Transfer truss adopting retard-bonded prestress
By using slow-bonded prestressed mechanisms and C60 self-compacting fine stone concrete at the transfer truss nodes, the problems of steel bar intersection and concrete pouring difficulties in traditional transfer trusses are solved, and a more efficient, stable and economical structural construction plan is achieved.
Patent Information
- Application Number
- CN202420067744.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-10
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-01-10
AI Technical Summary
The design and construction of traditional transfer trusses at the nodes are complicated. It is difficult to intersect ordinary steel bars and prestressed steel bars, and it is difficult to pour concrete. In particular, the large diameter of bonded prestressed corrugated pipes makes it difficult to penetrate beams, and it is difficult to pour concrete with dense nodes.
Adopt a slowly bonded prestressed conversion truss design, including upper chord bars, vertical web bars, oblique web bars and lower chord bars, set up a slowly bonded prestressed mechanism and limiting columns, and insert prestressed tendons in the form of curves to provide preload, and Use C60 self-compacting fine stone concrete, add steel bars and haunch dense steel bars to strengthen the structure.
It effectively solves the problem of steel bar intersection in node design, simplifies the construction process, improves construction efficiency and structural safety, reduces the difficulty of concrete pouring, and provides better durability and structural protection.
Smart Images

Figure CN221855957U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of prestressed concrete, and particularly relates to a conversion truss adopting slow-bonding prestress. Background Art
[0002] When using concrete transfer trusses in public buildings such as large venues, business conferences and railway stations, node design is a key issue. In traditional transfer trusses, there are complex design and construction problems at the nodes where multiple web members meet the upper (lower) chord members. At these nodes, ordinary steel bars and prestressed steel bars need to intersect in multiple directions, which makes the design and layout very difficult, and the pouring of concrete also faces a series of challenges.
[0003] The Chinese utility model patent with the current announcement number: CN215166539U discloses a large-span conversion truss with temporary support, which is provided with a conversion truss, a temporary support frame and embedded parts. The conversion truss includes multiple truss sections, and embedded parts are arranged at the lower floor corresponding to the intersection of the truss section connection. The bottom of the temporary support frame is connected to the embedded parts, and the top of the temporary support frame is connected to the bottom of the truss section end through a rigid circular tube or a sand box. By arranging a temporary support frame below the truss section position of the large-span conversion truss, the truss section connection is fixed, positioned and supported, so that the truss sections will not swing or misalign when docking, and the installation and construction quality of the conversion truss can be guaranteed; in addition, the bottom of the temporary support frame is fixedly connected to the embedded parts arranged on the lower floor, which enhances the stability of the support. Therefore, the arrangement of the temporary support frame can also reduce the safety risk of aerial operations. The temporary support frame is a detachable structure and can be reused.
[0004] The conversion truss in this patent is a traditional conversion truss, which uses bonded prestressed corrugated pipes. Traditional bonded prestressed corrugated pipes have large diameters and are difficult to thread, and the nodes are densely packed with concrete and difficult to pour. Utility Model Content
[0005] The utility model aims to provide a conversion truss using slow-bonded prestressing, which solves the problem that the traditional conversion truss uses bonded prestressed corrugated pipes, which have large diameters and are difficult to thread, and the nodes are densely packed with concrete and difficult to pour.
[0006] The above technical purpose of the utility model is achieved through the following technical scheme: a conversion truss using slow-bonding prestressing, comprising an upper chord, a vertical web, a diagonal web and a lower chord, wherein the vertical web is arranged on the surface of the upper chord, the vertical web is arranged vertically, the diagonal web is arranged on the surface of the upper chord and is inclined, the lower chord is arranged at the other end of the vertical web and the diagonal web, the vertical web and the diagonal web converge at a point on the surface of the lower chord, and the upper chord, the vertical web, the diagonal web and the lower chord are all provided with slow-bonding prestressing mechanisms inside.
[0007] By adopting the above technical scheme, an upper chord, vertical webs, diagonal webs, a lower chord and a slow-bonding prestressing mechanism are arranged. When in use, the vertical webs are arranged between the upper chord and the lower chord and are arranged vertically, and the vertical webs are arranged obliquely between the upper chord and the lower chord. The slow-bonding prestressing mechanism can be inserted into the vertical webs, diagonal webs, the lower chord and the upper chord in a curved form, and the prestress of the structure is provided through the prestressing action, thereby effectively solving the problem of the intersection of ordinary steel bars and prestressed steel bars in traditional node design.
[0008] The utility model is further configured as follows: the slow-bonding prestressing mechanism includes limit columns and slow-bonding prestressing tendons, the number of the limit columns is several, the limit columns are respectively arranged inside the upper chord, vertical web members, diagonal web members and lower chord and are staggered, the slow-bonding prestressing tendons are arranged inside the upper chord, vertical web members, diagonal web members and lower chord, the slow-bonding prestressing tendons are bent on the limit columns, the number of the slow-bonding prestressing tendons is several and arranged linearly.
[0009] By adopting the above technical scheme, by setting limit columns and slow-bonding prestressed tendons, when in use, the limit columns are set inside the upper chord, vertical webs, diagonal webs and lower chord, so that the slow-bonding prestressed tendons bypass the limit columns, and the slow-bonding prestressed tendons are bent inside the upper chord, vertical webs, diagonal webs and lower chord, and the prestress of the structure is provided through the prestressing effect, thereby effectively solving the problem of the intersection of ordinary steel bars and prestressed steel bars in traditional node design.
[0010] The utility model is further configured as follows: the upper chord, vertical web members, diagonal web members and lower chord members are reinforced concrete structures cast with C60 self-compacting concrete.
[0011] By adopting the above technical scheme, C60 self-compacting fine stone concrete is used by setting the materials of the upper chord, vertical web members, diagonal web members and lower chord members to solve some problems existing in the traditional transfer trusses, such as the large diameter of the bonded prestressed corrugated pipe is difficult to thread, the node dense steel bar construction is difficult and the node dense concrete is difficult to pour. At the same time, the use of C60 self-compacting fine stone concrete not only solves the problem of the difficulty of concrete pouring, but also provides better durability and structural protection.
[0012] The utility model is further configured as follows: the two ends of the slow-bonding prestressed tendons extend to the outside of the upper chord, the vertical web, the diagonal web and the lower chord respectively, the two ends of the slow-bonding prestressed tendons are provided with threaded structures, the two ends of the slow-bonding prestressed tendons are provided with fixing covers, and the fixing covers are threadedly connected to the two ends of the slow-bonding prestressed tendons.
[0013] By adopting the above technical solution, a fixing cover is set, and when in use, the fixing cover is threadedly connected to both ends of the slow-bonding prestressed tendons, so that the slow-bonding prestressed tendons can be fixed to prevent the slow-bonding prestressed tendons from shaking in the upper chord, vertical web, diagonal web and lower chord.
[0014] The utility model is further configured as follows: a reinforced reinforcement steel bar is arranged at the intersection of the vertical web member, the diagonal web member and the lower chord member.
[0015] By adopting the above technical solution, by arranging additional reinforcement bars, which are arranged at the intersection of vertical web members, diagonal web members and lower chord members, the connection of the structure can be strengthened and the overall rigidity can be increased.
[0016] The utility model is further configured as follows: the upper chord is provided with upper chord reinforcement, the vertical web is provided with vertical web reinforcement, the diagonal web is provided with diagonal web reinforcement, and the lower chord is provided with lower chord reinforcement. The upper chord reinforcement, vertical web reinforcement, diagonal web reinforcement and lower chord reinforcement are in a plurality and are linearly arranged in the upper chord, vertical web, diagonal web and lower chord, respectively.
[0017] By adopting the above technical solution, the rigidity and bearing capacity of the structure can be increased by arranging upper chord reinforcement, vertical web reinforcement, diagonal web reinforcement and lower chord reinforcement.
[0018] The utility model is further configured as follows: the surfaces of the upper chord rod, the vertical web rod, the diagonal web rod and the lower chord rod are provided with an anti-rust coating.
[0019] By adopting the above technical solution and providing an anti-rust coating, it is possible to avoid rust on the upper chord, the vertical web, the diagonal web and the lower chord.
[0020] In summary, the utility model has the following beneficial effects:
[0021] By arranging an upper chord, vertical web members, diagonal web members, a lower chord and a slow-bonding prestressed mechanism, when in use, the vertical web members are arranged between the upper chord and the lower chord and are arranged vertically, and the vertical web members are arranged obliquely between the upper chord and the lower chord, wherein the slow-bonding prestressed mechanism can be inserted into the vertical web members, diagonal web members, the lower chord and the upper chord in a curved form, and the prestress of the structure is provided through the prestressed action, thereby effectively solving the problem of the intersection of ordinary steel bars and prestressed steel bars in traditional node design.
[0022] By setting limit columns and slow-bonding prestressed tendons, when in use, the limit columns are set inside the upper chord, vertical webs, diagonal webs and lower chord, so that the slow-bonding prestressed tendons bypass the limit columns, and the slow-bonding prestressed tendons are bent inside the upper chord, vertical webs, diagonal webs and lower chord, and the prestress of the structure is provided through the prestressed action, thereby effectively solving the problem of the intersection of ordinary steel bars and prestressed steel bars in traditional node design.
[0023] Based on the above-mentioned improvements, the overall technical effect achieved by this device is that it can reduce the construction process and construction period, improve construction efficiency, ensure the construction quality and structural safety of the nodes, and achieve more efficient, stable and economical structural solutions in public buildings by adopting the conversion truss node design with slow-bonding prestressing. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0025] Figure 2 It is a structural schematic diagram of the slow-bonding prestressing mechanism of the utility model;
[0026] Figure 3 The utility model Figure 2 Enlarged view of point A in the middle.
[0027] In the figure, 1. upper chord; 2. vertical web member; 3. diagonal web member; 4. lower chord; 5. slow-bonding prestressed structure; 6. fixed cover; 7. axil reinforcement; 8. upper chord reinforcement; 9. vertical web member reinforcement; 10. diagonal web member reinforcement; 11. lower chord reinforcement; 501. limit column; 502. slow-bonding prestressed tendons. DETAILED DESCRIPTION
[0028] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0029] Example:
[0030] See also Figure 1-Figure 3The utility model provides a technical solution: a conversion truss adopting slow-bonding prestressing, comprising an upper chord 1, a vertical web member 2, a diagonal web member 3 and a lower chord 4, wherein the vertical web member 2 is arranged on the surface of the upper chord 1, the vertical web member 2 is arranged vertically, the diagonal web member 3 is arranged on the surface of the upper chord 1 and is arranged obliquely, the lower chord 4 is arranged at the other end of the vertical web member 2 and the diagonal web member 3, the vertical web member 2 and the diagonal web member 3 converge at a point on the surface of the lower chord 4, and the upper chord 1, the vertical web member 2, the diagonal web member 3 and the lower chord 4 are all provided with a slow-bonding prestressing mechanism 5 inside. By setting an upper chord 1, a vertical web member 2, a diagonal web member 3, a lower chord 4 and a slow-bonding prestressing mechanism 5, when in use, the vertical web member 2 is arranged between the upper chord 1 and the lower chord 4 and is arranged vertically, and the vertical web member 2 is arranged obliquely between the upper chord 1 and the lower chord 4, wherein the slow-bonding prestressing mechanism 5 can be inserted into the vertical web member 2, the diagonal web member 3, the lower chord 4 and the upper chord 1 in a curved form, and the prestress of the structure is provided through the prestressing action, thereby effectively solving the problem of the intersection of ordinary steel bars and prestressed steel bars in traditional node design.
[0031] refer to Figure 2 The slow-bonding prestressing mechanism 5 includes a limit column 501 and a slow-bonding prestressing tendon 502. The limit columns 501 are in a plurality and are arranged inside the upper chord 1, the vertical web member 2, the diagonal web member 3 and the lower chord 4 and are staggered. The slow-bonding prestressing tendons 502 are arranged inside the upper chord 1, the vertical web member 2, the diagonal web member 3 and the lower chord 4. The slow-bonding prestressing tendons 502 are bent on the limit columns 501. The slow-bonding prestressing tendons 502 are in a plurality and are arranged linearly. A limit column 501 and a slow-bonding prestressed tendon 502 are arranged. When in use, the limit column 501 is arranged inside the upper chord 1, the vertical web member 2, the diagonal web member 3 and the lower chord 4, so that the slow-bonding prestressed tendon 502 bypasses the limit column 501, and the slow-bonding prestressed tendon 502 is in a bent state inside the upper chord 1, the vertical web member 2, the diagonal web member 3 and the lower chord 4, and the prestress of the structure is provided through the prestressing effect, thereby effectively solving the problem of the intersection of ordinary steel bars and prestressed steel bars in traditional node design.
[0032] refer to Figure 1 The upper chord 1, vertical web members 2, diagonal web members 3 and lower chord 4 are reinforced concrete structures cast with C60 self-compacting concrete. By setting the material of the upper chord 1, vertical web members 2, diagonal web members 3 and lower chord 4, C60 self-compacting fine stone concrete is used to solve some problems existing in traditional conversion trusses, such as the large diameter of the bonded prestressed corrugated pipe is difficult to pass through, the node steel bars are densely constructed and the nodes are difficult to cast. At the same time, the use of C60 self-compacting fine stone concrete not only solves the problem of difficulty in concrete casting, but also provides better durability and structural protection.
[0033] refer to Figure 3The two ends of the slow-bonding prestressed tendon 502 extend to the outside of the upper chord 1, the vertical web 2, the diagonal web 3 and the lower chord 4 respectively, and the two ends of the slow-bonding prestressed tendon 502 are provided with a threaded structure, and the two ends of the slow-bonding prestressed tendon 502 are provided with a fixing cover 6, and the fixing cover 6 is threadedly connected to the two ends of the slow-bonding prestressed tendon 502. By setting the fixing cover 6, the fixing cover 6 is threadedly connected to the two ends of the slow-bonding prestressed tendon 502 when in use, so that the slow-bonding prestressed tendon 502 can be fixed to prevent the slow-bonding prestressed tendon 502 from shaking in the upper chord 1, the vertical web 2, the diagonal web 3 and the lower chord 4.
[0034] refer to Figure 1 The intersection of the vertical web members 2, the diagonal web members 3 and the lower chord members 4 is provided with axillary densifying steel bars 7. By providing the axillary densifying steel bars 7, the axillary densifying steel bars 7 are provided at the intersection of the vertical web members 2, the diagonal web members 3 and the lower chord members 4, the connection of the structure can be strengthened and the overall stiffness can be increased.
[0035] refer to Figure 1 The upper chord 1 is provided with an upper chord steel bar 8, the vertical web member 2 is provided with a vertical web member steel bar 9, the diagonal web member 3 is provided with a diagonal web member steel bar 10, and the lower chord 4 is provided with a lower chord steel bar 11. The upper chord steel bar 8, the vertical web member steel bar 9, the diagonal web member steel bar 10 and the lower chord steel bar 11 are in plurality and are linearly arranged in the upper chord 1, the vertical web member 2, the diagonal web member 3 and the lower chord 4 respectively. By arranging the upper chord steel bar 8, the vertical web member steel bar 9, the diagonal web member steel bar 10 and the lower chord steel bar 11, the stiffness and bearing capacity of the structure can be increased.
[0036] refer to Figure 1 The surfaces of the upper chord 1, the vertical web 2, the diagonal web 3 and the lower chord 4 are provided with an anti-rust coating. By providing the anti-rust coating, the upper chord 1, the vertical web 2, the diagonal web 3 and the lower chord 4 can be prevented from rusting.
[0037] Brief description of the use process: when in use, firstly, the vertical web member 2 is arranged between the upper chord member 1 and the lower chord member 4 and is arranged vertically, and the vertical web member 2 is arranged obliquely between the upper chord member 1 and the lower chord member 4, and then the limit column 501 is arranged inside the upper chord member 1, the vertical web member 2, the diagonal web member 3 and the lower chord member 4, so that the slow-bonding prestressed tendon 502 bypasses the limit column 501, so that the slow-bonding prestressed tendon 502 is in a bent state inside the upper chord member 1, the vertical web member 2, the diagonal web member 3 and the lower chord member 4, and the prestress of the structure is provided through the prestressing effect, thereby effectively solving the problem of the intersection of ordinary steel bars and prestressed steel bars in traditional node design, and then Later, C60 self-compacting fine stone concrete was used to solve some problems existing in traditional conversion trusses, such as the large diameter of the bonded prestressed corrugated pipe that is difficult to thread, the dense node steel bars that are difficult to construct, and the dense node concrete that is difficult to pour. At the same time, the use of C60 self-compacting fine stone concrete not only solves the problem of difficulty in concrete pouring, but also provides better durability and structural protection. Then, the fixing cover 6 is threadedly connected to both ends of the slow-bonding prestressed tendon 502, which can fix the slow-bonding prestressed tendon 502 and prevent the slow-bonding prestressed tendon 502 from shaking in the upper chord 1, vertical web 2, diagonal web 3 and lower chord 4.
[0038] This specific embodiment is merely an explanation of the present invention and is not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to the present embodiment as needed, but such modifications are protected by patent law as long as they are within the scope of the claims of the present invention.
Claims
1. A conversion truss using slow-bonding prestressing, comprising an upper chord (1), a vertical web member (2), a diagonal web member (3) and a lower chord member (4), characterized in that: The vertical web member (2) is arranged on the surface of the upper chord (1), the vertical web member (2) is arranged vertically, the diagonal web member (3) is arranged on the surface of the upper chord (1) and is arranged obliquely, the lower chord (4) is arranged at the other end of the vertical web member (2) and the diagonal web member (3), the vertical web member (2) and the diagonal web member (3) converge at a point on the surface of the lower chord (4), and the upper chord (1), the vertical web member (2), the diagonal web member (3) and the lower chord (4) are all provided with a slow-bonding prestressing mechanism (5) inside. The slow-bonding prestressed structure (5) comprises a limiting column (501) and a slow-bonding prestressed tendon (502). The limiting columns (501) are in a plurality and are arranged inside the upper chord (1), the vertical web (2), the diagonal web (3) and the lower chord (4) in a staggered manner. The slow-bonding prestressed tendon (502) is arranged inside the upper chord (1), the vertical web (2), the diagonal web (3) and the lower chord (4). The slow-bonding prestressed tendon (502) is bent on the limiting column (501). The slow-bonding prestressed tendon (502) is in a plurality and is arranged linearly.
2. A conversion truss using slow-bonding prestressing according to claim 1, characterized in that: The upper chord (1), vertical web members (2), diagonal web members (3) and lower chord (4) are reinforced concrete structures cast using C60 self-compacting concrete.
3. The conversion truss using slow-bonding prestressing according to claim 1, characterized in that: The two ends of the slow-bonding prestressed tendon (502) extend to the outside of the upper chord (1), the vertical web (2), the diagonal web (3) and the lower chord (4) respectively, and the two ends of the slow-bonding prestressed tendon (502) are provided with threaded structures. The two ends of the slow-bonding prestressed tendon (502) are provided with fixing covers (6), and the fixing covers (6) are threadedly connected to the two ends of the slow-bonding prestressed tendon (502).
4. The conversion truss using slow-bonding prestressing according to claim 1 is characterized in that: The intersection of the vertical web members (2), the diagonal web members (3) and the lower chord member (4) is provided with reinforced reinforcement steel bars (7).
5. The conversion truss using slow-bonding prestressing according to claim 1 is characterized in that: The upper chord bar (1) is provided with an upper chord bar steel bar (8), the vertical web bar (2) is provided with a vertical web bar steel bar (9), the diagonal web bar (3) is provided with a diagonal web bar steel bar (10), and the lower chord bar (4) is provided with a lower chord bar steel bar (11). The upper chord bar steel bar (8), the vertical web bar steel bar (9), the diagonal web bar steel bar (10) and the lower chord bar steel bar (11) are provided in a plurality and are linearly arranged in the upper chord bar (1), the vertical web bar (2), the diagonal web bar (3) and the lower chord bar (4), respectively.
6. The conversion truss using slow-bonding prestressing according to claim 1, characterized in that: The surfaces of the upper chord (1), the vertical web (2), the diagonal web (3) and the lower chord (4) are provided with an anti-rust coating.