Urban initial rainwater collection system

By introducing the initial rainwater collection structure into the urban rainwater collection system, including the main rainwater collection warehouse, the preliminary filtering inner warehouse and the graded water buffer warehouse, the problems of blocked drainage pipes and unpurified rainwater caused by silt are solved, and efficient Rainwater purification and detection simplify operations and enhance the sponge city process.

CN221855747UActive Publication Date: 2024-10-18ANHUI SHUIYUN ENVIRONMENTAL PROTECTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323494233.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-21
Publication Date
2024-10-18
Estimated Expiration
2033-12-21

AI Technical Summary

Technical Problem

After the existing urban rainwater collection system is used for a period of time, silt will be generated inside, causing the drainage pipe to be clogged, making the desilting process inconvenient, and the collected rainwater is not efficiently purified, affecting secondary use.

Method used

An initial rainwater collection structure including a main rainwater collection warehouse, a preliminary filtering inner warehouse, a graded water buffer and a water quality detector is designed. The filtration and purification of rainwater are realized through the water inlet volume control pipe and the built-in filter structure. A silt collection area is provided in the rain well to facilitate cleaning.

Benefits of technology

It simplifies the operation of the rainwater collection system, improves water purification efficiency, reduces manpower and material investment, alleviates silt clogging problems, and enhances the local optimization process of sponge cities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855747U_ABST
    Figure CN221855747U_ABST
Patent Text Reader

Abstract

The utility model relates to an urban initial rainwater collecting system which comprises an urban rainwater well body structure and an initial rainwater collecting structure connected with the urban rainwater well body structure, and the initial rainwater collecting structure comprises a water inflow control pipe structure connected with a water drainage pipe of the urban rainwater well body structure and a rainwater collecting and filtering structure. The rainwater collecting and filtering structure comprises a rainwater collecting main bin body, a preliminary filtering inner bin body, an initial filtering body structure and a graded water body temporary buffering bin arranged at the rear end of the preliminary filtering inner bin body, and the graded water body temporary buffering bin communicates with an urban circulating water network. The rainwater well has the advantages that the sludge collecting area is additionally arranged in the rainwater well, a certain amount of sludge can be stored, and manpower and material resources are saved for follow-up cleaning work. And the phenomenon of pipeline blockage caused by excessive sludge is relieved to a certain extent. The initial rainwater collecting structure is simple in structure and low in manufacturing cost, the water quality purification efficiency of a drainage pipe network is improved, the urban secondary water purification rate can be reduced, and the local excellence progress of a sponge city is also improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to an urban rainwater purification structure, in particular to an urban initial rainwater collection system. Background Art

[0002] At present, most designs of parks and houses do not consider the collection and utilization of rainwater, resulting in a great waste of water resources. When it rains, rainwater and sewage mix, causing precious rainwater resources to flow away in vain. At present, my country is promoting the construction of sponge cities, with the aim of restoring the city's ability to regulate and store rainwater, so that rainwater can be stored during rainy days and can be infiltrated and released during droughts, in order to alleviate the problems of urban waterlogging during rainy days and water shortage during droughts. Existing sponge city technologies include permeable pavement, ecological grass ditch, infiltration gravel pipe trough, urban wetland, underground PP water storage module, underground reinforced concrete reservoir, etc.

[0003] Rainwater wells are used to drain rainwater from ground roads or gas pipelines. They have holes on their sides that are connected to drainage pipes, and seepage pipes extending downward at the bottom. They can replenish rainwater into the underground and drain excess rainwater through the drainage pipes, slowing down ground subsidence and preventing road surface flooding during heavy rains.

[0004] In the prior art, after a period of use, the drainage outlets of urban rainwater wells will produce silt inside, causing the drainage pipes to be blocked; the traditional drainage outlet dredging requires workers to enter the rainwater well to dredge, and the dredging process is very inconvenient. In addition, the collected rainwater is not efficiently purified and needs further purification for secondary use. At the same time, the various indicators of the collected rainwater are not easy to extract.

[0005] Therefore, an initial rainwater collection system with simple operation, high efficiency, excellent purification effect and detection effect is of great significance for rainwater collection and treatment in roads and cities.

[0006] In view of the above situation, technical innovation is carried out based on the existing urban initial rainwater collection system. Utility Model Content

[0007] The utility model aims to provide an urban initial rainwater collection system, which is a simple, efficient, and excellent purification and detection effect initial rainwater collection system.

[0008] The technical solution adopted by the utility model to solve its technical problems is: an urban initial rainwater collection system, including an urban rainwater well body structure and an initial rainwater collection structure connected to the urban rainwater well body structure, the initial rainwater collection structure includes a water inlet control pipe structure connected to the drainage pipe of the urban rainwater well body structure and a rainwater collection and filtration structure of the water inlet control pipe structure, the rainwater collection and filtration structure includes a rainwater collection main bin body, a preliminary filtration inner bin body arranged in the rainwater collection main bin body, an initial filtration body structure arranged in the preliminary filtration inner bin body, and a graded water body temporary bin arranged at the rear end of the preliminary filtration inner bin body, and the graded water body temporary bin is connected to the urban circulating water network.

[0009] The urban rainwater well body structure includes a well cover body, a well body side wall structure and an inner drainage pipe body arranged on one side of the well body side wall structure. An inner support platform, a built-in debris collection frame arranged on the inner support platform and a debris interception body are arranged at the port of the inner drainage pipe body.

[0010] The water inlet control pipe structure comprises a control water pipe connected to the outer end of the inner drainage pipe body, a water level controller component arranged outside the control water pipe, and a built-in control valve body arranged in the control water pipe body below the water level controller component.

[0011] The initial filter body structure includes a group of connecting side platforms arranged in the preliminary filter inner chamber, a filter plate clamp and an assembly arranged between two connecting side platforms, and a filter plate body arranged in the filter plate clamp and the assembly, and a connecting sleeve of a sleeved fixing rod is arranged on the upper part of the multiple filter plate clamps and the assembly.

[0012] A water inlet buffer bin is arranged at the front end of the preliminary filtering inner bin body, and a water quality detector is arranged in each of the preliminary filtering inner bin body, the water inlet buffer bin and the graded water body temporary bin.

[0013] Beneficial effects of the utility model: A new sludge collection area is added to the rainwater well, which can store a certain amount of sludge, saving manpower and material resources for subsequent cleaning work. It can alleviate the phenomenon of pipe blockage due to excessive sludge to a certain extent. The initial rainwater collection structure is simple in structure and low in cost, which improves the water purification efficiency of the drainage network, reduces the purification rate of urban secondary water use, and also improves the local optimization process of sponge cities.

[0014] The present invention will be described in more detail below with reference to the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the structure of the utility model.

[0016] Figure 2 for Figure 1 Schematic diagram of the water inlet control pipe structure.

[0017] Figure 3 for Figure 1 A partial top view of the preliminary filtering inner warehouse structure.

[0018] Figure 4 for Figure 3 A partial enlarged view of .

[0019] Figure 5 It is a schematic structural diagram of another implementation mode of the utility model.

[0020] Figure 6 for Figure 5 A partial top view of the improved preliminary filtration inner chamber structure.

[0021] In the figure: 1. Manhole cover body, 2. Manhole side wall structure, 3. Internal drainage pipe body, 4. Internal support platform, 5. Built-in debris collection frame, 6. Debris interception body, 7. Rainwater collection main warehouse body, 8. Preliminary filtration inner warehouse body, 9. Temporary storage for graded water bodies, 10. Urban circulating water network, 11. Control water pipe, 12. Water level controller assembly, 13. Built-in control valve body, 14. Connecting side platform, 15. Filter plate clamp and assembly, 16. Filter plate body, 17. Fixing rod, 18. Connecting sleeve, 19. Water inlet buffer warehouse, 20. Water quality detector. DETAILED DESCRIPTION

[0022] The directions or positional relationships indicated by the terms "upper", "lower", "inner", "outer", "front end", "rear end", "two ends", "one end", "the other end" and the like in the application text are based on the directions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific direction, be constructed and operate in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0023] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0024] Embodiment 1, as Figure 1-4 As shown, an urban initial rainwater collection system includes an urban rainwater well body structure and an initial rainwater collection structure connected to the urban rainwater well body structure;

[0025] The urban rainwater well body structure includes a well cover body 1, a well body side wall structure 2 and an inner drainage pipe body 3 arranged on one side of the well body side wall structure, an inner support platform 4 is arranged in the well body side wall structure, a built-in debris collection frame 5 is arranged on the inner support platform, and a debris interception body 6 is arranged at the port of the inner drainage pipe body.

[0026] The initial rainwater collection structure includes a water inlet control pipe structure connected to the inner drainage pipe body 3 of the urban rainwater well structure, and a rainwater collection and filtration structure connected to the water inlet control pipe structure. The rainwater collection and filtration structure includes a rainwater collection main bin 7, a preliminary filtration inner bin 8 arranged in the rainwater collection main bin, an initial filtration body structure arranged in the preliminary filtration inner bin, and a graded water body temporary bin 9 arranged at the rear end of the preliminary filtration inner bin. The graded water body temporary bin is connected to the urban circulating water network 10.

[0027] The water inlet control pipe structure includes a control water pipe 11 connected to the outer end of the inner drainage pipe, a water level controller assembly 12 arranged outside the control water pipe, and a built-in control valve body 13 arranged in the control water pipe body below the water level controller assembly.

[0028] The initial filter body structure includes a group of connecting side platforms 14 arranged in the preliminary filter inner chamber 8, a filter plate clamp and assembly 15 arranged between two connecting side platforms, and a filter plate body 16 arranged in the filter plate clamp and assembly, and a connecting sleeve 18 of a sleeved fixing rod 17 is arranged on the upper part of the multiple filter plate clamps and assemblies.

[0029] Embodiment 2, as Figure 5 , 6 As shown, on the basis of Example 1, rainwater is purified more effectively. A water inlet buffer bin 19 is arranged at the front end of the preliminary filtration inner bin, and a water quality detector 20 is arranged in each of the preliminary filtration inner bin, the water inlet buffer bin and the graded water body temporary bin.

[0030] The city's initial rainwater collection system has added a sludge collection area in the rainwater well, which can store a certain amount of sludge, saving manpower and material resources for subsequent cleaning work. It can alleviate the phenomenon of pipe blockage due to excessive sludge to a certain extent. The initial rainwater collection structure is simple in structure and low in cost. It improves the water purification efficiency of the drainage network, reduces the purification rate of urban secondary water use, and also improves the local optimization process of the sponge city.

[0031] The above embodiments are merely descriptions of the preferred implementation modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary engineering and technical personnel in the field shall fall within the protection scope determined by the claims of the present invention.

[0032] The parts not involved in the present invention are the same as the prior art or can be implemented by using the prior art.

Claims

1. An urban initial rainwater collection system, comprising an urban rainwater well body structure and an initial rainwater collection structure connected to the urban rainwater well body structure, characterized in that: The initial rainwater collection structure includes a water inlet control pipe structure connected to the drainage pipe of the urban rainwater well structure and a rainwater collection and filtration structure of the water inlet control pipe structure. The rainwater collection and filtration structure includes a rainwater collection main bin, a preliminary filtration inner bin arranged in the rainwater collection main bin, an initial filtration body structure arranged in the preliminary filtration inner bin, and a graded water body temporary bin arranged at the rear end of the preliminary filtration inner bin; the graded water body temporary bin is connected to the urban circulating water network.

2. The urban initial rainwater collection system according to claim 1, characterized in that: The urban rainwater well body structure includes a well cover body, a well body side wall structure and an inner drainage pipe body arranged on one side of the well body side wall structure, an inner support platform arranged in the well body side wall structure, a built-in debris collection frame arranged on the inner support platform and a debris interception body arranged at the port of the inner drainage pipe body.

3. The urban initial rainwater collection system as claimed in claim 2, characterized in that: The water inlet control pipe structure comprises a control water pipe connected to the outer end of the inner drainage pipe body, a water level controller component arranged outside the control water pipe, and a built-in control valve body arranged in the control water pipe body below the water level controller component.

4. The urban initial rainwater collection system according to claim 1, characterized in that: The initial filter body structure includes a group of connecting side platforms arranged in the preliminary filter inner chamber, a filter plate clamp and an assembly arranged between two connecting side platforms, and a filter plate body arranged in the filter plate clamp and the assembly, and a connecting sleeve of a sleeved fixing rod is arranged on the upper part of the multiple filter plate clamps and the assembly.

5. The urban initial rainwater collection system according to claim 1, characterized in that: A water inlet buffer bin is arranged at the front end of the preliminary filtering inner bin body, and a water quality detector is arranged in each of the preliminary filtering inner bin body, the water inlet buffer bin and the graded water body temporary bin.