Building construction site management channel

By designing adjustable support structures and protective measures in the construction site management channel, the inconvenience and noise problems of existing equipment are solved, and the applicability and comfort of the equipment are improved.

CN221856284UActive Publication Date: 2024-10-18CHINA AEROSPACE CONSTR ENG GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420377714.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-28
Publication Date
2024-10-18
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

The existing construction site management channels are difficult to meet the diverse needs during use, and produce noise when dealing with falling objects, affecting comfort.

Method used

A management channel is designed that includes two sets of support plates, lifting seats, limit frames, glass plates, lifting plates, connecting seats, limit handles, clamps, base plates, positioning pyramids, protective frames, reinforcement plates and sound insulation pads. , adjust the overall height by lifting and lowering, protect the frame and reinforcement plate from falling, and reduce noise with sound insulation pads.

Benefits of technology

It achieves convenient adjustment of the device height, top protection and noise reduction, improving the comfort and safety of workers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221856284U_ABST
    Figure CN221856284U_ABST
Patent Text Reader

Abstract

The utility model discloses a building construction site management channel which comprises two sets of supporting plates, lifting seats are movably installed at the tops of the two sets of supporting plates, limiting frames are fixedly installed at the tops of the lifting seats, glass plates are fixedly installed in the two sets of supporting plates, and the glass plates are fixedly installed in the limiting frames. Lifting plates are inserted into the front ends and the tail ends of the tops of the two sets of supporting plates, the tops of the lifting plates are fixedly connected to the bottom of a lifting base, the bottoms of the lifting plates are slidably connected with a connecting base, and a limiting handle is fixedly installed at the bottom of the connecting base. The height of the lifting plate is limited and adjusted, so that the overall height of the device is adjusted, the protection frame and the reinforcing plate are mounted and connected, so that the top of the device can be protected against falling of heavy objects, the sound insulation pad is arranged, and when the top of the device is collided by the heavy objects, the sound insulation pad can be prevented from falling off. And the noise influence of the collision sound on the bottom space of the device is reduced, so that the working comfort of a worker in the internal space of the device is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction equipment, in particular to a building construction site management channel. Background Art

[0002] In construction work, the use of management channels can assist in the supervision work at the construction site and assist in the progress of construction work. However, with the increase in usage demand, some existing management channel structures for construction still have certain deficiencies when used, which in turn affects the use of the device and is difficult to meet more usage needs.

[0003] Patent document: CN217041838U, discloses a construction site management channel, "including: a main body mechanism, a spray mechanism and an adjustment mechanism; the main body mechanism includes four columns, and a top cover is fixedly installed on the top of the four columns; the spray mechanism includes an L-shaped plate fixedly installed on one side of the top cover, and the inside of the L-shaped plate is rotatably connected to the main shaft through a bearing; the construction site management channel of the building is provided with a spray mechanism and an adjustment mechanism in the main body mechanism, so that after the water in the connecting pipe is sprayed out through the nozzle, the air inside the management channel can be sprayed and dusted; and when the motor drives the rotating wheel to rotate, the rack can slide back and forth on the top cover, so that the gear can drive the connecting pipe and the nozzle to rotate back and forth through the rod body, so that the spray range of the nozzle can cover the entire channel; through the above arrangement, the problem of workers inhaling solid impurities such as dust into the body when entering and exiting the channel is solved;

[0004] In the above patent, when the device is in use, a spray mechanism and an adjustment mechanism are arranged on the main body so that the water in the connecting pipe is sprayed out through the nozzle, and the air inside the management channel can be sprayed to reduce dust; and when the motor drives the rotating wheel to rotate, the rack can slide back and forth on the top cover, so that the gear can drive the connecting pipe and the nozzle to rotate back and forth through the rod body, so that the spray range of the nozzle can cover the entire channel. Through the above settings, the problem that the staff will inhale solid impurities such as dust into the body when entering and exiting the channel is solved, but the use of the device still has certain shortcomings;

[0005] In the above-mentioned device, when the device is in use, when the device is applied to a construction environment, the device itself needs to deal with the safety impact of falling objects from high altitudes, and after the falling objects come into contact with the top of the device, they will produce a certain noise due to collision, which will then produce noise impact, and then affect the comfort of using the device. Utility Model Content

[0006] The purpose of the utility model is to provide a construction site management channel to solve the problems raised in the above background technology.

[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solution: a construction site management channel, comprising two groups of support plates, the tops of the two groups of support plates are movably mounted with lifting seats, and the tops of the lifting seats are fixedly mounted with a limited position frame;

[0008] Glass plates are fixedly installed inside the two groups of support plates, lifting plates are inserted at the front and rear ends of the tops of the two groups of support plates, and the tops of the lifting plates are fixedly connected to the bottoms of the lifting seats, the bottoms of the lifting plates are slidably connected to the connecting seats, the bottoms of the connecting seats are fixedly installed with limit handles, the front and back sides of the connecting seats are fixedly installed with limit clamps, and the inner walls of the support plates are provided with multiple groups of clamping grooves.

[0009] Preferably, a bottom plate is installed at the bottom of the separated surfaces of the two groups of support plates, and a plurality of groups of positioning angle pyramids are connected through the top of the bottom plate.

[0010] Preferably, a positioning seat is fixedly mounted on the inner wall of the limiting frame, and a plurality of groups of docking rods are fixedly mounted on the inner wall of the positioning seat.

[0011] Preferably, a protection frame is clamped inside the positioning seat, and a reinforcement plate is fixedly mounted on the inner wall of the protection frame.

[0012] Preferably, a docking block is fixedly mounted on the bottom of the reinforcement plate, and the docking block is clamped on the inner side of the plurality of docking rods.

[0013] Preferably, arc frames are fixedly mounted on the facing surfaces of the two groups of lifting seats, and the top of the arc frame is fixedly connected to the bottom of the docking rod.

[0014] Preferably, a sound insulation pad is fixedly installed on the top of the arc frame, and the top of the sound insulation pad is fixedly connected to the bottom of the docking rod.

[0015] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0016] 1. The utility model can adjust the overall height of the device by limiting the height of the lifting plate, and can protect the top of the device from falling heavy objects by installing and connecting the protective frame and the reinforcement plate. The setting of the sound insulation pad can reduce the noise impact of the collision sound on the bottom space of the device when the top of the device is hit by a heavy object, so as to improve the comfort of the staff working in the internal space of the device.

[0017] 2. The utility model increases the convenience of adjusting the overall height of the device through convenient lifting and lowering adjustment, so as to adjust the internal use space of the device, add convenience to the placement of equipment, and can be installed in the applicability of the overall structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1It is a three-dimensional structural schematic diagram of the utility model;

[0019] Figure 2 This is a schematic diagram of the lifting seat structure of the utility model;

[0020] Figure 3 This is a schematic diagram of the protective frame structure of the utility model;

[0021] Figure 4 This is a cross-sectional schematic diagram of the support plate structure of the utility model;

[0022] Figure 5 It is a schematic cross-sectional view of the arc frame structure of the utility model.

[0023] In the figure: 1. support plate; 2. lifting seat; 3. limit frame; 4. glass plate; 5. lifting plate; 6. connecting seat; 7. limit handle; 8. limit block; 9. clamping groove; 10. bottom plate; 11. positioning angle cone; 12. positioning seat; 13. docking rod; 14. protection frame; 15. reinforcement plate; 16. docking block; 17. arc frame; 18. sound insulation pad. DETAILED DESCRIPTION

[0024] See also Figures 1 to 5 , a construction site management channel, comprising two groups of support plates 1, the tops of the two groups of support plates 1 are movably mounted with lifting seats 2, the tops of the lifting seats 2 are fixedly mounted with limited position frames 3, the interiors of the two groups of support plates 1 are fixedly mounted with glass plates 4, the front ends and the rear ends of the tops of the two groups of support plates 1 are plugged with lifting plates 5, and the tops of the lifting plates 5 are fixedly connected to the bottoms of the lifting seats 2, the bottoms of the lifting plates 5 are slidably connected with connecting seats 6, the bottoms of the connecting seats 6 are fixedly mounted with limited position handles 7, the front and back sides of the connecting seats 6 are fixedly mounted with limited position blocks 8, and the inner walls of the support plates 1 are provided with a plurality of groups of clamping grooves 9;

[0025] When the device is used for construction management, by installing and placing the device, one side of the support plate 1 can lift the lifting plate 5 by lifting the limit handle 7, and the lifting seat 2 can be lifted by lifting the limit handles 7 around the device. As the lifting plate 5 is lifted, the limit handle 7 can be pushed so that the limit block 8 on the connecting seat 6 is engaged in the engaging groove 9, so that the height of the lifting plate 5 can be limited and adjusted, thereby adjusting the overall height of the device.

[0026] A bottom plate 10 is installed at the bottom of the separated surfaces of the two sets of support plates 1, and a plurality of sets of positioning pyramids 11 are connected through the top of the bottom plate 10;

[0027] By plugging the positioning cone 11 into the ground on which the device is placed, the device can be plugged in and positioned, thereby increasing the stability of the device when placed and used.

[0028] A positioning seat 12 is fixedly installed on the inner wall of the limit frame 3, and a plurality of docking rods 13 are fixedly installed on the inner wall of the positioning seat 12. A protective frame 14 is clamped inside the positioning seat 12, and a reinforcing plate 15 is fixedly installed on the inner wall of the protective frame 14. A docking block 16 is fixedly installed on the bottom of the reinforcing plate 15, and the docking block 16 is clamped on the inner side of the plurality of docking rods 13;

[0029] The reinforcing plate 15 can be installed in the gap between the multiple groups of docking rods 13 by setting up the bottom docking block 16, so as to achieve the purpose of the snap-on installation. The installation connection between the protective frame 14 and the reinforcing plate 15 can play a role in preventing heavy objects from falling on the top of the device.

[0030] The facing surfaces of the two sets of lifting seats 2 are fixedly mounted with an arc frame 17, and the top of the arc frame 17 is fixedly connected to the bottom of the docking rod 13;

[0031] By providing the arc frame 17, it can play a supporting role at the bottom of the docking rod 13, and increase the support of the top of the device when a heavy object falls.

[0032] A sound insulation pad 18 is fixedly installed on the top of the arc frame 17, and the top of the sound insulation pad 18 is fixedly connected to the bottom of the docking rod 13;

[0033] By providing the sound insulation pad 18, when the top of the device is hit by a heavy object, the noise impact of the collision sound on the bottom space of the device can be reduced, so that the workers can work comfortably in the internal space of the device.

[0034] The working principle is that the device is plugged and fixed by positioning the corner cone 11. After the auxiliary device is placed and installed, the height of the lifting plate 5 can be limited and adjusted by lifting the limit handle 7, thereby adjusting the overall height of the device to meet the use of different heights, and the top of the device is installed by snapping on the protective frame 14, which can protect the top of the device to ensure the safe use of the internal space of the device, so that the staff can perform observation and management work in the device in conjunction with the setting of the glass plate 4.

[0035] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

Claims

1. A construction site management channel, comprising two sets of support plates (1), characterized in that: A lifting seat (2) is movably mounted on the top of the two groups of support plates (1), and a limit frame (3) is fixedly mounted on the top of the lifting seat (2); Glass plates (4) are fixedly installed inside the two groups of support plates (1), and lifting plates (5) are inserted at the front and rear ends of the tops of the two groups of support plates (1), and the tops of the lifting plates (5) are fixedly connected to the bottoms of the lifting seats (2). The bottoms of the lifting plates (5) are slidably connected to the connecting seats (6), and the bottoms of the connecting seats (6) are fixedly installed with limit handles (7), and the front and back sides of the connecting seats (6) are fixedly installed with limit clamping blocks (8), and the inner walls of the support plates (1) are provided with multiple groups of clamping grooves (9).

2. A construction site management channel according to claim 1, characterized in that: A bottom plate (10) is installed at the bottom of the separated surfaces of the two groups of support plates (1), and a plurality of groups of positioning angle cones (11) are connected through the top of the bottom plate (10).

3. A construction site management channel according to claim 1, characterized in that: A positioning seat (12) is fixedly mounted on the inner wall of the limiting frame (3), and a plurality of groups of docking rods (13) are fixedly mounted on the inner wall of the positioning seat (12).

4. A construction site management channel according to claim 3, characterized in that: A protection frame (14) is clamped inside the positioning seat (12), and a reinforcement plate (15) is fixedly mounted on the inner wall of the protection frame (14).

5. A construction site management channel according to claim 4, characterized in that: A docking block (16) is fixedly mounted on the bottom of the reinforcing plate (15), and the docking block (16) is clamped on the inner side of the plurality of docking rods (13).

6. A construction site management channel according to claim 1, characterized in that: The facing surfaces of the two groups of lifting seats (2) are fixedly mounted with an arc frame (17), and the top of the arc frame (17) is fixedly connected to the bottom of the docking rod (13).

7. A construction site management channel according to claim 6, characterized in that: A sound insulation pad (18) is fixedly mounted on the top of the arc frame (17), and the top of the sound insulation pad (18) is fixedly connected to the bottom of the docking rod (13).