Unit system for efficient machine room

By using the first water pump to be connected in series with the first unit, the second water pump with the second unit in the high-efficiency machine room, and the third water pump to be connected in parallel with the first water pump and the second water pump, the instability and backup of hydraulic operation are solved. It solves the problem of insufficient water supply, achieves stable water supply and energy saving effects, and reduces the floor occupancy rate of the system.

CN221881857UActive Publication Date: 2024-10-22SICHUAN PROVINCIAL ARCHITECTURAL DESIGN & RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420450732.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-08
Publication Date
2024-10-22
Estimated Expiration
2034-03-08

AI Technical Summary

Technical Problem

The connection method between the water pump and the unit in the high-efficiency machine room leads to unstable hydraulic operation and insufficient backup and replaceability, which affects the energy saving effect.

Method used

The first water pump is connected in series with the first unit, the second water pump is connected in series with the second unit, and the third water pump is connected in parallel with the first water pump and the second water pump to ensure that there is a backup pump to replace the water supply in case of failure and to avoid the pumps from robbing water. phenomenon, while controlling valve configuration to optimize space utilization.

Benefits of technology

It achieves the stability and backup of hydraulic operation, reduces the risk of pump water grabbing, meets the energy-saving requirements of efficient machine rooms, and reduces the system's floor occupancy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221881857U_ABST
    Figure CN221881857U_ABST
Patent Text Reader

Abstract

The utility model discloses a unit system for an efficient machine room, and relates to the technical field of water cooling machine rooms. Comprising a first unit; the first water pump is connected with the first unit in series; the second unit is connected with the first unit in parallel; the second water pump is connected with the second unit in series; and the third water pump is simultaneously connected with the first water pump and the second water pump in parallel. Under the normal condition, water can be supplied to the first unit through the first water pump, water can be supplied to the second unit through the second water pump, water is supplied in a one-to-one mode under the normal working condition, the phenomenon that water is scratched by the pumps and the hydraulic operation condition temperature are avoided, and it can be guaranteed that the units have enough cold water amount; meanwhile, when any one of the first water pump and the second water pump breaks down, the corresponding water pump can be replaced to supply water to the corresponding unit, standby performance and replaceability are achieved, and the plane occupancy is small.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of cold water machine rooms, in particular to a machine unit system for a high-efficiency machine room. Background Art

[0002] To evaluate whether a chiller room is truly energy-efficient, the "comprehensive energy efficiency of the chiller room throughout the year" method is used. That is, according to the standards proposed by the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE), a "comprehensive energy efficiency of the chiller room throughout the year" above COP5.0 (0.7kw / ton) is a high-efficiency room. In a high-efficiency room, the connection method between the pump and the unit has a significant impact on the installation space and system cost.

[0003] At present, there are two main ways to connect the room water pumps and units in high-efficiency computer rooms. One is to adopt a one-to-one method suitable for square computer rooms, which can reliably guarantee the cooling water volume of the units, but the standby and replaceability of the water pumps are poor. The other is to adopt a method suitable for slender computer rooms, that is, the water pumps are connected in parallel and then in series with the parallel units through the mother pipe. Although the standby and replaceability of the water pumps are better, the pipe length is increased. In actual projects, pump water grabbing is prone to occur, and the hydraulic operation is unstable. Utility Model Content

[0004] Aiming at the technical problems that the hydraulic operation of the unit system of the existing high-efficiency machine room is unstable and lacks redundancy and replaceability, the utility model provides a unit system for a high-efficiency machine room, which can not only ensure the hydraulic conditions, but also has a small plane occupancy rate, and the water pump has redundancy and replaceability, thus meeting the energy-saving requirements of the high-efficiency machine room.

[0005] The utility model is realized by the following technical solutions:

[0006] The utility model provides a unit system for a high-efficiency machine room, comprising: a first unit; a first water pump, which is connected in series with the first unit; a second unit, which is connected in parallel with the first unit; a second water pump, which is connected in series with the second unit; and a third water pump, which is connected in parallel with the first water pump and the second water pump at the same time.

[0007] The utility model provides a unit system for a high-efficiency machine room, wherein the first unit is connected in series with a first water pump, and the second unit is connected in series with a second water pump. Under normal circumstances, the first water pump can supply water to the first unit, and the second water pump can supply water to the second unit, so that a one-to-one manner of water supply is adopted under normal working conditions, and the phenomenon of pumps grabbing water does not occur. The hydraulic operation temperature can ensure that the units have sufficient cooling water. At the same time, the third water pump is connected in parallel with the first water pump and the second water pump at the same time, and can replace the corresponding water pump to supply water to the corresponding unit when any of the first water pump and the second water pump fails, so the system has backup and replaceability.

[0008] Among them, the first water pump and the second water pump that play the main role of water supply are connected in parallel, the first unit and the second unit are connected in parallel, and the third water pump is directly connected in parallel with the first water pump and the second water pump. Compared with the method of first paralleling, then series and then paralleling, the plane occupancy rate is smaller.

[0009] Therefore, the unit system for a high-efficiency machine room provided by the utility model can ensure hydraulic conditions, and has a small plane occupancy rate, and the water pump has spareness and replaceability, thus meeting the energy-saving requirements of a high-efficiency machine room.

[0010] In an optional embodiment, a first switch valve is connected between the first water pump and the first unit to control the opening and closing of the pipeline between the first water pump and the first unit.

[0011] In an optional embodiment, a first one-way valve is connected between the first water pump and the first switch valve to prevent water from flowing back to the first water pump and damaging the first water pump.

[0012] In an optional embodiment, a second switch valve is connected between the water outlet of the third water pump and the water outlet of the first switch valve to facilitate the control of the opening and closing of the pipeline between the third water pump and the first unit to quickly connect the third water pump in series with the first unit.

[0013] In an optional embodiment, the water inlet and the water outlet of the first water pump are both equipped with a first pressure gauge to monitor the pressure difference between the water inlet and the water outlet of the first water pump, thereby monitoring the working status of the first water pump.

[0014] In an optional embodiment, a third switch valve is connected between the second water pump and the second unit to control the opening and closing of the pipeline between the second water pump and the second unit.

[0015] In an optional embodiment, a second one-way valve is connected between the second water pump and the third switch valve to prevent water from flowing back to the second water pump and damaging the second water pump.

[0016] In an optional embodiment, a fourth switch valve is connected between the water outlet of the third water pump and the water outlet of the third switch valve to facilitate the control of the on-off of the pipeline between the third water pump and the second unit to quickly connect the third water pump in series with the second unit.

[0017] In an optional embodiment, the water inlet and the water outlet of the second water pump are both equipped with a second pressure gauge to monitor the pressure difference between the water inlet and the water outlet of the second water pump, thereby monitoring the working status of the second water pump.

[0018] In an optional embodiment, a fifth switch valve is connected in series to the water inlet of the third water pump to control the on-off of the water inlet of the third water pump so that the third water pump can supply water quickly.

[0019] Compared with the prior art, the utility model has the following advantages and beneficial effects:

[0020] 1. The utility model provides a unit system for an efficient machine room, wherein the first unit is connected in series with a first water pump, and the second unit is connected in series with a second water pump. Under normal circumstances, the first water pump can supply water to the first unit, and the second water pump can supply water to the second unit, so that a one-to-one mode of water supply is adopted under normal working conditions, and there will be no phenomenon of pumps grabbing water. The hydraulic operation temperature can ensure that the units have sufficient cooling water. At the same time, the third water pump is connected in parallel with the first water pump and the second water pump at the same time, and can replace the corresponding water pump to supply water to the corresponding unit when any of the first water pump and the second water pump fails. The third water pump has standby and replaceability, can ensure hydraulic conditions, and the water pumps have standby and replaceability, and meet the energy-saving requirements of efficient machine rooms.

[0021] 2. The utility model provides a unit system for a high-efficiency machine room, in which the first water pump and the second water pump playing the main water supply role are connected in parallel, the first unit and the second unit are connected in parallel, and the third water pump is directly connected in parallel with the first water pump and the second water pump. Compared with the method of first paralleling, then series connection and then paralleling, the plane occupancy rate is smaller. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0023] In the attached picture:

[0024] Figure 1 This is a piping principle diagram of a unit system for a high-efficiency machine room according to an embodiment of the utility model.

[0025] Marks and corresponding parts names in the attached drawings:

[0026] 1-first unit, 2-first water pump, 3-second unit, 4-second water pump, 5-third water pump, 6-first switch valve, 7-first one-way valve, 8-second switch valve, 9-first pressure gauge, 10-third switch valve, 11-second one-way valve, 12-fourth switch valve, 13-second pressure gauge, 14-fifth switch valve. DETAILED DESCRIPTION

[0027] In order to make the purpose, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below in combination with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments.

[0028] In the description of the embodiments of the present application, the indicated orientation or position relationship is based on the orientation or position relationship shown in the accompanying drawings, or is the orientation or position relationship in which the product of the application is conventionally placed when in use, or is the orientation or position relationship conventionally understood by those skilled in the art. It is only for the convenience of describing the present application and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application.

[0029] At the same time, the terms "disposed", "opened", "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this utility model can be understood according to specific circumstances. Example

[0030] Combination Figure 1 This embodiment provides a unit system for a high-efficiency machine room, including: a first unit 1; a first water pump 2, the first water pump 2 is connected in series with the first unit 1; a second unit 3, the second unit 3 is connected in parallel with the first unit 1; a second water pump 4, the second water pump 4 is connected in series with the second unit 3; a third water pump 5, the third water pump 5 is connected in parallel with the first water pump 2 and the second water pump 4 at the same time.

[0031] In this embodiment, a first switch valve 6 is connected between the first water pump 2 and the first unit 1 to control the on-off of the pipeline between the first water pump 2 and the first unit 1 .

[0032] Specifically, a first check valve 7 is connected between the first water pump 2 and the first switch valve 6 to prevent water from flowing back to the first water pump 2 and damaging the first water pump 2 .

[0033] Typically, a second switch valve 8 is connected between the water outlet of the third water pump 5 and the water outlet of the first switch valve 6 to control the on-off of the pipeline between the third water pump 5 and the first unit 1 so as to quickly connect the third water pump 5 and the first unit 1 in series.

[0034] In this embodiment, the water inlet and the water outlet of the first water pump 2 are both equipped with a first pressure gauge 9 to monitor the pressure difference between the water inlet and the water outlet of the first water pump 2, thereby monitoring the working state of the first water pump 2.

[0035] In addition, a third switch valve 10 is connected between the second water pump 4 and the second unit 3 to control the on-off of the pipeline between the second water pump 4 and the second unit 3 .

[0036] It is understandable that switch valves are provided at the water outlet of the first unit 1, the water inlet of the first water pump 2, and the third water pump 5 to control the on-off of the water path. At the same time, a one-way valve is also provided at the water outlet of the third water pump 5 to prevent water from flowing back to the third water pump 5 and damaging the third water pump 5.

[0037] On this basis, the water inlet of the third water pump 5 is connected in series with a fifth switch valve 14 to control the on and off of the water inlet of the third water pump 5 so that the third water pump 5 can quickly supply water. Similarly, pressure gauges are provided at the water inlet and outlet of the third water pump 5 to monitor the working state of the third water pump 5.

[0038] Correspondingly, a second one-way valve 11 is connected between the second water pump 4 and the third switch valve 10 to prevent water from flowing back to the second water pump 4 and damaging the second water pump 4 .

[0039] Correspondingly, a fourth switch valve 12 is connected between the water outlet of the third water pump 5 and the water outlet of the third switch valve 10 to control the on-off of the pipeline between the third water pump 5 and the second unit 3 to quickly connect the third water pump 5 and the second unit 3 in series.

[0040] It should be understood that the water inlet and the water outlet of the second water pump 4 are both equipped with a second pressure gauge 13 to monitor the pressure difference between the water inlet and the water outlet of the second water pump 4 , thereby monitoring the working state of the second water pump 4 .

[0041] The switch valve involved in this embodiment can be a gate valve, a ball valve or other type of valve. For valves that need to be opened and closed quickly, an electric valve is used, and for valves in an open state, a manual valve is used.

[0042] It should be noted that, in this embodiment, under normal circumstances, the first switch valve 6 and the third switch valve 10 are opened respectively, and the second switch valve, the fourth switch valve 12 and the fifth switch valve 14 are closed, so that water is supplied to the first unit 1 through the first water pump 2 and water is supplied to the second unit 3 through the second water pump 4. Under normal operating conditions, water is supplied in a one-to-one manner, and there will be no phenomenon of pump grabbing water. The hydraulic operating temperature can ensure that the unit has sufficient cooling water.

[0043] When the first water pump 2 fails (the pressure difference between the two first pressure gauges 9 is abnormal), the first switch valve 6 is closed, and the second open valve and the fifth switch valve 14 are opened to supply water to the first unit 1 through the third water pump 5, thereby ensuring the normal operation of the first unit 1. When the second water pump 4 fails (the pressure difference between the two second pressure gauges 13 is abnormal), the third switch valve 10 is closed, and the fourth open valve and the fifth switch valve 14 are opened to supply water to the second unit 3 through the third water pump 5, thereby ensuring the normal operation of the second unit 3. That is, when any of the first water pump 2 and the second water pump 4 fails, the corresponding water pump can be replaced to supply water to the corresponding unit, which has standby and replaceability.

[0044] Among them, the first water pump 2 and the second water pump 4, which play the main role of water supply, are connected in parallel, the first unit 1 and the second unit 3 are connected in parallel, and the third water pump 5 is directly connected in parallel with the first water pump 2 and the second water pump 4, and has no direct connection with the first unit 1 and the second unit 3. Compared with the method of first paralleling, then series connection and then paralleling, the plane occupancy rate is smaller.

[0045] In summary, the unit system for a high-efficiency machine room provided in this embodiment can ensure hydraulic conditions, and has a small plane occupancy rate, and the water pump has backup and replaceability, thus meeting the energy-saving requirements of a high-efficiency machine room.

[0046] The specific implementation methods described above further illustrate the purpose, technical solutions and beneficial effects of the utility model in detail. It should be understood that the above description is only the specific implementation method of the utility model and is not used to limit the protection scope of the utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the utility model should be included in the protection scope of the utility model.

Claims

1. A unit system for a high-efficiency machine room, characterized in that: include: Unit 1 (1); A first water pump (2), the first water pump (2) being connected in series with the first unit (1); a second machine unit (3), the second machine unit (3) being connected in parallel with the first machine unit (1); a second water pump (4), the second water pump (4) being connected in series with the second unit (3); A third water pump (5), the third water pump (5) being connected in parallel with both the first water pump (2) and the second water pump (4).

2. The unit system for a high-efficiency machine room according to claim 1, characterized in that: A first switch valve (6) is connected between the first water pump (2) and the first machine unit (1).

3. The unit system for a high-efficiency machine room according to claim 2, characterized in that: A first one-way valve (7) is connected between the first water pump (2) and the first switch valve (6).

4. The unit system for a high-efficiency machine room according to claim 2, characterized in that: A second switch valve (8) is connected between the water outlet of the third water pump (5) and the water outlet of the first switch valve (6).

5. The unit system for a high-efficiency machine room according to claim 1, characterized in that: The water inlet and the water outlet of the first water pump (2) are both equipped with a first pressure gauge (9).

6. The unit system for a high-efficiency machine room according to claim 1, characterized in that: A third switch valve (10) is connected between the second water pump (4) and the second machine unit (3).

7. The unit system for a high-efficiency machine room according to claim 6, characterized in that: A second one-way valve (11) is connected between the second water pump (4) and the third switch valve (10).

8. The unit system for a high-efficiency machine room according to claim 6, characterized in that: A fourth switch valve (12) is connected between the water outlet of the third water pump (5) and the water outlet of the third switch valve (10).

9. The unit system for a high-efficiency machine room according to claim 1, characterized in that: The water inlet and the water outlet of the second water pump (4) are both equipped with a second pressure gauge (13).

10. The unit system for a high-efficiency machine room according to any one of claims 1 to 9, characterized in that: A fifth switch valve (14) is connected in series to the water inlet of the third water pump (5).