is installed with a telescopic tube, the lower end of the telescopic tube is installed with a pulling plate, the output end of the first electric hydraulic cylinder is installed at the upper end of one side of the pulling plate, and the output end of the second electric hydraulic cylinder is installed at the upper end of the other side of the pulling plate.
[0009] As a further solution of the utility model, the suppression assembly includes: a cylinder, a third electric hydraulic cylinder, a fixed frame, a suppression column, a fixed long plate and a slide groove, the slide groove is opened at the upper end of the fixed long plate, the output end of the third electric hydraulic cylinder is installed on the upper end of the suppression column, the lower end of the fixed frame is installed with a slider, the slider is movably installed in the slide groove, the lower end of the cylinder is fixedly installed with a welding plate, and the lower end of the third electric hydraulic cylinder is installed on the upper end of the fixed frame.
[0010] As a further solution of the utility model, the fixed long plates and the slide grooves are provided with two groups, and the outer sides of the two groups of fixed long plates are respectively fixedly mounted on both sides of the lower end of the support frame.
[0011] As a further solution of the utility model, the upper ends of the first electric hydraulic cylinder and the second electric hydraulic cylinder are fixedly mounted on the bottom of the upper end of the support frame, the lower end of the feeder is mounted on the upper end of the support frame, the discharge pipe passes through the upper and lower ends of the through hole, and the through hole is opened at the upper and lower ends of the upper end of the support frame.
[0012] As a further solution of the utility model, both sides of the welding plate are fixedly mounted on the sides of the support frame, and the output end of the cylinder is mounted on the rear end of the fixed frame.
[0013] Compared with the prior art, the beneficial effects of the utility model are:
[0014] By setting up a filling component and a suppression component, the filling component enters the pit through a telescopic tube to fill the soil inside the pit from bottom to top, further enhancing the filling fullness of the soil inside the pit. The pipe filling has the excellent effects of comprehensive filling, small filling gaps and proper filling, avoiding the problem of inadequate filling inside the pit and large filling gaps causing rework and filling later due to manual filling work from bottom to top. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the overall structure of a rapid pit filling device for water conservancy projects;
[0016] Figure 2 It is a schematic side view of the overall structure of a rapid pit filling device for water conservancy projects;
[0017] Figure 3This is a schematic diagram of the structure of a soil filling component of a rapid pit filling device for water conservancy projects;
[0018] Figure 4 The present invention is a schematic diagram of the structure of a suppression component of a rapid pit-filling device used in water conservancy projects.
[0019] In the figure: 1. support frame; 21. filling assembly; 211. soil feeder; 212. second electric hydraulic cylinder; 213. first electric hydraulic cylinder; 214. telescopic tube; 215. discharge pipe; 216. pulling plate; 217. through hole; 22. suppression assembly; 221. cylinder; 222. welding plate; 223. fixed long plate; 224. slide; 225. slider; 227. suppression column; 228. third electric hydraulic cylinder; 229. fixed frame; 23. operation controller; 3. moving roller. DETAILED DESCRIPTION
[0020] See also Figures 1-2 In an embodiment of the utility model, a rapid pit filling device for water conservancy projects includes a support frame 1, a movable roller 3 is installed at the lower end of the support frame 1, a filling component 21 is installed on the support frame 1, a suppression component 22 is installed in the support frame 1, and an operation controller 23 is installed on the support frame 1.
[0021] like Figure 3 As shown, the filling assembly 21 includes: a soil feeder 211, a through hole 217, a discharge pipe 215, a first electric hydraulic cylinder 213 and a second electric hydraulic cylinder 212, the upper end of the discharge pipe 215 is installed at the lower end of the soil feeder 211, the lower end of the discharge pipe 215 is installed with a telescopic tube 214, and the lower end of the telescopic tube 214 is installed with a pulling plate 216, the output end of the first electric hydraulic cylinder 213 is installed at the upper end of one side of the pulling plate 216, the output end of the second electric hydraulic cylinder 212 is installed at the upper end of the other side of the pulling plate 216, the upper ends of the first electric hydraulic cylinder 213 and the second electric hydraulic cylinder 212 are fixedly installed at the bottom of the upper end of the support frame 1, the lower end of the soil feeder 211 is installed at the upper end of the support frame 1, the discharge pipe 215 passes through the upper and lower ends of the through hole 217, and the through hole 217 is opened at the upper and lower ends of the upper end of the support frame 1.
[0022] like Figure 4As shown, the suppression assembly 22 includes: a cylinder 221, a third electric hydraulic cylinder 228, a fixed frame 229, a suppression column 227, a fixed long plate 223 and a slide 224, the slide 224 is provided at the upper end of the fixed long plate 223, the output end of the third electric hydraulic cylinder 228 is installed at the upper end of the suppression column 227, a slider 225 is installed at the lower end of the fixed frame 229, the slider 225 is movably installed in the slide 224, a welding plate 222 is fixedly installed at the lower end of the cylinder 221, the lower end of the third electric hydraulic cylinder 228 is installed at the upper end of the fixed frame 229, the fixed long plate 223 and the slide 224 are both provided with two groups, and the outer sides of the two groups of fixed long plates 223 are respectively fixedly installed on both sides of the lower end of the support frame 1, the two sides of the welding plate 222 are fixedly installed on the side of the support frame 1, and the output end of the cylinder 221 is installed at the rear end of the fixed frame 229;When the device is used, the soil to be landfilled needs to be poured into the feeding device 211 first. After the soil inside the feeding device 211 is put, the feeding device 211, the first electric hydraulic cylinder 213 and the second electric hydraulic cylinder 212 are started. After the feeding device 211 is started, the soil inside is transferred through the discharge pipe 215 installed at the lower end. Before the internal soil is transferred, the first electric hydraulic cylinder 213 and the second electric hydraulic cylinder 212 are driven by the output end of the telescopic tube 214 to be pulled up. After the telescopic tube 214 is pulled up, it can drive the telescopic tube 214 to enter the landfill that needs to be landfilled. After the telescopic tube 214 enters the pit, the soil to be buried is transferred to the inside of the mud pit through the discharge pipe 215. When the discharge pipe 215 is filling the inside of the mud pit, it can fill the inside of the pit from bottom to top by gradually moving upward. When the filling work in the pit is completed, the first electric hydraulic cylinder 213 and the second electric hydraulic cylinder 212 drive the pulling plate 216 at the lower end to move upward and return to its original position. After the pulling plate 216 returns to its position, the telescopic tube 214 completes the retraction and storage work. After the soil filling work in the pit is completed, the suppression column 227 needs to be used for suppression work. Before using the column 227, the cylinder 221 needs to be started. The output end of the cylinder 221 drives the fixed frame 229 to move forward and backward. When the fixed frame 229 moves forward, it drives the two sets of sliders 225 installed at the lower end to move in the slide groove 224. After the sliders 225 move to a suitable position, the third electric hydraulic cylinder 228 is started. After the third electric hydraulic cylinder 228 is started, it drives the suppression column 227 at the output end to move up and down. While the suppression column 227 is moving up and down reciprocatingly, it can suppress and beat the soil filled in the pit at the lower end. The soil filled in the pit is repeatedly beaten by the suppression column 227. After the filling work is completed, after the suppression column 227 completes the hammering work and returns to its original position, the staff can move the entire equipment out through the mobile support frame 1. After the equipment is moved, the next pit can be filled. The filling component 21 enters the pit through the telescopic pipe 214 to fill the soil inside the pit from bottom to top, further enhancing the filling and fullness of the soil inside the pit. The pipeline filling has the effects of full filling, small filling gaps and in-place filling, avoiding the problem of rework and filling in the later stage caused by manual filling from bottom to bottom. ;
[0023] The working principle of the utility model is as follows: when the device is used, the soil to be landfilled needs to be poured into the feeding device 211 first, and after the soil inside the feeding device 211 is put into the feeding device 211, the feeding device 211, the first electric hydraulic cylinder 213 and the second electric hydraulic cylinder 212 are started. After the feeding device 211 is started, the internal soil is transported through the discharge pipe 215 installed at the lower end. Before the internal soil is transported, the output end is driven by the first electric hydraulic cylinder 213 and the second electric hydraulic cylinder 212. The telescopic tube 214 is pulled up. After the telescopic tube 214 is pulled up, it can drive the telescopic tube 214 into the pit that needs to be filled. After the telescopic tube 214 enters, the soil to be filled is transferred to the inside of the mud pit through the discharge pipe 215. When the discharge pipe 215 is filling the inside of the mud pit, it can fill the inside of the soil pit from bottom to top by gradually moving upward. When the filling work is completed inside the soil pit, the first electric hydraulic cylinder 213 and the second electric hydraulic cylinder 212 drive the lower end The pulling plate 216 moves up and returns to its original position. After the pulling plate 216 returns to its original position, the telescopic tube 214 completes the retraction and storage work. After the soil pit is filled with soil, the suppression column 227 needs to be used for suppression work. Before the suppression column 227 is used, the cylinder 221 needs to be started. The output end of the cylinder 221 drives the fixing frame 229 to move forward and backward. When the fixing frame 229 moves forward, it drives the two sets of sliders 225 installed at the lower end to move in the slide groove 224. After the slider 225 moves to a suitable position, the third electric hydraulic cylinder 221 is started. 8. After the third electric hydraulic cylinder 228 is started, it drives the suppression column 227 at the output end to move up and down. While the suppression column 227 is moving up and down reciprocatingly, it can suppress and pound the soil filled in the pit at the lower end. The soil filled in the pit can be filled after repeated pounding by the suppression column 227. After the suppression column 227 completes the pounding work and returns to its original position, the staff can move the entire equipment out through the mobile support frame 1. After the equipment is moved, the next pit can be filled.
[0024] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A rapid pit filling device for water conservancy projects, comprising a support frame (1), characterized in that: A movable roller (3) is mounted at the lower end of the support frame (1), a soil filling assembly (21) is mounted on the support frame (1), a suppression assembly (22) is mounted inside the support frame (1), and an operation controller (23) is mounted on the support frame (1).
2. A rapid pit filling device for water conservancy projects according to claim 1, characterized in that: The soil filling assembly (21) comprises: a soil feeder (211), a through hole (217), a discharge pipe (215), a first electric hydraulic cylinder (213) and a second electric hydraulic cylinder (212); the upper end of the discharge pipe (215) is mounted on the lower end of the soil feeder (211); a telescopic tube (214) is mounted on the lower end of the discharge pipe (215); a pulling plate (216) is mounted on the lower end of the telescopic tube (214); the output end of the first electric hydraulic cylinder (213) is mounted on the upper end of one side of the pulling plate (216); and the output end of the second electric hydraulic cylinder (212) is mounted on the upper end of the other side of the pulling plate (216).
3. The rapid pit filling equipment for water conservancy projects according to claim 1 is characterized in that: The suppression assembly (22) comprises: a cylinder (221), a third electric hydraulic cylinder (228), a fixed frame (229), a suppression column (227), a fixed long plate (223) and a slide groove (224), wherein the slide groove (224) is provided at the upper end of the fixed long plate (223), an output end of the third electric hydraulic cylinder (228) is mounted at the upper end of the suppression column (227), a slider (225) is mounted at the lower end of the fixed frame (229), and the slider (225) is movably mounted in the slide groove (224), a welding plate (222) is fixedly mounted at the lower end of the cylinder (221), and the lower end of the third electric hydraulic cylinder (228) is mounted at the upper end of the fixed frame (229).
4. The rapid pit filling equipment for water conservancy projects according to claim 3 is characterized in that: The fixed long plates (223) and the slide grooves (224) are each provided with two groups, and the outer sides of the two groups of fixed long plates (223) are respectively fixedly mounted on both sides of the lower end of the support frame (1).
5. The rapid pit filling equipment for water conservancy projects according to claim 2 is characterized in that: The upper ends of the first electric hydraulic cylinder (213) and the second electric hydraulic cylinder (212) are fixedly mounted on the bottom of the upper end of the support frame (1); the lower end of the soil feeder (211) is mounted on the upper end of the support frame (1); the discharge pipe (215) passes through the upper and lower ends of the through hole (217); and the through hole (217) is provided at the upper and lower ends of the upper end of the support frame (1).
6. The rapid pit filling equipment for water conservancy projects according to claim 3 is characterized in that: Both sides of the welding plate (222) are fixedly mounted on the sides of the support frame (1), and the output end of the cylinder (221) is mounted on the rear end of the fixing frame (229).