Sound barrier device for existing high-speed rail line
By arranging roadbed, foundation, sound barrier plate and expansion bolts on the high-speed railway line roadbed, combined with anchors, wire ropes, fences and drainage channels, the problem of difficult column installation is solved, and the supporting and fixing strength and noise of the sound barrier device are improved. Noise reduction effect.
Patent Information
- Application Number
- CN202322913353.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-30
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-10-30
AI Technical Summary
The existing sound barrier devices used on existing high-speed rail lines are unable to meet the needs of high-speed rail lines due to the difficulty in installing the columns under roadbed construction conditions, resulting in insufficient support and fixing strength.
By setting up the roadbed, foundation, sound barrier plate and expansion bolts on the high-speed railway line roadbed, using threaded expansion bodies for installation, combined with anchors, wire ropes, fences and drainage channels, the installation fixed part and support structure are formed to enhance the sound barrier device The support and fixation strength.
It effectively solves the problem of difficult column installation, improves the support and fixation strength of the sound barrier device, achieves effective noise reduction treatment of high-speed rail vehicle noise, and ensures the safety performance and noise reduction effect of the device.
Smart Images

Figure CN221877805U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a sound barrier device, in particular to a sound barrier device used for an existing high-speed railway line. Background Art
[0002] In order to prevent the noise generated during the operation of high-speed railway vehicles from polluting the environment, a sound barrier device needs to be installed on the high-speed railway line. Therefore, the sound barrier device used in the existing high-speed railway line is an important building component. In the existing sound barrier devices used in the existing high-speed railway lines, columns are used to support and fix the sound barrier panels. Due to the limitations of the roadbed construction conditions of the high-speed railway line, the installation of the columns on the roadbed of the high-speed railway line cannot be met, which affects the support and fixing strength of the sound barrier device of the existing high-speed railway line.
[0003] The utility model has the technical feature of arranging the installation fixing part at the lower end, and has carried out effective exploration and research on the technical level on the technical problem that the installation of the column on the roadbed of the high-speed railway line cannot be satisfied due to the limitation of the roadbed construction conditions of the high-speed railway line when using the column to support and fix the sound barrier plate.
[0004] The statements here only provide background technology related to the utility model and do not necessarily constitute prior art. The technical solution of the application of the present invention is made based on the technical briefing document provided by the applicant on June 15, 2023, which solves actual technical problems in the work process, and the existing technical problems, technical features and technical effects in the similar patent literature and background technology obtained through retrieval. Summary of the invention
[0005] The object of the utility model is a sound barrier device used for an existing high-speed railway line.
[0006] In order to overcome the above-mentioned technical shortcomings, the purpose of the utility model is to provide a sound barrier device for an existing high-speed railway line, thereby ensuring the supporting and fixing strength of the sound barrier device for the existing high-speed railway line.
[0007] In order to achieve the above-mentioned purpose, the technical solution adopted by the utility model is: it includes a development roadbed set on the existing high-speed railway line roadbed, a foundation set on the development roadbed, a sound barrier plate set on the foundation, and expansion bolts set between the sound barrier plate and the foundation.
[0008] Due to the design of the development roadbed, foundation, sound barrier panels and expansion bolts, the development roadbed and foundation are used to realize an extended support body on the existing high-speed railway line roadbed, the sound barrier panels are used to reduce the noise generated during the running of high-speed railway vehicles, the expansion bolts are used to install the sound barrier panels using threaded expansion bodies, and the installation and fixing part is set at the lower end, which solves the technical problem of using columns to support and fix the sound barrier panels due to the limitations of the roadbed construction conditions of the high-speed railway line and cannot meet the installation requirements of the columns on the roadbed of the high-speed railway line. Therefore, the supporting and fixing strength of the sound barrier device of the existing high-speed railway line is guaranteed.
[0009] The utility model is designed to connect the development roadbed, the foundation, the sound barrier plate and the expansion bolts to each other in a manner of arranging an installation fixing part at the lower end.
[0010] The utility model is designed to connect the expansion bolts with the development roadbed, the foundation and the sound barrier plate in a way of installing by using a threaded expansion body.
[0011] The technical effects of the above three technical solutions are: highlighting the technical feature of setting an installation fixing part at the lower end, and introducing the technical field of sound barrier devices used in existing high-speed railway lines.
[0012] The utility model is designed to further include a first accessory device, and the first accessory device is arranged between the sound barrier plate and the development roadbed, and the first accessory device is arranged to include anchor nails and steel wire ropes.
[0013] The utility model is designed to further include a second accessory device, and the second accessory device is arranged on the development roadbed, and the second accessory device is arranged as a fence.
[0014] The utility model is designed to further include a third accessory device, and the third accessory device is arranged on the development roadbed, and the third accessory device is arranged as a drainage channel.
[0015] The technical effects of the above three technical solutions are: realizing the installation of other components and expanding the technical effects of the utility model.
[0016] The utility model is designed to arrange a development roadbed on the outer side of the existing high-speed railway line roadbed, on which a foundation, anchor nails, fences and drainage channels are respectively arranged, and a sound barrier plate is arranged on the foundation, expansion bolts are respectively arranged on the sound barrier plate, between the sound barrier plate and the foundation, and between the fence and the development roadbed, and a steel wire rope is arranged between the expansion bolts on the sound barrier plate and the anchor nails.
[0017] The technical effect of the above technical scheme is that the basic technical scheme of the utility model is formed by sound barrier panels, foundations, expansion bolts, anchors, wire ropes, fences, drainage troughs and roadbed development, which solves the technical problems of the utility model.
[0018] The utility model is designed that the sound barrier plate is configured as a metal composite sound-absorbing plate and the sound barrier plate is configured to include an inner layer portion, an inner plate portion and an outer plate portion, the inner end face portion of the vertical portion of the inner plate portion is configured to be connected to one of the side face portions of the inner layer portion and the inner end face portion of the vertical portion of the outer plate portion is configured to be connected to the other side face portion of the inner layer portion, the transverse portion of the inner plate portion and the transverse portion of the outer plate portion are respectively configured to be contact-connected to the foundation and the transverse portion of the inner plate portion and the transverse portion of the outer plate portion are respectively configured to be connected to the foundation through expansion bolts, the upper end portion of the inner layer portion, the upper end portion of the inner plate portion and the upper end portion of the outer plate portion are respectively configured to be connected to the expansion bolts, the inner layer portion is configured to be a sound-absorbing sponge plate-like body and the inner plate portion and the outer plate portion are configured to be an L-shaped sheet-like body with a through hole body.
[0019] The technical effect of the above technical solution is that: the splint-type sound-absorbing panel is set up, and the inner plate part and the outer plate part are reinforced from the inner layer part.
[0020] The utility model is designed that the development roadbed is arranged as a roadbed with a cement and concrete mortar layer, and the interior of the lower end face of the development roadbed and the inner end face portion of the development roadbed are arranged to be overlapped and connected with the outer side of the roadbed of the existing high-speed railway line, the inner side of the upper end face of the development roadbed is arranged to be accommodated and connected with the drainage trough, and the outer side of the upper end face of the development roadbed is arranged to be connected with the fence through expansion bolts, and the middle part of the development roadbed is arranged to be connected with the foundation and anchor nails respectively.
[0021] The technical effect of the above technical solution is that: the setting of the extended roadbed surface is realized.
[0022] The utility model is designed that the foundation is arranged to include a pile-column part and a concrete mortar casting layer part, and the upper end face part of the pile-column part is arranged to be connected with the lower end face part of the concrete mortar casting layer part, the upper end face part of the concrete mortar casting layer part is arranged to be connected with the sound barrier plate through expansion bolts and the pile-column part is arranged to be implantedly connected with the development roadbed, the lower end face part of the concrete mortar casting layer part is arranged to be contact-connected with the development roadbed and the pile-column part is arranged to be a rod-shaped body, and the concrete mortar casting layer part is arranged to be a sheet-shaped body.
[0023] The technical effect of the above technical solution is that it realizes the reinforcement surface support setting of the sound barrier board.
[0024] The utility model is designed in which the bolts of the expansion bolts of the first part are arranged to be implantedly connected to the sound barrier plate and the nuts of the expansion bolts of the first part are arranged to be compressedly connected to the wire rope, the bolts of the expansion bolts of the second part are arranged to be implantedly connected to the sound barrier plate and the foundation and the nuts of the expansion bolts of the second part are arranged to be compressedly connected to the sound barrier plate, and the bolts of the expansion bolts of the third part are arranged to be implantedly connected to the fence and the roadbed development and the nuts of the expansion bolts of the third part are arranged to be compressedly connected to the fence.
[0025] The technical effect of the above technical solution is that the implantation and fixation of the expansion threaded body is realized.
[0026] The utility model is designed that the anchor is arranged as an L-shaped nail-shaped body, the lower end of the anchor is arranged to be connected with the development roadbed in an implantation manner, and the transverse part of the anchor is arranged to be connected with the steel wire rope in a through-type manner.
[0027] The utility model is designed that the steel wire rope is arranged as a single-strand rope and one end of the steel wire rope is arranged to be connected with the sound barrier plate through an expansion bolt, and the other end of the steel wire rope is arranged to be connected with the anchor nail in a surrounding manner and a steel wire rope buckle is arranged on the other end of the steel wire rope.
[0028] The technical effect of the above two technical solutions is that the upper end of the sound barrier board is obliquely fixed.
[0029] The utility model is designed that a fence is arranged to include an isolation piece part, a beam part and a rolling cage part, and the lower ends of the horizontal part of the isolation piece part and the beam part are respectively arranged to be connected to the developed roadbed through expansion bolts, the upper end of the beam part is arranged to be connected to the lower side surface of the rolling cage part, and the lower side surface of the rolling cage part is arranged to be contact-connected to the upper end surface of the vertical part of the isolation piece part, the isolation piece part is arranged to be a T-shaped mesh body, the beam part is arranged to be a rod-shaped body, and the rolling cage part is arranged to be a barbed wire rolling cage.
[0030] The technical effect of the above technical solution is: it realizes the setting of an isolation body on the developed roadbed and ensures the safety performance of the sound barrier board.
[0031] The utility model is designed that groove part I and groove part II are respectively arranged on the upper end surface part of the strip part of the drainage channel groove, and the strip part is arranged to be sunken in connection with the developed roadbed, groove part I and groove part II are respectively arranged to be distributed corresponding to the sound barrier plate, and the strip part is arranged to be a block body, and groove part I and groove part II are arranged to be a U-shaped groove body.
[0032] The technical effect of the above technical solution is: it realizes the setting of a drainage body on the developed roadbed and ensures the safety performance of the sound barrier board.
[0033] The utility model is designed that the sound barrier board and the foundation, expansion bolts and the development roadbed are arranged in a bottom fixed manner, and the sound barrier board, the foundation, the expansion bolts and the development roadbed are arranged in a top tightened and fixed manner, the sound barrier board, the foundation, the expansion bolts and the development roadbed and the fence are arranged in an external isolation manner, and the sound barrier board, the foundation, the expansion bolts and the development roadbed and the drainage trough are arranged in a built-in groove manner.
[0034] The utility model is designed that the concrete mortar pouring layer is respectively arranged to be connected with the inner plate part and the outer plate part.
[0035] In the present technical scheme, the sound barrier panels, foundations, expansion bolts and roadbed development are basic components and are also the necessary technical features of the present utility model; the anchors, wire ropes, fences and drainage troughs are functional components and are the features for achieving other technical effects of the present utility model; the designs of the inner layer, inner plate, outer plate, pile and column, concrete mortar casting layer, isolation sheet, beam, rolling cage, strip, trough part I and trough part II are technical features that comply with the Patent Law and its implementing rules.
[0036] In the present technical scheme, the roadbed, foundation, sound barrier plate and expansion bolts with an installation and fixing part arranged at the lower end are important technical features. In the technical field of sound barrier devices for existing high-speed rail lines, it has novelty, creativity and practicality. The terms in the present technical scheme can be explained and understood using patent documents in this technical field. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0038] Figure 1 It is a schematic diagram of the utility model.
[0039] Figure 2 It is a schematic diagram of the connection relationship between the sound barrier board 1, the foundation 2 and the drainage channel 7.
[0040] Figure 3 is a schematic diagram of the structure of the fence 6,
[0041] Sound barrier board-1, foundation-2, expansion bolts-3, anchors-4, wire ropes-5, fences-6, drainage troughs-7, roadbed development-8, inner layer-11, inner plate-12, outer plate-13, pile-column section-21, concrete mortar casting layer section-22, isolation sheet section-61, beam section-62, rolling cage section-63, strip section-71, trough section I-72, trough section II-73. DETAILED DESCRIPTION
[0042] According to the Examination Guidelines, terms such as “having”, “including” and “comprising” used in the present invention should be understood as not precluding the existence or addition of one or more other elements or combinations thereof.
[0043] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0044] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0045] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0046] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0047] Figure 1This is the first embodiment of the utility model, which is described in detail in conjunction with the accompanying drawings. It includes a sound barrier plate 1, a foundation 2, expansion bolts 3, anchors 4, steel wire ropes 5, fences 6, drainage troughs 7 and a development roadbed 8, and a development roadbed 8 is arranged on the outer side of the existing high-speed railway line roadbed, and the foundation 2, anchors 4, fences 6 and drainage troughs 7 are respectively arranged on the development roadbed 8, and a sound barrier plate 1 is arranged on the foundation 2, expansion bolts 3 are respectively arranged on the sound barrier plate 1, between the sound barrier plate 1 and the foundation 2, and between the fence 6 and the development roadbed 8, and a steel wire rope 5 is arranged between the expansion bolts 3 on the sound barrier plate 1 and the anchors 4.
[0048] In the present embodiment, the sound barrier panel 1 is configured as a metal composite sound absorbing panel and the sound barrier panel 1 is configured to include an inner layer portion 11, an inner plate portion 12 and an outer plate portion 13, the inner end face portion of the vertical portion of the inner plate portion 12 is configured to be connected to one of the side face portions of the inner layer portion 11 and the inner end face portion of the vertical portion of the outer plate portion 13 is configured to be connected to another side face portion of the inner layer portion 11, the transverse portion of the inner plate portion 12 and the transverse portion of the outer plate portion 13 are respectively configured to be contact-connected to the foundation 2 and the transverse portion of the inner plate portion 12 and the transverse portion of the outer plate portion 13 are respectively configured to be connected to the foundation 2 through expansion bolts 3, the upper end portion of the inner layer portion 11, the upper end portion of the inner plate portion 12 and the upper end portion of the outer plate portion 13 are respectively configured to be connected to the expansion bolts 3, the inner layer portion 11 is configured to be a sound absorbing sponge plate-like body and the inner plate portion 12 and the outer plate portion 13 are configured to be an L-shaped sheet-like body with a through hole.
[0049] The sound barrier board 1 forms a supporting connection point for the foundation 2 and the expansion bolts 3. The inner plate 12 and the outer plate 13 realize the connection with the foundation 2. The inner layer 11, the inner plate 12 and the outer plate 13 realize the connection with the expansion bolts 3. The technical purpose is to be used as a component to reduce the noise generated during the running of high-speed railway vehicles.
[0050] In the present embodiment, the development roadbed 8 is configured as a roadbed having a cement and concrete mortar layer and the interior of the lower end face of the development roadbed 8 and the inner end face portion of the development roadbed 8 are configured to be overlapped and connected to the outer side of the existing high-speed railway line roadbed, the inner side portion of the upper end face of the development roadbed 8 is configured to be accommodated and connected to the drainage trough 7 and the outer side portion of the upper end face of the development roadbed 8 is configured to be connected to the fence 6 through the expansion bolts 3, and the middle portion of the development roadbed 8 is configured to be connected to the foundation 2 and the anchor 4 respectively.
[0051] By developing the roadbed 8, supporting connection points for the foundation 2, expansion bolts 3, anchors 4, fences 6 and drainage troughs 7 are formed. By developing the roadbed 8, connection with the foundation 2, connection with the expansion bolts 3, connection with the anchors 4, connection with the fence 6 and connection with the drainage trough 7 are achieved. The technical purpose is to serve as a supporting carrier for the foundation 2, anchors 4, fences 6 and drainage troughs 7.
[0052] In this embodiment, the foundation 2 is configured to include a pile-column portion 21 and a concrete mortar casting layer portion 22, and the upper end surface portion of the pile-column portion 21 is configured to be connected to the lower end surface portion of the concrete mortar casting layer portion 22, the upper end surface portion of the concrete mortar casting layer portion 22 is configured to be connected to the sound barrier board 1 through the expansion bolt 3, and the pile-column portion 21 is configured to be implanted and connected to the development roadbed 8, the lower end surface portion of the concrete mortar casting layer portion 22 is configured to be contact-connected to the development roadbed 8, and the pile-column portion 21 is configured to be a rod-shaped body, and the concrete mortar casting layer portion 22 is configured to be a sheet-shaped body.
[0053] Through the foundation 2, supporting connection points for the sound barrier board 1, the expansion bolts 3 and the development roadbed 8 are formed. The connection with the sound barrier board 1 and the expansion bolts 3 are realized by the concrete mortar casting layer 22. The connection with the development roadbed 8 is realized by the pile column part 21 and the concrete mortar casting layer 22. The technical purpose is to serve as a supporting carrier for the sound barrier board 1.
[0054] In this embodiment, the bolts of the expansion bolts 3 of the first part are arranged to be implantedly connected to the sound barrier board 1 and the nuts of the expansion bolts 3 of the first part are arranged to be compressedly connected to the steel wire rope 5, the bolts of the expansion bolts 3 of the second part are arranged to be implantedly connected to the sound barrier board 1 and the foundation 2 and the nuts of the expansion bolts 3 of the second part are arranged to be compressedly connected to the sound barrier board 1, and the bolts of the expansion bolts 3 of the third part are arranged to be implantedly connected to the fence 6 and the roadbed 8 and the nuts of the expansion bolts 3 of the third part are arranged to be compressedly connected to the fence 6.
[0055] Through the expansion bolts 3, supporting connection points are formed for the sound barrier board 1, the foundation 2, the steel wire rope 5, the fence 6 and the developed roadbed 8. The expansion bolts 3 realize the connection with the sound barrier board 1, the connection with the foundation 2, the connection with the steel wire rope 5, the connection with the fence 6, and the connection with the developed roadbed 8. The technical purpose is to serve as a component for connecting the sound barrier board 1 and the foundation 2, the steel wire rope 5 and the sound barrier board 1, and the fence 6 and the developed roadbed 8.
[0056] In this embodiment, the anchor 4 is configured as an L-shaped nail-shaped body and the lower end of the anchor 4 is configured to be implanted and connected to the development roadbed 8 , and the transverse portion of the anchor 4 is configured to be through-connected to the steel wire rope 5 .
[0057] Through the anchor 4, a supporting connection point for the steel wire rope 5 and the development roadbed 8 is formed. The anchor 4 realizes the connection with the steel wire rope 5 and the development roadbed 8. Its technical purpose is to serve as a supporting carrier for the steel wire rope 5.
[0058] In this embodiment, the steel wire rope 5 is configured as a single strand rope and one end of the steel wire rope 5 is configured to be connected to the sound barrier board 1 through an expansion bolt 3, and the other end of the steel wire rope 5 is configured to be connected to the anchor 4 in a circumferential manner and a wire rope buckle is provided on the other end of the steel wire rope 5.
[0059] The steel wire rope 5 forms a supporting connection point for the sound barrier board 1, the expansion bolt 3 and the anchor 4. The steel wire rope 5 realizes the connection with the sound barrier board 1, the connection with the expansion bolt 3 and the connection with the anchor 4. Its technical purpose is to be used as a component for tightening and fixing the sound barrier board 1.
[0060] In this embodiment, the fence 6 is configured to include an isolation piece portion 61, a beam portion 62 and a rolling cage portion 63, and the transverse portion of the isolation piece portion 61 and the lower end heads of the beam portion 62 are respectively configured to be connected to the development roadbed 8 through expansion bolts 3, the upper end head of the beam portion 62 is configured to be connected to the lower side surface of the rolling cage portion 63, and the lower side surface of the rolling cage portion 63 is configured to be contact-connected to the upper end surface portion of the vertical portion of the isolation piece portion 61, the isolation piece portion 61 is configured to be a T-shaped mesh body, the beam portion 62 is configured to be a rod-shaped body, and the rolling cage portion 63 is configured to be a barbed wire rolling cage.
[0061] The fence 6 forms a supporting connection point for the expansion bolt 3 and the development roadbed 8. The isolation piece 61 realizes the connection with the expansion bolt 3. The isolation piece 61 and the beam 62 realize the connection with the development roadbed 8. The rolling cage 63 realizes the partition treatment at the top. The technical purpose is to be used as a component for isolating the outer side of the sound barrier board 1.
[0062] In this embodiment, groove portion I 72 and groove portion II 73 are respectively arranged on the upper end surface portions of the strip portion 71 of the drainage groove 7, and the strip portion 71 is arranged to be sunk in connection with the development roadbed 8, groove portion I 72 and groove portion II 73 are respectively arranged to be distributed corresponding to the sound barrier board 1, and the strip portion 71 is arranged to be a block body, and groove portion I 72 and groove portion II 73 are arranged to be a U-shaped groove body.
[0063] A supporting connection point between the sound barrier board 1 and the development roadbed 8 is formed through the drainage groove 7. The connection with the sound barrier board 1 is realized by the groove part I 72 and the groove part II 73. The connection with the development roadbed 8 is realized by the strip part 71. Its technical purpose is to serve as a component for drainage treatment of the installation part of the sound barrier board 1.
[0064] In this embodiment, the sound barrier panel 1 and the foundation 2, the expansion bolts 3 and the development roadbed 8 are arranged to be distributed in a bottom fixed manner, and the sound barrier panel 1, the foundation 2, the expansion bolts 3 and the development roadbed 8 and the anchors 4 and the wire ropes 5 are arranged to be distributed in a top tightened and fixed manner, the sound barrier panel 1, the foundation 2, the expansion bolts 3 and the development roadbed 8 and the fence 6 are arranged to be distributed in an external isolation manner, and the sound barrier panel 1, the foundation 2, the expansion bolts 3 and the development roadbed 8 and the drainage trough 7 are arranged to be distributed in a built-in groove manner, and the concrete mortar casting layer portion 22 is respectively arranged to be connected to the inner plate portion 12 and the outer plate portion 13.
[0065] The method of using this embodiment is as follows: a concrete base of a development roadbed 8 is laid on the outer side of the existing high-speed railway line, a drainage channel 7 is placed on the inner side of the upper end surface of the base of the development roadbed 8, a concrete mortar layer of the development roadbed 8 is spread on the base of the development roadbed 8, and after the concrete mortar layer of the development roadbed 8 solidifies, a pile hole is formed in the middle part of the concrete mortar layer of the development roadbed 8 using a drilling machine, and concrete mortar of the pile column part 21 is injected into the pile hole of the development roadbed 8 and concrete mortar is spread on the middle part of the concrete mortar layer of the development roadbed 8, and after the concrete mortar layer solidifies, a pile hole is formed in the middle part of the concrete mortar layer of the development roadbed 8 using a drilling machine, and concrete mortar of the pile column part 21 is injected into the pile hole of the development roadbed 8 and concrete mortar is spread on the middle part of the concrete mortar layer of the development roadbed 8, ... After the mortar solidifies, the pile column part 21 and the concrete mortar casting layer part 22 are obtained, and the anchor nail 4 is driven into the middle part of the concrete mortar layer of the roadbed 8. The concrete mortar casting layer part 22 and the outer part of the upper end surface of the concrete mortar layer of the roadbed 8 are drilled using a drilling machine. The transverse part of the inner plate part 12 and the transverse part of the outer plate part 13 are placed on the concrete mortar casting layer part 22, so that the gap between the inner plate part 12 and the outer plate part 13 corresponds to the thickness of the inner layer part 11, and the expansion bolt 3 is installed in the hole body of the concrete mortar casting layer part 22, the transverse part of the inner plate part 12 and the outer plate part 13. 3, the inner plate 12 and the outer plate 13 are installed on the concrete mortar casting layer 22 by the expansion bolt 3, the sound-absorbing sponge material of the inner layer 11 is injected between the inner plate 12 and the outer plate 13, and after the sound-absorbing sponge material between the inner plate 12 and the outer plate 13 solidifies, a drilling machine is used to drill holes at the upper end of the inner layer 11, the upper end of the inner plate 12, and the upper end of the outer plate 13, and the other end of the wire rope 5 is connected to the anchor nail 4 through the wire rope buckle, and the bolt of the expansion bolt 3 is placed on the upper end of the inner layer 11. The upper end of the inner plate 12 and the upper end of the outer plate 13 are in the hole body, one end of the wire rope 5 is connected with the upper end of the inner layer 11, the upper end of the inner plate 12 and the upper end of the outer plate 13 by the expansion bolt 3, the isolation piece part 61 and the beam part 62 are placed on the outer side of the upper end surface of the concrete mortar layer of the development roadbed 8, the isolation piece part 61 and the beam part 62 are installed on the concrete mortar layer of the development roadbed 8 by the expansion bolt 3, and the rolling cage part 63 is installed between the upper end head of the beam part 62 and the upper end surface part of the vertical part of the isolation piece part 61.
[0066] When verifying the utility model, the inventor abandoned the existing technical feature of using columns to support and fix the sound barrier panels because the installation conditions of the columns on the roadbed of the high-speed railway line were limited by the roadbed construction conditions of the high-speed railway line. First, the technical feature of providing an installation and fixing part at the lower end was proposed, and the first unexpected technical effect was obtained: the upper and lower fixed connection of the sound barrier panel 1 was achieved, and the second unexpected technical effect was obtained: no damage was caused to the roadbed of the existing high-speed railway line, and the third unexpected technical effect was obtained: the new noise reduction component was set outside the existing high-speed railway line without affecting the operating status of the existing high-speed railway line.
[0067] In the second embodiment of the utility model, the developed roadbed 8, the foundation 2, the sound barrier plate 1 and the expansion bolts 3 are connected to each other by providing a mounting fixing portion at the lower end.
[0068] In this embodiment, the expansion bolts 3 are connected to the developed roadbed 8, the foundation 2 and the sound barrier board 1 in a manner of installation using threaded expansion bodies.
[0069] In this embodiment, a first accessory device is also included and is arranged between the sound barrier board 1 and the development roadbed 8. The first accessory device is configured to include anchors 4 and steel wire ropes 5.
[0070] In this embodiment, a second accessory device is also included and is arranged on the developed roadbed 8 , and the second accessory device is arranged as a fence 6 .
[0071] In this embodiment, a third accessory device is also included and is arranged on the developed roadbed 8 , and the third accessory device is arranged as a drainage channel 7 .
[0072] The second embodiment of the present utility model is based on the first embodiment.
[0073] The utility model has the following characteristics:
[0074] 1. Due to the design of the development roadbed 8, foundation 2, sound barrier plate 1 and expansion bolts 3, an extended support body is realized on the existing high-speed railway line roadbed through the development roadbed 8 and foundation 2, and the noise generated during the running of high-speed railway vehicles is reduced through the sound barrier plate 1. The sound barrier plate 1 is installed using a threaded expansion body through the expansion bolts 3, and an installation and fixing part is set at the lower end, which solves the technical problem that the sound barrier plate cannot be supported and fixed by columns due to the limitation of the roadbed construction conditions of the high-speed railway line and cannot be installed on the roadbed of the high-speed railway line. Therefore, the supporting and fixing strength of the sound barrier device of the existing high-speed railway line is guaranteed.
[0075] 2. Due to the design of the anchor nails 4 and the steel wire rope 5, the sound barrier board 1 can be tightened and fixed.
[0076] 3. Due to the design of the fence 6, the sound barrier board 1 is isolated.
[0077] 4. Due to the design of the drainage channel 7, drainage treatment is achieved for the part of the foundation 2.
[0078] 5. Since the design limits the numerical range of the structural shape, the numerical range is the technical feature in the technical solution of the utility model, and is not a technical feature calculated by formula or obtained through a limited number of tests. Tests have shown that the technical features of this numerical range have achieved good technical effects.
[0079] 6. Due to the design of the technical features of the utility model, the effects of the individual and combined technical features have been shown through experiments to have various performance indicators of the utility model that are at least 1.7 times the existing performance indicators, and the evaluation shows that the utility model has a good market value.
[0080] There are other technical features connected with the development roadbed 8, foundation 2, sound barrier board 1 and expansion bolt 3 with an installation and fixing part arranged at the lower end, which are all embodiments of the present utility model, and the technical features of the above-mentioned embodiments can be combined arbitrarily. In order to meet the requirements of the Patent Law, Patent Implementation Rules and Examination Guidelines, all possible combinations of the technical features in the above-mentioned embodiments will no longer be described.
[0081] Therefore, in the technical field of sound barrier devices used for existing high-speed rail lines, all technical contents including a development roadbed 8 set on the roadbed of an existing high-speed rail line, a foundation 2 set on the development roadbed 8, a sound barrier plate 1 set on the foundation 2, and expansion bolts 3 set between the sound barrier plate 1 and the foundation 2 are within the protection scope of the present utility model.
Claims
1. A sound barrier device for an existing high-speed railway line, characterized by: The invention comprises a development roadbed (8) arranged on an existing high-speed railway line roadbed, a foundation (2) arranged on the development roadbed (8), a sound barrier plate (1) arranged on the foundation (2), and expansion bolts (3) arranged between the sound barrier plate (1) and the foundation (2).
2. The sound barrier device for an existing high-speed railway line according to claim 1 is characterized in that: The developed roadbed (8), the foundation (2), the sound barrier plate (1) and the expansion bolts (3) are connected to each other in a manner of arranging an installation fixing portion at the lower end.
3. The sound barrier device for an existing high-speed railway line according to claim 2 is characterized in that: The expansion bolt (3) is connected to the development roadbed (8), the foundation (2) and the sound barrier plate (1) in a manner of installation using a threaded expansion body.
4. The sound barrier device for an existing high-speed railway line according to claim 1 is characterized in that: It also includes a first accessory device, and the first accessory device is arranged between the sound barrier plate (1) and the development roadbed (8), and the first accessory device is arranged to include an anchor nail (4) and a steel wire rope (5). Or, it further comprises a second accessory device and the second accessory device is arranged on the development roadbed (8), and the second accessory device is arranged as a fence (6), Or, it further comprises a third accessory device and the third accessory device is arranged on the developed roadbed (8), and the third accessory device is arranged as a drainage channel (7).
5. The sound barrier device for an existing high-speed railway line according to claim 4 is characterized in that: A development roadbed (8) is arranged on the outer side of the roadbed of an existing high-speed railway line, and a foundation (2), anchors (4), a fence (6) and a drainage channel (7) are arranged on the development roadbed (8), and a sound barrier plate (1) is arranged on the foundation (2). Expansion bolts (3) are arranged on the sound barrier plate (1), between the sound barrier plate (1) and the foundation (2), and between the fence (6) and the development roadbed (8), and a steel wire rope (5) is arranged between the expansion bolts (3) on the sound barrier plate (1) and the anchors (4).
6. The sound barrier device for an existing high-speed railway line according to claim 5 is characterized in that: The sound barrier plate (1) is configured as a metal composite sound absorbing plate and the sound barrier plate (1) is configured to include an inner layer portion (11), an inner plate portion (12) and an outer plate portion (13), the inner end face portion of the vertical portion of the inner plate portion (12) is configured to be connected to one side face portion of the inner layer portion (11) and the inner end face portion of the vertical portion of the outer plate portion (13) is configured to be connected to another side face portion of the inner layer portion (11), the transverse portion of the inner plate portion (12) and the transverse portion of the outer plate portion (13) are respectively configured to be connected to The foundation (2) is contact-connected and the transverse portion of the inner plate (12) and the transverse portion of the outer plate (13) are respectively arranged to be connected to the foundation (2) through expansion bolts (3), the upper end portion of the inner layer portion (11), the upper end portion of the inner plate (12) and the upper end portion of the outer plate (13) are respectively arranged to be connected to the expansion bolts (3), the inner layer portion (11) is arranged as a sound-absorbing sponge plate-like body and the inner plate (12) and the outer plate (13) are arranged as L-shaped sheet bodies with through holes.
7. The sound barrier device for an existing high-speed railway line according to claim 5 is characterized in that: The development roadbed (8) is configured as a roadbed having a cement and concrete mortar layer, and the interior of the lower end face of the development roadbed (8) and the inner end face of the development roadbed (8) are configured to be overlapped and connected to the outer side of the roadbed of the existing high-speed railway line, the inner side of the upper end face of the development roadbed (8) is configured to be accommodated and connected to the drainage channel (7), and the outer side of the upper end face of the development roadbed (8) is configured to be connected to the fence (6) through expansion bolts (3), and the middle part of the development roadbed (8) is configured to be connected to the foundation (2) and the anchor (4), respectively. Alternatively, the foundation (2) is configured to include a pile-column portion (21) and a concrete mortar casting layer portion (22), and the upper end face portion of the pile-column portion (21) is configured to be connected to the lower end face portion of the concrete mortar casting layer portion (22), the upper end face portion of the concrete mortar casting layer portion (22) is configured to be connected to the sound barrier plate (1) through an expansion bolt (3), and the pile-column portion (21) is configured to be implantably connected to the development roadbed (8), the lower end face portion of the concrete mortar casting layer portion (22) is configured to be contact-connected to the development roadbed (8), and the pile-column portion (21) is configured to be a rod-shaped body, and the concrete mortar casting layer portion (22) is configured to be a sheet-shaped body.
8. The sound barrier device for an existing high-speed railway line according to claim 5 is characterized in that: The first The bolts of the expansion bolts (3) of the first part are arranged to be connected to the sound barrier plate (1) in an implanted manner, and the nuts of the expansion bolts (3) of the first part are arranged to be connected to the wire rope (5) in a compression manner, the bolts of the expansion bolts (3) of the second part are arranged to be connected to the sound barrier plate (1) and the foundation (2), and the nuts of the expansion bolts (3) of the second part are arranged to be connected to the sound barrier plate (1) in a compression manner, and the bolts of the expansion bolts (3) of the third part are arranged to be connected to the fence (6) and the roadbed (8) in an implanted manner, and the nuts of the expansion bolts (3) of the third part are arranged to be connected to the fence (6) in a compression manner.
9. The sound barrier device for an existing high-speed railway line according to claim 5 is characterized in that: The anchor (4) is configured as an L-shaped nail-shaped body and the lower end of the anchor (4) is configured to be implanted and connected to the development roadbed (8), and the transverse portion of the anchor (4) is configured to be through-connected to the steel wire rope (5). Or, the steel wire rope (5) is configured as a single-strand rope and one end of the steel wire rope (5) is configured to be connected to the sound barrier plate (1) via an expansion bolt (3), the other end of the steel wire rope (5) is configured to be connected to the anchor nail (4) in a circumferential manner and a steel wire rope buckle is provided on the other end of the steel wire rope (5), Or, the fence (6) is configured to include an isolation sheet portion (61), a beam portion (62) and a rolling cage portion (63), and the horizontal portion of the isolation sheet portion (61) and the lower end of the beam portion (62) are respectively configured to be connected to the development roadbed (8) through expansion bolts (3), the upper end of the beam portion (62) is configured to be connected to the lower side surface of the rolling cage portion (63), and the lower side surface of the rolling cage portion (63) is configured to be contact-connected to the upper end surface of the vertical portion of the isolation sheet portion (61), the isolation sheet portion (61) is configured to be a T-shaped mesh body, the beam portion (62) is configured to be a rod-shaped body, and the rolling cage portion (63) is configured to be a barbed wire rolling cage, Alternatively, groove portion I (72) and groove portion II (73) are respectively arranged on the upper end surface portion of the strip portion (71) of the drainage channel groove (7), and the strip portion (71) is arranged to be sunken in connection with the development roadbed (8), groove portion I (72) and groove portion II (73) are respectively arranged to be distributed corresponding to the sound barrier plate (1), and the strip portion (71) is arranged to be a block body, and groove portion I (72) and groove portion II (73) are arranged to be a U-shaped groove body.
10. The sound barrier device for an existing high-speed railway line according to any one of claims 1 to 9, characterized in that: The sound barrier plate (1) and the foundation (2), the expansion bolts (3) and the developed roadbed (8) are arranged in a bottom fixed manner, and the sound barrier plate (1), the foundation (2), the expansion bolts (3) and the developed roadbed (8) are arranged in a top tightened fixed manner, the sound barrier plate (1), the foundation (2), the expansion bolts (3) and the developed roadbed (8) and the fence (6) are arranged in an external isolation manner, and the sound barrier plate (1), the foundation (2), the expansion bolts (3) and the developed roadbed (8) and the drainage channel (7) are arranged in a built-in groove manner, Alternatively, the concrete mortar pouring layer portion (22) is respectively arranged to be connected to the inner plate portion (12) and the outer plate portion (13).
