Slag receiving device for pipeline welding in mine shaft

By designing the welding slag collecting device for pipelines in the mine shaft, using the clamping mechanism of semicircular docking grooves and locking columns, combined with scrapers and arc-shaped splints, the problem of welding slag falling and accumulation is solved, and the safety and quality of welding are improved.

CN221849108UActive Publication Date: 2024-10-18CHIFENG CHAIHULANZI GOLD MINING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420742017.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-11
Publication Date
2024-10-18
Estimated Expiration
2034-04-11

AI Technical Summary

Technical Problem

During the existing pipeline welding process in the mine shaft, welding slag easily falls into the shaft and ignites, causing a fire accident. It is also inconvenient to manually collect the slag, affecting the welding quality and safety.

Method used

A device for welding and slag collecting of pipelines in the mine shaft is designed. The semicircular docking grooves of the first and second receiving trays are closely connected to the pipelines, and the locking mechanism of the locking column and the locking hole is used to achieve rapid fixation. , combined with a scraper and an arc-shaped splint to clean welding slag and prevent accumulation.

Benefits of technology

It realizes the effective reception and cleaning of welding slag, prevents fire accidents, improves welding quality and safety, simplifies the operating process, and reduces the risk of worker distraction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221849108U_ABST
    Figure CN221849108U_ABST
Patent Text Reader

Abstract

The utility model discloses a mine shaft inner pipeline welding slag receiving device which comprises a first material receiving disc and a second material receiving disc, material receiving grooves are formed in the first material receiving disc and the second material receiving disc, semicircular butt joint grooves are formed in the adjacent sides of the first material receiving disc and the second material receiving disc, the first material receiving disc is hinged to the second material receiving disc, and the semicircular butt joint grooves are formed in the adjacent sides of the first material receiving disc and the second material receiving disc. A fixing block is fixedly connected to the outer wall of the first material receiving disc, a telescopic groove is formed in the fixing block, a spring is fixedly connected to the inner bottom wall of the telescopic groove, a stretching block is fixedly connected to the other end of the spring, and a connecting column is fixedly connected to the upper end face of the stretching block. The first material receiving disc and the second material receiving disc are tightly attached to the pipeline through the semicircular butt joint grooves, and the locking columns and the locking holes are clamped, so that the connecting position of the first material receiving disc and the second material receiving disc is fixed, it is guaranteed that the first material receiving disc and the second material receiving disc can be rapidly in butt joint and locked with the pipeline, and welding slag is conveniently received; and the problem of incomplete welding slag receiving is prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of slag joining devices, in particular to a slag joining device for pipeline welding in a mine shaft. Background Art

[0002] A shaft refers to a vertical or inclined project excavated from the ground to the ore body during underground mining or underground engineering construction. During the construction and use of the mine, it needs to be used in conjunction with welded pipes. A series of pipelines set up to ensure the normal production of the mine and the safety of miners are mainly used to transport gas, water, electricity, etc. in the mine.

[0003] During the pipeline welding process in the existing mine shaft, some welding slag will fall into the shaft, ignite the cables and other pipelines in the shaft, and cause fire accidents. In order to ensure the safety of welding, the welding slag needs to be processed to prevent splashing. The existing slag collection method is generally to manually hold the slag collection container, and the container cannot always ensure a tight fit with the pipeline, which easily leads to incomplete slag collection and safety hazards. In addition, the workers need to collect slag while welding, which is inconvenient to operate and distracts the workers. They cannot fully devote themselves to the welding work, thus affecting the quality of pipeline welding. Summary of the invention

[0004] The purpose of the utility model is to provide a slag-jointing device for pipeline welding in a mine shaft. By splicing a first receiving plate and a second receiving plate, the first receiving plate and the second receiving plate can be tightly fitted with the pipeline through a semicircular docking groove, and the locking column and the locking hole are clamped together to fix the connection between the first receiving plate and the second receiving plate, thereby ensuring that the first receiving plate and the second receiving plate can be quickly docked and locked with the pipeline, making it convenient to handle the welding slag and preventing the problem of incomplete welding slag.

[0005] To achieve the above-mentioned objectives, the utility model provides the following technical solutions: a slag receiving device for pipeline welding in a mine shaft, comprising a first receiving tray and a second receiving tray, wherein the first receiving tray and the second receiving tray are both provided with a receiving groove, and the first receiving tray and the second receiving tray are both provided with a semicircular docking groove on one side adjacent to each other, the first receiving tray and the second receiving tray are hingedly connected, a fixing block is fixedly connected to the outer wall of the first receiving tray, a telescopic groove is provided in the fixing block, a spring is fixedly connected to the inner bottom wall of the telescopic groove, the other end of the spring is fixedly connected to a stretching block, the upper end face of the stretching block is fixedly connected to a connecting column, the end of the connecting column away from the stretching block is fixedly connected to a connecting rod, the lower end face of the connecting rod is fixedly connected to a locking column, the outer wall of the second receiving tray is fixedly connected to a locking block, the locking block is provided with a locking hole, and the locking column is engaged with the locking hole.

[0006] The beneficial effects of the utility model are as follows: by splicing the first material receiving tray and the second material receiving tray together, the first material receiving tray and the second material receiving tray can be closely fitted with the pipeline in cooperation with the corresponding semicircular docking grooves. The connecting rod is pulled, and the connecting column is pulled upward with the spring, so that the locking column moves accordingly, which facilitates the docking of the locking column with the locking groove on the locking block, thereby realizing the quick docking and locking between the first material receiving tray and the second material receiving tray.

[0007] In order to realize the rapid splicing and locking between the first receiving tray and the second receiving tray;

[0008] As a further improvement of the above technical solution: two symmetrical limiting grooves are provided on the inner wall of the telescopic groove, a limiting block is slidably connected in the limiting groove, and the limiting block is fixedly connected to the stretching block.

[0009] The beneficial effects of this improvement are as follows: the use of the limit groove and the limit block can limit the stretching block to prevent the stretching block from rotating arbitrarily, causing the spring to twist and affecting normal use, and can control the stable vertical up and down movement of the locking column to accurately dock with the locking groove;

[0010] In order to limit the stretching block and ensure the stability of movement;

[0011] As a further improvement of the above technical solution: a retaining block is fixedly connected to the first material receiving tray, a rotating rod is hinged on the retaining block, both ends of the rotating rod are fixedly connected to connecting blocks, and the connecting blocks are fixedly connected to the second material receiving tray.

[0012] The beneficial effect of this improvement is that the hinged connection between the retaining block and the rotating rod can rotate the second receiving tray with the first receiving tray through the two connecting blocks, thereby realizing the rapid splicing and separation of the first receiving tray and the second receiving tray, which is convenient for the staff to use;

[0013] In order to realize the rapid splicing between the first receiving tray and the second receiving tray;

[0014] As a further improvement of the above technical solution: scrapers are movably connected in the first material receiving tray and the second material receiving tray, and the two scrapers are fixedly connected by a semicircular arc bar.

[0015] The beneficial effect of the present improvement is that the scraper can be used to clean the welding slag at the connection between the first receiving tray and the second receiving tray, and the welding slag on the inner bottom wall of the first receiving tray and the second receiving tray can be scraped off to prevent the welding slag from accumulating in the receiving trough, which will cause accumulation and make it difficult to clean up later.

[0016] In order to clean the butt joint trough and prevent welding slag accumulation;

[0017] As a further improvement of the above technical solution: a rotating block is fixedly connected to the upper end surface of the semicircular arc strip, and the rotating block is movably connected to the first material receiving tray and the second material receiving tray.

[0018] The beneficial effects of this improvement are: the semicircular arc strip can be rotated by using the rotating block, so that the semicircular arc strip rotates with the two scrapers;

[0019] In order to move the semicircular scraper;

[0020] As a further improvement of the above technical solution: the two scrapers are arranged in a staggered manner with respect to each other.

[0021] The beneficial effects of this improvement are as follows: the two scrapers are staggered, and the two scrapers can be moved at the same time to achieve forward and reverse rotation, so as to clean the welding slag at the connection between the first receiving tray and the second receiving tray, and prevent the residue from falling when the first receiving tray and the second receiving tray are separated and opened;

[0022] In order to clean the residue at the connection;

[0023] As a further improvement of the above technical solution: an arc-shaped clamping plate is formed between the material receiving groove and the semicircular docking groove.

[0024] The beneficial effects of this improvement are: by using the arc-shaped clamping plate and the semicircular docking groove, the first receiving tray and the second receiving tray can be closely fitted with the pipeline, and in the process of cleaning the welding slag, the welding slag will not fall, and can be cleaned in a centralized manner;

[0025] In order to cover the residue and facilitate cleaning. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 The three-dimensional structure provided by the utility model is shown in FIG. Figure 1 ;

[0027] Figure 2 A top view provided for the utility model;

[0028] Figure 3 The utility model provides Figure 2 The three-dimensional cross-section view at AA in the middle;

[0029] Figure 4 The utility model provides Figure 3 The enlarged view of point A in the middle;

[0030] Figure 5 The three-dimensional structure provided by the utility model is shown in FIG. Figure 2 ;

[0031] Figure 6 The utility model provides Figure 5 Enlarged view of point B in the middle.

[0032] In the figure, 1, first receiving tray; 2, second receiving tray; 21, receiving groove; 22, semicircular docking groove; 23, fixed block; 24, telescopic groove; 25, spring; 26, stretching block; 27, connecting column; 28, connecting rod; 29, locking column; 30, locking block; 31, locking hole; 41, limiting groove; 42, limiting block; 51, retaining block; 52, rotating rod; 53, connecting block; 61, scraper; 62, semicircular arc strip; 71, rotating block; 81, arc splint. DETAILED DESCRIPTION

[0033] In order to enable those skilled in the art to better understand the technical solution of the utility model, the utility model is described in detail below in conjunction with the accompanying drawings. The description in this part is only exemplary and explanatory and should not have any limiting effect on the protection scope of the utility model.

[0034] like Figures 1 to 6As shown, the slag-jointing device for pipeline welding in a mine shaft provided by an embodiment of the utility model comprises a first receiving plate 1 and a second receiving plate 2, both of which are provided with a receiving groove 21, and both of the adjacent sides of the first receiving plate 1 and the second receiving plate 2 are provided with a semicircular docking groove 22, and the docking between the first receiving plate 1 and the second receiving plate 2 can cooperate with their respective corresponding semicircular docking grooves 22 to fit tightly with the pipeline, and an arc-shaped clamping plate 81 is formed between the receiving groove 21 and the semicircular docking groove 22, and the two arc-shaped clamping plates 81 can shield the welding slag to prevent contact with the pipeline and adhesion, and the first receiving plate 1 and the second receiving plate 2 are hinged, and a fixing block 23 is fixedly connected to the outer wall of the first receiving plate 1, and an opening is formed in the fixing block 23. A telescopic slot 24 is provided, and a spring 25 is fixedly connected to the inner bottom wall of the telescopic slot 24. The other end of the spring 25 is fixedly connected to a stretching block 26. A connecting column 27 is fixedly connected to the upper end surface of the stretching block 26. A connecting rod 28 is fixedly connected to the end of the connecting column 27 away from the stretching block 26. A locking column 29 is fixedly connected to the lower end surface of the connecting rod 28. A locking block 30 is fixedly connected to the outer wall of the second receiving tray 2. A locking hole 31 is provided on the locking block 30, and the locking column 29 is engaged with the locking hole 31. When the connecting rod 28 is pulled upward, the stretching block 26 can be brought to squeeze the spring 25, so that the locking column 29 moves upward and docks with the locking slot on the upper end surface of the locking block 30, thereby fixing the first receiving tray 1 and the second receiving tray 2. Two symmetrical limiting grooves 41 are provided on the wall, and limiting blocks 42 are slidably connected in the limiting grooves 41, and the limiting blocks 42 are fixedly connected to the stretching block 26. The use of the two limiting grooves 41 and the two limiting blocks 42 can limit the stretching block 26 to prevent the stretching block 26 from rotating, causing the spring 25 to twist, affecting the normal use of the spring 25, and ensuring the vertical up and down movement of the locking column 29 and the stretching block 26. A retaining block 51 is fixedly connected to the first material receiving tray 1, and a rotating rod 52 is hinged on the retaining block 51. Both ends of the rotating rod 52 are fixedly connected to connecting blocks 53, and the connecting block 53 is fixedly connected to the second material receiving tray 2. The retaining block 51 cooperates with the connecting blocks 53 at both ends of the rotating rod 52, so that the first material receiving tray 1 and the second material receiving tray 2 can move at the same time. When the first receiving tray 1 and the second receiving tray 2 are connected, they do not separate from each other, which is convenient for quickly splicing and opening the first receiving tray 1 and the second receiving tray 2. The first receiving tray 1 and the second receiving tray 2 are both movably connected with scrapers 61, and the two scrapers 61 are fixedly connected by a semicircular arc bar 62. Through the rotation of the semicircular arc bar, the two scrapers 61 can be used to scrape the welding slag in the docking trough 21 to prevent the welding slag from adhering to the first receiving tray 1 and the second receiving tray 2. The two scrapers 61 are staggered with each other. The two scrapers 61 are staggered with each other, and the connection between the first receiving tray 1 and the second receiving tray 2 can be cleaned to prevent the welding slag from falling when opening. The upper end surface of the semicircular arc bar 62 is fixedly connected with a rotating block 71, and the rotating block 71 is movably connected to the first receiving tray 1 and the second receiving tray 2.The rotating block 71 can easily move the semicircular arc strip, making it easy to operate.

[0035] The working principle and use process of the utility model are as follows: when in use, first, through the connection of the first receiving plate 1 and the second receiving plate 2, the two semicircular docking grooves 22 and the two arc-shaped clamping plates 81 are closely fitted with the pipe. In the process of splicing, the connecting rod 28 is pulled to make the connecting column 27 move upward with the stretching block 26, and the spring 25 is stretched, leaving enough space for the first receiving plate 1 and the second receiving plate 2 to dock. After the first receiving plate 1 and the second receiving plate 2 are fully docked, the spring 25 rebounds quickly, and the locking column 29 docks with the locking hole 31, so as to realize the connection between the first receiving plate 1 and the second receiving plate 2. Fix, and then place the two scrapers 61 on the semicircular arc strip in the material receiving trough 21. During the process of welding the pipe, the welding slag falls into the material receiving trough 21, and the rotating block 71 is used to scrape the fallen welding slag to avoid sticking to the first material receiving plate 1 and the second material receiving plate 2. When the welding is completed, the two offset scrapers 61 are rotated left and right to clean the welding slag at the connection between the first material receiving plate 1 and the second material receiving plate 2, and then the locking column 29 is disengaged from the locking hole 31, and the welding slag in the material receiving trough 21 is cleaned centrally, so as to realize the use process of the entire welding slag receiving device.

[0036] The contents not described in detail in this specification belong to the prior art known to professionals in this field.

[0037] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A slag receiving device for pipeline welding in a mine shaft, comprising a first receiving tray (1) and a second receiving tray (2), characterized in that: The first material receiving tray (1) and the second material receiving tray (2) are both provided with a material receiving groove (21), and the adjacent sides of the first material receiving tray (1) and the second material receiving tray (2) are both provided with a semicircular docking groove (22); The first material receiving tray (1) and the second material receiving tray (2) are hingedly connected. A fixing block (23) is fixedly connected to the outer wall of the first material receiving tray (1). A telescopic slot (24) is provided in the fixing block (23). A spring (25) is fixedly connected to the inner bottom wall of the telescopic slot (24). The other end of the spring (25) is fixedly connected to a stretching block (26). A connecting column (27) is fixedly connected to the upper end surface of the stretching block (26). A connecting rod (28) is fixedly connected to the end of the connecting column (27) away from the stretching block (26). A locking column (29) is fixedly connected to the lower end surface of the connecting rod (28). A locking block (30) is fixedly connected to the outer wall of the second material receiving tray (2). A locking hole (31) is provided in the locking block (30). The locking column (29) is engaged with the locking hole (31).

2. The slag welding device for pipelines in mine shafts according to claim 1 is characterized in that: Two symmetrical limiting grooves (41) are provided on the inner wall of the telescopic groove (24), a limiting block (42) is slidably connected in the limiting groove (41), and the limiting block (42) is fixedly connected to the stretching block (26).

3. The slag welding device for pipelines in mine shafts according to claim 1 is characterized in that: A retaining block (51) is fixedly connected to the first material receiving tray (1), a rotating rod (52) is hingedly connected to the retaining block (51), both ends of the rotating rod (52) are fixedly connected to connecting blocks (53), and the connecting blocks (53) are fixedly connected to the second material receiving tray (2).

4. The slag welding device for pipelines in mine shafts according to claim 1 is characterized in that: The first material receiving tray (1) and the second material receiving tray (2) are both movably connected with a scraper (61), and the two scrapers (61) are fixedly connected via a semicircular arc bar (62).

5. The slag welding device for pipelines in mine shafts according to claim 4 is characterized in that: A rotating block (71) is fixedly connected to the upper end surface of the semicircular arc strip (62), and the rotating block (71) is movably connected to the first material receiving tray (1) and the second material receiving tray (2).

6. The slag welding device for pipelines in mine shafts according to claim 4 is characterized in that: The two scrapers (61) are arranged offset from each other.

7. The slag welding device for pipelines in mine shafts according to claim 1, characterized in that: An arc-shaped clamping plate (81) is formed between the material receiving groove (21) and the semicircular docking groove (22).