System for generating heating power and cooling power in processing plant for workpieces
By using a combination of three water network systems and heat pump devices in the workpiece processing equipment, the problems of low heating and cooling power efficiency and limited heat recovery efficiency in the existing technology are solved, and adaptive design and adaptability to different seasonal climates are achieved. Energy conversion efficiency is improved.
Patent Information
- Application Number
- CN202322629089.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Priority Date
- 2023-04-27
- Filing Date
- 2023-09-27
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2033-09-27
AI Technical Summary
When existing workpiece processing equipment provides heating and cooling power, there are problems such as low energy conversion efficiency, high power consumption, and equipment design that does not comply with seasonal climate changes. As a result, the equipment is not fully loaded at any time, and the heat recovery efficiency is affected. Warm water network temperature limit.
Three water network systems are used to connect water networks with different temperature levels through heat pump devices. The heat pump is used to adjust the temperature of warm water and cold water networks under different climate conditions in summer and winter to realize the recovery and reuse of heat energy, and through heat transfer devices and storage devices balance process load peaks and reduce equipment electrical power requirements.
The energy conversion efficiency of heating and cooling power is improved, the electrical power consumption of the equipment is reduced, the adaptable design to different seasonal climate conditions is realized, and the sustainability and energy-saving performance of the equipment are improved.
Smart Images

Figure CN221847709U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a system for generating heating power and cooling power in a workpiece processing device, in particular in a vehicle body painting shop, wherein seasonal climate conditions are particularly taken into consideration. Background Art
[0002] It is known in practice that in the fight against global warming, more and more automobile manufacturers are considering electrifying their process plants, such as their paint shops. If the electricity used for this comes from renewable energy sources, the production can be considered CO2-neutral. In addition to the direct electrification of processes such as the drying process, other processes are supplied via a warm water network and / or a cold water network.
[0003] It is known to use fossil and / or electric heaters or heating devices when providing warm water. The supplied electrical energy is converted directly into thermal energy in the electric heater. The supplied energy is converted into heat for the warm water network in the fossil heater with an energy conversion efficiency of nearly 100% with reference to the combustion value.
[0004] However, fossil heaters do not allow CO2-neutral operation and are therefore increasingly less in demand. In the alternative use of H2 burners for heating warm water networks, availability is highly location-dependent and certain safety aspects also need to be observed.
[0005] When using electric heaters, the greatest expense is the provision of the connected power. The location of the heater in the process plant plays an important role in this. In addition, a transformer substation must be provided if necessary to be able to provide the required operating voltage for the heater. In addition, depending on the temperature level or temperature, the overall energy conversion efficiency of purely electrically operated heating is three to five times lower than that of heating based on heat pumps.
[0006] Compression refrigeration machines are known for providing cooling water. Here, the supplied electrical energy is used to compress the refrigerant. The amount of heat released to the environment corresponds to the cooling capacity plus the power received electrically. On average, three to four kilowatt-hours of cooling energy can be generated from one kilowatt-hour of electrical energy.
[0007] However, in compression refrigerators, the installed electrical power must be designed according to the maximum possible cooling demand of the connected process. Therefore, the peak power required only for a few hours a year is installed separately. In addition, heat removal to the environment is mandatory and the energy conversion efficiency decreases as the outside air temperature increases.
[0008] In both production processes, i.e., when producing warm water and cold water, the inlet temperature of the warm water network or the cold water network is used as a constant target control variable to adjust the operating power of the heater or the refrigerator. Thus, in the case of low consumption, for example, the corresponding unit, i.e., the heater or the refrigerator, is switched off, wherein the number and parameters of the units are defined by the maximum required power.
[0009] The required cooling capacity or heating capacity can vary greatly during the year or even during the day, because it is influenced by external climatic conditions. Therefore, units that are operated during part of the year are located separately. In addition, it is always necessary to consider that heating capacity is required at night and cooling capacity is required during the day due to fluctuations in external conditions during the day.
[0010] Accordingly, due to known climate fluctuations, the heater outputs are usually designed for winter operation and the refrigerator outputs are designed for summer operation, so that under normal circumstances all units are not fully loaded at any time.
[0011] In order to recover heat from the exhaust gas of the treatment process of the plant, in particular for reasons of sustainability and efficiency, it is fed into the existing warm water network. This is done via a heat exchanger and is therefore only possible if the exhaust gas flow has a higher temperature level than the warm water network. In other words, the temperature level of the warm water network limits the temperature level of the heat recovery. Therefore, a temperature of the exhaust gas flow that is higher than the temperature of the warm water network is required so that heat recovery from the exhaust gas is possible.
[0012] In treatment plants, such as paint shops for vehicle bodies, warm water is often used for air conditioning. The temperature level for this is determined by air conditioning in winter (dry, cold air). This level must be high enough to bring the outside air to a specific enthalpy level of the target state. The target state with the required relative humidity is then achieved by subsequent injection humidification (adiabatic). It should be taken into account here that in winter there are high temperature differences between the air flow leaving the treatment plant and the air flow sucked into the treatment plant. This results in an enthalpy difference between the air flow flowing into the plant and the air flow flowing out. This enthalpy difference must be used for the air conditioning of the plant.
[0013] The inflow temperature of the warm water, which serves as a constant target adjustment parameter, is determined by heating the outside air in winter. Before the dry outside air can be humidified, it must be heated until the air contains the enthalpy for evaporating the water to be absorbed and the target temperature to be reached. The required enthalpy of the drying air is therefore set by heating to the corresponding temperature. The higher the required drying air temperature, the higher the air humidity should be. This difference is greatest in the cold winter months.
[0014] In summer, on the other hand, the outside air already has a higher humidity, so that the required temperature level of the warm water circuit is lower, since the incoming air flow does not have to be heated to the same extent.
[0015] In the case of a constant temperature level of the warm water network of a treatment plant, the temperature level itself is still determined by the driest and coldest outside air and is therefore above the required temperature level for a long period of time during an adult life. Utility Model Content
[0016] The object of the utility model is to provide a system which optimizes the energy consumption process of a processing device for a workpiece and continuously supplies heating power or cooling power.
[0017] According to the present invention, this object is achieved by a system having the following characteristics.
[0018] A system for generating heating and cooling power in a workpiece processing installation, in particular in a paint shop for vehicle bodies, is proposed.
[0019] The system according to the utility model preferably includes:
[0020] - at least one cold water network for supplying cold water to the consumer process, the cold water network having at least one cold water storage device for balancing process load peaks and / or at least one cold water network heat transfer device for heat recovery from the consumer process;
[0021] at least one warm water network for supplying warm water to a consumer process, the warm water network having at least one warm water storage device for balancing process load peaks and / or at least one warm water network heat transfer device for heat recovery from a consumer process; and
[0022] at least one heat pump device, in particular at least one first heat pump device,
[0023] At least one cold water network is connected to at least one warm water network by means of at least one heat pump device, and the networks have different temperature levels.
[0024] Advantageously, the system further comprises at least one hot water network for supplying hot water to the consumer process, wherein the at least one hot water network has at least one hot water storage device for balancing process load peaks.
[0025] It can also be provided that the system comprises at least one hot water network for supplying hot water to the consumer process, the at least one hot water network having at least one hot water network heat transfer device for recovering heat from the consumer process.
[0026] Preferably, the system further comprises at least one second heat pump device, wherein:
[0027] a) at least one warm water network is connected to at least one hot water network by means of at least one second heat pump device; or
[0028] b) At least one hot water network is connected to at least one cold water network by means of at least one second heat pump device.
[0029] Particularly preferably, the system according to the present invention comprises in total:
[0030] - at least one cold water network for supplying cold water to the consumer process, the cold water network having at least one cold water storage device for balancing process load peaks and / or at least one cold water network heat transfer device for heat recovery from the consumer process;
[0031] at least one warm water network for supplying warm water to a consumer process, the warm water network having at least one warm water storage device for balancing process load peaks and / or at least one warm water network heat transfer device for heat recovery from a consumer process;
[0032] at least one hot water network for supplying hot water to a consumer process, the hot water network having at least one hot water storage device for balancing process load peaks and / or at least one hot water network heat transfer device for heat recovery from a consumer process;
[0033] - at least one first heat pump device; and
[0034] - at least one second heat pump device,
[0035] At least one cold water network is connected to at least one warm water network by means of at least one heat pump device, at least one hot water network is connected to at least one warm water network or at least one cold water network by means of at least one second heat pump device, and the networks have different temperature levels.
[0036] The basic concept on which the utility model is based is that, in a processing device for workpieces, preferably, centralized hot water generation, warm water generation and cold water generation are arranged in three corresponding networks by means of at least two heat pump devices or heat pumps, wherein the networks are connected to each other via heat pumps. Different seasonal climate conditions in summer (warm and humid ambient air) and winter (cold and dry ambient air) should be taken into account here, so that in summer, the excess heat generated from the cold water is supplied to the warm water network and the hot water network. If there is still heat, it is provided to the exhaust gas or to the environment of the processing device via a heat transfer device or heat transfer. In winter, on the contrary, the cold water network is used as a heat collector by taking heat recovery measures. The heat recovered from it is then converted into warm water and / or hot water that can be used again via a heat pump device.
[0037] Furthermore, as already mentioned above, by pursuing the CO2-neutral generation of the cold, warm and hot water required in the process plant, the entire electrification of the plant for the cold, warm and hot water generation is provided, wherein the installed power of the plant should be as low as possible in order to be able to take into account the concept of sustainability and energy saving. The energy consumption per workpiece or vehicle body should be reduced to a minimum accordingly, for which purpose, in particular, heat recovery measures according to the invention are integrated into the system.
[0038] In principle, the combined system of the three water networks can be divided into three functional areas: the first area represents heat recovery, the heat pump device and the storage device are assigned to the second area, and the consumers of the treatment plant or the consumer processes are located in the third area.
[0039] In the present description and the appended claims, the term "network" or "water network" is to be understood as the joint action of a plurality of circuits through which water of a corresponding temperature level or a corresponding temperature flows.
[0040] In the present description and the appended claims, the term "loop" is to be understood as a pipeline complex which can be constructed from pipes, hoses, etc., forming an open or closed circulation and through which water of the corresponding temperature level can flow in one direction, preferably in both directions, wherein other elements in the loop can directly or indirectly be, for example, consumer processes, heat transfer devices, storage devices or heat pump devices.
[0041] In the present description and the appended claims, the terms "consumer process" or "consumer" are to be understood as any process or any device arrangement which, within the scope of the processing of a workpiece, requires the provision of cold, warm or hot water.
[0042] In the present description and the appended claims, the term "connected" is to be understood in particular as being fluidly connected in a direct or indirect manner and method.
[0043] Different consumption processes or consumers are supplied via the different temperature levels of the three networks, of which a large number can be connected to the cold water network and the warm water network. Such process components or consumers are primarily ventilation devices that must be adjusted to the changing external conditions. Therefore, in particular in the cold water network and the warm water network, there are large fluctuations in the required power over the course of a day. In contrast, process components or consumers of the hot water network, such as one or more pretreatment stations and one or more intermediate dryers in the case of a paint shop for vehicle bodies, have a very constant heat consumption from the network or distribution network, and boilers or burners can be installed only for start-up purposes. In other words, the hot water network is preferably connected to a continuous consumption process.
[0044] Different storage devices can be used by means of different temperature levels of the web. Preferably, a trade-off is made here between the available space in the processing plant and the complexity of the storage device.
[0045] As regards the first heat pump device between the cold water network and the warm water network, one or more conventional industrial heat pump devices may be used due to the low temperature levels of preferably maximum 60°C and preferably a prevailing temperature range of 30°C to 40°C.
[0046] Heat recovery by means of a heat transfer device is used to be able to reuse the consumed process streams leaving the treatment equipment in terms of energy. With the help of a heat pump device, it can be increased to a temperature level available for the corresponding network. Here, the waste heat of different consuming processes can be fed into the cold water network to be used optimally in terms of energy. However, it must be noted that the first heat pump device only has a certain installed power. This power usually corresponds to the maximum refrigeration capacity. At the latest, once this cooling power (including the consuming processes in the cold water network) is exceeded, heat recovery measures must be taken in the warm water network. In particular, process streams below the dew point are important for heat recovery in terms of energy. Examples of process streams for heat recovery in a paint shop for vehicle bodies are cooling zone exhaust gases, dryer exhaust gases, spray chamber exhaust gases, waste heat from compressed air generation, exhaust gases from pretreatment (VBH) or from cathode dip coating (KTL), dryer waste heat, etc.
[0047] Advantageously, for a large number of process streams a dedicated heat transfer device can be provided for heat recovery, wherein the piping outlay must be weighed against the benefits.
[0048] The hot water network is directly connected to the cold water network via the second heat pump device, that is, bypassing the warm water network and the first heat pump device, which provides the following advantages, that is, the power in the hot water network can be used to generate cooling capacity. In addition, by bypassing the warm water network, the transmission losses are minimized, thereby improving the efficiency of generating cooling capacity.
[0049] Thus, by bypassing the first heat pump device between the cold water network and the warm water network, the energy conversion efficiency can even be increased. This is particularly advantageous in hot environments / climatic conditions (determined by the climate zone and / or season) where a large amount of cooling capacity is known to be required. Thus, the waste heat required for the cooling generation can be used by the consumers in the hot water network.
[0050] It can be advantageous if at least one cold water storage device and / or at least one warm water storage device and / or at least one hot water storage device are connected to the inflow and return of the respective network.
[0051] By preferably acting as a buffer store in the corresponding network, the process load peaks, i.e., the maximum and minimum values, of the consumption processes connected or connected to the corresponding network can be balanced. In order to keep the parameters of the corresponding storage device economically attractive, the parameters or capacity are designed to smooth or level the load process of the day. The resulting advantage is that, on the one hand, the size of the heat pump device can be designed to be smaller, and on the other hand, the continuous operation of the heat pump device is feasible. In addition, in the case of changes in consumption process conditions, fluctuations during heat recovery can be intercepted and transferred to the consumption process in a metered manner.
[0052] It can also be provided that each of the networks comprises at least one consumer process circuit and / or at least one heat pump circuit, wherein in each of the circuits at least one storage device of the respective network is directly or indirectly integrated.
[0053] In a further embodiment of the invention, it can be provided that at least one of the networks comprises at least one heat recovery circuit, in which a corresponding storage device is directly or indirectly integrated.
[0054] It is particularly advantageous if the at least one first heat pump device is adjustable as a function of at least one parameter from the following group: cooling capacity, heat demand, temperature, storage energy load and storage capacity.
[0055] By being connected to the cold water network and the warm water network, the first heat pump device generates cold for the consumption process on one side and heat or thermal energy for the consumption process on the other side. The maximum efficiency and utilization of the heat pump device are thus achieved. The electrical power used for the installation of the heat pump device corresponds to the maximum cooling capacity to be provided, because it is usually greater than the maximum heating value. The maximum heating value and the cooling capacity of the first heat pump device are reduced to the average power demand for extreme days by the storage devices of the two networks.
[0056] The operation of the first heat pump device in summer is preferably determined by the cooling capacity required by the consumption process. The generated heat is released to the warm water storage device. If the consumption value (including the consumption value of the second heat pump device) is greater than the generation, the heat recovery that may be provided is not carried out in the first place. In other cases of excess (increase in the inlet temperature of the warm water network), the generated heat must first be taken from the warm water network via the exhaust gas heat transfer device and, if this is not enough, also via the free cooling device or free cooler.
[0057] If the temperature level of the warm water drops in summer, the temperature travel of the first heat pump device is reduced. This increases the efficiency. This results in less heat generation in the warm water network. However, it becomes more difficult to release the excess heat energy from the warm water network to the environment or to the free cooling device or to the exhaust gas. Therefore, an additional hydraulic connection of the warm water network to the heat transfer device of the exhaust gas to be heated must be carried out, because this exhaust gas (low temperature level) feeds its heat energy into the cold water network in winter operation. This cost is preferably compared with the benefits.
[0058] In winter, the first heat pump device is preferably dimensioned according to the heat demand of the warm water network. However, since the demand for cold cannot be met by generating heat energy for the warm water network alone, the demand for cold must be increased. This means that the heat must be introduced into the cold water network via heat recovery measures, i.e. via heat transfer devices in the process exhaust gas. As a result, all process flows leaving the treatment plant can be pulled down almost to the temperature level of the cold water network, so that the process flows leaving the treatment plant are maximally utilized in terms of energy.
[0059] The installation capacity of the first heat pump device is preferably designed according to the average daily demand for refrigeration on extreme days, because according to experience it represents a larger heat flow of the first heat pump device in operation. Therefore, the heat recovery measures for generating thermal energy in winter represent the utilization of the already existing installation capacity. If the temperature level of the cold water network is reduced, on the one hand, more heat can be recovered by the process device, and on the other hand, the temperature range of the first heat pump device is increased. Therefore, in order to bring the same thermal energy into the warm water network, more electrical energy is required, but less thermal energy from the cold water network.
[0060] In the transition period between summer and winter, the first heat pump device is preferably adjusted according to the larger consumer, that is, as a result, according to the warm water network or the cold water network. Therefore, the temperature level of the two networks, especially the temperature level of the inlet temperature, is kept constant using the adjustment measures for summer operation or winter operation. In this case, the first heat pump device works most efficiently, because the heating generation and the cooling generation are important. Optimally, the heating generation and the cooling generation are balanced in terms of the coefficient of performance (COP) and the energy efficiency ratio (EER) of the heat pump.
[0061] It may be advantageous if the at least one further second heat pump device is a high-temperature heat pump.
[0062] In order to connect the warm or cold water network with the hot water network, a high temperature heat pump is required, the main purpose of which is to generate heat energy for the hot water network. Here, the high temperature heat pump uses the heat energy from the warm or cold water network. Since such a high temperature heat pump is connected to a continuous consumer, it must be ensured that the heat supply from the network has a lower temperature level.
[0063] Thus, in case the first heat pump device and the second heat pump device are linked via a warm water network, thermal energy from the cold water network can be used indirectly in the hot water network, wherein higher efficiency is expected compared to direct generation by means of electric boilers.
[0064] When the cold water network and the hot water network are connected by a second heat pump device, the heat energy from the cold water network can be used directly in the hot water network, thereby avoiding transmission losses to the warm water network and from the warm water network to the second heat pump device compared to the above case.
[0065] In a further embodiment of the invention, it can be provided that the system has at least one latent heat storage device which is arranged in at least one cold water network and / or at least one warm water network.
[0066] In the system according to the utility model, the excess heat energy of the warm water network can be stored in summer by the additional latent heat storage device and fed into the cold water network in winter. Therefore, the heat energy from the cold water network is raised to the level of the warm water network by the first heat pump device.
[0067] In another embodiment of the invention, it can be provided that the system has at least one thermal wheel for transferring moisture and heat in the warm water network.
[0068] The rotary heat transfer device, also called heat wheel, is preferably a heat transfer device capable of achieving moisture and heat recovery in two air streams. Moisture and heat are transferred from one air stream to the other in such a way that the rotating storage material is alternately heated by one air stream and cooled by the other air stream.
[0069] Due to the moisture and heat transfer of the heat wheel, fresh air can be preconditioned and the temperature level of the air before humidification can be reduced due to the recovered heat. The heat wheel is preferably integrated between the supply and exhaust air of all processes requiring humidified supply air.
[0070] It can be advantageous if at least one warm water network has at least one free cooling device, preferably a free cooling device for summer operation of the treatment plant.
[0071] In the case of excess thermal energy exceeding the heat recovery, ie, in the case where it can no longer be transferred by means of the heat transfer device, the generated heat can be drawn from the warm water network by means of a free cooling device.
[0072] In another design of the present invention, it can be provided that at least one cold water network has a temperature level of 0°C to 30°C, preferably 0°C to 25°C, at least one warm water network has a temperature level of 20°C to 65°C, preferably 25°C to 60°C, and at least one hot water network has a temperature level of 55°C to 100°C, preferably 60°C to 100°C.
[0073] It may be advantageous if the temperature level of the at least one cold water network and / or the temperature level of the at least one warm water network can be adapted to the air humidity and / or the temperature of the environment of the treatment plant.
[0074] Preferably, it can also be provided that the storage capacity of the cold water storage device is 25% to 400% greater, in particular 50% to 300% greater, than the storage capacity of the warm water storage device.
[0075] In another embodiment of the present invention, it may be provided that the storage capacity of the hot water storage device is smaller than the storage capacity of the cold water storage device and / or the warm water storage device, preferably 10% to 75% smaller, more preferably 25% to 50% smaller.
[0076] In another design scheme of the present invention, it can be stipulated that a hot water network is indirectly or directly connected to at least one cold water network, multiple hot water networks are indirectly and / or directly connected to multiple cold water networks, a hot water network is indirectly and / or directly connected to multiple cold water networks, and multiple hot water networks are indirectly and / or directly connected to one cold water network.
[0077] The object of the invention is also achieved by a method for generating heating power and cooling power in a workpiece processing plant, in particular in a paint shop for vehicle bodies.
[0078] The method according to the utility model is performed by the above-mentioned system and comprises the following steps:
[0079] - providing cold and / or warm water to the consumer processes of the treatment plant;
[0080] - Temporary storage of thermal energy in cold water storage devices and / or warm water storage devices;
[0081] - Recovering heat from waste gases from one or more consuming processes; and
[0082] - generating cooling and / or heating by means of a first heat pump device.
[0083] The method may in particular have one or more features and / or advantages described in conjunction with the system.
[0084] Preferably, it can also be provided that the method further comprises the following steps:
[0085] - providing hot water to the consumer processes of the treatment plant; and
[0086] - Temporarily store heat in hot water storage devices.
[0087] In another advantageous design of the present invention, it can be provided that the method further comprises the following steps:
[0088] - Generating heating power by means of a second heat pump device.
[0089] It may also be advantageous to pump heat from the cold water network into the hot water network indirectly and / or directly. BRIEF DESCRIPTION OF THE DRAWINGS
[0090] The following description and illustrations of the embodiments describe other features and / or advantages of the present invention.
[0091] As shown in the accompanying drawings,
[0092] Figure 1 A schematic diagram showing a first embodiment of a system according to the present invention is shown;
[0093] Figure 2 A schematic diagram showing a second embodiment of the system according to the present invention is shown;
[0094] Figure 3 A schematic diagram showing a third embodiment of the system according to the present invention is shown;
[0095] Figure 4 Shows Figure 3 Another schematic diagram of a third embodiment of the present invention;
[0096] Figure 5 A schematic diagram showing a fourth embodiment of the system according to the present invention;
[0097] Figure 6 Shows Figure 5 Another schematic diagram of a fourth embodiment of the present invention;
[0098] Figure 7 A schematic diagram showing a fifth embodiment of the system according to the present invention; and
[0099] Figure 8 A schematic diagram showing a sixth embodiment of the system according to the present invention is shown.
[0100] In all the figures, identical or functionally equivalent elements are provided with the same reference symbols. DETAILED DESCRIPTION
[0101] The system 100 is denoted by 100 as a whole. Figure 1The first embodiment shown serves to generate heating and cooling power in a treatment system 102 for workpieces.
[0102] The treatment plant 102 is, in particular, a paint shop 103 for vehicle bodies.
[0103] The system 100 according to the present invention includes at least one cold water network 104 , at least one warm water network 106 , and at least one hot water network 108 .
[0104] The wires 104 , 106 , 108 preferably have different temperature levels or different temperatures, ie in particular the temperature of the water conducted in the respective wire is different from the temperature of the water conducted in the other two wires.
[0105] The cold water network 104 preferably has a temperature level of 0°C to 25°C, the warm water network 106 preferably has a temperature level of 25°C to 60°C and the hot water network 108 preferably has a temperature level of 60°C to 100°C.
[0106] The cold water network 104 has at least one cold water storage device 110 and at least one cold water network heat transfer device 112 .
[0107] Furthermore, the cold water network 104 comprises at least one consumer process loop 114 , at least one heat pump loop 116 and at least one heat recovery loop 118 , in which the cold water network heat transfer device 112 is arranged.
[0108] The warm water network 106 has at least one warm water storage device 120 and at least one warm water network heat transfer device 122 .
[0109] Furthermore, the warm water network 106 comprises at least one consumer process loop 124, at least one first heat pump loop 126, at least one second heat pump loop 128 and at least one heat recovery loop 130, in which the warm water network heat transfer device 122 is arranged.
[0110] The cold water network 104 and the warm water network 106 are connected to each other by means of a first heat pump device 132 . In particular, the heat pump circuit 116 of the cold water network 104 and the first heat pump circuit 126 of the warm water network 106 are connected to the first heat pump device 132 .
[0111] The first heat pump storage device 132 is preferably a conventional industrial heat pump.
[0112] The hot water network 108 has at least one hot water storage device 134 and at least one hot water network heat transfer device 136 .
[0113] Furthermore, the hot water network 108 comprises at least one consumer process loop 138 , at least one heat pump loop 140 and at least one heat recovery loop 142 , in which the hot water network heat transfer device 136 is arranged.
[0114] The warm water network 106 and the hot water network 108 are connected to each other by means of a second heat pump device 144 . In particular, the second heat pump circuit 128 of the warm water network 106 and the heat pump circuit 140 of the hot water network 108 are connected to the second heat pump device 144 .
[0115] The second heat pump device 144 is preferably a high temperature heat pump.
[0116] The first heat pump device 132 and the second heat pump device 144 are electrically driven pump devices with a defined installed power, wherein the defined power preferably corresponds to the maximum power to be provided for the necessary cooling or heating in the system 100 during periods of climatic peaks.
[0117] The consumer process loops 114 , 124 , 138 of the webs 104 , 106 , 108 provide cold, warm and / or hot water to one or more consumer processes 146 .
[0118] The consumption process 146 is, for example, a cooling zone or a pretreatment station in the paint shop 103, and the exhaust gas 148 of the consumption process 146 is basically supplied to one or more cold water network heat transfer devices 112. The consumption process 146 is, for example, a dryer in the paint shop 103, and the exhaust gas 148 of the consumption process 146 is basically supplied to one or more warm water network heat transfer devices 122.
[0119] Exhaust gas 148 directed from one or more consuming processes 146 is directed from the processing device 102 via an exhaust gas line 150 to an exhaust gas outlet 152 on the top plate.
[0120] The exhaust gas line leads through the heat transfer devices 112 , 122 , 136 of the networks 104 , 106 , 108 , whereby the exhaust gas or the discharged process medium 148 flows through them and at least part of the thermal energy contained in the exhaust gas is transferred back into the heat recovery circuit 118 , 130 , 142 .
[0121] The waste gas 148 of the consumption process 146 is cooled by cold water in the cold water network heat transfer device 112 before reaching the waste gas outlet 152 on the top plate, thereby reducing the waste gas temperature on the top plate to a minimum.
[0122] The storage devices 110, 120, 134 are connected to the inflow and return of the corresponding networks 104, 106, 108 and attenuate the fluctuations in the corresponding networks 104, 106 and 108 when providing water to the consumer process 146, wherein the capacity of the storage devices 110, 120, 134 is preferably designed to smooth the load course of the consumer process 146 within a day. Therefore, the heat pump devices 132, 144, etc. can be designed to be minimized.
[0123] In particular, in the paint shop 103, all consumable processes 146 that are affected by external conditions (i.e., climatic conditions outside the paint shop) are supplied almost exclusively through the cold water network 104 and the warm water network 106, and therefore the storage capacity of the cold water storage device 110 and the warm water storage device 120 is dimensioned to be greater than the capacity of the hot water storage device 134.
[0124] By coupling cold water network 104 to warm water network 106 via first heat pump device 132 , thermal energy fed into cold water network 104 can be raised by means of first heat pump device 132 to a temperature level usable for consumer processes 146 supplied by warm water network 106 .
[0125] The connection of the first heat pump device 132 to the cold water network 104 and the warm water network 106 generates cold on one side and heat on the other side, thereby achieving maximum efficiency and utilization. In addition, cooling capacity and heating capacity can be generated simultaneously outside the extreme months in winter and summer. The installed electrical power preferably corresponds to the maximum cooling capacity to be provided.
[0126] The necessary thermal energy can be supplied by means of the second heat pump device 144 to the hot water network 108 for demanding processes 146 having a higher temperature level, ie, in particular, a water temperature level of more than 60° C.
[0127] If there is sufficient or surplus thermal energy in the cold water network 104 and / or the warm water network 106 , this thermal energy can be raised to the temperature level of the hot water network 108 by means of the second heat pump device 144 or by means of the first heat pump device 132 and the second heat pump device 144 .
[0128] Thus, advantageously, during normal operation of a processing plant 102 such as a paint shop 103, no additional units are required to generate heating and cooling power in addition to the heat pump devices 132, 144. According to the previously mentioned temperature levels of the webs 104, 106, 108, consumption processes 146 (e.g. drying process components) which require temperatures exceeding 100°C are not included here.
[0129] Furthermore, in order to reduce the temperature level of the warm water grid 106, a heat wheel (not shown) can be integrated between the supply air and the exhaust air of all consumer processes 146 that require humidified supply air. Due to the moisture transfer of the heat wheel, the supplied fresh air can be preconditioned and the temperature level of the fresh air before entering the humidification can be reduced accordingly. Thus, even under dry and cold external conditions in winter, the fresh air can be conditioned to a relative air humidity of 65%.
[0130] In summer, the temperature level of the warm water network 106 is preferably reduced so that the efficiency of the first heat pump device for producing cold water is increased. However, if it is provided that excess heat energy is fed from the warm water network 106 to the outside air outside the treatment plant 102 or to the exhaust gas 148 of the consumption process 146, an increase in the temperature level of the warm water network 15 should be taken into account.
[0131] In winter, the temperature level of the cold water network 104 is reduced, thereby achieving more efficient heat recovery. Through the reduced COP, the first heat pump device 132 can provide higher heat to the warm water network 106 from the same heat energy from the cold water network 104.
[0132] The following discusses the system 100 according to the present invention. Figures 2 to 7 The differences between the other embodiments shown are that it should be understood that all the advantages and technical effects described above in conjunction with the first embodiment can also be achieved through the following embodiments.
[0133] Figure 2 , a second embodiment of a system 100 according to the invention is shown in which a plurality of parallel heat transfer devices are incorporated into a heat recovery circuit 118 of a cold water network 104. Thus, for example, in a separate heat transfer device 154, the heat energy contained in the exhaust gas 156 from a separate consumer process 146 is transferred to the cold water of the heat recovery circuit 118, and in a further separate heat transfer device 158, the heat energy contained in the exhaust gas 160 from a further separate consumer process 146 is transferred. Furthermore, in the heat transfer device 112, the heat energy contained in the exhaust gas 148 guided in the exhaust gas line 150 is transferred to the cold water.
[0134] Furthermore, the system 100 comprises a compressed air compressor device 162 which transfers the remaining heat to warm water in a first circuit 164 by means of a further heat transfer device 166 in the heat recovery circuit 130 of the warm water network 106 and to hot water in a second circuit 168 by means of a hot water network heat transfer device 136 in the heat recovery circuit 142 of the hot water network 108 .
[0135] In the system Figure 2 In the second embodiment shown in FIG. 1 , the exhaust gas line 150 is preferably not guided through the hot water network heat transfer device 136 .
[0136] In system 100 Figure 3 and Figure 4 In the third embodiment shown, an additional latent heat storage device 170 is provided, which is connected to the cold water network 104 and the warm water network 106 via a latent heat storage circuit 172. In summer, the excess heat energy of the warm water network 106 is stored in the latent heat storage device 170. Figure 3 The heat energy stored in the latent heat storage device 170 can then be provided in the cold water network 104 in winter, such as Figure 4 As shown, and then by means of the first heat pump device 132 the temperature level of the cold water network 104 is increased to the warm water network 106 .
[0137] exist Figure 5 and Figure 6 2 shows a fourth embodiment of a system 100 according to the present invention, wherein the system 100 can be seen in summer operation in a treatment plant 102 .
[0138] In summer operation, the first heat pump device is determined by the cooling capacity required by the consumption process 146. The generated heat is released to the warm water storage device 120. If the consumption value including the second heat pump device 144 is greater than the generation, the heat recovery via the heat recovery circuit 130, which may be provided, is not performed first, such as Figure 6 shown.
[0139] In the case of other excesses, for example by increasing the inlet temperature of the warm water grid 106 , the heat generated must first be discharged from the treatment device 102 via the exhaust gas heat transfer device 174 via the exhaust gas outlet 152 in the ceiling.
[0140] If this is not sufficient, a free cooling device 176 is provided, which is integrated into the warm water network 106 via a free cooling circuit 178. Excess thermal energy can be removed from the warm water network 106 by means of the free cooling device 176.
[0141] In addition, Figure 5 and Figure 6 In the fourth embodiment shown, it can be seen that the cooled exhaust gas 148 of one or more consumer processes 146 downstream of the hot water network heat transfer device 136 can be supplied again to one or more consumer processes 146, which can use the exhaust gas with reduced temperature as supply gas, thereby not additionally applying heat energy recovered from the hot water network 108 to the heat recovery loop 130.
[0142] exist Figure 7 Winter operation is shown in a fifth embodiment of the system 100. In this fifth embodiment, Figure 2As in the second embodiment, three heat transfer devices 112, 154, and 158 are arranged in the heat recovery circuit 118 of the cold water network 104, and the heat transfer devices 112, 154, and 158 recover the heat energy from the consumption processes 156, 160 and the exhaust gas pipeline 150 into the cold water network 104 in parallel.
[0143] In addition, the heat transfer circuit 130 of the warm water network 166 also has a further heat transfer device 166, through which the temperature-reduced exhaust gas 148 is supplied to one or more consumer processes 146 via the further heat transfer device 166 after transferring the thermal energy or at least a portion of the thermal energy from the exhaust gas 148 of one or more consumer processes 146 and thereby initially remains in the treatment device 102.
[0144] The same applies to the hot water network 108 , in which the temperature-reduced waste gases 148 downstream of the hot water network heat transfer device are likewise supplied again to one or more consumer processes 146 in the heat recovery circuit 142 of the hot water network 108 .
[0145] exist Figure 8 In the sixth embodiment of the system 100, it is shown that: Figure 1 Compared to the first embodiment of the present invention, instead of generating cooling capacity in the cold water network 104, the available power from the hot water network 108 can be used directly. Therefore, the warm water network 106 and the first heat pump device 132 are bypassed.
[0146] For this purpose, the second heat pump device 144 is connected to the cold water storage device 110 via the second heat pump circuit 128 of the cold water network 104 on the one hand and to the hot water storage device 134 via the heat pump circuit 140 of the hot water network 108 on the other hand, so that heat can be pumped directly from the cold water network 104 to the hot water network 108. Thus, the consumption processes in the hot water network 146 can be supplied with waste heat from the cold water network 104.
[0147] Description of Reference Numerals
[0148] 100 Systems
[0149] 102 Processing equipment
[0150] 103 Painting workshop
[0151] 104 Cold Water Network
[0152] 106 Wenshui Network
[0153] 108 Hot water network
[0154] 110 Cold water storage device
[0155] 112 Cold water network heat transfer device
[0156] 114 Consumption process loop
[0157] 116 Heat pump circuit
[0158] 118 Heat recovery circuit
[0159] 120 Warm water storage device
[0160] 122 Warm water network heat transfer device
[0161] 124 Consumption process loop
[0162] 126 First heat pump circuit
[0163] 128 Second heat pump circuit
[0164] 130 Heat recovery circuit
[0165] 132 First heat pump device
[0166] 134 Hot water storage device
[0167] 136 Hot water network heat transfer device
[0168] 138 Consumable process loop
[0169] 140 Heat pump circuit
[0170] 142 Heat recovery circuit
[0171] 144 Second heat pump device
[0172] 146 Consumable Process
[0173] 148 Exhaust
[0174] 150 Exhaust pipe
[0175] 152 Exhaust outlet on top plate
[0176] 154 Heat transfer device
[0177] 156 Exhaust
[0178] 158 Heat transfer device
[0179] 160 Exhaust
[0180] 162 Compressed air compressor unit
[0181] 164 First Circuit
[0182] 166 Heat transfer device
[0183] 168 Second Circuit
[0184] 170 Latent heat storage device
[0185] 172 Latent heat storage circuit
[0186] 174 Exhaust gas heat transfer device
[0187] 176 Free cooling device
[0188] 178 Free cooling circuit.
Claims
1. A system (100) for generating heating power and cooling power in a device (102) for processing a workpiece, It is characterized in that The system (100) comprises: at least one cold water network (104) for supplying cold water to a consumer process (146), the cold water network having at least one cold water storage device (110) for balancing process load peaks and / or at least one cold water network heat transfer device (112, 154, 158) for heat recovery from the consumer process (146); at least one warm water network (106) for supplying warm water to a consumer process (146), the warm water network having at least one warm water storage device (120) for balancing process load peaks and / or at least one warm water network heat transfer device (122, 166) for heat recovery from the consumer process (146); and - at least one heat pump device (132), At least one of the cold water networks (104) is connected to at least one of the warm water networks (106) by means of at least one heat pump device (132), and the cold water network (104) and the warm water network (106) have different temperature levels.
2. The system (100) according to claim 1, It is characterized in that The system (100) comprises at least one hot water network (108) for supplying hot water to a consumer process (146), wherein at least one of the hot water networks (108) has at least one hot water storage device (134) for balancing process load peaks.
3. The system (100) according to claim 1, It is characterized in that The system (100) comprises at least one hot water network (108) for supplying hot water to a consumer process (146), wherein at least one of the hot water networks (108) has at least one hot water network heat transfer device (136) for recovering heat from the consumer process (146).
4. The system (100) according to claim 2, It is characterized in that The system (100) comprises at least one hot water network (108) for supplying hot water to a consumer process (146), wherein at least one of the hot water networks (108) has at least one hot water network heat transfer device (136) for recovering heat from the consumer process (146).
5. The system (100) according to any one of claims 2 to 4, It is characterized in that The heat pump device (132) is a first heat pump device, the system (100) comprises at least one second heat pump device (144), wherein: a) at least one of the warm water networks (106) is connected to at least one of the hot water networks (108) by means of at least one of the second heat pump devices (144), or b) at least one of the hot water networks (108) is connected to at least one of the cold water networks (104) by means of at least one of the second heat pump devices (144).
6. The system (100) according to any one of claims 2 to 4, It is characterized in that At least one of the cold water storage devices (110) and / or at least one of the warm water storage devices (120) and / or at least one of the hot water storage devices (134) are connected to the inflow and return of the corresponding network (104, 106, 108).
7. The system (100) according to any one of claims 2 to 4, It is characterized in that Each of the networks (104, 106, 108) comprises at least one consumer process loop (114, 124, 138) and / or at least one heat pump loop (116, 126, 128, 140), wherein in each of the loops at least one of the storage devices (110, 120, 134) of the respective network (104, 106, 108) is directly or indirectly incorporated.
8. The system (100) according to any one of claims 2 to 4, It is characterized in that At least one of the networks (104, 106, 108) comprises at least one heat recovery circuit (118, 130, 142) in which the corresponding storage device (110, 120, 134) is directly or indirectly incorporated.
9. The system (100) according to claim 5, It is characterized in that At least one of said first heat pump devices (132) is adjustable according to at least one parameter from the group consisting of: cooling capacity, heat demand, temperature, storage energy load and storage capacity.
10. The system (100) according to claim 5, It is characterized in that At least one of said second heat pump devices (144) is a high temperature heat pump.
11. The system (100) according to any one of claims 2 to 4, It is characterized in that The system (100) has at least one latent heat storage device (170), which is arranged in at least one of the cold water networks (104) and / or in at least one of the warm water networks (106).
12. The system (100) according to any one of claims 2 to 4, It is characterized in that The system (100) has at least one thermal wheel for transferring moisture and heat in the warm water network (106).
13. The system (100) according to any one of claims 2 to 4, It is characterized in that At least one of the warm water networks (106) has at least one free cooling device (176).
14. The system (100) according to claim 13, It is characterized in that At least one of the warm water networks (106) has at least one free cooling device for summer operation of the treatment plant.
15. The system (100) according to any one of claims 2 to 4, It is characterized in that At least one of the cold water networks (104) has a temperature level of 0°C to 30°C, at least one of the warm water networks (106) has a temperature level of 20°C to 65°C, and at least one of the hot water networks (108) has a temperature level of 55°C to 100°C.
16. The system (100) according to claim 15, It is characterized in that At least one of the cold water networks (104) has a temperature level of 0°C to 25°C, at least one of the warm water networks (106) has a temperature level of 25°C to 60°C, and at least one of the hot water networks (108) has a temperature level of 60°C to 100°C.
17. The system (100) according to claim 15, It is characterized in that The temperature level of at least one of the cold water networks (104) and / or the temperature level of at least one of the warm water networks (106) can be adapted to the air humidity and / or temperature of the environment of the treatment plant (102).
18. The system (100) according to any one of claims 2 to 4, It is characterized in that The storage capacity of the cold water storage device (110) is 25% to 400% greater than the storage capacity of the warm water storage device (120).
19. The system (100) according to claim 18, It is characterized in that The storage capacity of the cold water storage device (110) is 50% to 300% greater than the storage capacity of the warm water storage device (120).
20. The system (100) according to claim 2, It is characterized in that The storage capacity of the hot water storage device (134) is smaller than the storage capacity of the cold water storage device (110) and / or the warm water storage device (120).
21. The system (100) according to claim 20, It is characterized in that The storage capacity of the hot water storage device (134) is 10% to 75% smaller than the storage capacity of the cold water storage device (110) and / or the warm water storage device (120).
22. The system (100) according to claim 21, It is characterized in that The storage capacity of the hot water storage device (134) is 25% to 50% smaller than the storage capacity of the cold water storage device (110) and / or the warm water storage device (120).
23. The system (100) according to any one of claims 2 to 4, It is characterized in that One of the hot water networks (108) is indirectly or directly connected to one of the cold water networks (104), multiple hot water networks (108) are indirectly and / or directly connected to multiple cold water networks (104), one of the hot water networks (108) is indirectly and / or directly connected to multiple cold water networks (104), and multiple hot water networks (108) are indirectly and / or directly connected to one of the cold water networks (104).
24. The system (100) according to any one of claims 1 to 4, It is characterized in that The system (100) is a system for generating heating power and cooling power in a paint shop (103) for vehicle bodies.
