Waste heat recovery equipment for boiler combustion box

By designing the waste heat recovery equipment of the boiler combustion box, the motor drives the fan blades and the heat conduction block to realize the secondary utilization of the residual heat energy in the boiler combustion box, which solves the problem of waste of heat energy during boiler combustion and improves the environmental protection and energy saving effect and the convenience of operation.

CN221858615UActive Publication Date: 2024-10-18SICHUAN DIANLI TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323295608.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-05
Publication Date
2024-10-18
Estimated Expiration
2033-12-05

AI Technical Summary

Technical Problem

The large amount of heat energy generated during boiler combustion cannot be completely absorbed by the liquid, resulting in a waste of heat energy. The waste heat can be reused through the boiler combustion box waste heat recovery equipment to avoid waste of resources.

Method used

A boiler combustion box waste heat recovery equipment is designed, including a recovery box, a waste heat pipe, a heat storage tank, a recovery component and a support component. The motor drives the fan blades to allow the residual waste heat to heat the liquid through the exhaust pipe. The heat conduction block and The heat separation network separates and absorbs hot air, and combines with air pressure detectors and control panels to achieve automated control.

Benefits of technology

It effectively utilizes waste heat, avoids waste of heat energy, improves environmental protection and energy saving effects, simplifies the operating process, and improves the practicality and safety of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221858615U_ABST
    Figure CN221858615U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of boiler equipment, and discloses boiler combustion box waste heat recovery equipment which comprises a recovery box body, the right end of the recovery box body is fixedly communicated with a waste heat pipe, the lower end of the inner end of the recovery box body is fixedly provided with a heat storage tank, and the heat storage tank is fixedly communicated with the waste heat pipe. A recycling assembly is arranged at the position, located above the heat storage groove, of the inner end of the recycling box body. The recycling assembly comprises a ventilation groove, the ventilation groove is fixedly formed in the inner end of the recycling box body, a partition plate is fixedly installed at the inner end of the ventilation groove, the ventilation groove is fixedly formed in the inner end of the partition plate, a motor is fixedly installed at the inner end of the ventilation groove, and fan blades are fixedly installed at the outer end of the motor. According to the waste heat recovery equipment for the boiler combustion box, the motor drives the fan blades to enable residual waste heat to heat liquid in the recovery box body through the exhaust pipe, secondary use of the waste heat can be effectively achieved, waste of the waste heat is avoided, and the environment-friendly and energy-saving effects are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of boiler equipment, in particular to a boiler combustion box waste heat recovery device. Background Art

[0002] A boiler is an energy conversion device. The energy input to the boiler includes chemical energy and electrical energy in the fuel. The boiler outputs steam, high-temperature water or organic heat carrier with a certain amount of thermal energy. The original meaning of pot refers to a water container heated on fire, and furnace refers to a place where fuel is burned. The boiler consists of two major parts: the pot and the furnace. The hot water or steam generated in the boiler can directly provide the required thermal energy for industrial production and people's lives, or can be converted into mechanical energy through a steam power device, or the mechanical energy can be converted into electrical energy through a generator. A boiler that provides hot water is called a hot water boiler, which is mainly used for life and also has a small number of applications in industrial production. A boiler that generates steam is called a steam boiler, often referred to as a boiler, and is mostly used in thermal power plants, ships, locomotives and industrial and mining enterprises.

[0003] Boilers can be used as thermal power boilers and heating boilers. Power boilers include power station boilers, ship boilers and locomotive boilers, etc., which are used for power generation, ship power and locomotive power respectively. Heating boilers include steam boilers, hot water boilers, heat pipe boilers, hot air furnaces and heat carrier heating furnaces, etc., which can obtain steam, hot water, hot air and heat carriers respectively.

[0004] During the use of the boiler, the internal liquid is heated by the combustion of fuel, causing the liquid to heat up and form water vapor. However, the large amount of heat energy generated by the combustion of fuel cannot be completely absorbed by the liquid, which will cause some heat energy to be discharged from the pipeline along with the exhaust gas, thereby wasting resources. Utility Model Content

[0005] 1. Technical issues to be solved

[0006] The purpose of the utility model is to provide a boiler combustion box waste heat recovery device to solve the problem in the above background technology that a large amount of heat energy generated during fuel combustion cannot be completely absorbed by the liquid, which will cause some heat energy to be discharged from the pipeline along with the waste, thereby resulting in a waste of resources.

[0007] (II) Technical solution

[0008] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a boiler combustion box waste heat recovery device, comprising a recovery box body, the right end of which is fixedly connected to a waste heat pipe, a heat storage tank is fixedly arranged at the lower end of the inner end of the recovery box body, the heat storage tank is fixedly connected to the waste heat pipe, and a recovery component is arranged at the inner end of the recovery box body above the heat storage tank;

[0009] The recovery component includes ventilation slot 1, which is fixedly arranged at the inner end of the recovery box, a partition plate is fixedly installed at the inner end of the ventilation slot 1, ventilation slot 2 is fixedly installed at the inner end of the partition plate, a motor is fixedly installed at the inner end of the ventilation slot 2, a fan blade is fixedly installed at the outer end of the motor, an exhaust pipe is fixedly connected to the upper end of the ventilation slot 1, a heat conduction block is fixedly installed at the outer end of the exhaust pipe, a heat distribution network is fixedly installed at the outer end of the heat conduction block, a through hole is fixedly arranged at the inner end of the heat distribution network, and the recovery component is installed so that the residual waste heat can heat the liquid inside the recovery box through the exhaust pipe by driving the fan blades through the motor, so that the waste heat can be effectively reused for a second time, thereby avoiding the waste of waste heat, achieving the effect of environmental protection and energy saving, and facilitating the use of the staff.

[0010] Preferably, a stopper is fixedly installed on the inner end of the exhaust pipe, and an air pressure detector is fixedly installed on the inner end of the recovery box body located on the left side of the heat distribution network. The heat conductive block is located on the outer end of the exhaust pipe and is distributed in parallel up and down. The through holes are located on the inner end of the heat distribution network and are distributed in parallel up and down. The installation of the stopper can block the hot air and slow down the circulation speed of the hot air during the circulation of the hot air in the exhaust pipe, thereby avoiding the waste of hot air and effectively improving the practicality and energy saving.

[0011] Preferably, the upper end of the recovery box is fixedly connected to a steam pipe, and the steam pipe is located on the right side of the exhaust pipe. An exhaust valve is fixedly installed on the inner end of the exhaust pipe, and the exhaust valve is matched with the exhaust pipe. A pressure gauge is fixedly installed on the front end of the recovery box, and the pressure gauge is matched with the air pressure detector. An auxiliary component is provided at the front end of the recovery box below the pressure gauge. The installation of the steam pipe can transport the steam generated inside the recovery box, which effectively improves the practicability.

[0012] Preferably, the auxiliary component includes an auxiliary groove, the auxiliary groove is fixedly arranged at the front end of the recycling box, the outer side of the auxiliary groove is located at the front end of the recycling box and a hinge is fixedly installed, the hinge is distributed in parallel up and down, and the inner end of the hinge is fixedly installed with a box door. The installation of the auxiliary component can be controlled by the staff through the control panel, which effectively simplifies the operation process, reduces the difficulty of operation, improves the convenience of use, and facilitates the use of the staff.

[0013] Preferably, an observation groove is fixedly provided at the inner end of the box door, a transparent glass sheet is fixedly installed at the inner end of the observation groove, an opening handle is fixedly installed at the front end of the box door, and a switch button is movably installed at the inner end of the auxiliary groove. The setting of the observation groove can facilitate the staff to watch the display screen and understand the situation in time. At the same time, the transparent glass sheet can also play a role in dust and moisture prevention, effectively improving the safety of use.

[0014] Preferably, a display screen is fixedly installed at the inner end of the auxiliary slot on the right side of the switch button, and a control panel is fixedly installed at the inner end of the auxiliary slot below the display screen. The installation of the control panel can facilitate control by the staff.

[0015] Preferably, a support assembly is provided at the lower end of the recycling box, and the support assembly includes a bearing plate, and the bearing plate is fixedly installed at the lower end of the recycling box. The installation of the support assembly increases the friction with the placement surface through the anti-slip pad, and at the same time, the support with the support column can effectively prevent slipping and shaking, keep away from liquid stains, and play a role of moisture-proof and rust-proof.

[0016] Preferably, a support column is fixedly installed at the lower end of the recycling box, and the support column is located at the lower end of the recycling box and is symmetrically distributed on the left and right. An anti-skid pad is fixedly installed at the lower end of the support column, which increases the friction with the placement surface and plays an anti-skid role.

[0017] Compared with the prior art, the beneficial effects of the utility model are:

[0018] 1. The boiler combustion box waste heat recovery equipment, through the installation of the recovery component, drives the fan blades through the motor to heat the liquid inside the recovery box through the exhaust pipe, which can effectively reuse the waste heat, avoid the waste heat, achieve the effect of environmental protection and energy saving, and facilitate the use of the staff;

[0019] 2. The boiler combustion box waste heat recovery equipment can block the hot air and slow down the circulation speed of the hot air during the circulation of the exhaust pipe by installing the block, thus avoiding the waste of hot air and effectively improving the practicality and energy saving;

[0020] 3. The boiler combustion box waste heat recovery equipment, through the installation of the support components, increases the friction with the placement surface through the anti-skid pad. At the same time, with the support of the support column, it can effectively prevent slipping and shaking, stay away from liquid stains, and play a role in moisture-proof and rust-proof. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;

[0022] Figure 2 It is a partial three-dimensional structural schematic diagram of the utility model;

[0023] Figure 3 It is a partial three-dimensional structural schematic diagram of the utility model;

[0024] Figure 4 It is a schematic diagram of a partial cross-section structure of the utility model;

[0025] Figure 5 This is a schematic diagram of the second structure of a partial cross section of the utility model;

[0026] Figure 6 It is a schematic diagram of the third structure of the local section of the utility model.

[0027] In the figure: 1. recovery box; 2. waste heat pipe; 3. heat storage tank; 4. recovery component; 5. steam pipe; 6. exhaust valve; 7. pressure gauge; 8. auxiliary component; 9. support component; 401. ventilation slot one; 402. partition plate; 403. ventilation slot two; 404. motor; 405. fan blade; 406. exhaust pipe; 407. heat transfer block; 408. heat distribution network; 409. through hole; 410. block; 411. air pressure detector; 801. auxiliary slot; 802. hinge; 803. box door; 804. observation slot; 805. transparent glass sheet; 806. opening handle; 807. switch button; 808. display screen; 809. control panel; 901. load-bearing plate; 902. support column; 903. anti-slip mat. DETAILED DESCRIPTION

[0028] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0029] See also Figure 1 - Figure 6 The utility model provides a technical solution: a boiler combustion box waste heat recovery device, comprising a recovery box 1, the right end of the recovery box 1 is fixedly connected with a waste heat pipe 2, the lower end of the inner end of the recovery box 1 is fixedly provided with a heat storage tank 3, the heat storage tank 3 is fixedly connected with the waste heat pipe 2, and the inner end of the recovery box 1 is located above the heat storage tank 3 and is provided with a recovery component 4;

[0030] The recycling component 4 includes a ventilation slot 1 401, which is fixedly arranged at the inner end of the recycling box 1, a partition plate 402 is fixedly installed at the inner end of the ventilation slot 1 401, a ventilation slot 2 403 is fixedly arranged at the inner end of the partition plate 402, a motor 404 is fixedly installed at the inner end of the ventilation slot 2 403, a fan blade 405 is fixedly installed at the outer end of the motor 404, an exhaust pipe 406 is fixedly connected to the upper end of the ventilation slot 1 401, a heat conducting block 407 is fixedly installed at the outer end of the exhaust pipe 406, a heat distribution network 408 is fixedly installed at the outer end of the heat conducting block 407, a through hole 409 is fixedly arranged at the inner end of the heat distribution network 408, a stopper 410 is fixedly installed at the inner end of the exhaust pipe 406, and a gas block 410 is fixedly installed at the inner end of the recycling box 1 on the left side of the heat distribution network 408. Pressure detector 411, heat conductive block 407 is located at the outer end of exhaust pipe 406 and is distributed in parallel up and down, through hole 409 is located at the inner end of heat distribution network 408 and is distributed in parallel up and down. During use by the staff, the air with residual heat will enter the interior of heat storage tank 3 through residual heat pipe 2, and the fan blade 405 is driven to rotate by motor 404, so that the air with residual heat passes through ventilation slot 2 403 and enters the interior of exhaust pipe 406. When entering the interior of exhaust pipe 406, block 410 will block the air with residual heat and slow down the circulation of the air with residual heat. At the same time, heat conductive block 407 will absorb the residual heat in the air and transmit it to heat distribution network 408, so that heat distribution network 408 heats the liquid inside recovery box 1.

[0031] Furthermore, the upper end of the recovery box 1 is fixedly connected with a steam pipe 5, and the steam pipe 5 is located on the right side of the exhaust pipe 406. The inner end of the exhaust pipe 406 is fixedly installed with an exhaust valve 6, and the exhaust valve 6 is adapted to the exhaust pipe 406. A pressure gauge 7 is fixedly installed at the front end of the recovery box 1, and the pressure gauge 7 is adapted to the air pressure detector 411. An auxiliary component 8 is provided at the front end of the recovery box 1 below the pressure gauge 7. The auxiliary component 8 includes an auxiliary groove 801, and the auxiliary groove 801 is fixedly arranged at the front end of the recovery box 1. The outer side of the auxiliary groove 801 is located at the front end of the recovery box 1 and is fixedly installed with a hinge 802. The hinges 802 are parallelly distributed up and down, and a box door 803 is fixedly installed at the inner end of the hinge 802. The inner end of the box door 803 is fixedly installed. An observation slot 804 is fixedly provided, a transparent glass sheet 805 is fixedly installed at the inner end of the observation slot 804, an opening handle 806 is fixedly installed at the front end of the box door 803, a switch button 807 is movably installed at the inner end of the auxiliary slot 801, a display screen 808 is fixedly installed on the right side of the switch button 807 at the inner end of the auxiliary slot 801, and a control panel 809 is fixedly installed at the inner end of the auxiliary slot 801 below the display screen 808. During use, the staff first pulls the opening handle 806 to rotate and open the box door 803 through the hinge 802, and then the staff presses the switch button 807 to start the display screen 808, and then operates the control panel 809 to start the motor 404 and the air pressure detector 411.

[0032] Furthermore, a support assembly 9 is provided at the lower end of the recycling box 1, and the support assembly 9 includes a load-bearing plate 901, and the load-bearing plate 901 is fixedly installed at the lower end of the recycling box 1. A support column 902 is fixedly installed at the lower end of the recycling box 1. The support column 902 is located at the lower end of the recycling box 1 and is symmetrically distributed on the left and right. An anti-slip pad 903 is fixedly installed at the lower end of the support column 902. The support column 902 is supported by force, and the anti-slip pad 903 increases the friction with the placement surface.

[0033] Working principle: The staff first pulls the opening handle 806 to rotate the door 803 through the hinge 802 to open it, and then presses the switch button 807 to start the display screen 808. After the air with residual heat enters the heat storage tank 3 through the residual heat pipe 2, the staff operates the control panel 809 to start the motor 404, and drives the fan blades 405 to rotate through the motor 404, so that the air with residual heat passes through the ventilation slot 2 403 and enters the exhaust pipe 406. While entering the exhaust pipe 406, the block 410 will block the air with residual heat and slow down the circulation of the air with residual heat. At the same time, the heat conduction block 407 will absorb the residual heat in the air and transmit it to the heat distribution network 408, so that the heat distribution network 408 heats the liquid inside the recovery box 1.

[0034] Finally, it should be noted that the above content is only used to illustrate the technical solution of the utility model, rather than to limit the protection scope of the utility model. Simple modifications or equivalent substitutions of the technical solution of the utility model by ordinary technicians in this field do not deviate from the essence and scope of the technical solution of the utility model.

Claims

1. A boiler combustion box waste heat recovery device, comprising a recovery box (1), characterized in that: The right end of the recovery box (1) is fixedly connected to a waste heat pipe (2); a heat storage tank (3) is fixedly arranged at the lower end of the inner end of the recovery box (1); the heat storage tank (3) is fixedly connected to the waste heat pipe (2); and a recovery component (4) is arranged at the inner end of the recovery box (1) above the heat storage tank (3); The recovery component (4) comprises a ventilation slot 1 (401), wherein the ventilation slot 1 (401) is fixedly arranged at the inner end of the recovery box (1), a partition plate (402) is fixedly installed at the inner end of the ventilation slot 1 (401), a ventilation slot 2 (403) is fixedly installed at the inner end of the partition plate (402), a motor (404) is fixedly installed at the inner end of the ventilation slot 2 (403), a fan blade (405) is fixedly installed at the outer end of the motor (404), an exhaust pipe (406) is fixedly connected to the upper end of the ventilation slot 1 (401), a heat conduction block (407) is fixedly installed at the outer end of the exhaust pipe (406), a heat distribution network (408) is fixedly installed at the outer end of the heat conduction block (407), and a through hole (409) is fixedly provided at the inner end of the heat distribution network (408).

2. A boiler combustion box waste heat recovery device according to claim 1, characterized in that: A stopper (410) is fixedly installed at the inner end of the exhaust pipe (406), an air pressure detector (411) is fixedly installed at the inner end of the recovery box (1) located on the left side of the heat distribution network (408), the heat conductive block (407) is located at the outer end of the exhaust pipe (406) and is distributed in parallel up and down, and the through holes (409) are located at the inner end of the heat distribution network (408) and are distributed in parallel up and down.

3. A boiler combustion box waste heat recovery device according to claim 2, characterized in that: The upper end of the recovery box (1) is fixedly connected to a steam pipe (5), the steam pipe (5) is located on the right side of the exhaust pipe (406), the inner end of the exhaust pipe (406) is fixedly installed with an exhaust valve (6), the exhaust valve (6) is compatible with the exhaust pipe (406), the front end of the recovery box (1) is fixedly installed with a pressure gauge (7), the pressure gauge (7) is compatible with the air pressure detector (411), and an auxiliary component (8) is arranged below the pressure gauge (7) at the front end of the recovery box (1).

4. The boiler combustion box waste heat recovery device according to claim 3 is characterized in that: The auxiliary component (8) comprises an auxiliary groove (801), the auxiliary groove (801) is fixedly arranged at the front end of the recovery box (1), a hinge (802) is fixedly installed on the outer side of the auxiliary groove (801) and located at the front end of the recovery box (1), the hinge (802) is distributed in parallel up and down, and a box door (803) is fixedly installed on the inner end of the hinge (802).

5. The boiler combustion box waste heat recovery device according to claim 4, characterized in that: An observation slot (804) is fixedly provided at the inner end of the box door (803), a transparent glass sheet (805) is fixedly installed at the inner end of the observation slot (804), an opening handle (806) is fixedly installed at the front end of the box door (803), and a switch button (807) is movably installed at the inner end of the auxiliary slot (801).

6. The boiler combustion box waste heat recovery device according to claim 5, characterized in that: A display screen (808) is fixedly installed on the right side of the switch button (807) at the inner end of the auxiliary slot (801), and a control panel (809) is fixedly installed below the display screen (808) at the inner end of the auxiliary slot (801).

7. The boiler combustion box waste heat recovery device according to claim 6, characterized in that: A support assembly (9) is provided at the lower end of the recovery box (1), and the support assembly (9) comprises a bearing plate (901), and the bearing plate (901) is fixedly mounted at the lower end of the recovery box (1).

8. The boiler combustion box waste heat recovery device according to claim 7, characterized in that: A support column (902) is fixedly mounted on the lower end of the recovery box (1); the support column (902) is located at the lower end of the recovery box (1) and is symmetrically distributed on the left and right; and an anti-slip pad (903) is fixedly mounted on the lower end of the support column (902).