Support suitable for one-time variable-pitch installation in blade of gas-heat deicing equipment
By adding a transverse reinforcement beam in the middle of the bracket in the blade of the gas thermal deicing equipment to form a closed frame, one-time pitch installation in the blade is realized, which solves the problem of too long installation time in the existing technology, improves construction efficiency and reduces economic losses.
Patent Information
- Application Number
- CN202420374115.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2034-02-28
AI Technical Summary
The bracket design of the air-thermal de-icing equipment in the existing wind turbine blades results in a long installation time and requires two pitch changes to complete the installation, which affects the efficiency of wind power generation and construction.
Design a bracket suitable for one-time pitch installation in the blades of gas-thermal deicing equipment. By adding transverse reinforcement beams in the middle of the bracket, a closed frame is formed to ensure that shear resistance and overall structural strength are maintained at high design heights, and the blower can be realized And the heater installation plane is installed parallel to the air duct and air flow baffle.
It simplifies the installation process of gas thermal de-icing equipment, shortens the construction period, and only requires one pitch change to complete the installation within the blade. The construction time is shortened by more than 50%, and the economic losses of wind power companies are reduced.
Smart Images

Figure CN221838465U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of wind power generation, and in particular relates to a bracket suitable for one-time pitch installation in blades of gas-heat deicing equipment. Background Art
[0002] At present, the design of the bracket of the gas-heat deicing equipment in the blades of wind turbines only considers the stability and the passability of the fan. The brackets for installing the blower and the brackets for installing the heater are made very short. Correspondingly, the height of the blower and the heater on the inner surface of the blade is relatively low. In order to make the air outlet of the heater well connected with the air duct inlet installed on the leading edge web, the bracket can only be installed on the leading edge of the PS surface (windward surface) or the leading edge of the SS surface (leeward surface) close to the leading edge web. This makes the installation position of the bracket in the blade not on the same or parallel plane as the installation position of the air duct and the air flow baffle, and the construction in the blade can only be carried out in a horizontal position, which results in that each blade must undergo two pitch changes to complete the installation of the gas-heat deicing equipment.
[0003] During installation, first adjust the hub so that the working blades are in a horizontal position, then perform two pitch changes and install the gas-heat deicing equipment in two steps. Figure 1 As shown in (a), the first pitch change is to offset the retracted position by a certain angle so that the blower and heater bracket 14 are in a nearly horizontal position in the blade, and then the two brackets are fixed by hand-paste with glass fiber cloth, resin and structural adhesive, and then the structural adhesive and resin are waited for initial curing. The hand-paste materials used are mainly glass fiber cloth, resin and structural adhesive. The curing time of resin and structural adhesive is relatively long, generally 4 hours in summer and 6 hours in winter. Initial curing is a necessary process. If the pitch is changed without initial curing, the blower and heater bracket will move due to gravity and centrifugal force, resulting in failure of hand-paste quality and bracket installation. After the initial curing is completed, the blade can be pitched, but it cannot generate electricity; Figure 1 As shown in (b), the second pitch change is to make the leading edge web 15 horizontal. The air duct 13 and the air flow baffle 12 are installed by hand-paste using fiberglass cloth, resin and structural adhesive. The multi-section air duct 13 is laid flat and hand-pasted on the leading edge web 15, and the air flow baffle 12 is hand-pasted on the leading edge inner cavity to separate the leading edge cavity and form an air flow channel. The initial curing time is also required, which generally takes 4 hours in summer and 6 hours in winter. For the wind turbine to generate electricity normally, the resin and structural adhesive curing time must be at least 12 hours. Otherwise, there will be a risk of movement of the bracket due to gravity and centrifugal force.
[0004] Therefore, due to the long waiting time, it takes at least 2 days to install the gas-heat deicing equipment in one blade, and at least 6 days to complete the construction in three blades of the whole wind turbine. For wind power generation companies, a 2MW wind turbine will lose more than 10,000 kWh of electricity on average in one day of power outage. For construction units, adding one day of construction time will also increase the cost by tens of thousands of yuan. Therefore, it is necessary to propose a new bracket for installing gas-heat deicing equipment to reduce the construction time of installing gas-heat deicing equipment in blades. Utility Model Content
[0005] The purpose of the utility model is to solve the deficiencies of the prior art and provide a bracket with high strength and good stability suitable for one-time pitch installation in the blades of gas-heat deicing equipment.
[0006] In order to achieve the above object, the technical solution of the utility model is implemented as follows:
[0007] The utility model provides a bracket suitable for one-time variable pitch installation in the blade of gas-heat deicing equipment, comprising a first base, a blower mounting frame connected to the first base, a second base and a heater mounting frame connected to the second base, the first base and the second base are used to be installed on the inner surface of the blade trailing edge cavity parallel to the blade web, the blower mounting frame comprises a plurality of first columns and a first mounting plate connected to the top of the first columns, the heater mounting frame comprises a plurality of second columns, a plurality of transverse reinforcement beams connected between two adjacent second columns and a second mounting plate connected to the top of the second column, the second column is divided into a column lower section fixedly connected to the second base and a column upper section fixedly connected to the second mounting plate by the transverse reinforcement beam, a plurality of the transverse reinforcement beams are sequentially connected end to end to form a closed frame and are connected between the column lower section and the column upper section.
[0008] In one embodiment, an oblique reinforcement beam is connected between the transverse reinforcement beam and the second column, and the oblique reinforcement beam cooperates with the connected transverse reinforcement beam and the second column to form a triangular structure.
[0009] In one of the embodiments, it also includes a reinforcing bracket connected between the blower mounting frame and the heater mounting frame, the reinforcing bracket includes three reinforcing beams connected between a pair of the first columns and a pair of the second columns, both ends of any of the reinforcing beams are respectively connected to the corresponding first column and the second column, and the three reinforcing beams are spliced into a Z shape.
[0010] In one embodiment, the first base and the second base are both cylinders, and the curvature radius of the fixed curve of the first base being the cylinder and the curvature radius of the fixed curve of the second base being the cylinder are consistent with the curvature radius of the inner surface of the blade to be installed.
[0011] In one embodiment, the first base and the second base are integrated into a whole.
[0012] In one embodiment, the first column, the second column, and the transverse reinforcement beam are all angle steels.
[0013] In one embodiment, a reinforcing angle steel is fixedly connected to the connection between the second column and the second base.
[0014] In one embodiment, the mounting surface of the first mounting plate for mounting the blower is horizontal relative to the first base, the mounting surface of the second mounting plate for mounting the heater is obliquely upward relative to the second base and is higher than the first mounting plate, and the mounting surface of the second mounting plate extends obliquely upward in a direction close to the blade web.
[0015] In one embodiment, the mounting surface of the first mounting plate for mounting the blower is distributed obliquely upward relative to the first base, and the mounting surface of the second mounting plate for mounting the heater is distributed obliquely upward relative to the second base and is higher than the first mounting plate, and the mounting surfaces of the first mounting plate and the second mounting plate both extend obliquely upward in a direction close to the blade web.
[0016] In one embodiment, the bottom end of the first column is fully connected to the first base by welding, and the bottom end of the second column is fully connected to the second base by welding.
[0017] Compared with the prior art, the beneficial effect of the utility model is that a transverse reinforcement beam connected to form a closed frame is added in the middle part of the bracket, and more force-conducting paths are formed inside the bracket, ensuring that the bracket can still maintain good shear resistance and overall structural strength and stability when the design height is relatively high, and providing structural support for the one-time pitch installation in the blade of the gas thermal deicing equipment, that is, the installation plane of the blower and the heater is to be set to be parallel or basically parallel to the installation plane of the air duct and the air flow baffle, simplifying the installation process of the gas thermal deicing equipment in the blade, without the need for secondary pitch change, after adjusting the hub to make the working blade in a horizontal position, it is only necessary to change the pitch of the blade to make the leading edge web horizontally facing upward, that is, only one pitch change is required, and the bracket, air duct, and air flow baffle can be hand-laid at the same level of the blade at the same time, and the installation of the gas thermal deicing equipment in a blade can be easily completed in less than a day, and the construction period is shortened by more than 50%. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1The diagram is a schematic diagram of the pitch position of the wind turbine blade when the gas-heat deicing equipment is installed through two pitch changes, wherein (a) is a schematic diagram of the position of the wind turbine blade for the first pitch change; (b) is a schematic diagram of the position of the wind turbine blade for the second pitch change;
[0019] Figure 2 It is a structural schematic diagram of the first embodiment of the bracket of the utility model;
[0020] Figure 3 for Figure 2 The structural schematic diagram of the bracket shown in the front view;
[0021] Figure 4 for Figure 2 The structural schematic diagram of the bracket shown is from a left perspective;
[0022] Figure 5 for Figure 2 The structural schematic diagram of the bracket shown is in a top view;
[0023] Figure 6 for Figure 2 The schematic diagram of the structure of the bracket for mounting the blower and the heater is shown;
[0024] Figure 7 for Figure 6 A schematic diagram of the installation position of the structure shown in the wind turbine blade from a first perspective;
[0025] Figure 8 for Figure 6 A schematic diagram of the installation position of the structure shown in the wind turbine blade from a second viewing angle;
[0026] Fig. 9 It is a structural schematic diagram of a second embodiment of the bracket of the utility model;
[0027] Fig.10 for Fig. 9 The schematic diagram of the installation position of the bracket in the wind turbine blade after the blower and the heater are installed;
[0028] Fig.11 Schematic diagram of the structure of the third embodiment of the bracket of the utility model and a schematic diagram of its installation position in a wind turbine blade, wherein (a) is a schematic diagram of the structure, and (b) is a schematic diagram of the installation position;
[0029] Fig.12 Schematic diagram of the structure of the fourth embodiment of the bracket of the utility model and a schematic diagram of its installation position in a wind turbine blade, wherein (a) is a schematic diagram of the structure, and (b) is a schematic diagram of the installation position;
[0030] Fig.13Schematic diagram of the structure of the fifth embodiment of the bracket of the utility model and a schematic diagram of its installation position in a wind turbine blade, wherein (a) is a schematic diagram of the structure, and (b) is a schematic diagram of the installation position;
[0031] Fig.14 This is a schematic diagram of the structure of the sixth embodiment of the bracket of the utility model and a schematic diagram of its installation position in a wind turbine blade, wherein (a) is a schematic diagram of the structure, and (b) is a schematic diagram of the installation position.
[0032] Explanation of the reference numerals: 11 leading edge of blade, 12 air flow baffle, 13 air duct, 14 blower and heater bracket, 15 leading edge web, 2 first base, 3 blower mounting frame, 31 first column, 32 first mounting plate, 4 second base, 5 heater mounting frame, 51 second column, 511 lower section of column, 513 upper section of column, 52 transverse reinforcement beam, 53 second mounting plate, 54 oblique reinforcement beam, 55 reinforcement angle steel, 56 oblique support beam, 6 reinforcement bracket, 61 reinforcement beam, 71 blower, 72 heater, 73 leading edge of blade, 74 leading edge web, 75 air duct, 76 air flow baffle, 77 bracket. DETAILED DESCRIPTION
[0033] Embodiment 1
[0034] Combined with reference Figure 1-8 The present embodiment provides a bracket suitable for one-time pitch installation in a blade of an air-heat deicing device, comprising a first base 2, a blower mounting frame 3 connected to the first base 2, a second base 4, a heater mounting frame 5 connected to the second base 4, and a reinforcing bracket 6 connected between the blower mounting frame 3 and the heater mounting frame 5. The first base 2 and the second base 4 are used to be installed on the inner surface of the blade trailing edge cavity parallel to the blade web. The blower mounting frame 3 comprises four first columns 31 and a first mounting plate 32 connected to the top of the first column 31. The heater mounting frame 5 comprises four second columns 51, four transverse reinforcing beams 52 connected between two adjacent second columns 51, and a second mounting plate 53 connected to the top of the second column 51. The second column 51 is divided into a column lower section 511 fixedly connected to the second base 4 and a column upper section 513 fixedly connected to the second mounting plate 53 through the transverse reinforcing beam 52.
[0035] In this embodiment, four transverse reinforcement beams 52 are connected end to end in sequence to form a closed rectangular frame and are connected between the column lower section 511 and the column upper section 513. The closed rectangular frame formed by connecting the four transverse reinforcement beams 52 can improve the shear resistance of the second column 51 and improve the lateral structural strength and stability of the heater mounting frame 5. The first base 2 and the second base 4 are installed on the inner surface of the blade trailing edge cavity parallel to the blade web, and the air outlet of the heater 72 is connected to the air duct 75 installed on the blade leading edge web. Therefore, the second column 51 used to support the heater 72 is longer and the overall height of the bracket is higher. The strength of the bracket can be improved by adding a reinforcing beam. For easy transportation, the second column 51 can be designed as a split structure consisting of a column lower section 511 and a column upper section 513. The column lower section 511 and the column upper section 513 are bolted together, and the ends of the column lower section 511 and the column upper section 513 are respectively fixedly connected to the ends of the transverse reinforcing beam 52, thereby forming more force-conducting paths on the heater mounting frame 5, further improving the overall structural strength of the heater mounting frame 5. The reinforcing bracket 6 includes three reinforcing beams 61 connected between a pair of first columns 31 and a pair of second columns 51. The two ends of any reinforcing beam 61 are respectively connected to the corresponding first column 31 and second column 51, and the three reinforcing beams 61 are spliced into a Z shape. The Z-shaped reinforcing bracket 6 is equivalent to forming two triangular stable structures between the blower mounting frame 3 and the heater mounting frame 5, which realizes the force transmission between the blower mounting frame 3 and the heater mounting frame 5, and can further improve the shear resistance of the first column 31 and the second column 51 and the overall strength of the bracket. An oblique reinforcing beam 54 is also connected between the transverse reinforcing beam 52 and the connected second column 51. The oblique reinforcing beam 54 cooperates with the connected transverse reinforcing beam 52 and the second column 51 to form a stable triangular structure, further improving the structural strength of the heater mounting frame 5 under the condition of large amplitude.
[0036] In this embodiment, the first base 2 and the second base 4 are both cylindrical, and the curvature radius of the fixed curve of the first base 2 being a cylinder and the curvature radius of the fixed curve of the second base 4 being a cylinder are consistent with the curvature radius of the inner surface of the blade to be installed, and the thickness of the steel plate of the first base 2 and the second base 4 is to ensure that after the hand-laid fiberglass cloth is applied, it will not deform after being subjected to load tension. The first column 31, the second column 51, and the transverse reinforcement beam 52 are all angle steels. The bottom end of the first column 31 is fully welded to the first base 2, and the bottom end of the second column 51 is fully welded to the second base 4, and the connection between the second column 51 and the second base 4 is also reinforced by a reinforcing angle steel 55. Similarly, the connection between the first column 31 and the first base 2 can also be reinforced by a reinforcing angle steel. The mounting surface of the first mounting plate 32 for mounting the blower 71 is distributed obliquely upward relative to the first base 2, and the mounting surface of the second mounting plate 53 for mounting the heater 72 is distributed obliquely upward relative to the second base 4 and is higher than the first mounting plate 32. The mounting surfaces of the first mounting plate 32 and the second mounting plate 53 both extend obliquely upward in the direction close to the blade web. By designing the second mounting plate 53 as an inclined surface, it is helpful to control the overall height of the heater 72 installed on the heater mounting frame 5, ensuring that the heater mounting frame 5 is not too high to affect the structural stability. It is only necessary to match a small section of curved connecting air duct between the outlet of the heater 72 and the air duct 75 for transition, and then reduce the wind resistance of the connecting air duct by adjusting the bending radius and inner surface roughness of the connecting air duct. The pipe opening size of the curved connecting air duct is designed to be consistent with the outlet size of the heater 72.
[0037] In this embodiment, Figure 2 The bracket shown is made of Q345 steel plate and steel section welded together, and the surface is galvanized and then sprayed. Figure 7 and Figure 8 As shown, when the bracket of this embodiment is installed, the installation position plane of the blower mounting frame 3 and the heater mounting frame 5 is parallel or substantially parallel to the installation position plane of the air duct 75 and the air flow baffle 76 (i.e., the front edge web 74). After adjusting the hub to make the working blade in a horizontal position, only one pitch change is required, that is, only the blade pitch change is required to make the front edge web horizontally facing upward, and then the bracket 77 is installed between the manhole baffle and the web. The installation of the air-heat deicing device in the blade can be completed by hand-paste with one pitch change. Moreover, the construction area of the bracket is between the manhole baffle and the web, the area is large, the construction environment is relatively open, the connection between the air duct 75 and the heater 72 is more naturally docked, and the connection stress can be completely eliminated. If necessary, the bracket 77, the air duct 75, and the air flow baffle 76 can be hand-paste constructed at the same time, and the installation of the air-heat deicing device in the blade can be easily completed in less than one day, and the construction period is shortened by more than 50%.
[0038] Embodiment 2
[0039] Compared with the first embodiment, the difference of the bracket of this embodiment is that the first base 2 and the second base 4 are integrated into a whole, and Fig. 9 As shown, the blower mounting frame 3 and the heater mounting frame 5 no longer need to be connected and reinforced by the reinforcing bracket 6. Instead, the two adjacent angle steels constituting the first mounting plate 32 of the blower mounting frame 3 are respectively welded to the second column 51 in the heater mounting frame 5 at the intersection, so that force can be transmitted between the blower mounting frame 3 and the heater mounting frame 5 through the fixedly connected first mounting plate 32 and the second column 51, thereby improving the overall strength of the bracket. The two adjacent angle steels of the first mounting plate 32 and the second column 51 can be bolted or welded.
[0040] In other embodiments, Fig.11 and Fig.12 As shown, the mounting surface of the first mounting plate 32 for mounting the blower 71 can also be designed to be horizontally distributed relative to the first base 2. In other embodiments, such as Fig.13 As shown, the mounting surface of the first mounting plate 32 for mounting the blower 71 and the mounting surface of the second mounting plate 53 for mounting the heater 72 can be designed to be horizontal relative to the base, and it is only necessary to adjust the height of the first column 31 and the second column 51 accordingly and add the horizontal reinforcement beam, reinforcement bracket 6 and oblique support beam 56 accordingly. In other embodiments, such as Fig.14 As shown, the first base 2 and the second base 4 can also be integrated into a whole, and then the main fan part of the blower is installed in the space surrounded by the four second columns 51 of the heater mounting frame 5. The first mounting plate 32 on the first base 2 only needs to install the motor part of the blower, which can effectively reduce the weight of the bracket and the space occupied by the bracket in the wind turbine blade.
[0041] The utility model discloses a bracket suitable for one-time variable pitch installation in the blade of gas thermal deicing equipment, wherein a transverse reinforcement beam connected to form a closed frame is added in the middle part of the heater mounting frame, so as to form more force-conducting paths inside the bracket, thereby ensuring that the bracket can still maintain good shear resistance and overall structural strength and stability when the design height is relatively high, and provides structural support for one-time variable pitch installation in the blade of gas thermal deicing equipment (that is, the installation plane of the blower and the heater should be set to be parallel or substantially parallel to the installation plane of the air duct and the air flow baffle), simplifies the installation process of the gas thermal deicing equipment in the blade, and does not require a secondary variable pitch. After adjusting the wheel hub to make the operating blade in a horizontal position, it is only necessary to change the pitch of the blade so that the leading edge web is horizontally facing upward, that is, only one variable pitch is required, and the bracket, the air duct and the air flow baffle can be hand-laid at the same time in the same horizontal state of the blade, and the installation of a gas thermal deicing equipment in a blade can be easily completed in less than one day, and the construction period is shortened by more than 50%.
[0042] A person skilled in the art should understand that the discussion of any of the above embodiments is merely illustrative and is not intended to imply that the scope of protection of the present application is limited to these examples. In line with the concept of the present application, the technical features in the above embodiments or different embodiments may be combined, the steps may be implemented in any order, and there are many other variations of different aspects of one or more embodiments of the present application as described above, which are not provided in detail for the sake of simplicity.
[0043] One or more embodiments of the present application are intended to cover all such substitutions, modifications and variations that fall within the broad scope of the present application. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of one or more embodiments of the present application should be included in the protection scope of the present application.
Claims
1. A bracket suitable for one-time pitch installation in a blade of a gas-heat deicing device, characterized in that: The invention comprises a first base (2), a blower mounting frame (3) connected to the first base (2), a second base (4) and a heater mounting frame (5) connected to the second base (4), wherein the first base (2) and the second base (4) are used to be mounted on the inner surface of a blade trailing edge cavity parallel to the blade web, the blower mounting frame (3) comprises a plurality of first columns (31) and a first mounting plate (32) connected to the top of the first columns (31), and the heater mounting frame (5) comprises a plurality of second columns (51), a plurality of connecting plates (32) and a plurality of connecting plates (33). A transverse reinforcement beam (52) connected between two adjacent second columns (51) and a second mounting plate (53) connected to the top of the second column (51); the second column (51) is divided into a column lower section (511) fixedly connected to the second base (4) and a column upper section (513) fixedly connected to the second mounting plate (53) via the transverse reinforcement beam (52); a plurality of the transverse reinforcement beams (52) are sequentially connected end to end to form a closed frame and are connected between the column lower section (511) and the column upper section (513).
2. The bracket according to claim 1, characterized in that An oblique reinforcement beam (54) is also connected between the transverse reinforcement beam (52) and the second upright column (51) connected thereto, and the oblique reinforcement beam (54) cooperates with the connected transverse reinforcement beam (52) and the second upright column (51) to form a triangular structure.
3. The bracket according to claim 1, characterized in that: It also includes a reinforcing bracket (6) connected between the blower mounting frame (3) and the heater mounting frame (5), the reinforcing bracket (6) including three reinforcing beams (61) connected between a pair of the first columns (31) and a pair of the second columns (51), the two ends of any one of the reinforcing beams (61) being respectively connected to the corresponding first column (31) and the second column (51), and the three reinforcing beams (61) being spliced into a Z shape.
4. The bracket according to claim 1, characterized in that The first base (2) and the second base (4) are both cylindrical surfaces, and the curvature radius of the fixed curve of the first base (2) being the cylinder and the curvature radius of the fixed curve of the second base (4) being the cylinder are both consistent with the curvature radius of the inner surface of the blade to be installed.
5. The bracket according to claim 4, characterized in that The first base (2) and the second base (4) are designed to be integrated into a whole.
6. The bracket according to any one of claims 1 to 5, characterized in that: The first upright column (31), the second upright column (51), and the transverse reinforcement beam (52) are all angle steels.
7. The bracket according to any one of claims 1 to 5, characterized in that: A reinforcing angle steel (55) is also fixedly connected at the connection between the second column (51) and the second base (4).
8. The bracket according to any one of claims 1 to 5, characterized in that: The mounting surface of the first mounting plate (32) for mounting the blower is in a horizontal state relative to the first base (2), and the mounting surface of the second mounting plate (53) for mounting the heater is distributed obliquely upward relative to the second base (4) and is higher than the first mounting plate (32), and the mounting surface of the second mounting plate (53) extends obliquely upward in a direction close to the blade web.
9. The bracket according to any one of claims 1 to 5, characterized in that: The mounting surface of the first mounting plate (32) for mounting the blower is distributed obliquely upward relative to the first base (2), and the mounting surface of the second mounting plate (53) for mounting the heater is distributed obliquely upward relative to the second base (4) and is higher than the first mounting plate (32), and the mounting surfaces of the first mounting plate (32) and the second mounting plate (53) both extend obliquely upward in a direction close to the blade web.
10. The bracket according to any one of claims 1 to 5, characterized in that: The bottom end of the first upright column (31) is fully connected to the first base (2) by welding, and the bottom end of the second upright column (51) is fully connected to the second base (4) by welding.
Citation Information
Cited By
Mounting bracket and mounting method for gas-heat deicing equipment in blade of wind generating set
CN120845284A
Installation bracket and installation method for internal air-heat de-icing equipment for wind turbine blades
CN120845284B