Inspection well lid elevation re-checking tool
By designing an inspection manhole cover elevation review tool with four vertical marking poles and marking lines, the problem of poor manhole cover elevation review accuracy in the existing technology is solved, and the precise measurement of the manhole cover elevation is achieved and is applicable to multiple scenarios, improving the efficiency of the manhole cover elevation review. Construction efficiency and pavement smoothness.
Patent Information
- Application Number
- CN202420393598.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-01
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-03-01
AI Technical Summary
In the existing technology, the inspection accuracy of the inspection manhole cover elevation is poor, and the pipeline elevation cannot be accurately measured, which affects the smoothness of the road surface and driving comfort.
An inspection manhole cover elevation review tool including four vertical marking rods is designed. The marking rods are equipped with assembly openings and marking holes. A square with the manhole cover as an inscribed circle is formed through the marking lines. The marking holes and scales help in accurate measurement. Manhole cover elevation is suitable for multiple construction scenarios.
It achieved an all-round review of manhole covers, improved construction efficiency, ensured the rationality of the paving thickness of the upper layer, and improved road surface smoothness and driving comfort.
Smart Images

Figure CN221859429U_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of municipal road construction, and specifically relates to a tool for checking the elevation of a manhole cover. Background Art
[0002] During the construction of municipal highways, the lower layer is constructed first and then the upper layer. After the lower layer is completed, it will be used as a construction access road for other subsequent projects. Therefore, a certain period of time is required between the completion of the lower layer construction and the start of the upper layer construction. When construction vehicles are driving on the lower layer, they will repeatedly roll over the lower layer and ancillary facilities such as manhole covers, which may change the elevation of the manhole cover or the lower layer. Therefore, before laying the upper layer, the relative elevation of the manhole cover and the lower layer needs to be reviewed to determine the paving thickness of the upper layer to avoid unreasonable paving thickness of the upper layer leading to uneven road surface and affecting driving comfort.
[0003] In the prior art, the hanging wire method is often used to measure the elevation and slope of the top of the manhole cover. This method is easily affected by the flatness of the underlying layer or the elasticity of the wire and cannot accurately measure the pipeline elevation. Summary of the invention
[0004] The invention provides a tool for checking the elevation of a manhole cover, which solves the problem of poor checking accuracy of the manhole cover in the prior art.
[0005] The technical solution of the present invention is as follows:
[0006] A tool for checking the elevation of a manhole cover comprises four marking rods placed vertically around the manhole cover, wherein an assembly opening is provided at the upper end of the marking rods, and the upper ends of the marking rods are sequentially connected via assembly rods that can cooperate with the assembly opening; a plurality of marking holes that can indicate the paving thickness of the upper layer are provided at a plurality of heights at the lower end of the marking rods, and the marking holes at the same height of the marking rods are connected in series via a plurality of marking lines, and the marking lines are connected in series to form a square with the manhole cover as the inscribed circle.
[0007] Furthermore, the marking holes include a first marking hole, a second marking hole and a third marking hole, the center of the first marking hole is 3 cm away from the bottom surface of the marking rod, the center of the second marking hole is 4 cm away from the bottom surface of the marking rod, and the center of the third marking hole is 5 cm away from the bottom surface of the marking rod.
[0008] Furthermore, hard rope flowers are provided at both ends of the marking line.
[0009] Furthermore, the cross section of the marking rod is rectangular, and gaskets are provided at the four corners of the bottom surface of the marking rod.
[0010] Furthermore, scales are provided between the marking holes.
[0011] Due to the adoption of the above technical solution, the beneficial effects of the present invention are:
[0012] 1. This application helps to conduct a comprehensive review of the manhole cover by marking the line tangent to the manhole cover.
[0013] 2. This application can change the marking line height according to the expected paving height of the upper layer, which is convenient for application in multiple construction scenarios.
[0014] 3. As a preferred embodiment of the present application, the scales between the marked holes in the present application can show the deviation height of the manhole cover in each direction, which is helpful for the subsequent adjustment of the manhole cover elevation and improves the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application.
[0016] Figure 1 A schematic diagram of the structure of a manhole cover elevation verification tool provided for this application;
[0017] Figure 2 This is a partial enlarged view of the lower end of the marking rod described in this application.
[0018] In the attached picture:
[0019] 1. Manhole cover; 2. Marking rod; 3. Assembly port; 4. Assembly rod; 5. Marking hole; 6. Marking line; 6-1. First marking hole; 6-2. Second marking hole; 6-3. Third marking hole; 7. Rope flower; 8. Gasket; 9. Scale. DETAILED DESCRIPTION
[0020] In order to enable those skilled in the art to better understand the content of the present invention, the present invention is further described in conjunction with the accompanying drawings and specific implementation methods.
[0021] Based on the background technology, during the road construction process, when the upper layer is paved, it is necessary to verify the elevation of the manhole cover 1. The present application provides a tool for verifying the elevation of the manhole cover 1, including four marking rods 2 placed vertically around the manhole cover 1, and the upper ends of the marking rods 2 are provided with assembly openings 3, and the upper ends of the marking rods 2 are sequentially connected by assembly rods 4 that can cooperate with the assembly openings 3; several heights of the lower ends of the marking rods 2 are provided with several marking holes 5 that can indicate the paving thickness of the upper layer, and the marking holes 5 at the same height of each of the marking rods 2 are connected in series by several marking lines 6, and the marking lines 6 are connected in series to form a square with the manhole cover 1 as the inscribed circle.
[0022] As attached Figure 1 and attached Figure 2As shown, the marking rod 2 is flattened at the top and bottom, and the upper end of the marking rod 2 is provided with assembly openings 3 in two directions, and the assembly rod 4 is placed horizontally and the two ends are cut to match the assembly openings 3. Since there may be errors between different manhole covers 1, the assembly rod 4 and the assembly openings 3 should be designed to be detachably connected. The purpose of the assembly rod 4 is mainly to ensure that the marking rod 2 remains vertical. After the assembly rods 4 are connected in sequence, each marking rod 2 forms a stable skeleton. The lower end of the marking rod 2 is provided with marking holes facing in two directions, and the marking holes pass through the marking rod 2. The marking line 6 connects the marking holes at the same height in series and then tightens them. When in use, the marking line 6 should be stretched straight. In addition, the marking line 6 can have a certain elasticity, which helps to correct the distance of the entire device. After the marking line 6 is passed through, the square formed should use the manhole cover 1 as the inscribed circle to more accurately show the elevation of each direction.
[0023] As a preferred embodiment of the present application, the marking hole 5 includes a first marking hole 6-1, a second marking hole 6-2 and a third marking hole 6-3, the center of the first marking hole 6-1 is 3 cm away from the bottom surface of the marking rod 2, the center of the second marking hole 6-2 is 4 cm away from the bottom surface of the marking rod 2, and the center of the third marking hole 6-3 is 5 cm away from the bottom surface of the marking rod 2. Normally, the paving height of the upper layer is generally 3 to 5 cm. When the verification tool is placed on the lower layer, the bottom surface of the marking rod 2 is 0, and three marking holes with heights of 3 cm, 4 cm and 5 cm are set upward. After threading at the required position, it can be observed whether the elevation of the inspection well cover 1 meets the requirements.
[0024] As a preferred embodiment of the present application, hard rope flowers 7 are provided at both ends of the marking line 6. The rope flowers 7 are provided to facilitate the passing of the marking line 6, and the rope flowers 7 can be stuck on the side of the marking rod 2 after passing through, so as to facilitate the installation and removal of the marking line 6.
[0025] As a preferred embodiment of the present application, the cross section of the marking rod 2 is rectangular, and gaskets 8 are provided at the four corners of the bottom surface of the marking rod 2. The gasket 8 is provided at the bottom of the marking rod 2, and the gasket 8 is relatively thin, which can avoid the situation where the verification tool is tilted due to uneven road surface and improve the verification accuracy.
[0026] As a preferred embodiment of the present application, scales 9 are provided between the marked holes. The scales 9 between the marked holes are marked from bottom to top starting from the center of the marked hole. The scales 9 between the marked holes are not cumulative. For example, after marking 0~10mm between the bottom marked hole and the marked hole above it, 0~10mm is also marked between other marked holes.
[0027] The above description is only the basic principle and preferred embodiments of the present invention. Improvements and substitutions made by those skilled in the art based on the present invention belong to the protection scope of the present invention.
Claims
1. A tool for checking the elevation of a manhole cover, characterized in that: It comprises four marking rods vertically placed around the manhole cover, the upper ends of the marking rods are provided with assembly openings, and the upper ends of the marking rods are sequentially connected through assembly rods that can cooperate with the assembly openings; A plurality of marking holes indicating the thickness of the upper layer are provided at a plurality of heights of the lower end of the marking rod, and the marking holes at the same height of the marking rods are connected in series through a plurality of marking lines, and the marking lines are connected in series to form a square with the manhole cover as the inscribed circle.
2. A tool for checking the elevation of a manhole cover according to claim 1, characterized in that: The marking holes include a first marking hole, a second marking hole and a third marking hole. The center of the first marking hole is 3 cm away from the bottom surface of the marking rod, the center of the second marking hole is 4 cm away from the bottom surface of the marking rod, and the center of the third marking hole is 5 cm away from the bottom surface of the marking rod.
3. A tool for checking the elevation of a manhole cover according to claim 1 or 2, characterized in that: Both ends of the marking line are provided with hard rope flowers.
4. A tool for checking the elevation of a manhole cover according to claim 3, characterized in that: The cross section of the marking rod is rectangular, and gaskets are arranged at the four corners of the bottom surface of the marking rod.
5. A tool for checking the elevation of a manhole cover according to claim 4, characterized in that: Scales are arranged between the marking holes.