Middle partition wall floor support changing structure for foundation pit separate construction
By adopting the middle partition wall and floor slab bracing structure in the construction of the foundation pit, and using the insertion bars and corbel connections to achieve continuous force transmission, the problem of force transmission gaps and steel joint staggering rates that are not easily met has been solved, and construction safety has been improved. .
Patent Information
- Application Number
- CN202420018483.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-04
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-01-04
Smart Images

Figure CN221855593U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of foundation pit construction, in particular to a middle partition wall floor slab replacement support structure for foundation pit sub-pit construction. Background Art
[0002] When the foundation pit area is large or close to important buildings such as subways, the method of foundation pit sub-pit construction is often used, that is, several middle partition walls are set up in the middle of the foundation pit to divide the foundation pit into several sub-pits, and the construction is carried out in sequence as required. After the construction of the underground structure of each sub-pit is completed, the middle partition wall will be removed, and the basement structure on both sides of the middle partition wall will be connected to form a complete structure. In order to ensure the safety of foundation pit construction, during the construction of the basement structure of each sub-pit and the removal of the horizontal support, the beams and slabs of each floor of the basement need to form a replacement support force transmission structure at the middle partition wall to ensure the stability of the foundation pit.
[0003] At present, the main force transmission structure for the replacement of braces during the construction of deep foundation pits is steel components. However, the main problem when using steel components for replacement of braces is that it is difficult to leave steel bars due to the arrangement of steel bars, and connectors are required. In addition, when the floor is closed after the middle partition wall is removed, the staggered rate of the joints connected by the steel bars is difficult to meet. In addition, after the middle partition wall is removed and before the floor is closed, the replacement steel needs to be removed, which leaves a gap in force transmission and poses certain safety hazards. Utility Model Content
[0004] In order to overcome the defects of the existing technology, a middle partition wall floor replacement support structure for foundation pit sub-pit construction is provided to solve the problems that the existing replacement support force transmission structure has a force transmission gap period and the staggered rate of the steel bar connection joints is difficult to meet.
[0005] In order to achieve the above technical effects, the solution provided by the utility model is to provide a middle partition wall floor slab replacement support structure for foundation pit sub-pit construction, which includes:
[0006] Middle partition wall;
[0007] First construct the floor slab, wherein the first constructed floor slab abuts against the first side of the middle partition wall;
[0008] A rear construction floor slab, the rear construction floor slab is arranged on the second side of the middle partition wall, and a spacing space is provided between the rear construction floor slab and the middle partition wall, a dowel is pre-buried on a side surface of the rear construction floor slab facing the middle partition wall, a first end of the dowel is buried inside the rear construction floor slab, and a second end of the dowel extends to the spacing space;
[0009] A corbel, the corbel is added to the partition space, the top surface of the corbel is fixed to the bottom surface of the rear construction floor slab, and the side surface of the corbel is fixed to the side surface of the middle partition wall;
[0010] The vertical support members are supported on the bottom surfaces of the first-constructed floor slab and the second-constructed floor slab.
[0011] Preferably, a circular steel bar is provided in the corbel.
[0012] Preferably, the bracket is arranged to be inclined downward at 45°.
[0013] Preferably, the vertical support member includes a first support rod and a second support rod, the first support rod is supported on the bottom surface of the first constructed floor slab, and the second support rod is supported on the bottom surface of the corbel.
[0014] Preferably, a steel bar connector is pre-buried inside the side of the first constructed floor slab facing the middle partition wall, and the second end of the inserted bar is connected to the steel bar connector through a later-added steel bar.
[0015] The beneficial effect of the utility model is that the floor slab replacement structure of the middle partition wall in the foundation pit construction of the utility model, when the foundation pits on both sides of the middle partition wall are excavated to the bottom and the structure is backbuilt, the floor slab of the foundation pit on the "first construction side" of the middle partition wall directly hits the top of the middle partition wall. The floor slab of the foundation pit on the "later construction side" of the middle partition wall is set at a certain distance from the middle partition wall and a sufficient number of dowel bars with spacing are pre-embedded. At the same time, a corbel is installed on the floor slab of the foundation pit on the "later construction side" and connected to the middle partition wall through the corbel, so that the floor slab of the foundation pit on the "later construction side" and the middle partition wall transmit force through the corbel. At this time, the floor slab of the rear construction, the middle partition wall and the corbel enclose a notch, and the dowel bars extend into the notch. In the floor slab replacement structure of the middle partition wall in the foundation pit construction of the utility model, before the upper middle partition wall is removed, the front and rear construction side floor slabs are connected into a whole through the middle partition wall and the corbel, which is equivalent to the floor slab being closed and the force transmission is continuous. When the upper middle partition wall is removed, the middle partition wall can be removed through the notch. At this time, the front and rear floor slabs transmit force through the corbel and the lower middle partition wall, and the force transmission between the floor slabs is continuous. After the upper middle partition wall is removed, the floor slab steel bars on both sides are connected and welded, and concrete is poured to connect the floor slabs on both sides. At this time, the floor slabs on both sides are connected as a whole, and the force transmission between the floor slabs is continuous. And because the later construction floor slab has no direct contact with the middle partition wall, the later construction floor slab reserves sufficient steel bar lap length, which can meet the steel bar joint stagger rate of not less than 50%. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0017] Figure 1 It is an overall schematic diagram of the intermediate partition wall floor slab support replacement structure of the utility model in foundation pit sub-pit construction.
[0018] Figure 2 The utility model is a structural schematic diagram of a middle partition wall floor slab replacement support structure after the upper middle partition wall is removed in foundation pit sub-pit construction.
[0019] Figure 3 The utility model is a structural schematic diagram of the front and rear side construction floors of the middle partition wall floor replacement support structure of the foundation pit sub-pit construction after being connected.
[0020] The corresponding relationship of the numbers in the figure is as follows:
[0021] 1-middle partition wall; 101-lower middle partition wall; 102-upper middle partition wall; 2-construct floor slab first; 3-rebar connector; 4-construct floor slab later; 5-inserted reinforcement; 6-corbel; 7-first support rod; 8-second support rod; 9-rebar; 10-notch; 11-post-casting strip; 12-roughened surface. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] See also Figures 1 to 3 As shown, the embodiment of the utility model provides a middle partition wall and floor slab replacement support structure for foundation pit sub-pit construction, comprising a middle partition wall 1, a first-construction floor slab 2, a second-construction floor slab 4, a corbel 6, and a vertical support member. Among them:
[0024] like Figure 1 As shown, the floor slab 2 is first constructed to abut against the first side of the middle partition wall 1 .
[0025] The rear construction floor 4 is arranged on the second side of the middle partition wall 1 and forms a spacing space between the rear construction floor 4 and the middle partition wall 2. A dowel bar 5 is pre-embedded on the side surface of the rear construction floor 4 facing the middle partition wall 1. The first end of the dowel bar 5 is embedded in the rear construction floor 4, and the second end of the dowel bar 5 extends into the spacing space.
[0026] The corbel 6 is added to the partition space, and the top surface of the corbel 6 is fixed to the bottom surface of the rear construction floor 4, and the side surface of the corbel 6 is fixed to the side surface of the middle partition wall 1.
[0027] The vertical support members are supported on the bottom surfaces of the first constructed floor 2 and the second constructed floor 4, and the bottoms of the vertical support rods are fixed on the lower floor.
[0028] As a preferred embodiment, a circular steel bar is provided inside the corbel 6 .
[0029] As a preferred embodiment, the bracket 6 is arranged to be inclined downward at 45 degrees.
[0030] As a preferred embodiment, the vertical support member includes a first support rod 7 and a second support rod 8, wherein the first support rod 7 is supported on the bottom surface of the first construction floor 2. The second support rod 8 is supported on the bottom surface of the corbel 6. The first support rod 7 and the second support rod 8 provide support force for the first construction floor 2 and the second construction floor 4 respectively.
[0031] As a preferred implementation, a steel bar connector 3 is pre-buried inside the side of the first constructed floor 2 facing the middle partition wall 1, and the second end of the inserted reinforcement 5 is connected to the steel bar connector through a later-added reinforcement.
[0032] When the foundation pits on both sides of the middle partition wall 1 are excavated to the bottom and the structure is back-built, the foundation pit floor slab on the "first construction side" of the middle partition wall, that is, the first construction floor slab 2, directly tops the middle partition wall 1, and the foundation pit floor slab on the "later construction side" of the middle partition wall, that is, the later construction floor slab 4, is set at a certain distance from the middle partition wall 1. In this embodiment, the distance between the later construction floor slab 4 and the middle partition wall 1 is 500mm. And the later construction floor slab 4 is pre-embedded with a sufficient number and spacing of dowel bars 5 on the side facing the middle partition wall 1, and a construction joint is set here through a wire mesh. A 45° oblique horizontal bracket is set between the later construction floor slab 4 and the middle partition wall 1 for force transmission, and a circular steel bar is built into the bracket 6. Temporary vertical steel supports (first support rod 7, second support rod 8) of HW400×400×13×21 (i.e. I-beam section, height 400mm, width 400mm, web thickness 13mm, flange thickness 21mm) are set under the floor slabs on both sides according to the requirements of the floor slab cantilever and placed under the beam and back to the top. The later-constructed floor slab 4 and the middle partition wall 1 and the corbel 6 enclose a notch 10, and the later-constructed floor slab 4 and the first-constructed floor slab 2 are transmitted through the middle partition wall 1 and the corbel 6.
[0033] like Figure 2 As shown, the upper middle partition wall 102 is chiseled out to the bottom of the floor slab through the notch 10, and a post-casting strip 11 is formed. At this time, the post-construction floor slab 4 and the first-construction floor slab 2 are force-transmitted through the lower middle partition wall 101 and the corbel 6. The sides of the first-construction floor slab 2 and the post-construction floor slab 4, the upper surface of the lower corbel 6, and the lower middle partition wall 101 are roughened to form a roughened surface 12. Then the steel bar connector 3 and the inserted bar 5 are connected by steel bars, and the steel bar joint stagger rate should be not less than 50%. Subsequently, concrete is poured in this post-casting strip 11 and the notch 10 area to complete the connection between the first-construction floor slab 2 and the post-construction floor slab 4. At this time, the floor slab is closed and the force transmission is continuous. In order to ensure the safety of the floor slab structure on both sides, the support rods within 2m on both sides of the middle partition wall 1 need to be retained, and the upper middle partition wall 102 is removed and the internal structure beam slab is cast and connected before being removed.
[0034] Finally, if Figure 3As shown, the temporary corbel 6 on the "rear construction side" is chiseled off, and the temporary steel supports (first support rod 7, second support rod 8) on both sides of the middle partition wall 1 are removed. Then the floor slab is constructed downwards. At this time, the lower middle partition wall 101 will be chiseled off to form a Figure 3 The structure shown.
[0035] In the structure for replacing the middle partition wall slab during foundation pit construction of the utility model, there is a certain distance between the later-constructed slab and the middle partition wall, and they are not in direct contact, so that a sufficient length of steel bar overlap length can be retained, and the staggered rate of steel bar joints can be satisfied to be not less than 50%. In addition, the setting of the corbels ensures that the first-constructed slab and the later-constructed slab are closed and the force transmission is continuous before the middle partition wall is demolished. In the traditional construction method, the steel section replacement requires that the first-constructed slab be connected to the middle partition wall through the steel section after the construction of the first-constructed slab is completed. Before the floor slab construction is completed and the steel section is installed, the floor slab is not subjected to force and is not supported by the middle partition wall. This process has the problem of insufficient and continuous force transmission. In the support replacement structure of the utility model, the first construction floor slab is directly placed on the middle partition wall, and the bottom is supported by support rods, so the structure is stable. Due to the provision of the corbels, the second construction floor slab is connected to the middle partition wall through the corbels, and the bottom of the corbels is supported by the support rods. Therefore, the structure of the second construction floor slab is also stable. Before the middle partition wall is removed, the second construction floor slab and the first construction floor slab form a closed structure through the corbels and the middle partition wall, and the force transmission is continuous.
[0036] In addition, after the upper middle partition wall is demolished and before the floor slab is closed, that is, before the concrete in the groove and post-casting zone is poured, the floor slabs on both sides are connected and closed through the lower middle partition wall and the corbels, and the force transmission is also continuous.
[0037] The utility model discloses a middle partition wall floor slab replacement support structure for foundation pit sub-pit construction. The floor slab top is first constructed and arranged on the middle partition wall. The floor slab is then constructed and arranged at a certain distance relative to the middle partition wall and a corbel connection is arranged. This makes the replacement support structure continuous and the force transmission continuous, and can meet the staggered rate of the joints of the steel bar connections.
[0038] Parts not involved in the present invention are the same as the prior art or can be implemented by the prior art. Although the embodiments of the present invention have been shown and described, it is understood by those skilled in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the attached claims and their equivalents.
Claims
1. A middle partition wall floor slab replacement support structure for foundation pit sub-pit construction, characterized in that: include: Middle partition wall; First construct the floor slab, wherein the first constructed floor slab abuts against the first side of the middle partition wall; A rear construction floor slab, the rear construction floor slab is arranged on the second side of the middle partition wall, and a spacing space is provided between the rear construction floor slab and the middle partition wall, a dowel is pre-buried on a side surface of the rear construction floor slab facing the middle partition wall, a first end of the dowel is buried inside the rear construction floor slab, and a second end of the dowel extends to the spacing space; A corbel, the corbel is added to the partition space, the top surface of the corbel is fixed to the bottom surface of the rear construction floor slab, and the side surface of the corbel is fixed to the side surface of the middle partition wall; The vertical support members are supported on the bottom surfaces of the first-constructed floor slab and the second-constructed floor slab.
2. The intermediate partition wall slab replacement support structure for foundation pit sub-pit construction according to claim 1 is characterized in that: A circular steel bar is arranged inside the corbel.
3. The intermediate partition wall and floor slab replacement support structure for foundation pit sub-pit construction according to claim 1 is characterized in that: The bracket is arranged to be inclined downward at 45 degrees.
4. The intermediate partition wall and floor slab replacement support structure for foundation pit sub-pit construction according to claim 1 is characterized in that: The vertical support member includes a first support rod and a second support rod, wherein the first support rod is supported on the bottom surface of the first-constructed floor slab, and the second support rod is supported on the bottom surface of the corbel.
5. The intermediate partition wall and floor slab replacement support structure for foundation pit sub-pit construction according to claim 1 is characterized in that: A steel bar connector is pre-buried inside the side of the first constructed floor slab facing the middle partition wall, and the second end of the inserted bar is connected to the steel bar connector through the later-added steel bar.
Citation Information
Cited By
Pre-connection back-jacking-free construction method for beam plates on two sides of partition wall in pit division construction
CN120231341A
Force transfer waterproof structure for basement top plates on two sides of temporary mid-partition wall and construction method
CN120401718A
Temporary partition wall both sides of basement roof force transmission and waterproof structure and construction method
CN120401718B
