Intelligent construction site fire alarm
By installing fire alarms that combine smoke sensors and temperature sensors on smart construction sites, timely detection and remote alarm of fires are achieved, solving the problem of insufficient fire supervision during the construction process and improving fire safety on the construction site.
Patent Information
- Application Number
- CN202420330471.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-22
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-02-22
AI Technical Summary
During the construction process of smart construction sites, due to the long construction period, there is a lack of equipment to detect fires and alarm in time, which may lead to economic losses and casualties.
Design a smart construction site fire alarm that includes a sound and light mechanism and a communication mechanism. It uses a smoke sensor and a temperature sensor combined with a central processing chip to realize remote alarm through a signal transceiver and signal card, and emits warning sounds and lights through a sound effect chip and a timing circuit. .
Effectively detect fires and warn staff in a timely manner, and remotely transmit fire information to the control center, improving the timeliness and informatization level of fire monitoring and alarming.
Smart Images

Figure CN221884428U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of smart construction sites, and in particular to a smart construction site fire alarm. Background Art
[0002] Smart construction sites are the embodiment of the smart earth concept in the engineering field. They are a brand-new concept for the management of the entire life cycle of projects. Smart construction sites refer to the use of information technology to accurately design and simulate construction projects through a three-dimensional design platform. Focusing on construction process management, they establish an information ecosystem for construction projects that features interconnected collaboration, intelligent production, and scientific management. They also conduct data mining and analysis on this data in a virtual reality environment together with engineering information collected by the Internet of Things, provide process trend forecasts and expert plans, and realize visual intelligent management of engineering construction, so as to improve the level of information technology in engineering management and gradually realize green construction and ecological construction.
[0003] In the prior art, during the construction of a smart construction site, due to the long construction period, fire safety issues must also be supervised during the construction period. However, in the prior art, before the construction of the smart construction site is completed, there is no fire alarm installed inside the smart construction site that can detect fires and issue an alarm in time. In this way, once a fire occurs, the staff cannot discover it in time, which will cause huge economic losses and may even cause casualties. Therefore, we propose a smart construction site fire alarm. Utility Model Content
[0004] The purpose of the utility model is to solve the shortcomings existing in the prior art. During the construction of the smart construction site, due to the long construction period, fire safety issues must also be supervised during the construction period. However, in the prior art, before the construction of the smart construction site is completed, the interior of the smart construction site is not equipped with a fire alarm that can detect fires and issue an alarm in time. As a result, once a fire occurs, the staff cannot discover it in time, which will cause huge economic losses and may even cause casualties.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] A smart construction site fire alarm comprises a fixed base, a sound and light mechanism is arranged on the front of the fixed base, and a communication mechanism is arranged on the bottom of the sound and light mechanism;
[0007] The sound and light mechanism comprises a C-shaped mounting plate, a speaker body is arranged inside the C-shaped mounting plate, a sound chip is arranged inside the speaker body, a triode is arranged on the front of the sound chip, a transformer is arranged on the front of the triode, a lamp base is arranged on the top of the C-shaped mounting plate, a timing circuit is arranged inside the lamp base, a diode is arranged on the top of the timing circuit, and a transparent lampshade is arranged on the periphery of the diode;
[0008] The communication mechanism includes a communicator body, a heat dissipation window is opened on the left side of the communicator body, a smoke sensor is arranged inside the communicator body and near the heat dissipation window, a central processing chip is arranged on the right side of the smoke sensor, a signal transceiver is arranged above the central processing chip, a signal card is arranged on the top of the signal transceiver, and a temperature sensor is arranged at the bottom of the communicator body.
[0009] As a preferred solution of the utility model, the temperature sensor is fixedly connected to the bottom bolt of the communicator body.
[0010] The technical effect of adopting the above further solution is that it can effectively sense the change of the ambient temperature and thus determine whether a fire has occurred.
[0011] As a preferred solution of the utility model, the smoke sensor is fixedly connected to the left side wall of the communicator body by bolts.
[0012] The technical effect of adopting the above further solution is: the smoke sensor can effectively determine whether there is thick smoke around, thereby determining whether a fire has occurred.
[0013] As a preferred solution of the utility model, connection holes are provided at the four corners of the fixed base.
[0014] The technical effect of adopting the above further solution is that the equipment can be easily installed at any location on the construction site and can be set up in places with great fire safety hazards.
[0015] As a preferred solution of the utility model, the smoke sensor, the temperature sensor and the signal transceiver are all electrically connected to the central processing chip, and the central processing chip establishes a connection with the remote control center through the signal transceiver and the signal card.
[0016] The technical effect of adopting the above further scheme is: using temperature sensors and smoke sensors to detect whether a fire occurs in the surrounding area, sending the parameters to the central processing chip, and the central processing chip remotely transmits the parameters to the control center of the smart construction site through a signal transceiver and a signal card, thereby realizing the remote alarm function.
[0017] As a preferred solution of the present invention, the sound chip and the timing circuit are both electrically connected to the central processing chip.
[0018] The technical effect of adopting the above further solution is: the sound chip and the timing circuit can be effectively controlled by the central processing chip, and sound and light can be effectively emitted to warn the surrounding staff and remind them to escape.
[0019] As a preferred solution of the utility model, the transparent lampshade is threadedly connected to the lamp tube base.
[0020] The technical effect of adopting the above further solution is that the diode can be effectively protected and an alarm can be effectively performed when a fire occurs.
[0021] Compared with the prior art, the beneficial effects of the utility model are:
[0022] In the utility model, through the setting of the sound and light mechanism and the communication mechanism, the smoke sensor and the temperature sensor can effectively detect and judge whether a fire occurs, and the central processing chip is used for centralized processing. If a fire occurs, the central processing chip controls the sound chip to emit a sound, and the sound is amplified by the triode and the transformer, and the central processing chip controls the timing circuit to power the diode to realize the alternation of sound and light, so as to remind the surrounding staff to escape as soon as possible. The signal transceiver and the signal card can effectively realize remote interaction, and the on-site situation can be fed back to the remote control center for processing by the remote control center. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0024] Figure 2 This is a schematic diagram of the structure of the communication mechanism of the utility model;
[0025] Figure 3 This is a schematic diagram of the internal planar structure of the speaker body of the utility model;
[0026] Figure 4 This is a schematic diagram of the internal planar structure of the lamp base of the utility model;
[0027] Figure 5 This is a principle block diagram of the utility model.
[0028] Legend: 1. Fixed base; 11. Connection hole; 2. Sound and light mechanism; 21. C-type mounting plate; 22. Speaker body; 23. Sound chip; 24. Transistor; 25. Transformer; 26. Lamp base; 27. Timing circuit device; 28. Diode; 29. Transparent lampshade; 3. Communication mechanism; 31. Communicator body; 32. Heat dissipation window; 33. Smoke sensor; 34. Central processing chip; 35. Signal transceiver; 36. Signal card; 37. Temperature sensor. DETAILED DESCRIPTION
[0029] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0030] In order to facilitate the understanding of the present invention, the present invention will be described more comprehensively below with reference to the relevant literature, and several embodiments of the present invention are given. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive.
[0031] It should be noted that when an element is referred to as being "fixed on" another element, it may be directly on the other element or there may also be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used in this article are for illustrative purposes only.
[0032] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by technicians in the technical field of the present invention. The terms used in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used in this article includes any and all combinations of one or more related listed items.
[0033] Example 1
[0034] like Figure 1-5As shown, the utility model provides a technical solution: a smart construction site fire alarm, comprising a fixed base 1, a sound and light mechanism 2 is arranged on the front of the fixed base 1, a communication mechanism 3 is arranged at the bottom of the sound and light mechanism 2, the sound and light mechanism 2 comprises a C-shaped mounting plate 21, a speaker body 22 is arranged inside the C-shaped mounting plate 21, a sound chip 23 is arranged inside the speaker body 22, a triode 24 is arranged on the front of the sound chip 23, a transformer 25 is arranged on the front of the triode 24, a lamp base 26 is arranged on the top of the C-shaped mounting plate 21, and a fixed A timing circuit 27 is provided, a diode 28 is arranged on the top of the timing circuit 27, a transparent lampshade 29 is arranged on the periphery of the diode 28, the communication mechanism 3 includes a communicator body 31, a heat dissipation window 32 is opened on the left side of the communicator body 31, a smoke sensor 33 is arranged inside the communicator body 31 and near the heat dissipation window 32, a central processing chip 34 is arranged on the right side of the smoke sensor 33, a signal transceiver 35 is arranged above the central processing chip 34, a signal card 36 is arranged on the top of the signal transceiver 35, and a temperature sensor 37 is arranged at the bottom of the communicator body 31.
[0035] Example 2
[0036] like Figure 1-5 As shown, the temperature sensor 37 is fixedly connected to the bottom bolt of the communicator body 31, which can effectively detect temperature changes and realize fire monitoring. The smoke sensor 33 is fixedly connected to the left wall of the communicator body 31 with bolts, which can effectively detect thick smoke to determine whether a fire has occurred. Connection holes 11 are provided at the four corners of the fixed base 1, which is convenient for installing the equipment on the wall. The smoke sensor 33, the temperature sensor 37 and the signal transceiver 35 are all electrically connected to the central processing chip 34. The central processing chip 34 establishes a connection with the remote control center through the signal transceiver 35 and the signal card 36, which can effectively monitor the site and realize the smart construction site. The sound chip 23 and the timing circuit 27 are both electrically connected to the central processing chip 34, which is convenient for on-site alarms. The transparent lampshade 29 is threadedly connected to the lamp tube base 26 to protect the interior.
[0037] The working process of the utility model is as follows: when using a smart construction site fire alarm to perform a smart construction site fire alarm, first, install the fixed base 1 in a suitable place through the connecting hole 11, then program the address into the central processing chip 34, so that when a fire occurs, the location can be determined in time. After completion, the external power supply is turned on. At this time, the smoke sensor 33 and the temperature sensor 37 are monitoring in real time, and the data are fed back to the central processing chip 34. If a fire occurs at this time, the smoke in the fire will first rise, and the smoke will enter the interior through the heat dissipation window 32. The smoke sensor 33 will send data to the central processing chip 34, and then the central processing chip 34 will start to send a signal to control the sound chip 23 to start The sound chip 23 amplifies the sound through the transistor 24 and the transformer 25, and at the same time controls the timing circuit 27 to power the diode 28, thereby emitting a prompt light, and the central processing chip 34 controls the signal transceiver 35 to send a signal to the remote control center to remind the staff to verify. If the smoke sensor 33 sends a signal, the temperature sensor 37 also sends a signal afterwards. At this time, while handling the matter, the staff also needs to call the fire department to notify the fire department to handle it. The utility model can effectively monitor the fire in real time on the smart construction site through design, and can promptly and effectively issue an alarm. At the same time, it can realize the informatization of the alarm equipment and realize the intelligence of the construction site.
[0038] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A smart construction site fire alarm, comprising a fixed base (1), characterized in that: The front of the fixed base (1) is provided with an acoustic and optical mechanism (2), and the bottom of the acoustic and optical mechanism (2) is provided with a communication mechanism (3); The sound and light mechanism (2) comprises a C-shaped mounting plate (21), a speaker body (22) is arranged inside the C-shaped mounting plate (21), a sound effect chip (23) is arranged inside the speaker body (22), a triode (24) is arranged on the front of the sound effect chip (23), a transformer (25) is arranged on the front of the triode (24), a lamp base (26) is arranged on the top of the C-shaped mounting plate (21), a timing circuit device (27) is arranged inside the lamp base (26), a diode (28) is arranged on the top of the timing circuit device (27), and a transparent lampshade (29) is arranged on the periphery of the diode (28); The communication mechanism (3) comprises a communicator body (31), a heat dissipation window (32) is provided on the left side of the communicator body (31), a smoke sensor (33) is provided inside the communicator body (31) and near the heat dissipation window (32), a central processing chip (34) is provided on the right side of the smoke sensor (33), a signal transceiver (35) is provided above the central processing chip (34), a signal card (36) is provided on the top of the signal transceiver (35), and a temperature sensor (37) is provided at the bottom of the communicator body (31).
2. The intelligent construction site fire alarm according to claim 1, characterized in that: The temperature sensor (37) is fixedly connected to the bottom bolt of the communicator body (31).
3. The intelligent construction site fire alarm according to claim 1, characterized in that: The smoke sensor (33) is fixedly connected to the left side wall of the communicator body (31) by bolts.
4. The intelligent construction site fire alarm according to claim 1, characterized in that: Connection holes (11) are provided at the four corners of the fixed base (1).
5. The intelligent construction site fire alarm according to claim 1, characterized in that: The smoke sensor (33), the temperature sensor (37) and the signal transceiver (35) are all electrically connected to the central processing chip (34), and the central processing chip (34) establishes a connection with the remote control center through the signal transceiver (35) and the signal card (36).
6. The intelligent construction site fire alarm according to claim 1, characterized in that: The sound effect chip (23) and the timing circuit device (27) are both electrically connected to the central processing chip (34).
7. The intelligent construction site fire alarm according to claim 1, characterized in that: The transparent lampshade (29) is threadedly connected to the lamp tube base (26).
