Portable boundary pile

By refining the boundary pile into a soil-breaking section, a connecting section and a pile head section, and designing installation holes and threaded connections, the problem of time-consuming, laborious and perishable installation of existing boundary piles is solved, portability and stability are achieved, and it is suitable for outdoor use in forestry. Boundary stakes for professional surveys are fixed.

CN221855331UInactive Publication Date: 2024-10-18HUBEI FORESTRY SCI INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420223815.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-30
Publication Date
2024-10-18
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing boundary piles are heavy and difficult to transport and fix during forestry field surveys. Cement boundary piles last long but are time-consuming and laborious to install. Pure PVC or bamboo boundary piles are prone to decay and are difficult to fix in thin soil layers or rocky areas.

Method used

A portable boundary pile is designed, which includes a broken soil section that can be driven into the soil layer, a connecting section installed on the broken soil section, and a pile head section that can be detachably installed on the connecting section. A handle is installed through the mounting hole to facilitate the application of force to the broken soil section. Drilled into the soil, it uses threaded connections and a conical structure to simplify installation and fixing.

Benefits of technology

It realizes the portability and quick installation of boundary piles, reduces the workload, extends the storage time, and is suitable for different geological conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855331U_ABST
    Figure CN221855331U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of boundary piles, and provides a portable boundary pile which comprises a ground breaking section capable of being driven into a soil layer, a connecting section installed on the ground breaking section and a pile head section detachably installed on the connecting section, marks are painted on the pile head section, a mounting hole is formed in the connecting section, and the pile head section and the connecting section are connected through the mounting hole. And a handle for driving the connecting section to drive the ground breaking section to be driven into a soil layer is mounted on the mounting hole. According to the portable boundary pile, the boundary pile is divided into the ground breaking section, the connecting section and the pile head section, and the boundary pile can be spliced on site and is convenient to carry; and through the designed mounting holes, the handle can be conveniently mounted, a ground breaking section can be conveniently driven into a soil layer by applying force, pile descending and rooting are facilitated, the storage time is long, the workload of boundary pile fixing of forestry field investigation is reduced, and the working procedure is simplified.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of boundary stakes, in particular to a portable boundary stake. Background Art

[0002] When conducting forestry surveys and forestry scientific research, especially when designing and completing forestry projects, forestry sample plots and field surveys are often carried out. Forestry field surveys mainly investigate the conditions of forest land and trees within the scope of the project land. The specific contents include investigating forest land ownership, land types, forest categories, types of forest land used, forest land protection levels, forest land quality levels, main functional areas, areas, nature of forest land use and the categories of forestry construction projects to which they belong; investigating ownership, tree species (groups), dominant tree species (groups), tree species structure, community structure, small classes, etc. Forestry field surveys are very important basic work to ensure the completion of project demonstration and the progress of project implementation. When conducting forestry field surveys, especially when defining forest land areas and project demonstration plots, boundary stakes are often needed.

[0003] There are two types of boundary stakes commonly used. One is cement boundary stakes. Cement boundary stakes have a long shelf life, but they are heavy and difficult to carry and fix. It takes multiple workers to dig the foundation and then fix it with cement. It is time-consuming and laborious. Only a few boundary stakes can be fixed in one day. The other is pure PVC or bamboo boundary stakes. Although these boundary stakes are easy to install, bamboo is easy to rot and it is difficult to fix them in plots with thin soil or rocky texture. Utility Model Content

[0004] The purpose of the utility model is to provide a portable boundary stake, which can at least solve some defects in the prior art.

[0005] To achieve the above-mentioned purpose, an embodiment of the utility model provides the following technical solution: a portable boundary stake, comprising a ground-breaking section that can be driven into the soil layer, a connecting section installed on the ground-breaking section, and a pile head section detachably installed on the connecting section, the pile head section is painted with a mark, and the connecting section has a mounting hole, and a handle is installed on the mounting hole for driving the connecting section to drive the ground-breaking section to be driven into the soil layer.

[0006] Furthermore, the mounting hole is a through hole that penetrates the connecting section, the handle passes through the through hole, and both ends of the handle are exposed outside the connecting section.

[0007] Furthermore, the body of the ground-breaking section is covered with threads.

[0008] Furthermore, one end of the ground-breaking section away from the connecting section is a pointed end.

[0009] Furthermore, the ground-breaking section is conical.

[0010] Furthermore, the pile head section and the connecting section are connected via threads.

[0011] Furthermore, the pile head section is in the shape of an elongated strip.

[0012] Furthermore, the pile head section is hollow inside.

[0013] Furthermore, the lengths of the ground-breaking section and the pile head section are both between 50 and 60 cm, the inner diameter of the pile head section is between 4.5 and 5.5 cm, the connecting section is cylindrical, the diameter of the connecting section is between 4 and 5 cm, and the length is between 3 and 5 cm.

[0014] Furthermore, the length of the handle is between 50 and 60 cm.

[0015] Compared with the prior art, the beneficial effects of the utility model are: a portable boundary stake, which can be spliced ​​on site by dividing the boundary stake into a ground-breaking section, a connecting section and a pile head section, and is easy to carry; and the designed installation hole can facilitate the installation of the handle, making it convenient to apply force to drive the ground-breaking section into the soil layer, making it easy to stake and take root and having a longer preservation time, thereby reducing the workload of boundary stake setting in forestry field surveys and simplifying the work procedures. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A schematic diagram of a ground-breaking section and a connecting section of a portable boundary stake provided in an embodiment of the utility model;

[0017] Figure 2 A schematic diagram of a pile head section of a portable boundary stake provided in an embodiment of the utility model;

[0018] Figure 3 A schematic diagram of a handle of a portable boundary stake provided in an embodiment of the utility model;

[0019] In the accompanying drawings: 1-ground-breaking section; 2-connecting section; 20-installation hole; 3-pile head section; 4-handle; 5-thread. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] See also Figure 1 , Figure 2 and Figure 3The embodiment of the utility model provides a portable boundary stake, including a ground-breaking section 1 that can be driven into the soil layer, a connecting section 2 installed on the ground-breaking section 1, and a pile head section 3 that can be detachably installed on the connecting section 2, the pile head section 3 is painted with a mark, and the connecting section 2 has a mounting hole 20, and the mounting hole 20 is equipped with a handle 4 for driving the connecting section 2 to drive the ground-breaking section 1 into the soil layer. In this embodiment, by subdividing the boundary stake into the ground-breaking section 1, the connecting section 2 and the pile head section 3, it can be spliced ​​on site, which is convenient for carrying; and through the designed mounting hole 20, it is convenient to install the handle 4, which is convenient for applying force to drive the ground-breaking section 1 into the soil layer, making it easy to stake and take root and keep it for a long time, reducing the workload of setting stakes in the boundary of forestry field surveys, and simplifying the work procedures. When in use, the portable boundary stake is first carried to the position, and then the pile head section 3 and the connecting section 2 are assembled on site, and the detachable structure is easier to disassemble and carry. Then install the handle 4 at the hole of the pile head section 3, and apply force to drive the ground-breaking section 1 into the soil layer. There are several ways to drive into the soil layer here. One is to directly press down the connecting section 2 so that the ground-breaking section 1 is inserted into the soil layer. Another way is to rotate the connecting section 2. At this time, the thread 5 on the ground-breaking section 1 can be used to make the action of driving into the soil layer more labor-saving. Of course, when rotating and driving, it is also necessary to cooperate with the downward pressure. In order to save more effort, the end of the ground-breaking section 1 away from the connecting section 2 can be designed as a pointed end, which is more conducive to breaking into the soil layer. To further optimize the structure of the ground-breaking section 1, it can be conical, so that the entire section can be inserted into the soil layer, and a more stable and reliable boundary pile can be obtained. Figure 2 As shown, the pile head section 3 may be painted with marks, such as red, white and red alternating marks as shown in the figure. The painting may be done when the pile head section 3 leaves the factory, or may be flexibly painted on site as needed.

[0022] As an optimization solution of the embodiment of the utility model, please refer to Figure 1 , Figure 2 and Figure 3 The mounting hole 20 is a through hole that passes through the connecting section 2, and the handle 4 passes through the through hole, and both ends of the handle 4 are exposed outside the connecting section 2. In this embodiment, the handle 4 passes through the through hole, so when driving into the soil layer, the worker holds the exposed part of the handle 4 with both hands and applies force, whether it is pressing force or rotating force.

[0023] As an optimization solution of the embodiment of the utility model, please refer to Figure 1 , Figure 2 and Figure 3 , the pile head section 3 and the connecting section 2 are connected by a thread 5. In this embodiment, the pile head section 3 and the connecting section 2 can be connected by a thread 5, such as Figure 1 and Figure 2As shown, the thread 5 on the pile head section 3 can be installed in cooperation with the thread 5 on the connecting section 2, wherein one of the threads 5 is designed as an internal thread 5 and the other thread 5 is designed as an external thread 5. In order to show the thread 5, the internal thread 5 is also shown in the figure. Preferably, the connecting section 2 and the ground-breaking section 1 can also be designed in a form of detachable connection, so that different types of ground-breaking sections 1 can be replaced as needed to adapt to different types of soil layers, such as replacing ground-breaking sections 1 of different thicknesses and shapes.

[0024] As an optimization solution of the embodiment of the utility model, please refer to Figure 1 , Figure 2 and Figure 3 , the pile head section 3 is in the shape of a long strip. In this embodiment, the pile head is designed in the shape of a long strip, which is convenient for Figure 2 The pile head is designed to have alternating colors. Preferably, the pile head section is preferably cylindrical and hollow. The pile head is designed to be cylindrical, which is convenient for Figure 1 The conical end of the ground-breaking section 1 of the design shown is placed into the hollow of the pile head section. At this time, the pile head section 3 can be used as a receiving component for easy transportation and carrying.

[0025] As an optimization solution of the embodiment of the utility model, please refer to Figure 1 , Figure 2 and Figure 3 The ground-breaking section 1, the connecting section 2 and the pile head section 3 can all be made of metal material, which is more durable than pure PVC material or bamboo material.

[0026] As an optimization solution of the embodiment of the utility model, please refer to Figure 1 , Figure 2 and Figure 3 The lengths of the ground-breaking section 1 and the pile head section 3 are both between 50 and 60 cm, and the inner diameter of the pile head section 3 is between 4.5 and 5.5 cm. The connecting section 2 is cylindrical, and the diameter of the connecting section 2 is between 4 and 5 cm, and the length is between 3 and 5 cm. The length of the handle 4 is between 50 and 60 cm. The bottom surface diameter of the cone connecting to the connecting section 2 is 2 cm-3 cm, and there are threads 5 on the entire cone.

[0027] As an optimization solution of the embodiment of the utility model, please refer to Figure 1 , Figure 2 and Figure 3 The handle 4 is provided with an anti-slip structure so that the handle 4 will not rotate randomly after being inserted into the through hole, and the staff can hold the handle 4 more stably. Preferably, the anti-slip structure includes a rubber sleeve or a frosted area.

[0028] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A portable boundary stake, characterized in that: It comprises a ground-breaking section which can be driven into the soil layer, a connecting section installed on the ground-breaking section, and a pile head section which is detachably installed on the connecting section. The pile head section is painted with a mark, and the connecting section is provided with a mounting hole. A handle is installed on the mounting hole for driving the connecting section to drive the ground-breaking section into the soil layer.

2. A portable boundary stake as claimed in claim 1, characterized in that: The mounting hole is a through hole that penetrates the connecting section, the handle passes through the through hole, and both ends of the handle are exposed outside the connecting section.

3. A portable boundary stake as claimed in claim 1, characterized in that: The body of the ground-breaking section is covered with threads.

4. A portable boundary stake as claimed in claim 1, characterized in that: The end of the ground-breaking section away from the connecting section is a pointed end.

5. A portable boundary stake as claimed in claim 4, characterized in that: The ground-breaking section is in a cone shape.

6. A portable boundary stake as claimed in claim 1, characterized in that: The pile head section and the connecting section are connected via threads.

7. A portable boundary stake as claimed in claim 1, characterized in that: The pile head section is in the shape of an elongated strip.

8. A portable boundary stake as claimed in claim 1, characterized in that: The pile head section is hollow inside.

9. A portable boundary stake as claimed in claim 1, characterized in that: The lengths of the ground-breaking section and the pile head section are both between 50 and 60 cm, the inner diameter of the pile head section is between 4.5 and 5.5 cm, and the connecting section is cylindrical with a diameter of 4 to 5 cm and a length of 3 to 5 cm.

10. A portable boundary stake as claimed in claim 1, characterized in that: The length of the handle is between 50 and 60 cm.