Pile embracing type operation platform for high pile
By designing a pile-holding operating platform on high piles, the safety risks and stability problems of working on high piles on the water are solved, more efficient construction operations are achieved, the risk of workers falling into the water from high places is reduced, and construction efficiency is improved. .
Patent Information
- Application Number
- CN202420181791.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-25
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-01-25
AI Technical Summary
The traditional construction method of working on high piles on the water has the problems of high safety risks, poor stability and heavy personnel investment. This is mainly because the construction hanging basket relies on the vertical traction provided by the floating crane and is greatly affected by wind, resulting in safety hazards and improper operation. Stablize.
A pile-holding operating platform for high piles is designed, which includes a working platform component and a pile-holding component. By fastening the pile-holding component to the pile, it provides a more stable operating platform and reduces the risk of workers falling into the water from high places. risks, and through the design of movable doors, flaps and pile-holding components, construction operations are simplified and work efficiency is improved.
It effectively reduces the safety risks of working at high altitudes, enhances the stability of the operating platform, reduces the impact of wind, improves construction efficiency, and reduces personnel investment during construction.
Smart Images

Figure CN221855399U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a pile-holding type operating platform for high-place piles. Background Art
[0002] Compared with seaport terminals, inland river terminals have a larger water level drop. After the construction of the pipe pile foundation is completed, there is often a height difference of more than 5 meters between the pile top and the water surface. Construction workers need to perform high-altitude operations on the top of the pipe piles, such as corbel construction, clamp installation, pile connection, and pile cutting. Limited by operating conditions and hydrological conditions, most of the construction methods used are floating cranes, hanging baskets, and cable wind rope traction.
[0003] In traditional construction methods, the construction basket only relies on the floating crane to provide vertical traction to maintain high-altitude working conditions. If the wire rope falls off or breaks, the construction workers will fall into the water from a height, which poses a high safety risk. At the same time, the basket is greatly affected by wind and has low stability. During construction, special personnel need to be arranged to carry out cable rope traction, which increases the manpower input.
[0004] Therefore, in order to solve the problems of high safety risks, poor stability and high manpower input in traditional construction of high-altitude pile operations on water, a pile-holding operation platform for high-altitude piles is proposed. Utility Model Content
[0005] The utility model aims to overcome the existing defects and provide a high pile holding type operating platform, thereby ensuring production safety and improving work efficiency.
[0006] The technical solution to achieve the above purpose is: a pile-holding operating platform for high-altitude piles, comprising a work platform assembly and a pile-holding assembly, wherein the pile-holding assembly is arranged in the middle of the work platform assembly, and the pile-holding assembly is used to connect the pile column;
[0007] The working platform assembly comprises a frame assembly and a door assembly, wherein the door assembly is arranged on one side of the frame assembly.
[0008] Preferably, the frame assembly comprises a frame, the frame is composed of a plurality of rods connected to each other, and a bottom plate is arranged on the bottom surface; the frame is square; and guardrails are connected to the four sides of the frame.
[0009] Preferably, the door assembly comprises two movable doors and two flaps, and each of the two movable doors is movably connected to the frame via a door shaft;
[0010] The two flaps are movably connected to the bottom plate of the frame inside the movable door;
[0011] An iron chain is respectively connected to the frames on both sides of the two movable doors, and a clamping plate is respectively connected to the lower ends of the two iron chains. The two clamping plates can be plugged into the corresponding clamping ports of the flaps to fix the flaps.
[0012] Preferably, the pile holding assembly comprises a fixed half hoop and a movable hoop, the fixed half hoop is connected to the bottom plate of the frame, and the movable hoop is connected to the fixed half hoop via a fixed assembly; a plurality of sets of fastening assemblies are provided on the fixed half hoop for pile column connection.
[0013] Preferably, the fixing assembly includes four fixing plates, two of the fixing plates are connected to each of the fixing half hoop and the movable hoop, and the two fixing plates on the same side of the fixing half hoop and the movable hoop are connected by bolts.
[0014] Preferably, the fastening assembly comprises a fastening handle and a pressure plate, wherein the pressure plate is located inside the fixed half hoop, and the fastening handle passes through the fixed half hoop and is connected to the pressure plate; a rubber sheet is connected to the inside of the pressure plate.
[0015] Preferably, the outer wall of the fastening handle is provided with threads, the fixing half hoop is provided with threaded holes, and the fastening handle passes through the threaded holes and is connected to the pressing plate.
[0016] Preferably, a hanging hole is provided on each of the four corners of the frame.
[0017] The beneficial effects of the utility model are as follows: the pile-holding operating platform of the high pile forms a reliable operating platform by arranging an operating platform component and a pile-holding component, and effectively solves the problem of low safety of high-altitude hanging basket operations by fastening the pile-holding component to the high-altitude pile body, reduces the risk of workers falling into water from heights, and enhances stability. The design of the pile-holding component enables the operating platform to have better stability on the high-altitude pile body, reduces the influence of wind force, and improves construction efficiency. The movable design of the movable door, flap and pile-holding component makes it more convenient to sleeve on the pile body, reduces the input of personnel in construction, and improves overall work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of a pile-holding operation platform for a high pile of the utility model;
[0019] Figure 2 It is a top view of the pile-holding type operating platform for the high pile of the utility model;
[0020] Figure 3 It is a front view of the pile-holding type operating platform of the utility model for high piles;
[0021] Figure 4 It is a detail diagram of the pile holding assembly of the utility model.
[0022] In the figure: 1. working platform assembly; 11. frame; 12. movable door; 13. guardrail; 111. lifting hole; 112. flap; 1122. chain; 1123. clamping plate; 2. pile holding assembly; 21. fixed half hoop; 22. movable hoop; 23. fixed plate; 24. bolt; 25. pressure plate; 26. tightening handle. DETAILED DESCRIPTION
[0023] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0024] The utility model will be further described below in conjunction with the accompanying drawings.
[0025] like Figure 1-4 As shown, a pile-holding operating platform for high-altitude piles includes a working platform component 1 and a pile-holding component 2. The pile-holding component 2 is arranged in the middle of the working platform component 1 and is used to connect the pile column; the working platform component 1 includes a frame component and a door component, and the door component is arranged on one side of the frame component.
[0026] Specifically, a reliable operating platform is formed by the working platform component 1 and the pile holding component 2. By fastening the pile holding component 2 to the high pile body, the operating platform is safely fixed. It has the advantages of high safety, strong stability, high construction efficiency, low labor cost, etc., ensuring the safety of high-altitude pile construction.
[0027] Specifically, the frame assembly includes a frame 11, which is composed of multiple rods connected to each other, and a bottom plate is provided on the bottom surface; the frame 11 is square; guardrails 13 are connected around the frame 11 to provide a standing platform for personnel. The door assembly includes two movable doors 12 and two flaps 112, and the two movable doors 12 are each movably connected to the frame 11 through a door shaft; the two flaps 112 are movably connected to the bottom plate of the frame 11 inside the movable door 12; and a lifting hole 111 is provided at each of the four corners of the frame 11. The lifting hole 111 is used as a lifting point for the lifting equipment to lift the operating platform during construction.
[0028] like Figure 2 , 3As shown, an iron chain 1122 is connected to the frame 11 on both sides of the two movable doors 12, the upper ends of the two iron chains 1122 are clamped on the upper crossbar of the frame 11 through a latch, and the lower ends of the two iron chains 1122 are connected to a clamping plate 1123, which can be plugged into the corresponding clamping ports of the flap 112 to fix the flap 112. The two flaps 112 are laid flat, and then the clamping plates 1123 connected to the lower ends of the iron chains 1122 are plugged into the corresponding clamping ports of the flap 112 to fix the two flaps; conversely, the two clamping plates 1123 are removed to make the flap 112 flip on the bottom plate.
[0029] like Figure 4 As shown, the pile holding assembly 2 includes a fixed half hoop 21 and a movable hoop 22. The fixed half hoop 21 is connected to the bottom plate of the frame 11, and the movable hoop 22 is connected to the fixed half hoop 21 through a fixed assembly. A plurality of fastening assemblies are arranged on the fixed half hoop 21 for pile column connection.
[0030] Specifically, the fixing assembly includes four fixing plates 23, two fixing plates 23 are connected to each of the fixed half hoop 21 and the movable hoop 22, and the two fixing plates 23 on the same side of the fixed half hoop 21 and the movable hoop 22 are connected through bolts 24. The two fixing plates 23 on the butt surface of the fixed half hoop 21 and the movable hoop 22 are staggered up and down, and then the bolts 24 are used to penetrate the two fixing plates 23, so that the fixed half hoop 21 and the movable hoop 22 are connected. The fastening assembly includes a fastening handle 26 and a pressing plate 25, the pressing plate 25 is located on the inner side of the fixed half hoop 21, the fastening handle 26 penetrates the fixed half hoop 21 and is connected to the pressing plate 25; a rubber sheet is connected to the inner side of the pressing plate 25. The outer wall of the fastening handle 26 is provided with a thread, and the fixed half hoop 21 is provided with a threaded hole, and the fastening handle 26 penetrates the threaded hole and is connected to the pressing plate 25. The pressing plate 25 is made of a steel plate, and a rubber sheet is attached to the outer side of the steel plate to increase friction. By rotating the tightening handle 26, the pressing plate 25 is brought close to the pile, so that the fixed half hoop 21 and the movable hoop 22 are connected to the pile together.
[0031] Specifically, when in use, the movable door 12 is opened, the flap 112 is flipped ninety degrees, the movable clamp 22 is removed, and then the equipment is lifted by a crane, so that the working platform is put onto the pile body from the opened gap, and then the movable clamp 22 is installed, connected by the fixing component and the fastening component, the flap 112 is flipped and fixed, and the movable door 12 is closed to complete the connection between the equipment and the pile column.
[0032] The pile-holding operation platform of the high pile is a reliable operation platform formed by the operation platform component 1 and the pile-holding component 2. By fastening the pile-holding component 2 to the high pile body, the problem of low safety of high-altitude hanging basket operation is effectively solved, and the risk of workers falling into the water from a height is reduced. Enhanced stability: The design of the pile-holding component 2 makes the operation platform have better stability on the high pile body and reduces the impact of wind. Improved construction efficiency: The movable design of the movable door, flap and pile-holding component 2 makes it more convenient to sleeve the pile body, reduces the input of personnel in the construction, and improves the overall work efficiency.
[0033] The above embodiments are only used to illustrate the technical solution of the utility model, rather than to limit it. Although the utility model is described in detail with reference to the above embodiments, ordinary technicians in this field should understand that they can still modify the technical solutions recorded in the above embodiments, or replace some or all of the technical features therein with equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the utility model.
Claims
1. A pile-holding operating platform for high piles, characterized in that: It comprises a working platform component (1) and a pile holding component (2), wherein the pile holding component (2) is arranged in the middle of the working platform component (1), and the pile holding component (2) is used to connect piles; The working platform assembly (1) comprises a frame assembly and a door assembly, wherein the door assembly is arranged on one side of the frame assembly; The frame assembly comprises a frame (11), the frame (11) is composed of a plurality of rods connected to each other, and a bottom plate is arranged on the bottom surface; the frame (11) is square; and guardrails (13) are connected to the periphery of the frame (11); The door assembly comprises two movable doors (12) and two flaps (112), and the two movable doors (12) are each movably connected to the frame (11) via a door shaft; The two flaps (112) are movably connected to the bottom plate of the frame (11) inside the movable door (12); An iron chain (1122) is connected to each of the frames (11) on both sides of the two movable doors (12); the lower ends of the two iron chains (1122) are connected to each of the clamping plates (1123); and the two clamping plates (1123) can be plugged into corresponding clamping ports of the flap (112) for fixing the flap (112).
2. The pile-holding operation platform for high-altitude piles according to claim 1, characterized in that: The pile holding assembly (2) comprises a fixed half hoop (21) and a movable hoop (22); the fixed half hoop (21) is connected to the bottom plate of the frame (11); the movable hoop (22) is connected to the fixed half hoop (21) via a fixed assembly; and a plurality of sets of fastening assemblies are arranged on the fixed half hoop (21) for pile-column connection.
3. The pile-holding operation platform for high-altitude piles according to claim 2, characterized in that: The fixing assembly comprises four fixing plates (23), two fixing plates (23) are respectively connected to the fixing half hoop (21) and the movable hoop (22), and the fixing half hoop (21) and the movable hoop (22) are connected to the two fixing plates (23) on the same side through which they are butted by bolts (24).
4. The pile-holding operation platform for high-altitude piles according to claim 2, characterized in that: The fastening assembly comprises a fastening handle (26) and a pressure plate (25); the pressure plate (25) is located on the inner side of the fixed half hoop (21); the fastening handle (26) passes through the fixed half hoop (21) and is connected to the pressure plate (25); a rubber sheet is connected to the inner side of the pressure plate (25).
5. The pile-holding operation platform for high-altitude piles according to claim 4, characterized in that: The outer wall of the fastening handle (26) is provided with a thread, the fixing half hoop (21) is provided with a threaded hole, and the fastening handle (26) passes through the threaded hole and is connected to the pressing plate (25).
6. The pile-holding operation platform for high-altitude piles according to claim 1, characterized in that: A hanging hole (111) is respectively provided at the four corners of the frame (11).