Air energy water heater mounting assembly
By designing the installation components of air-energy water heaters and using structures such as limit frames, connecting rods, and adjustment slots, the troublesome and dangerous problems of batch installation and high-altitude deployment of air-energy water heaters in the existing technology have been solved, and the main installation and installation can be completed indoors. Fixed, improving the safety and practicality of installation.
Patent Information
- Application Number
- CN202420367807.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-02-28
AI Technical Summary
Since the existing air-source water heater consists of two major parts: an outdoor machine and a water tank, it needs to be installed and deployed in batches, causing trouble and danger for workers when working at high altitudes.
An air source water heater installation component is designed, including a mounting base, an outdoor unit and a water tank. Through structures such as limit brackets, connecting rods, limit rings and shock-absorbing pads, the fixation and piping of the outdoor unit and water tank can be completed indoors. connection, reducing vibration and noise, and enabling easy handling of the overall mount through adjustment grooves and fixing bolts.
It enables the main installation and fixing work to be completed indoors, reduces the complexity and danger of installation and deployment in outdoor high-altitude environments, and improves the safety and practicality of installation.
Smart Images

Figure CN221858850U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of air energy water heaters, in particular to an air energy water heater installation component. Background Art
[0002] The air-energy water heater is also called "air source heat pump water heater", which consists of an outdoor unit and a water tank. Patent document: CN213713569 U proposes an air-energy water heater installation structure, including a base, a slot is provided inside the base, a water heater body is inserted inside the slot, a rotating mechanism for providing power is provided at the inner bottom of the base, and a locking mechanism for fixing the water heater body that cooperates with the rotating mechanism is provided inside the slot. The problem with this technical solution is that most of the existing air-energy water heaters are installed on outdoor air-conditioning desks. Since the air-energy water heater consists of two major parts, an outdoor unit and a water tank, it needs to be installed and deployed in batches, which is more troublesome and dangerous for workers to work at high altitudes. Utility Model Content
[0003] The purpose of the utility model is to solve the following problems existing in the prior art: most of the existing air-energy water heaters are installed on outdoor air-conditioning platforms. Since the air-energy water heaters consist of two major parts, an outdoor unit and a water tank, they need to be installed and deployed in batches, which is troublesome and dangerous for workers to work at high altitudes.
[0004] In order to solve the problems existing in the prior art, the utility model provides an air-energy water heater installation assembly, including a mounting base, an external unit and a water tank, the top of the mounting base is respectively provided with an external unit and a water tank, both ends of the external unit are provided with limit frames, connecting rods are provided between the limit frames on the top of the external unit, a limit ring is provided on the periphery of the water tank, and limit bolts are provided on both sides of the limit ring.
[0005] Furthermore, a shock-absorbing pad is provided on the inner side of the limit frame, and a buffer pad is provided on the top of the mounting seat at the bottom of the external unit. The shock-absorbing pad has a shock-absorbing and buffering effect on the connection between the limit frame and the external unit, and the buffer pad has a shock-absorbing and buffering effect on the connection between the bottom of the external unit and the mounting seat, thereby reducing the vibration and noise generated when the external unit is running.
[0006] Furthermore, an adjustment slot is provided inside the mounting seat at one end of the external unit, and an adjustment block is provided at the bottom of the limit frame at the top of the adjustment slot. The position of the limit frame can be adjusted by adjusting the adjustment block in the adjustment slot, which is convenient for the staff to install the external unit.
[0007] Furthermore, the connecting rod is a threaded rod, and the outer periphery of the connecting rod outside the limiting frame is provided with fixing bolts. The limiting frames at both ends of the external machine are connected by the threaded rod, and the limiting frames at both ends of the external machine can be connected and fixed by installing and tightening the fixing bolts.
[0008] Furthermore, the limiting ring is composed of two semicircular snap rings, which are connected by limiting bolts. After the water tank is placed in the limiting ring composed of the semicircular snap rings, the limiting ring is connected and fixed by installing and tightening the limiting bolts, thereby completing the limiting fixation of the water tank.
[0009] Compared with the prior art, the beneficial effects of the utility model are:
[0010] The staff of the utility model first places the outdoor unit and the water tank on the mounting base indoors respectively, adjusts the distance between the limit frames by means of the adjusting blocks and the adjusting grooves, and then fixes the limit frames by installing the connecting rods and the fixing bolts until the limit frames are adjusted to be close to the outdoor unit, thereby completing the limit fixing work of the outdoor unit; after placing the cylindrical water tank in the limit ring, the limit ring is pressed against the water tank by installing and tightening the limit bolts, thereby completing the limit fixing work of the water tank; at this time, the staff only needs to complete the connection and deployment of the pipeline lines indoors, and then transport or hoist the mounting base as a whole to the outdoor air-conditioning platform to complete the installation and deployment work, thereby solving the problems of the existing batch installation and the subsequent troublesome and dangerous deployment of pipeline lines in outdoor high-altitude environments, and increasing the practicality of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0012] Figure 2 It is a side view of the utility model;
[0013] Figure 3 It is a rear view of the utility model;
[0014] Figure numerals: 1. mounting seat; 2. adjusting slot; 3. limiting frame; 4. external unit; 5. connecting rod; 6. water tank; 7. limiting ring; 8. shock-absorbing pad; 9. limiting bolt. DETAILED DESCRIPTION
[0015] In order to make the technical means, creative features, objectives and effects of the utility model easy to understand, the utility model is further described below in conjunction with specific embodiments and drawings, but the following embodiments are only preferred embodiments of the utility model, not all. Based on the embodiments in the implementation mode, other embodiments obtained by those skilled in the art without creative work are all within the protection scope of the present invention.
[0016] The specific embodiments of the present utility model are described below in conjunction with the accompanying drawings.
[0017] Example 1
[0018] like Figure 1-3As shown, an air-energy water heater installation component includes a mounting base 1, an external unit 4 and a water tank 6, the top of the mounting base 1 is respectively provided with the external unit 4 and the water tank 6, both ends of the external unit 4 are provided with a limit frame 3, an adjusting groove 2 is provided inside the mounting base 1 at one end of the external unit 4, an adjusting block is provided at the bottom of the limit frame 3 at the top of the adjusting groove 2, shock-absorbing pads 8 are provided on the inner side of the limit frame 3, a buffer pad is provided on the top of the mounting base 1 at the bottom of the external unit 4, a connecting rod 5 is provided between the limit frames 3 at the top of the external unit 4, a limit ring 7 is provided on the periphery of the water tank 6, and limit bolts 9 are provided on both sides of the limit ring 7.
[0019] Description of working principle: The staff first places the outdoor unit 4 and the water tank 6 on the mounting base 1 indoors, adjusts the spacing of the limit frame 3 by adjusting the block and the adjusting slot 2, until the limit frame 3 is adjusted to be close to the outdoor unit 4, and then fixes the limit frame 3 by installing the connecting rod 5 and the fixing bolt, thereby completing the limit fixation of the outdoor unit 4. After placing the cylindrical water tank 6 in the limit ring 7, the limit ring 7 is pressed against the water tank 6 by installing and tightening the limit bolt 9, thereby completing the limit fixation of the water tank 6. At this time, the staff only needs to complete the pipeline line connection deployment indoors, and then transport or hoist the mounting base 1 as a whole to the outdoor air-conditioning platform to complete the installation and deployment work, thereby solving the problems of existing batch installation and subsequent troublesome and dangerous deployment of pipeline lines in outdoor high-altitude environments, and increasing the practicality of the device.
[0020] The mounting base 1 is mainly used for mounting the external unit 4 and the water tank 6. When selecting, conventional selections can be made in the prior art according to the needs.
[0021] The adjusting groove 2 is mainly used for adjusting the limiting frame 3. When selected, an adjusting block is provided at the bottom of the limiting frame 3 at the top of the adjusting groove 2.
[0022] The limiting frame 3 is mainly used for limiting and fixing the external unit 4. When selecting, a conventional one can be selected from the existing technology according to the needs.
[0023] The external unit 4 is mainly an external unit 4 of an air-energy water heater. When selecting, a conventional selection can be made in the prior art according to the needs.
[0024] The connecting rod 5 is mainly used to connect and fix the limiting frame 3. When selected, the connecting rod 5 adopts a threaded rod, and the outer periphery of the connecting rod 5 outside the limiting frame 3 is provided with a fixing bolt.
[0025] The water tank 6 is mainly a water tank 6 of an air energy water heater. When selecting, a conventional selection can be made in the prior art according to the needs.
[0026] The limiting ring 7 is mainly used to limit and fix the water tank 6. When selected, the limiting ring 7 is composed of two semicircular clamping rings, and the limiting ring 7 is connected by a limiting bolt 9.
[0027] The shock-absorbing pad 8 is mainly used to provide a shock-absorbing and buffering effect on the connection between the limiting frame 3 and the external unit 4. When selecting, a conventional one can be selected from the existing technology according to the needs.
[0028] The limiting bolt 9 is mainly used to connect and fix the limiting ring 7. When selecting, a conventional one can be selected from the existing technology according to the needs.
[0029] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.
Claims
1. An air-energy water heater installation assembly, comprising a mounting base (1), an external unit (4) and a water tank (6), characterized in that: An external machine (4) and a water tank (6) are respectively arranged on the top of the mounting seat (1); limiting frames (3) are arranged at both ends of the external machine (4); a connecting rod (5) is arranged between the limiting frames (3) at the top of the external machine (4); a limiting ring (7) is arranged on the periphery of the water tank (6); and limiting bolts (9) are arranged on both sides of the limiting ring (7).
2. The air energy water heater installation assembly according to claim 1, characterized in that: A shock-absorbing pad (8) is provided on the inner side of the limiting frame (3), and a buffer pad is provided on the top of the mounting seat (1) at the bottom of the external machine (4).
3. The air energy water heater installation assembly according to claim 1, characterized in that: An adjusting groove (2) is provided inside the mounting seat (1) at one end of the external unit (4), and an adjusting block is provided at the bottom of the limiting frame (3) at the top of the adjusting groove (2).
4. The air energy water heater installation assembly according to claim 1, characterized in that: The connecting rod (5) is a threaded rod, and fixing bolts are provided on the periphery of the connecting rod (5) outside the limiting frame (3).
5. The air energy water heater installation assembly according to claim 1, characterized in that: The limiting ring (7) is composed of two semicircular clamping rings, and the limiting rings (7) are connected via a limiting bolt (9).