Waterproof and drainage device for highway construction strong water-rich section
By designing anti-drainage devices during highway tunnel construction, including grooves, connecting pipes and filters, the problem of drainage blockage caused by silt accumulation is solved, the drainage effect and tunnel safety are improved, and the recycling of water resources is realized.
Patent Information
- Application Number
- CN202323470463.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-19
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2033-12-19
AI Technical Summary
The waterproof and drainage structure of existing highway tunnel construction is simple, and foreign matter such as silt can easily accumulate, causing blockage of drainage pipes, reducing the drainage effect, affecting vehicle driving safety, and accumulated water cannot be reused, resulting in a waste of water resources.
An anti-drainage device including a base layer, grooves, connecting pipes, sedimentation tanks and discharge pipes is designed. By setting grooves and connecting pipes on the top of the base layer, the first and second filters are used for multiple filtrations, and the water flows into the storage. The sink realizes the recycling of accumulated water, and the manhole cover and ladder make it easier for staff to clean impurities.
It effectively avoids blockage caused by silt accumulation, improves drainage effect, ensures safe driving of vehicles, prevents water from seeping into the tunnel structure, improves tunnel safety performance, and realizes the recycling of water resources.
Smart Images

Figure CN221837693U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of waterproofing and drainage in highway tunnel construction, in particular to a waterproofing and drainage device used in strong water-rich sections of highway construction. Background Art
[0002] Highway tunnels are passages specially used for automobile transportation. With the development of social economy and production, a large number of expressways have emerged, which put forward higher standards for road construction technology, requiring straight lines, gentle slopes, and wide roads. Therefore, when roads pass through mountainous areas, the previous detours have been changed to tunnel plans. The construction of tunnels plays an important role in improving the technical status of highways, shortening operating distances, increasing transportation capacity, and reducing accidents. The Qinling Zhongnanshan Tunnel built and operated in China is 18.1km long. Its completion will shorten the road crossing the Qinling Mountains by about 60km and reduce the time by more than two hours. The main building of a highway tunnel is generally composed of a tunnel body, lining and tunnel portal. In areas where the tunnel entrance is prone to collapse, an open tunnel is also built. The ancillary structures of the tunnel include waterproofing and drainage facilities, ventilation and lighting facilities, etc. The design of a highway tunnel usually starts with scheme design, and then the specific design of the tunnel's plane and longitudinal section, clearance, lining, etc.
[0003] The existing waterproof drainage structure of highway tunnel construction is relatively simple. Silt and other foreign objects are easily accumulated, causing blockage in the drainage pipes, reducing the drainage effect, resulting in excessive water accumulation on the road, affecting vehicle driving. Once the accumulated water seeps into the tunnel, it will cause serious damage to the tunnel structure and reduce the safety performance of the tunnel. Moreover, the accumulated water is directly discharged through drainage facilities and cannot be reused, resulting in a waste of water resources. Utility Model Content
[0004] 1. Technical issues to be solved
[0005] In view of the deficiencies of the prior art, the utility model provides a drainage device for strong water-rich sections of highway construction.
[0006] (II) Technical solution
[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a drainage device for strong water-rich sections of highway construction, comprising a base layer; a highway tunnel body arranged on the top of the base layer; and a drainage mechanism arranged below the highway tunnel body, the drainage mechanism comprising a groove, a connecting pipe, a sedimentation tank and a discharge pipe, the groove is opened on the left and right sides of the top of the base layer, the sedimentation tank is arranged below the base layer, the connecting pipe is arranged on the left and right sides of the sedimentation tank, and the discharge pipe is connected to the bottom of the sedimentation tank.
[0008] Preferably, one end of the connecting pipe is connected to the bottom of the groove, and the other end is connected to the side of the sedimentation tank. A water storage tank is provided at one end of the discharge pipe. A first filter is fixedly installed inside the groove, and a second filter is fixedly installed inside the sedimentation tank. The accumulated water can be further filtered by setting the second filter, and then stored in the water storage tank along with the discharge pipe for recycling. By using a water pump, a fire-proof pipe is set inside the main body of the highway tunnel, and the recycled accumulated water can be used for extinguishing fire. This is the prior art.
[0009] Preferably, a slope is provided at the bottom of the inner wall of the groove, and a slope is provided on one side of the top of the groove. The slope facilitates water to flow into the groove, and the slope facilitates water after preliminary filtration to flow into the connecting pipe.
[0010] Preferably, a manhole cover is provided on the top of the base layer, a well is provided at the bottom of the manhole cover, and a ladder is fixedly installed inside the well, so that the ladder is provided to facilitate the staff to enter and exit the sedimentation tank.
[0011] Preferably, a fixed pulley is fixedly installed inside the well, and the fixed pulley is movably connected with a connecting rope. A pull rod is provided at one end of the connecting rope, and a box body is fixedly installed at the bottom of the pull rod. The box body can be used to store debris during cleaning, and the fixed pulley can be used to facilitate lifting the box body containing debris, so that the staff can climb out of the well and remove the box body to clean up the debris.
[0012] Preferably, a storage roller is wound around the other end of the connecting rope, and the storage roller is provided to facilitate storage of part of the connecting rope.
[0013] (III) Beneficial effects
[0014] Compared with the prior art, the utility model provides a drainage device for strong water-rich sections of highway construction, which has the following beneficial effects:
[0015] 1. This is a drainage device used in strong water-rich areas of highway construction. By opening grooves on the left and right sides of the top of the base layer, foreign matter such as silt flows into the grooves along the slope with the water flow. The first filter screen performs preliminary filtration on it, and the water flows into the sedimentation tank through the connecting pipe. The second filter screen further filters the water flow, and finally flows into the water storage tank from the discharge pipe, avoiding the problem of blockage caused by the accumulation of foreign matter such as silt, improving the drainage effect, effectively draining road surface water, ensuring the safe driving of vehicles, preventing the infiltration of accumulated water from damaging the tunnel structure, and improving the safety performance of the tunnel.
[0016] 2. This is a drainage device used in strong water-rich areas of highway construction. By opening the manhole cover, moving down the ladder to the sedimentation tank, cleaning foreign objects and other impurities into a box body, one end of the connecting rope is hooked on the pull rod through a hook, and the other end is removed from the storage roller. The connecting rope is pulled to raise the box body to a suitable height, and then the connecting rope is wrapped and knotted on the storage roller. Climb out of the well, remove the box body to clean foreign objects, and then hang the box body to close the manhole cover, which is convenient for the staff to clean the sedimentation tank without having to climb repeatedly to clean up the debris. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0018] Figure 1 It is a schematic diagram of the structure of the utility model;
[0019] Figure 2 This is a cross-sectional view of the utility model;
[0020] Figure 3 It is an enlarged view of A of the present utility model.
[0021] In the figure: 1. base layer; 2. main body of highway tunnel; 3. drainage mechanism; 301. groove; 302. first filter screen; 303. slope; 304. connecting pipe; 305. sedimentation tank; 306. second filter screen; 307. discharge pipe; 4. manhole cover; 5. shaft; 6. ladder; 7. fixed pulley; 8. connecting rope; 9. storage roller; 10. box body; 11. pull rod. DETAILED DESCRIPTION
[0022] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0023] Example 1
[0024] like Figure 1-3As shown, the utility model provides a drainage device for strong water-rich sections of highway construction, including a base layer 1; a highway tunnel body 2 arranged on the top of the base layer 1; and a drainage mechanism 3 arranged below the highway tunnel body 2, the drainage mechanism 3 includes a groove 301, a connecting pipe 304, a sedimentation tank 305 and a discharge pipe 307, the groove 301 is opened on the left and right sides of the top of the base layer 1, the sedimentation tank 305 is arranged below the base layer 1, the connecting pipe 304 is arranged on the left and right sides of the sedimentation tank 305, the discharge pipe 307 is connected and arranged at the bottom of the sedimentation tank 305, the number of sedimentation tanks 305 can be set according to the length of the highway tunnel body 2, one end of the connecting pipe 304 is connected and arranged to communicate with the bottom of the groove 301, and the other end is connected and arranged to communicate with the side of the sedimentation tank 305, one end of the discharge pipe 307 is provided with a water storage tank, and the interior of the groove 301 is fixedly installed with The first filter screen 302 and the second filter screen 306 are fixedly installed inside the sedimentation tank 305. By setting the second filter screen 306, the accumulated water can be further filtered and then stored in the water storage tank along the discharge pipe 307 for recycling. By using a water pump, a fire prevention pipe is set inside the highway tunnel body 2, and the recycled accumulated water can be used to extinguish the fire. This is the prior art. A slope 303 is set at the bottom of the inner wall of the groove 301, and a slope is set on one side of the top of the groove 301. The slope is set to facilitate the flow of water to the groove 301, and the slope 303 is set to facilitate the flow of water after preliminary filtration into the connecting pipe 304. Each connecting pipe 304 is drained by two relatively arranged slopes 303. The connecting pipe 304 is set according to the number of sedimentation tanks 305, and the sedimentation tank 305 is set by the length of the highway tunnel body 2, so as to improve the waterproof and drainage effect.
[0025] In this embodiment, by opening grooves 301 on the left and right sides of the top of the base layer 1, foreign matter such as silt flows into the grooves 301 along the slope with the water flow, and the first filter screen 302 performs preliminary filtration on it. The water flows into the sedimentation tank 305 through the connecting pipe 304, and the second filter screen 306 further filters the water flow, and finally flows into the water storage tank from the discharge pipe 307, thereby avoiding the problem of blockage caused by the accumulation of foreign matter such as silt, improving the drainage effect, effectively draining the road surface water, ensuring the safe driving of vehicles, preventing the infiltration of accumulated water from damaging the tunnel structure, and improving the safety performance of the tunnel.
[0026] Example 2
[0027] like Figure 1-3As shown, on the basis of Example 1, the utility model provides a technical solution: preferably, a manhole cover 4 is provided on the top of the base layer 1, a shaft 5 is provided at the bottom of the manhole cover 4, a ladder 6 is fixedly installed inside the shaft 5, and the ladder 6 is provided to facilitate the staff to enter and exit the sedimentation tank 305, a fixed pulley 7 is fixedly installed inside the shaft 5, and the fixed pulley 7 is movably connected with a connecting rope 8, a pull rod 11 is provided at one end of the connecting rope 8, and a box body 10 is fixedly installed at the bottom of the pull rod 11, and the box body 10 can be used to store debris for cleaning, and the fixed pulley 7 is provided to facilitate the lifting of the box body 10 containing debris, so that the staff can climb out of the shaft 5 and remove the box body 10 to clean up the debris, and a storage roller 9 is provided around the other end of the connecting rope 8, and the storage roller 9 is provided to facilitate the storage of part of the connecting rope 8.
[0028] In this embodiment, by opening the manhole cover 4, moving down the ladder 6 to the sedimentation tank 305, foreign objects and other impurities are cleaned and put into the box body 10, one end of the connecting rope 8 is hooked on the pull rod 11 through a hook, and the other end is removed from the storage roller 9, and the connecting rope 8 is pulled to raise the box body 10 to a suitable height, and then the connecting rope 8 is wrapped and knotted on the storage roller 9, climb out of the shaft 5, remove the box body 10 to clean foreign objects, and then hang the box body 10 to close the manhole cover 4, which is convenient for the staff to clean the sedimentation tank 305 without having to climb repeatedly to clean up the debris.
[0029] The following is a detailed description of the working principle of this drainage device used in high-water-rich areas during highway construction.
[0030] like Figure 1-3 As shown, when in use, by opening grooves 301 on the left and right sides of the top of the base layer 1, foreign matter such as silt flows into the grooves 301 along the slope with the water flow, and the first filter screen 302 performs preliminary filtering on it. The water flows into the sedimentation tank 305 through the connecting pipe 304, and the second filter screen 306 further filters the water flow, and finally flows into the water storage tank from the discharge pipe 307, thereby avoiding the problem of blockage caused by the accumulation of foreign matter such as silt, improving the drainage effect, effectively draining the road surface water, ensuring the safe driving of vehicles, preventing the infiltration of accumulated water from damaging the tunnel structure, and improving the safety performance of the tunnel. When it is necessary to clean the sedimentation tank 305, the manhole cover 4 is opened, and the ladder 6 is moved down into the sedimentation tank 305, and foreign objects and other impurities are cleaned and put into the box body 10. One end of the connecting rope 8 is hooked on the pull rod 11 through a hook, and the other end is taken off from the storage roller 9. The connecting rope 8 is pulled to raise the box body 10 to a suitable height, and then the connecting rope 8 is wound and knotted on the storage roller 9, and the well 5 is climbed out. The box body 10 is removed to clean the foreign objects, and the box body 10 is hung up to close the manhole cover 4, which is convenient for the staff to clean the sedimentation tank 305, and there is no need to repeatedly climb to clean up the debris.
Claims
1. A drainage device for use in a water-rich section of a highway construction, comprising a base layer (1); A highway tunnel body (2) disposed on top of a base layer (1); and a drainage prevention mechanism (3) arranged below the highway tunnel body (2), Features: The anti-drainage mechanism (3) comprises a groove (301), a connecting pipe (304), a sedimentation tank (305) and a discharge pipe (307); the groove (301) is provided on the left and right sides of the top of the base layer (1); the sedimentation tank (305) is provided below the base layer (1); the connecting pipe (304) is provided on the left and right sides of the sedimentation tank (305); and the discharge pipe (307) is provided in communication with the bottom of the sedimentation tank (305).
2. A drainage device for strong water-rich areas in highway construction according to claim 1, Features: One end of the connecting pipe (304) is connected to the bottom of the groove (301), and the other end is connected to the side of the sedimentation tank (305). One end of the discharge pipe (307) is provided with a water storage tank. A first filter screen (302) is fixedly installed inside the groove (301), and a second filter screen (306) is fixedly installed inside the sedimentation tank (305).
3. A drainage device for strong water-rich sections of highway construction according to claim 2, Features: The bottom of the inner wall of the groove (301) is provided with a slope (303), and one side of the top of the groove (301) is provided with an inclined surface.
4. A drainage device for strong water-rich sections of highway construction according to claim 1, Features: A manhole cover (4) is arranged on the top of the base layer (1), a shaft (5) is arranged at the bottom of the manhole cover (4), and a ladder (6) is fixedly installed inside the shaft (5).
5. A drainage device for strong water-rich areas in highway construction according to claim 4, Features: A fixed pulley (7) is fixedly installed inside the well (5), and the fixed pulley (7) is movably connected to a connecting rope (8). A pull rod (11) is provided at one end of the connecting rope (8), and a box body (10) is fixedly installed at the bottom of the pull rod (11).
6. A drainage device for strong water-rich areas in highway construction according to claim 5, Features: A storage roller (9) is wound around the other end of the connecting rope (8).
