Construction method of special-shaped large-section prestressed annular frame beam
By using high-performance concrete and customized formwork systems in the construction of special-shaped large-section prestressed annular frame beams, layered casting and oblique vibration, the problems of high construction difficulty and concrete temperature rise are solved, and the uniform casting and structure of concrete are achieved. stability.
Patent Information
- Application Number
- CN202411175674.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-22
AI Technical Summary
In soil-covered buildings, the construction of special-shaped large-section prestressed annular frame beams is difficult, and it is easy to cause problems such as uneven local concrete vibration and excessive appreciation of concrete temperature, especially due to the large volume and dense steel bars, the cooling water pipes are difficult to insert, resulting in concrete Cracking.
High-performance concrete is used to divide the construction sections, layered casting and reserved post-pouring tapes, set up formwork system, arrange temperature monitoring points and tension control equipment, and use oblique vibration and chutes to ensure the quality and uniform temperature of concrete casting sex.
Through layered casting and custom-made formwork systems, we ensure the construction efficiency and structural stability of concrete, reduce the internal temperature of concrete, avoid concrete cracking, and improve construction progress and molding quality.
Smart Images

Figure CN118997482A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of civil engineering, in particular to a method for constructing a special-shaped large-section prestressed annular frame beam. Background Art
[0002] In the earth-covered building, there is a large concrete ring beam, the general situation of which is as follows: the beam cross section is a parallelogram with dimensions of 6.3m (b) × 4.3m (h), the inner side is a hyperbolic ring with an inner diameter circumference of 369m and an outer diameter circumference of 432m; the molding effect is required to be plain concrete; according to design calculations, the overall concrete material consumption is about 1,100 cubic meters; at the same time, because it plays a key force-bearing role of "bridging the upper and lower parts" in the entire building, its interior must be densely reinforced with steel bars and a prestressed pipe in the middle.
[0003] For the above-mentioned special-shaped large-section prestressed annular frame beams, if conventional construction methods are adopted, that is, first tying the steel bars layer by layer from bottom to top, threading the prestressed pipes as the steel bars are tied, then installing the formwork, and finally pouring concrete for construction, it is very likely that problems such as uneven vibration of local concrete and excessive temperature rise of concrete will occur.
[0004] The main reasons for the above problems are: 1. The overall volume is large and the internal steel bars are dense, so it is difficult to ensure the continuous supply of concrete and the pouring quality; 2. Due to its large volume, the cement hydration process will release a large amount of heat, which may easily lead to a large temperature difference between the internal and surface concrete, thus causing concrete cracking.
[0005] 3. The traditional solution to the problem of large temperature difference between the inner and outer surfaces of large-volume concrete is to adopt cooling measures, such as inserting cooling water pipes inside the structure. However, when the steel bars are too dense, the gaps between the steel bars are very small, making it difficult to insert the cooling water pipes. Summary of the invention
[0006] The present invention aims to overcome the defects of the prior art and provide a method for constructing a prestressed annular frame beam with a special shape and a large cross-section, so as to solve the problem that the construction of the annular frame beam with a special shape and a large cross-section is difficult.
[0007] In order to solve the above-mentioned technical problems, the present invention is achieved as follows: A method for constructing a special-shaped large-section prestressed annular frame beam, characterized in that it comprises the following steps: Step 1: Select or mix high performance concrete; Step 2: Divide the construction sections; Step 3: Formwork setup: Step 4: Tie the steel bars of the ring beam, insert and fix the corrugated pipe, reserve holes for anchoring the seam bars at the post-casting belt, and arrange the temperature monitoring points and the pressure ring and strain gauge for tension control after the steel bars are tied. The temperature monitoring points are arranged along the axis of the ring beam; Step 5: Pour the concrete in layers, with each layer being no thicker than 500mm. Add a chute every 3m to allow the concrete to be poured to the bottom. Step 6: Template removal; Step 7: Prestressing is performed in the tensioning sequence, and the tensioning sequence is symmetrical starting from the top; Step 8: Complete segmented tensioning and inspect and accept; Step 9: Pour the post-casting belt. During the pouring process, attention should be paid to vibrating and compacting. Use concrete of a higher grade for pouring. Pour in layers to reduce the internal temperature of the concrete. Step 10: Overall acceptance of ring beam.
[0008] The method for constructing a special-shaped large-section prestressed annular frame beam is characterized in that: in step 1, the high-performance concrete is selected from silicate cement concrete, slag cement concrete, and polymer modified concrete.
[0009] The method for constructing a special-shaped large-section prestressed annular frame beam is characterized in that: in step 2, the ring beam is divided into 12 sections for construction, and a post-casting strip is reserved in the middle. The post-casting strip is divided into 12 strips in total, which are divided into 4 flow sections for simultaneous construction. Each construction flow section has 3 post-casting strips, and flow construction is carried out from the northwest and southeast directions to both sides, so as to achieve turnover of on-site materials.
[0010] The method for constructing a special-shaped large-section prestressed annular frame beam is characterized in that step 3 specifically comprises: Step 3.1, according to the segmentation plan, prepare the post-casting strip support structure, which mainly includes support rods, and the support rods are connected to the main ribs of the formwork through tie rods; Step 3.2, a corresponding formwork system is made for each section of the ring beam, the formwork system includes support trusses respectively arranged on the inner and outer sides of the ring beam section and steel formworks arranged on the trusses; wherein the support trusses respectively arranged on the inner and outer sides of the ring beam section are provided with different support structures according to the curve of the cross-section shape of the ring beam, and the formwork systems between the ring beam sections are connected by the post-casting belt support structure; a steel springboard is arranged at the bottom of the formwork system, and the bottom formwork adopts a steel plate combined with an I-steel keel; the side formwork adopts a ribbed steel formwork; Step 3.3: Make the outer large ring beam operating frame around each formwork system: use the disc-type scaffolding to set up, with the bar size of 0.9m horizontal distance, 1.5m vertical distance and 1.5m step distance; Step 3.4, make the post-cast strip template: due to the large cross-section of the ring beam and the large number of longitudinal steel bars, it is difficult to temporarily seal the post-cast strip template. The main bars are connected all around the beam, and the middle longitudinal steel bars are reinforced. Wire mesh is used as the template in the outer ring main reinforcement area. The main bars pass directly through the wire mesh, and the internal area uses a steel template. A straight threaded sleeve is connected to the end of the internal steel bar. The post-cast strip steel bars are connected to the large ring beam steel bars as a whole through a straight threaded sleeve. The bottom and inner steel templates are uniformly erected, and the outer wooden templates are erected in sections after each section of steel bars is tied. At the same time, an attached vibrator is added every 1m on the side template of each construction section.
[0011] The method for constructing a special-shaped large-section prestressed annular frame beam is characterized in that: in step 4, 3 temperature measuring points are arranged in each section, and 9 temperature measuring points are arranged at each point from top to bottom. The pressure ring is arranged at the anchor of the prestressed tensioning end, and the strain gauge is posted on the surface after the concrete pouring is completed.
[0012] The method for constructing a special-shaped large-section prestressed annular frame beam is characterized in that step 5 specifically comprises: Step 5.1, use a vibrating rod of φ70 / φ50, and the vibrating points should be increased at the corners of the post-casting belt and construction joints, and the vibration time should be extended. After the concrete is poured, the secondary vibration and finishing time is determined according to the state of the concrete after entering the mold. The ring beam reinforcement is dense and the horizontal main reinforcement is arranged in an oblique direction. The reinforcement is dense, and the vibrating rod cannot vibrate vertically. It needs to vibrate obliquely. Therefore, the vibrating rod conduit must be pre-buried in advance during the reinforcement binding process. The spacing between the vibrating rod conduits is controlled at about 600mm to facilitate the oblique vibration of the vibrating rod; Step 5.2: Install a flat vibrator at an interval of 600mm on the inclined surface, and open a vibration opening at an interval of 500mm to assist the vibration of the inclined surface of the ring beam and prevent the upper surface from being loosely vibrated; Step 5.3, set up the chute: the height of the large ring beam is 4.3m high. When pouring concrete, it is easy to cause concrete segregation when using a sky pump to vertically release concrete. A 300*300 concrete discharge port is opened at an interval of 1500mm at a height of 2m in the middle of the inclined surface, and a 150*150 concrete chute is set at an interval of 2m in the middle of the ring beam during construction to prevent the bottom concrete from segregating. Considering the density of steel bars and the shape of the ring beam, the concrete chute is divided into two sections. The first section is at the steel bar binding At the same time, a 150*150 square tube is pre-buried obliquely in the middle of the steel bar along the angle of the steel bar. The conduit is about 1m away from the bottom, and the top of the conduit is about 50mm away from the concrete surface. If the steel bar is touched when the first section of the concrete conduit is pre-buried, the steel bar needs to be staggered to the left or right. The circumferential spacing of the bottom conduit is controlled at about 5m. Because it is pre-buried obliquely, the first section of the conduit cannot be taken out later. The second section of the conduit has a trumpet chute at the top, which is connected to the upper part of the first section of the chute when pouring concrete to ensure smooth flow of concrete.
[0013] The beneficial effects of the present invention are as follows: It can be seen from the above technical scheme that the present application provides a method for constructing a prestressed annular frame beam with a large cross-section and a special shape, which is improved and planned from three aspects: concrete mix ratio, mold, and construction area division, and high-performance concrete is selected to ensure that the construction efficiency and the durability and stability of the structure meet the design requirements; the ring beam is divided into 12 sections for construction, and a post-casting strip is reserved in the middle. The site is divided into 4 flow sections for simultaneous construction, and each construction flow section is 3 post-casting strips, which are constructed from the northwest and southeast directions to both sides, so as to achieve the effect of on-site material turnover and reduce the demand intensity of concrete supply; a segmented mold system of steel molds and wooden molds with customized structures and shapes is used in conjunction with supporting trusses to fit the shape of the ring beam, solving the problem of special-shaped templates required for the special-shaped surface of the ring beam; at the same time, the total weight of a single section of the ring beam is 730 tons, and the bottom mold of the mold system adopts a steel plate combined with an I-beam keel; the side mold adopts a ribbed steel template, and is reinforced with truss support to ensure that the template has sufficient strength and does not deform; at the same time, it also ensures the quality of concrete casting and molding and the construction progress. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments: Figure 1 This is a schematic diagram of the post-cast strip.
[0015] Figure 2 This is the cross-section diagram of the ring beam.
[0016] Figure 3 This is the pump pipe layout diagram.
[0017] Figure 4 This is a schematic diagram of layered pouring.
[0018] Figure 5 Schematic diagram of the chute. DETAILED DESCRIPTION
[0019] The technical solutions of the embodiments of the present application will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. All other embodiments obtained by ordinary technicians in this field without creative work based on the embodiments in the embodiments of the present application are within the scope of protection requested by the present application. like Figure 1 , 2 3: A method for constructing a prestressed annular frame beam with a special-shaped large cross-section, comprising the following steps: Step 1: Considering the complex structure inside the special-shaped large-section ring frame structure beam to be built and the stress requirements, concrete with large hydration heat, high expansion and good workability is selected to ensure that the performance of the concrete, construction efficiency and durability and stability of the structure meet the design requirements. The concrete selected here can be selected from silicate cement concrete, slag cement concrete, polymer modified concrete and high-performance concrete, and the formula and proportion can be adjusted as needed; (the specific concrete formula is to be applied for separately) Step 2: Divide the construction sections: Considering the tension length and the curvature of the ring beam, the ring beam is divided into 12 sections for construction, and a post-casting strip is reserved in the middle. According to the structural characteristics and overlap relationship, the post-casting strip is divided to ensure the overall construction schedule of the space ring beam and the positioning of the post-casting strip in the design drawing. There are 12 post-casting strips in total. The site is divided into 4 flow sections for simultaneous construction. Each construction flow section has 3 post-casting strips, which are constructed from the northwest and southeast directions to both sides, so as to achieve the effect of on-site material turnover; Step 3: Formwork setup: Step 3.1, according to the segmentation plan, prepare the post-casting strip support structure, which mainly includes support rods, and the support rods are connected to the main ribs of the formwork through tie rods; Step 3.2, a corresponding formwork system is made for each section of the ring beam, the formwork system includes support trusses respectively arranged on the inner and outer sides of the ring beam section and steel formworks arranged on the trusses; wherein the support trusses respectively arranged on the inner and outer sides of the ring beam section are provided with different support structures according to the curve of the cross-section shape of the ring beam, and the formwork systems between the ring beam sections are connected by the post-casting belt support structure; a steel springboard is arranged at the bottom of the formwork system, and the bottom formwork adopts a steel plate combined with an I-steel keel; the side formwork adopts a ribbed steel formwork; Step 3.3: Make the outer large ring beam operating frame around each formwork system: use the disc-type scaffolding to set up, with the bar size of 0.9m horizontal distance, 1.5m vertical distance and 1.5m step distance; Step 3.4, make the post-casting strip template: Due to the large cross-section of the ring beam and the large number of longitudinal steel bars, it is difficult to temporarily seal the post-casting strip template. The main bars are connected all around the beam, and the middle longitudinal steel bars are used. Wire mesh is used as the template in the outer ring main reinforcement area. The main bars pass directly through the wire mesh. Steel templates are used in the internal area. Straight threaded sleeves are connected to the ends of the internal steel bars. The post-casting strip steel bars are connected to the large ring beam steel bars as a whole through straight threaded sleeves. The bottom and inner steel templates are uniformly erected, and the outer wooden templates are erected in sections after each section of steel bars is tied. At the same time, an attached vibrator is added every 1m on the side templates of each construction section; Step 4: Tie the steel bars of the ring beam, insert and fix the corrugated pipe, reserve the anchor holes of the seam needle bars at the post-casting strip, arrange the temperature monitoring points and the pressure ring and strain gauge for tension control after the steel bars are tied, and the temperature monitoring points are arranged along the axis of the ring beam, with 3 temperature measuring points arranged in each section, and 9 temperature measuring points arranged from top to bottom at each point. The pressure ring is arranged at the anchor of the prestressed tension end, and the strain gauge is posted on the surface after the concrete is poured in the later stage; Step 5: Figure 4 As shown: concrete is poured in layers, with each layer being no thicker than 500mm, and a chute is added every 3m so that the concrete can be poured to the bottom; where: Step 5.1. Use a φ70 / φ50 vibrator. The vibration points should be increased at the corners of the post-casting strips and construction joints, and the vibration time should be extended. After the concrete is poured, the second vibration and finishing time should be determined according to the state of the concrete after entering the mold. The ring beam reinforcement is dense and the horizontal main reinforcement is arranged in an oblique direction. The reinforcement is dense, so the vibrator cannot vibrate vertically and needs to be vibrated obliquely. Therefore, the vibrator guide tube needs to be pre-buried in advance during the reinforcement binding process. The spacing between the vibrator guide tubes is controlled at about 600mm to facilitate the oblique vibration of the vibrator. Step 5.2: Install a flat vibrator at an interval of 600mm on the inclined surface, and open a vibration opening at an interval of 500mm to assist the vibration of the inclined surface of the ring beam and prevent the upper surface from being loosely vibrated; Step 5.3: Figure 5As shown: Setting the chute: The height of the large ring beam is 4.3m. When pouring concrete, using a sky pump to vertically release concrete is prone to concrete segregation. A 300*300 concrete discharge port is opened at an interval of 1500mm at a height of 2m in the middle of the inclined surface, and a 150*150 concrete chute is set at an interval of 2m in the middle of the ring beam during construction to prevent the bottom concrete from segregating. Considering the steel density and the shape of the ring beam, the concrete chute is divided into two sections. The first section is Pre-embed the 150*150 square tube obliquely along the angle of the steel bar in the middle of the steel bar. The distance between the conduit and the bottom is about 1m, and the distance between the top of the conduit and the concrete surface is about 50mm. If the steel bar is touched when pre-embedding the first section of the concrete conduit, the steel bar needs to be staggered to the left or right. The circumferential spacing of the bottom conduit is controlled at about 5m. Because it is pre-embedded obliquely, the first section of the conduit cannot be taken out later. The second section of the conduit is made into a bell-mouth chute at the top, which is connected to the upper part of the first section of the chute when pouring concrete, so as to ensure the smooth flow of concrete. Step 6: Template removal; Step 7: Prestressing is performed in the tensioning sequence, and the tensioning sequence is symmetrical starting from the top; Step 8: Complete segmented tensioning and inspect and accept; Step 9: Pour the post-casting belt. During the pouring process, attention should be paid to vibrating and compacting. Use concrete of a higher grade for pouring. Pour in layers to reduce the internal temperature of the concrete. Step 10: Overall acceptance of ring beam.
[0020] The present invention makes improvement planning from three aspects of concrete proportion, mould and construction area division, and selects high-performance concrete, thereby ensuring that the construction efficiency and the durability and stability of the structure meet the design requirements.
[0021] The above are only embodiments provided for the present application and are not intended to limit the present application. Although the present application is described in detail with reference to the embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. However, any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. A method for constructing a prestressed annular frame beam with a special-shaped large cross-section, characterized in that It includes the following steps: Step 1: Select or mix high performance concrete; Step 2: Divide the construction sections; Step 3: Formwork setup: Step 4: Tie the steel bars of the ring beam, insert and fix the corrugated pipe, reserve holes for anchoring the seam bars at the post-casting belt, and arrange the temperature monitoring points and the pressure ring and strain gauge for tension control after the steel bars are tied. The temperature monitoring points are arranged along the axis of the ring beam; Step 5: Pour the concrete in layers, with each layer being no thicker than 500mm. Add a chute every 3m to allow the concrete to be poured to the bottom. Step 6: Template removal; Step 7: Prestressing is performed in the tensioning sequence, and the tensioning sequence is symmetrical starting from the top; Step 8: Complete segmented tensioning and inspect and accept; Step 9: Pour the post-casting belt. During the pouring process, attention should be paid to vibrating and compacting. Use concrete of a higher grade for pouring. Pour in layers to reduce the internal temperature of the concrete. Step 10: Overall acceptance of ring beam.
2. The method for constructing a special-shaped large-section prestressed annular frame beam according to claim 1, characterized in that: In step 1, the high performance concrete is selected from silicate cement concrete, slag cement concrete, and polymer modified concrete.
3. The method for constructing a prestressed annular frame beam with a special-shaped large cross-section according to claim 1, characterized in that: In step 2, the ring beam is divided into 12 sections for construction, with post-casting strips reserved in the middle. There are 12 post-casting strips in total, which are divided into 4 flow sections for simultaneous construction. Each construction flow section has 3 post-casting strips, which are constructed from the northwest and southeast directions to both sides, so as to achieve turnover of on-site materials.
4. The method for constructing a special-shaped large-section prestressed annular frame beam according to claim 1, characterized in that: Step 3 is as follows: Step 3.1, according to the segmentation plan, prepare the post-casting strip support structure, which mainly includes support rods, and the support rods are connected to the main ribs of the formwork through tie rods; Step 3.2, a corresponding formwork system is made for each section of the ring beam, the formwork system includes support trusses respectively arranged on the inner and outer sides of the ring beam section and steel formworks arranged on the trusses; wherein the support trusses respectively arranged on the inner and outer sides of the ring beam section are provided with different support structures according to the curve of the cross-section shape of the ring beam, and the formwork systems between the ring beam sections are connected by the post-casting belt support structure; a steel springboard is arranged at the bottom of the formwork system, and the bottom formwork adopts a steel plate combined with an I-steel keel; the side formwork adopts a ribbed steel formwork; Step 3.3: Make the outer large ring beam operating frame around each formwork system: use the disc-type scaffolding to set up, with the bar size of 0.9m horizontal distance, 1.5m vertical distance and 1.5m step distance; Step 3.4, make the post-cast strip template: due to the large cross-section of the ring beam and the large number of longitudinal steel bars, it is difficult to temporarily seal the post-cast strip template. The main bars are connected all around the beam, and the middle longitudinal steel bars are reinforced. Wire mesh is used as the template in the outer ring main reinforcement area. The main bars pass directly through the wire mesh, and the internal area uses a steel template. A straight threaded sleeve is connected to the end of the internal steel bar. The post-cast strip steel bars are connected to the large ring beam steel bars as a whole through a straight threaded sleeve. The bottom and inner steel templates are uniformly erected, and the outer wooden templates are erected in sections after each section of steel bars is tied. At the same time, an attached vibrator is added every 1m on the side template of each construction section.
5. The method for constructing a special-shaped large-section prestressed annular frame beam according to claim 1, characterized in that: In step 4, three temperature measuring points are arranged in each section, and nine temperature measuring points are arranged in each point from top to bottom. The pressure ring is arranged at the anchor of the prestressed tensioning end, and the strain gauge is posted on the surface after the concrete pouring is completed.
6. The method for constructing a special-shaped large-section prestressed annular frame beam according to claim 1, characterized in that: Step 5 is as follows: Step 5.1, use a vibrating rod of φ70 / φ50, and the vibrating points should be increased at the corners of the post-casting belt and construction joints, and the vibration time should be extended. After the concrete is poured, the secondary vibration and finishing time is determined according to the state of the concrete after entering the mold. The ring beam reinforcement is dense and the horizontal main reinforcement is arranged in an oblique direction. The reinforcement is dense, and the vibrating rod cannot vibrate vertically. It needs to vibrate obliquely. Therefore, the vibrating rod conduit must be pre-buried in advance during the reinforcement binding process. The spacing between the vibrating rod conduits is controlled at about 600mm to facilitate the oblique vibration of the vibrating rod; Step 5.2: Install a flat vibrator at an interval of 600mm on the inclined surface, and open a vibration opening at an interval of 500mm to assist the vibration of the inclined surface of the ring beam and prevent the upper surface from being loosely vibrated; Step 5.3, set up the chute: the height of the large ring beam is 4.3m high. When pouring concrete, it is easy to cause concrete segregation when using a sky pump to vertically release concrete. A 300*300 concrete discharge port is opened at an interval of 1500mm at a height of 2m in the middle of the inclined surface, and a 150*150 concrete chute is set at an interval of 2m in the middle of the ring beam during construction to prevent the bottom concrete from segregating. Considering the density of steel bars and the shape of the ring beam, the concrete chute is divided into two sections. The first section is at the steel bar binding At the same time, a 150*150 square tube is pre-buried obliquely in the middle of the steel bar along the angle of the steel bar. The conduit is about 1m away from the bottom, and the top of the conduit is about 50mm away from the concrete surface. If the steel bar is touched when the first section of the concrete conduit is pre-buried, the steel bar needs to be staggered to the left or right. The circumferential spacing of the bottom conduit is controlled at about 5m. Because it is pre-buried obliquely, the first section of the conduit cannot be taken out later. The second section of the conduit has a trumpet chute at the top, which is connected to the upper part of the first section of the chute when pouring concrete to ensure smooth flow of concrete.
Citation Information
Patent Citations
Coal retaining wall for circular coal yards and method for constructing coal retaining wall
CN105257058A
Special-shaped steel pipe column reinforced concrete ring beam construction method
CN106284688A
Special-shaped ring beam construction method suitable for circulating cooling water station
CN113914545A
Cited By
Design method of special-shaped large-section annular prestressed beam based on finite element model
CN119577923A
Design method of special-shaped large-section circular prestressed beams based on finite element model
CN119577923B