Air pipe mounting device for heating and ventilation clean air conditioning engineering
By designing a convenient installation device and utilizing clamping components, hydraulic rods and magnetic force, the problem of inconvenient installation of HVAC air ducts in the existing technology is solved, automated pipe clamping and stable installation are achieved, and operation efficiency and stability are improved. sex.
Patent Information
- Application Number
- CN202323561507.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-26
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-12-26
AI Technical Summary
Existing air duct installation equipment in HVAC engineering requires a lot of manual operations to fix and disassemble, and cannot be installed and disassembled conveniently, making the operation inconvenient.
An installation device including a base plate, traveling wheel, lifting assembly, working platform, clamping assembly and hydraulic rod is designed. The clamping assembly, hydraulic rod and elastic ring are used to conveniently clamp and disassemble the pipeline, and The pipe is kept stable by magnetic force.
It realizes convenient installation and disassembly of pipelines, reduces manual operation burden, improves installation convenience, and prevents pipeline wear through elastic rings and magnetic force, enhancing clamping stability.
Smart Images

Figure CN221876494U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of heating, ventilation and air conditioning, and in particular to an air duct installation device for a heating, ventilation and clean air conditioning project. Background Art
[0002] The application scope of HVAC ducts is very wide, including purification system return air ducts, central air conditioning ventilation ducts, industrial supply and exhaust air ventilation ducts, environmental protection system suction and exhaust ducts, mining gas extraction pipes, mining rubberized cloth air ducts, etc., and the thickness and specifications of HVAC ducts can be changed according to requirements. Usually when connecting, the two ends of the duct are always connected to the accessories. Under normal circumstances, there are no grooves at both ends of the HVAC duct and they are equipped with sealing rings. The clean air conditioning ducts can be made of cold-rolled galvanized steel plates, aluminum alloy plates, stainless steel plates and other materials. They have the advantages of smooth surface, not easy to accumulate dust, and corrosion resistance.
[0003] When using the existing installation equipment, the pipeline needs to be fixed, then moved to the desired position by a lifting device, and then disassembled after installation. This requires a lot of manual operations and cannot be installed and disassembled conveniently, which is very inconvenient.
[0004] To this end, we propose a duct installation device for HVAC clean air conditioning engineering. Utility Model Content
[0005] The utility model mainly solves the technical problems existing in the above-mentioned prior art and provides an air duct installation device for a HVAC clean air conditioning project.
[0006] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a duct installation device for a HVAC clean air conditioning project, comprising a base plate, wherein the four corners of the bottom of the base plate are provided with walking wheels for moving, a first lifting assembly for lifting is provided on the top of the base plate, a working platform is provided on the first lifting assembly, a fence for protection is surrounded on the top of the working platform, and a second lifting assembly is provided on the top of the working platform, a support plate is provided on the second lifting assembly, a clamping assembly for clamping the pipe is provided on the top of the support plate, the clamping assembly includes a limit slide rod and a clamping plate, and the clamping assembly is provided with an adjustment part for adjusting the limit slide rod and the clamping plate, and the adjustment part includes a third telescopic rod, a return spring and a sliding rod.
[0007] Furthermore, the first lifting assembly includes a first hydraulic rod and a first telescopic rod, the first hydraulic rod is arranged at the center position of the top of the base plate, the first telescopic rod is arranged at the four corners of the top of the base plate, the first hydraulic rod and the top of the first telescopic rod are both fixedly connected to the bottom outer wall of the working platform, and the second lifting assembly includes a second hydraulic rod and a second telescopic rod, the second hydraulic rod is arranged at the center position of the top of the working platform, the second telescopic rod is arranged at both ends of the top of the base plate, and the tops of the second hydraulic rod and the second telescopic rod are both fixedly connected to the bottom outer wall of the support plate.
[0008] Furthermore, limiting slide grooves are provided on both sides of the left and right ends of the top outer wall of the support plate, the limiting slide rod is slidably connected to the inner wall of the limiting slide groove, the clamping plate is fixedly connected to the top outer wall of the limiting slide rod, the limiting slide rod is inclined, and the tops of the two limiting slide rods on the same side are close to each other, and the inner side of the clamping plate is arc-shaped.
[0009] Furthermore, the outer walls of the two limiting slide bars on the same side opposite to each other are provided with wedge-shaped slide grooves, the wedge-shaped slide grooves are inclined, and the two ends of the slide bars are respectively slidably connected to the inner walls of the two wedge-shaped slide grooves.
[0010] Furthermore, the third telescopic rod and the bottom of the return spring are fixedly connected to the top outer wall of the support plate, and the return spring is sleeved on the outer wall of the third telescopic rod, and the third telescopic rod and the top of the return spring are fixedly connected to the bottom outer wall of the sliding rod.
[0011] Furthermore, a connecting rod is fixedly connected to the center position of the top of the sliding rod, and a bearing plate is fixedly connected to the top of the connecting rod, and the upper end of the bearing plate is arc-shaped.
[0012] Furthermore, a plurality of elastic rings arranged in a circle are fixedly connected to the inner side of the clamping plate, the outer side of the elastic ring is arc-shaped and the inner side is a hollow structure, and the elastic ring surrounds the inner side of the clamping plate.
[0013] Furthermore, a fixing groove is provided on the outer wall of the clamping plate near one end of the inner side of the elastic ring, an elastic ball is fixedly connected to the inner wall of the fixing groove, and a plurality of buffer cavities arranged in a circle are provided on the inner wall of the fixing groove, a second magnet is fixedly connected to one end of the buffer cavity away from the fixing groove, a first magnet is slidably connected to the inner wall of the buffer cavity, and the first magnet and the second magnet have the same magnetic poles at one relative end.
[0014] Beneficial Effects
[0015] The utility model provides a device for installing air ducts in a HVAC clean air conditioning project. It has the following beneficial effects:
[0016] (1) This HVAC clean air conditioning engineering air duct installation device can conveniently clamp and disassemble the pipe through the provided clamping assembly, the first hydraulic rod and the second hydraulic rod, without manual operation, thereby reducing the burden of labor and improving the convenience of pipe installation.
[0017] (2) The duct installation device for a HVAC clean air conditioning project has an elastic ring. The design of the elastic ring allows the elastic ring to be deformed when the clamping plate clamps the pipe, so that the elastic ring fits against the pipe surface, thereby preventing the clamping plate from wearing the pipe and increasing the friction between the two, thereby improving the stability of pipe clamping.
[0018] (3) This air duct installation device for a HVAC clean air conditioning project has a first magnet and a second magnet. When the pipe shakes during installation, the stress of the shaking can squeeze the elastic ball through the elastic ring, driving the elastic ball to deform and enter the buffer cavity to squeeze the first magnet. The first magnet and the second magnet are close to each other, and the stress can be buffered by magnetic force, thereby maintaining the stability of the pipe and facilitating installation by the staff. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is the front view of the utility model;
[0020] Figure 2 This is a cross-sectional view of the utility model;
[0021] Figure 3 For this utility model Figure 2 A magnified view of part A;
[0022] Figure 4 This is a cross-sectional view of the clamping plate of the utility model;
[0023] Figure 5 For this utility model Figure 4 Enlarged view of part B.
[0024] Legend: 1. Base plate; 2. Travel wheel; 3. Working platform; 4. Support plate; 5. Fence; 6. First hydraulic rod; 7. First telescopic rod; 8. Second hydraulic rod; 9. Second telescopic rod; 10. Limiting slide; 11. Limiting slide rod; 12. Clamping plate; 13. Third telescopic rod; 14. Return spring; 15. Wedge slide; 16. Sliding rod; 17. Connecting rod; 18. Load-bearing plate; 19. Elastic ring; 20. Elastic ball; 21. Buffer chamber; 22. First magnet; 23. Second magnet. DETAILED DESCRIPTION
[0025] Embodiment 1: A HVAC clean air conditioning engineering air duct installation device, such as Figure 1 , Figure 2 and Figure 3As shown, it includes a base plate 1, and four corners of the bottom of the base plate 1 are each provided with walking wheels 2 for moving, a first lifting assembly for lifting is provided on the top of the base plate 1, a working platform 3 is provided on the first lifting assembly, the top of the working platform 3 is surrounded by a fence 5 for protection, and a second lifting assembly is provided on the top of the working platform 3, a support plate 4 is provided on the second lifting assembly, and a clamping assembly for clamping the pipe is provided on the top of the support plate 4, the clamping assembly includes a limit slide bar 11 and a clamping plate 12, and the clamping assembly is provided with an adjusting part for adjusting the limit slide bar 11 and the clamping plate 12, and the adjusting part includes a third telescopic rod 13, a return spring 14 and a sliding rod 16.
[0026] The first lifting assembly includes a first hydraulic rod 6 and a first telescopic rod 7. The first hydraulic rod 6 is arranged at the top center position of the base plate 1, and the first telescopic rod 7 is arranged at the four corners of the top of the base plate 1. The tops of the first hydraulic rod 6 and the first telescopic rod 7 are fixedly connected to the bottom outer wall of the working platform 3. The second lifting assembly includes a second hydraulic rod 8 and a second telescopic rod 9. The second hydraulic rod 8 is arranged at the top center position of the working platform 3, and the second telescopic rod 9 is arranged at both ends of the top of the base plate 1. The tops of the second hydraulic rod 8 and the second telescopic rod 9 are fixedly connected to the bottom outer wall of the support plate 4.
[0027] Limiting grooves 10 are provided on both sides of the left and right ends of the top outer wall of the support plate 4, a limiting slide bar 11 is slidably connected to the inner wall of the limiting slide bar 10, a clamping plate 12 is fixedly connected to the top outer wall of the limiting slide bar 11, the limiting slide bar 11 is inclined, and the tops of the two limiting slide bars 11 on the same side are close to each other, and the inner side of the clamping plate 12 is arc-shaped.
[0028] The outer walls of the two limiting slide bars 11 on the same side are both provided with wedge-shaped slide grooves 15 on the opposite sides. The wedge-shaped slide grooves 15 are inclined, and the two ends of the slide bar 16 are slidably connected to the inner walls of the two wedge-shaped slide grooves 15 respectively.
[0029] The bottoms of the third telescopic rod 13 and the return spring 14 are fixedly connected to the top outer wall of the support plate 4, and the return spring 14 is sleeved on the outer wall of the third telescopic rod 13, and the tops of the third telescopic rod 13 and the return spring 14 are fixedly connected to the bottom outer wall of the sliding rod 16.
[0030] A connecting rod 17 is fixedly connected to the center position of the top of the sliding rod 16 , and a bearing plate 18 is fixedly connected to the top of the connecting rod 17 . The upper end of the bearing plate 18 is arc-shaped.
[0031] In summary, by means of the provided clamping assembly, the first hydraulic rod 6 and the second hydraulic rod 8, the pipeline can be conveniently clamped and disassembled without manual operation, thereby reducing the burden of labor and improving the convenience of pipeline installation.
[0032] Embodiment 2: Based on Embodiment 1, refer to Figure 4A plurality of elastic rings 19 arranged in a circle are fixedly connected to the inner side of the clamping plate 12 . The outer side of the elastic ring 19 is arc-shaped and the inner side is a hollow structure, and the elastic ring 19 surrounds the inner side of the clamping plate 12 .
[0033] By setting the elastic ring 19 and designing the elastic ring 19, when the clamping plate 12 clamps the pipe, the elastic ring 19 can be deformed to fit the pipe surface, thereby preventing the clamping plate 12 from causing wear to the pipe and increasing the friction between the two to improve the stability of pipe clamping.
[0034] like Figure 4 and Figure 5 As shown, a fixing groove is provided on the outer wall of the clamping plate 12 near one end of the inner side of the elastic ring 19, an elastic ball 20 is fixedly connected to the inner wall of the fixing groove, and a plurality of buffer cavities 21 arranged in a circle are provided on the inner wall of the fixing groove, a second magnet 23 is fixedly connected to one end of the buffer cavity 21 away from the fixing groove, a first magnet 22 is slidably connected to the inner wall of the buffer cavity 21, and the first magnet 22 and the second magnet 23 have the same magnetic poles at one opposite end.
[0035] By setting the first magnet 22 and the second magnet 23, when the pipeline shakes during installation, the stress of the shaking can squeeze the elastic ball 20 through the elastic ring 19, driving the elastic ball 20 to deform and enter the buffer cavity 21 to squeeze the first magnet 22. The first magnet 22 and the second magnet 23 are close to each other, and the stress can be buffered by magnetic force, thereby maintaining the stability of the pipeline and facilitating installation by the staff.
[0036] The working principle of the utility model is as follows: when it is necessary to install the pipeline, the pipeline is hoisted to the top of the bearing plate 18 by hoisting. At this time, the third telescopic rod 13 and the return spring 14 at the bottom can be squeezed by the gravity of the pipeline. The return spring 14 can be squeezed to shrink and drive the third telescopic rod 13 to shrink, and then drive the sliding rod 16, the connecting rod 17 and the bearing plate 18 to move downward, and the sliding rod 16 can slide in the wedge-shaped slide groove 15, and then drive the limiting slide bars 11 on both sides to slide in the limiting slide groove 10 and approach each other, and the limiting slide bar 11 can drive the clamping plate 12 to approach each other to clamp the pipeline, and the first hydraulic rod 6 and the second hydraulic rod 8 can be used to lift and lower, and the pipeline is moved to a suitable position for installation. After the installation is completed, the first hydraulic rod 6 and the second hydraulic rod 8 are lowered. At this time, the pipeline no longer squeezes the bearing plate 18, and the sliding rod 16 can be driven to rise by the elastic force of the return spring 14, and then the limiting slide bars 11 and the clamping plate 12 on both sides are driven to move away from each other, and no longer clamp the pipeline.
[0037] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. A duct installation device for a HVAC clean air conditioning project, comprising a base plate (1), characterized in that: The bottom four corners of the base plate (1) are all provided with walking wheels (2) for traveling, the top of the base plate (1) is provided with a first lifting assembly for lifting, a working platform (3) is provided on the first lifting assembly, the top of the working platform (3) is surrounded by a fence (5) for protection, and a second lifting assembly is provided on the top of the working platform (3), a support plate (4) is provided on the second lifting assembly, a clamping assembly for clamping the pipe is provided on the top of the support plate (4), the clamping assembly includes a limit slide bar (11) and a clamping plate (12), and the clamping assembly is provided with an adjustment part for adjusting the limit slide bar (11) and the clamping plate (12), and the adjustment part includes a third telescopic rod (13), a return spring (14) and a sliding rod (16).
2. The HVAC clean air conditioning engineering air duct installation device according to claim 1 is characterized in that: The first lifting assembly comprises a first hydraulic rod (6) and a first telescopic rod (7); the first hydraulic rod (6) is arranged at the center position of the top of the base plate (1); the first telescopic rod (7) is arranged at the four corners of the top of the base plate (1); the tops of the first hydraulic rod (6) and the first telescopic rod (7) are fixedly connected to the bottom outer wall of the working platform (3); the second lifting assembly comprises a second hydraulic rod (8) and a second telescopic rod (9); the second hydraulic rod (8) is arranged at the center position of the top of the working platform (3); the second telescopic rod (9) is arranged at both ends of the top of the base plate (1); the tops of the second hydraulic rod (8) and the second telescopic rod (9) are fixedly connected to the bottom outer wall of the support plate (4).
3. The HVAC clean air conditioning engineering air duct installation device according to claim 1 is characterized in that: The support plate (4) has limit slide grooves (10) on both sides of the left and right sides of the top outer wall of the two ends, the limit slide rod (11) is slidably connected to the inner wall of the limit slide groove (10), and the clamping plate (12) is fixedly connected to the top outer wall of the limit slide rod (11). The limit slide rod (11) is inclined, and the tops of the two limit slide rods (11) on the same side are close to each other, and the inner side of the clamping plate (12) is arc-shaped.
4. The HVAC clean air conditioning engineering air duct installation device according to claim 3 is characterized in that: The outer walls of the two limiting slide bars (11) on the same side opposite to each other are both provided with wedge-shaped slide grooves (15), the wedge-shaped slide grooves (15) are inclined, and the two ends of the slide bar (16) are respectively slidably connected to the inner walls of the two wedge-shaped slide grooves (15).
5. The HVAC clean air conditioning engineering air duct installation device according to claim 4 is characterized in that: The bottoms of the third telescopic rod (13) and the return spring (14) are fixedly connected to the top outer wall of the support plate (4), and the return spring (14) is sleeved on the outer wall of the third telescopic rod (13), and the tops of the third telescopic rod (13) and the return spring (14) are fixedly connected to the bottom outer wall of the sliding rod (16).
6. The HVAC clean air conditioning engineering air duct installation device according to claim 5 is characterized in that: A connecting rod (17) is fixedly connected to the center position of the top of the sliding rod (16), and a bearing plate (18) is fixedly connected to the top of the connecting rod (17), and the upper end of the bearing plate (18) is arc-shaped.
7. The HVAC clean air conditioning engineering air duct installation device according to claim 1 is characterized in that: A plurality of elastic rings (19) arranged in a circumferential pattern are fixedly connected to the inner side of the clamping plate (12); the outer side of the elastic ring (19) is arc-shaped and the inner side is a hollow structure; and the elastic ring (19) surrounds the inner side of the clamping plate (12).
8. The HVAC clean air conditioning engineering air duct installation device according to claim 7 is characterized in that: The outer wall of the clamping plate (12) is provided with a fixing groove at one end close to the inner side of the elastic ring (19), an elastic ball (20) is fixedly connected to the inner wall of the fixing groove, and a plurality of buffer cavities (21) arranged in a circumference are provided on the inner wall of the fixing groove, a second magnet (23) is fixedly connected to one end of the buffer cavity (21) away from the fixing groove, a first magnet (22) is slidably connected to the inner wall of the buffer cavity (21), and the first magnet (22) and the second magnet (23) have the same magnetic pole at one opposite end.