PE (polyethylene) pipeline placing rack

By designing the main spring, auxiliary spring and stopper structure of the PE pipe storage rack, the problem of deformation of the bottom pipe due to excessive pressure is solved, the stable storage of the pipes is achieved, and the use effect of the storage rack is improved.

CN221874637UActive Publication Date: 2024-10-22XINJIANG JUNCHENG HAOXIN PLASTIC IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323452888.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-18
Publication Date
2024-10-22
Estimated Expiration
2033-12-18

AI Technical Summary

Technical Problem

When PE pipes are stored, the pressure at the bottom is greater, which can easily lead to deformation and damage.

Method used

A PE pipe placement rack is designed, which uses a combined structure of main spring, auxiliary spring, bottom rod and stopper rod to gradually reduce the pressure of the bottom pipe when the pipe is placed. Through the cooperation of the hydraulic cylinder and the clamping plate, multi-layer Stable support for pipes.

Benefits of technology

It effectively avoids the deformation of the bottom pipe due to excessive pressure, ensures the stable storage of the pipe, and increases the service life of the storage rack.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221874637U_ABST
    Figure CN221874637U_ABST
Patent Text Reader

Abstract

The utility model provides a PE pipeline placing rack, and relates to the technical field of PE pipeline storage. The PE pipeline placing frame comprises a grounding frame, vertical rods are fixedly connected to the four corners of the upper surface of the grounding frame, the outer surface of each vertical rod is movably sleeved with a bottom ring, the bottom face of each bottom ring is fixedly connected with a main spring, and the four vertical rods are located in the four main springs correspondingly; the lower ends of the four main springs are fixedly connected with the circumferential side faces of the four vertical rods respectively, two bottom rods are arranged among the four vertical rods, the two ends of the two bottom rods are fixedly connected with the four bottom rings respectively, the two bottom rings located on the left side are fixedly connected through the main rods, and the two bottom rings located on the right side are fixedly connected through the main rods. According to the PE pipeline placing frame, the main springs, the auxiliary springs, the bottom rods and the stop rods are arranged, so that a pipeline located on the lower portion is not subjected to pressure of a pipeline located on the upper portion, and the problem that the pipeline located on the lowermost portion is prone to deformation when being stacked due to large pressure is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of PE pipe storage, in particular to a PE pipe placement rack. Background Art

[0002] PE pipes are made of polyethylene plastic. PE materials are widely used in water supply and drainage manufacturing due to their high strength, high temperature resistance, corrosion resistance, non-toxicity, and wear resistance. Because it will not rust, it is an ideal pipe to replace ordinary iron water supply pipes.

[0003] PE pipes are generally stacked in rows on a rack when stored, which causes the PE pipes at the bottom to be subjected to greater pressure, making the PE pipes at the bottom easily deformed, causing damage to the PE pipes. Therefore, a PE pipe rack is proposed. Utility Model Content

[0004] In view of the deficiencies in the prior art, the utility model provides a PE pipe placement rack, which solves the problem that the pipe at the bottom is subjected to greater pressure and is prone to deformation when stacked.

[0005] Technical Solution

[0006] To achieve the above purpose, the utility model is implemented through the following technical solutions: a PE pipe placement rack, including a grounding frame, the four corners of the upper surface of the grounding frame are fixedly connected with vertical poles, the outer surface of each vertical pole is movably sleeved with a bottom ring, the bottom surface of each bottom ring is fixedly connected with a main spring, the four vertical poles are respectively located inside the four main springs, the lower ends of the four main springs are respectively fixedly connected to the circumferential side surfaces of the four vertical poles, two bottom poles are arranged between the four vertical poles, the two ends of the two bottom poles are respectively fixedly connected to the four bottom rings, the two bottom rings on the left and the two bottom rings on the right are fixedly connected through the main pole, and auxiliary poles are arranged above the two main poles, the front and rear ends of each auxiliary pole are fixedly connected with a cross pipe, and the other side of the cross pipe is fixedly connected with A force ring, each force ring is slidably sleeved on the outer surface of an adjacent vertical pole, the bottom surface of each force ring is fixedly connected with a secondary spring, the secondary spring is movably sleeved on the outer surface of the adjacent vertical pole, the lower end of the secondary spring is fixedly connected to the outer surface of the adjacent vertical pole, the inside of the horizontal tube located on the right side of the grounding frame axis is slidably inserted with a force rod, a longitudinal plate is provided on the right side of the secondary rod located on the right side of the grounding frame axis, the right end of the force rod is fixedly connected to the left side surface of the adjacent longitudinal plate, the left side of the longitudinal plate is fixedly connected with a tension spring, the left end of the tension spring is fixedly connected to the right side surface of the adjacent secondary rod, a baffle rod is provided on the left side of each horizontal tube, the lower end of each baffle rod is fixedly connected to the upper surface of the adjacent lower force ring, and the lower end of the baffle rod located at the bottom is fixedly connected to the upper surface of the adjacent bottom ring.

[0007] Preferably, a flat rod is provided inside the tension spring, the left end of the flat rod is fixedly connected to the right side surface of the adjacent auxiliary rod, and the right end of the flat rod slides through the left side surface of the adjacent longitudinal plate.

[0008] Preferably, a hydraulic cylinder is fixedly inserted inside the grounding frame, a telescopic rod is fixedly connected to the upper surface of the right end of the hydraulic cylinder, a fixed frame is fixedly connected to the upper end of the telescopic rod, a clamping plate is provided below the longitudinal plate and on the front and rear sides of the tension spring, the right end of the clamping plate is fixedly connected to the left side of the fixed frame, and the shape of the clamping plate is an inverted "Z" shape.

[0009] Preferably, the left end of the stress-bearing rod is a conical tip structure, and the stress-bearing rod is arranged parallel to the bottom rod.

[0010] Preferably, the main rod and the auxiliary rod are arranged in parallel, and the main rod and the vertical rod are arranged vertically. A plurality of auxiliary rods are arranged above each main rod, and the plurality of auxiliary rods are distributed above the main rod at equal distances.

[0011] Preferably, the tension spring is arranged in parallel with the stress-bearing rod, and the stress-bearing rod located in front of the tension spring and the stress-bearing rod located behind the tension spring are symmetrically distributed front and back about the axis of the tension spring.

[0012] Beneficial Effects

[0013] The utility model provides a PE pipe placement rack, which has the following beneficial effects:

[0014] The PE pipe placement rack is provided with a main spring, a secondary spring, a bottom rod and a stop rod. When the pipe is first placed, the pipe will first fall onto the bottom rod. As the number of pipes on the bottom rod increases, the lowest stop rod moves downward. When the number of pipes meets the conditions, the stop rod detaches from the left side of the stress rod, so that the stress rod moves to the left above the pipe under the pull of the tension spring, so that when another pipe falls, it falls onto the stress rod, so that the secondary spring is gradually compressed. When the pipe continues to fall, the multiple layers of stress rods support the pipe respectively, so that the pipe at the bottom is not subjected to the pressure of the pipe above, thereby solving the problem that the pipe at the bottom is subjected to greater pressure and is prone to deformation during stacking.

[0015] The PE pipe placement rack is provided with a clamping plate and a connecting telescopic rod. When a plurality of force-bearing rods need to be pulled to the right at the same time, the fixing frame is pulled upward to stretch the connecting telescopic rod, and then the upper end of the clamping plate is clamped to the longitudinal rod. When the hydraulic cylinder controls the movement of the fixing frame, a plurality of longitudinal plates can be pulled to move at the same time. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the structure of the utility model;

[0017] Figure 2 This is a schematic diagram of the front view structure of the utility model;

[0018] Figure 3 This is a schematic diagram of the connection between the tension spring and the longitudinal plate of the utility model;

[0019] Figure 4 It is a schematic diagram of the connection between the transverse tube and the stress ring of the utility model.

[0020] Among them, 1 is a ground frame, 2 is a vertical pole, 3 is a main spring, 4 is a bottom ring, 5 is a main pole, 6 is a secondary pole, 7 is a horizontal tube, 8 is a force ring, 9 is a secondary spring, 10 is a force pole, 11 is a longitudinal plate, 12 is a tension spring, 13 is a baffle, 14 is a horizontal pole, 15 is a hydraulic cylinder, 16 is a connecting telescopic pole, 17 is a fixed frame, 18 is a card plate, and 19 is a bottom pole. Implementation

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] The utility model embodiment provides a PE pipe placement rack, such as Figure 1-4 As shown, it includes a grounding frame 1, and four corners of the upper surface of the grounding frame 1 are fixedly connected with upright poles 2, the outer surface of each upright pole 2 is movably sleeved with a bottom ring 4, and the bottom surface of each bottom ring 4 is fixedly connected with a main spring 3, the four upright poles 2 are respectively located inside the four main springs 3, and the lower ends of the four main springs 3 are respectively fixedly connected to the circumferential side surfaces of the four upright poles 2, two bottom poles 19 are arranged between the four upright poles 2, and the two ends of the two bottom poles 19 are respectively fixedly connected to the four bottom rings 4, the two bottom rings 4 on the left and the two bottom rings 4 on the right are fixedly connected through a main pole 5, and a secondary pole 6 is arranged above the two main poles 5, the main pole 5 is arranged parallel to the secondary pole 6, the main pole 5 is arranged perpendicular to the upright pole 2, and the top of each main pole 5 A plurality of auxiliary rods 6 are provided, and the plurality of auxiliary rods 6 are equidistantly distributed above the main rod 5 so that the multi-layer pipelines are equidistantly distributed. The front and rear ends of each auxiliary rod 6 are fixedly connected with a cross tube 7, and the other side of the cross tube 7 is fixedly connected with a force ring 8. Each force ring 8 is slidably sleeved on the outer surface of the adjacent vertical rod 2, and the bottom surface of each force ring 8 is fixedly connected with a secondary spring 9. The elasticity of the main spring 3 and the auxiliary spring 9 is equal. The auxiliary spring 9 is movably sleeved on the outer surface of the adjacent vertical rod 2, and the lower end of the auxiliary spring 9 is fixedly connected to the outer surface of the adjacent vertical rod 2. A force rod 10 is slidably inserted into the interior of the cross tube 7 located on the right side of the axis of the grounding frame 1. The left end of the force rod 10 is a conical tip structure, and the force rod 10 is arranged parallel to the bottom rod 19.

[0023] A longitudinal plate 11 is provided on the right side of the auxiliary rod 6 located on the right side of the axis of the grounding frame 1, the right end of the force-bearing rod 10 is fixedly connected to the left side of the adjacent longitudinal plate 11, and a tension spring 12 is fixedly connected to the left side of the longitudinal plate 11, and the left end of the tension spring 12 is fixedly connected to the right side of the adjacent auxiliary rod 6. The tension spring 12 has a tendency to pull the force-bearing rod 10 close to the longitudinal plate 11, and a flat rod 14 is provided inside the tension spring 12, and the left end of the flat rod 14 is fixedly connected to the right side of the adjacent auxiliary rod 6, and the right end of the flat rod 14 slides through the left side of the adjacent longitudinal plate 11, and the flat rod 14 prevents the longitudinal plate 11 from being misaligned with the auxiliary rod 6 when moving, and a hydraulic cylinder 15 is fixedly inserted inside the grounding frame 1, and the right end of the hydraulic cylinder 15 A connecting telescopic rod 16 is fixedly connected to the upper surface, and a fixing frame 17 is fixedly connected to the upper end of the connecting telescopic rod 16. A clamping plate 18 is provided below the longitudinal plate 11 and on both the front and rear sides of the tension spring 12. The right end of the clamping plate 18 is fixedly connected to the left side of the fixing frame 17. The clamping plate 18 is in an inverted "Z" shape. When the clamping plate 18 is in contact with the longitudinal plate 11, multiple clamping plates 18 are clamped with the longitudinal plate 11 through the fixing frame 17, so that the fixing frame 17 can simultaneously pull multiple longitudinal plates 11 to move when moving. The tension spring 12 is arranged parallel to the force-bearing rod 10, and the force-bearing rod 10 located in front of the tension spring 12 and the force-bearing rod 10 located behind the tension spring 12 are symmetrically distributed front and back about the axis of the tension spring 12.

[0024] A baffle rod 13 is provided on the left side of each transverse tube 7 , and the lower end of each baffle rod 13 is fixedly connected to the upper surface of the adjacent force-bearing ring 8 below, and the lower end of the baffle rod 13 located at the bottom is fixedly connected to the upper surface of the adjacent bottom ring 4 .

[0025] Working principle: when the pipeline is just being placed, the pipeline will first fall onto the bottom rod 19, and the main spring 3 will be gradually compressed. As the number of pipelines on the bottom rod 19 increases, the lowest baffle rod 13 will move downward. When the number of pipelines meets the conditions, the baffle rod 13 will be separated from the left side of the force-bearing rod 10, so that the force-bearing rod 10 will move to the left above the pipeline under the pull of the tension spring 12, and the force-bearing rod 10 will be inserted into the left side of the horizontal tube 7, so that when another pipeline falls, it will fall onto the force-bearing rod 10, so that the auxiliary spring 9 will be gradually compressed. When the pipeline continues to fall, the multiple layers of force-bearing rods 10 will gradually move to the left to support the pipeline respectively, so that the pipeline located below is not affected by the pressure of the pipeline above.

[0026] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A PE pipe placement rack, comprising a grounding frame (1), characterized in that: The four corners of the upper surface of the grounding frame (1) are fixedly connected to vertical poles (2), the outer surface of each vertical pole (2) is movably sleeved with a bottom ring (4), the bottom surface of each bottom ring (4) is fixedly connected to a main spring (3), the four vertical poles (2) are respectively located inside the four main springs (3), the lower ends of the four main springs (3) are respectively fixedly connected to the circumferential side surfaces of the four vertical poles (2), two bottom poles (19) are arranged between the four vertical poles (2), the two ends of the two bottom poles (19) are respectively fixedly connected to the four bottom rings (4), the two bottom rings (4) on the left and the two bottom rings (4) on the right are fixedly connected through the main pole (5), and the upper parts of the two main poles (5) are provided with auxiliary poles (6), the front and rear ends of each auxiliary pole (6) are fixedly connected to a transverse tube (7), the other side of the transverse tube (7) is fixedly connected to a force ring (8), and each force ring (8) is slidably sleeved on the outer surface of the adjacent vertical pole (2). The bottom surface of each force ring (8) is fixedly connected to a secondary spring (9), the secondary spring (9) is movably sleeved on the outer surface of the adjacent vertical pole (2), the lower end of the secondary spring (9) is fixedly connected to the outer surface of the adjacent vertical pole (2), the inside of the horizontal tube (7) located on the right side of the axis of the grounding frame (1) is slidably plugged with a force rod (10), the right side of the secondary rod (6) located on the right side of the axis of the grounding frame (1) is provided with a longitudinal plate (11), the right end of the force rod (10) is connected to the The left sides of adjacent longitudinal plates (11) are fixedly connected, a tension spring (12) is fixedly connected to the left side of the longitudinal plate (11), the left end of the tension spring (12) is fixedly connected to the right side of the adjacent auxiliary rod (6), a baffle rod (13) is provided on the left side of each transverse tube (7), the lower end of each baffle rod (13) is fixedly connected to the upper surface of the adjacent lower force ring (8), and the lower end of the baffle rod (13) located at the bottom is fixedly connected to the upper surface of the adjacent bottom ring (4).

2. A PE pipe placement rack according to claim 1, characterized in that: A flat rod (14) is arranged inside the tension spring (12), the left end of the flat rod (14) is fixedly connected to the right side surface of the adjacent auxiliary rod (6), and the right end of the flat rod (14) slides through the left side surface of the adjacent longitudinal plate (11).

3. A PE pipe placement rack according to claim 1, characterized in that: A hydraulic cylinder (15) is fixedly inserted inside the ground frame (1), a connecting telescopic rod (16) is fixedly connected to the upper surface of the right end of the hydraulic cylinder (15), and a fixing frame (17) is fixedly connected to the upper end of the connecting telescopic rod (16). A clamping plate (18) is provided below the longitudinal plate (11) and on both the front and rear sides of the tension spring (12). The right end of the clamping plate (18) is fixedly connected to the left side of the fixing frame (17), and the shape of the clamping plate (18) is an inverted "Z"-shaped structure.

4. A PE pipe placement rack according to claim 1, characterized in that: The left end of the stress-bearing rod (10) is a conical tip structure, and the stress-bearing rod (10) is arranged in parallel with the bottom rod (19).

5. The PE pipe placement rack according to claim 1, characterized in that: The main rod (5) and the auxiliary rod (6) are arranged in parallel, the main rod (5) and the vertical rod (2) are arranged perpendicularly, and a plurality of auxiliary rods (6) are arranged above each main rod (5), and the plurality of auxiliary rods (6) are distributed above the main rod (5) at equal distances.

6. A PE pipe placement rack according to claim 1, characterized in that: The tension spring (12) and the force-bearing rod (10) are arranged in parallel, and the force-bearing rod (10) located in front of the tension spring (12) and the force-bearing rod (10) located behind the tension spring (12) are symmetrically distributed front and back about the axis of the tension spring (12).