High-low voltage cabinet busbar penetrating traction device
By designing the high and low voltage cabinet busbar through-cabinet traction device, the traction rope and the introduction pulley are used to achieve accurate installation of the busbar, which solves the problems of long installation time and the risk of busbar damage, and improves the installation efficiency and safety.
Patent Information
- Application Number
- CN202420219398.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-29
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-01-29
AI Technical Summary
The installation process of high and low voltage cabinet busbars requires a long period of precise measurement and connection, which results in a long installation time and the risk of workers being injured by the busbars, affecting project progress and safety.
A high and low voltage cabinet busbar traction device is designed, which includes the busbar entrance, traction rope, fixed frame, introduction pulley, box set and clamping components. The traction rope and introduction pulley enable the busbar to be accurately installed along a specific path, reducing Adjust the time and prevent the busbar from falling through elastic clamping blocks and rubber anti-slip pads.
It achieves the accurate direction and position installation of the busbar, reduces the installation and adjustment time, reduces the risk of workers being injured by the busbar, improves the speed and convenience of installation and removal, and reduces labor costs.
Smart Images

Figure CN221885842U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of busbar through-cabinet, and particularly relates to a high- and low-voltage cabinet busbar through-cabinet traction device. Background Art
[0002] The high and low cabinet busbars in the power system are important components for distributing and transmitting electrical energy. They are usually made of copper or aluminum and have good electrical conductivity and thermal conductivity. The installation of high and low cabinet busbars is a key link in the electrical installation process of modern power systems. However, the installation of high and low cabinet busbars usually takes a long time, especially in the installation process of high and low voltage cabinets, precise measurements, connections and other operations are required. Each step needs to be handled with caution to ensure safety and reliability, which leads to a long installation time, which may affect the progress and delivery time of the project. At the same time, the risk of being hit by the busbar is also a problem that cannot be ignored. The busbar is usually made of metal material and needs to be transported and installed during the installation process. If the operation is improper or the necessary safety measures are lacking, the workers may suffer injuries from being hit by the busbar, which not only poses a threat to the workers' physical health, but also may cause work interruptions and project delays. In order to solve these problems, it is necessary to develop a high and low voltage cabinet busbar through-cabinet traction device. Utility Model Content
[0003] In view of the deficiencies in the prior art, the utility model aims to provide a high and low voltage cabinet busbar through-cabinet traction device to solve the problems raised in the above-mentioned background technology.
[0004] The utility model is realized by the following technical scheme: a high-low voltage cabinet busbar through-cabinet traction device, comprising: a busbar inlet and a traction rope, a traction rope is arranged in the middle of the busbar inlet, a fixing frame is respectively installed above and below the left side of the busbar inlet, and a plurality of introduction pulleys are symmetrically installed between the two fixing frames;
[0005] A sleeve box is installed on the left side of the two fixing frames, a side clamp rod is installed above and below the left side of the sleeve box respectively, and an assembly clamp component is respectively arranged at the left end of the two side clamp rods;
[0006] The clamping components include a shrinkage cavity, a lifting plate and an elastic clamping block. A shrinkage cavity is respectively opened inside the left end of the two side clamping rods. A lifting plate is installed on the upper left side of the upper side clamping rod, and a hollow block is installed on the lower left side. An elastic clamping block is arranged below the hollow block, and an inner connecting plate is arranged in the middle of the hollow block. A compression spring is respectively arranged on the front and rear sides of the shrinkage cavity, and a center rod is respectively arranged in the middle of the two compression springs.
[0007] As a preferred embodiment, the upper end of the center rod passes through the shrinkage cavity and is connected to the lifting plate, and the lower end is connected to the inner connecting plate. The lower part of the inner connecting plate is connected to the elastic clamp block, and the upper ends of the two compression springs are connected to the inner wall of the shrinkage cavity, and the lower ends are connected to the inner connecting plate.
[0008] As a preferred embodiment, the two groups of clamping parts are installed in a mirror image, and rubber anti-slip pads are installed on the side of the two elastic clamping blocks away from the hollow block, and a finger groove is respectively provided on the front and rear surfaces of the lifting plate.
[0009] As a preferred embodiment, the left end of the traction rope passes through between the two fixed frames and out of the sleeve box to its left side, a bearing is installed in the middle of each of the introduction pulleys, and a fixing rod is installed in the middle of each of the bearings.
[0010] As a preferred embodiment, the front and rear sides of each fixing rod are respectively connected to the inner side of the fixing frame, the introduction pulley is a flat groove pulley, and the length and width of the right end of the busbar inlet are greater than the length and width of the left side.
[0011] As a preferred embodiment, the sleeve is made of stainless steel, the sleeve lining is made of smooth nitrile rubber, the size of the sleeve lining is 2 mm larger than the busbar size, and the compression spring is a stainless steel spring.
[0012] Before actual use, the center rods inside the two contraction chambers are pulled by two lifting plates, and the center rods can drive the elastic clamping block to move to the inside of the contraction chamber through the inner connecting plate. At the same time, the inner connecting plate can squeeze the compression spring to compress it, and then move the middle of the left side of the two side clamping rods to the busbar system of the high and low voltage cabinets, and then release the lifting plates. At the same time, the compression spring can rebound and drive the elastic clamping block to rebound through the inner connecting plate, and then the two side clamping rods can be clamped and fixed on the outside of the busbar system through the rubber anti-skid pad. The rubber anti-skid pad can increase the friction force so that the elastic clamping block is not easy to slide when clamped;
[0013] When in use, the right end of the traction rope is connected to the busbar, and then the left end of the busbar is passed into the busbar entrance, and the busbar is pulled by the left end of the traction rope. The busbar can enter the diameter of the two fixed frames, and then enter the sleeve box along the path between the two sets of introduction pulleys. When the busbar passes through the two sets of introduction pulleys, it can drive the two sets of introduction pulleys to rotate, and then the busbar can be pulled to the busbar installation section of the busbar system through the smooth lining inside the sleeve box. The next step is to untie the traction rope to fix the busbar to the busbar system installation section. Through the above steps, the final effect is that the busbar can be easily pulled along the inside of the sleeve box to the busbar system installation section in the high and low voltage cabinet, so that the busbar can be smoothly pulled to the installation section along a specific path, which can ensure the direction and position of the busbar accurately, and reduce the adjustment time during installation. At the same time, by pulling the busbar inside the sleeve box, the busbar is not easy to fall and injure workers during installation, and the design of the clamping parts can make the sleeve box easy to install quickly, and also make its disassembly process faster and more convenient. The staff can quickly install the sleeve box on the front side of the installation section, reducing installation time and labor costs.
[0014] As a preferred embodiment, an upper docking box is installed in the middle above the sleeve box, the upper surface of the upper docking box is recessed downward to form a docking groove, and an adsorption magnetic sheet is installed below the docking groove.
[0015] As a preferred embodiment, a support plate is installed in the middle of the lower part of the sleeve box, and an insertion block is installed below the support plate. The material of the insertion block is iron, and the adsorption magnetic sheet is made of a ferrite magnet.
[0016] After adopting the above technical solution, the beneficial effects of the utility model are as follows: by setting the sleeve box, the fixing frame and the guide pulley, the busbar can be easily pulled along the inside of the sleeve box to the busbar system installation section in the high and low voltage cabinet, so that the busbar can be smoothly pulled to the installation section along a specific path, which can ensure the direction and position of the busbar to be accurate, reduce the adjustment time during installation, and at the same time, by pulling the busbar inside the sleeve box, the busbar is not easy to fall and injure the staff during installation;
[0017] By providing the clamping components, the design of the clamping components can make the kit easy to install quickly and also make the disassembly process faster and more convenient. The staff can quickly install the kit on the front side of the installation section, reducing installation time and labor costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0019] Figure 1 The utility model is a schematic diagram of the overall structure of a high and low voltage cabinet busbar through-cabinet traction device.
[0020] Figure 2 The utility model is a schematic diagram of the combined connection structure of three sets of boxes in a high and low voltage cabinet busbar through-cabinet traction device.
[0021] Figure 3 It is a schematic diagram of the front view inside the clamping components in a high- and low-voltage cabinet busbar through-cabinet traction device of the utility model.
[0022] Figure 4 It is a schematic diagram of a top view of a docking slot in a high and low voltage cabinet busbar through-cabinet traction device of the utility model.
[0023] In the figure, 100-busbar entrance, 200-traction rope, 300-fixed frame, 400-introduction pulley, 500-sleeve box, 600-upper docking box, 700-docking groove, 800-support plate, 900-insertion block, 110-clamping component, 1101-contraction cavity, 1102-lifting plate, 1103-elastic clamping block, 1104-inner connecting plate, 1105-compression spring, 1106-center rod, 1107-hollow block, 120-adsorption magnetic sheet, 130-side clamping rod. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0025] See also Figures 1 to 4 The utility model provides a technical solution: a high-low voltage cabinet busbar through-cabinet traction device, comprising: a busbar inlet 100 and a traction rope 200, a traction rope 200 is arranged in the middle of the busbar inlet 100, a fixing frame 300 is respectively installed on the upper and lower left sides of the busbar inlet 100, and a plurality of introduction pulleys 400 are symmetrically installed between the two fixing frames 300;
[0026] A sleeve box 500 is installed on the left side of the two fixing frames 300, and a side clamping rod 130 is installed on the upper and lower left sides of the sleeve box 500, and a clamping component 110 is respectively provided at the left end of the two side clamping rods 130;
[0027] The clamping component 110 includes a shrinkage cavity 1101, a lifting plate 1102 and an elastic clamping block 1103. A shrinkage cavity 1101 is respectively opened inside the left end of the two side clamping rods 130. A lifting plate 1102 is installed on the upper left side of the upper side clamping rod 130, and a hollow block 1107 is installed on the lower left side. An elastic clamping block 1103 is arranged below the hollow block 1107, and an inner connecting plate 1104 is arranged in the middle of the hollow block 1107. A compression spring 1105 is respectively arranged on the front and rear sides of the shrinkage cavity 1101, and a center rod 1106 is respectively arranged in the middle of the two compression springs 1105.
[0028] The upper end of the center rod 1106 passes through the contraction cavity 1101 and is connected to the lifting plate 1102, and its lower end is connected to the inner connecting plate 1104. The lower part of the inner connecting plate 1104 is connected to the elastic clamp block 1103. The upper ends of the two compression springs 1105 are connected to the inner wall of the contraction cavity 1101, and their lower ends are connected to the inner connecting plate 1104.
[0029] The two sets of clamping components 110 are installed in a mirror image, and rubber anti-skid pads are installed on the side of the two elastic clamping blocks 1103 away from the hollow block 1107, and a finger groove is respectively provided on the front and rear surfaces of the lifting plate 1102.
[0030] The left end of the traction rope 200 passes through between the two fixing frames 300 and passes out of the sleeve box 500 to the left side thereof. A bearing is installed in the middle of each introduction pulley 400, and a fixing rod is installed in the middle of each bearing.
[0031] The front and rear sides of each fixing rod are respectively connected to the inner side of the fixing frame 300 , the introduction pulley 400 is a flat groove pulley, and the length and width of the right end of the busbar inlet 100 are greater than those of the left side thereof.
[0032] The sleeve 500 is made of stainless steel, and the inner lining of the sleeve 500 is made of smooth nitrile rubber. The size of the inner lining of the sleeve 500 is 2 mm larger than the size of the busbar, and the compression spring 1105 is a stainless steel spring.
[0033] Example 1: Please refer to Figure 1 and Figure 3Before actual use, the center rod 1106 inside the two contraction chambers 1101 is pulled by two lifting plates 1102, and the center rod 1106 can drive the elastic clamp block 1103 to move to the inside of the contraction chamber 1101 through the inner connecting plate 1104. At the same time, the inner connecting plate 1104 can squeeze the compression spring 1105 to compress it, and then move the middle of the left side of the two side clamp rods 130 to the busbar system of the high and low voltage cabinets, and then release the lifting plate 1102. At the same time, the compression spring 1105 can rebound and drive the elastic clamp block 1103 to rebound through the inner connecting plate 1104, and then the two side clamp rods 130 can be clamped and fixed on the outside of the busbar system through the rubber anti-skid pad. The rubber anti-skid pad can increase the friction force so that the elastic clamp block 1103 is not easy to slide when clamped;
[0034] When in use, the right end of the traction rope 200 is connected to the busbar, and then the left end of the busbar is passed into the busbar entrance 100, and the busbar is pulled by the left end of the traction rope 200, so that the busbar can enter the diameter of the two fixed frames 300, and then enter the sleeve box 500 along the path between the two sets of introduction pulleys 400. When the busbar passes through the two sets of introduction pulleys 400, it can drive the two sets of introduction pulleys 400 to rotate, and then the busbar can be pulled to the busbar installation section of the busbar system through the smooth lining inside the sleeve box 500. The next step is to untie the traction rope 200 to fix the busbar to the busbar system installation section. Through the above steps, the final The effect is that the busbar can be easily pulled along the inside of the box 500 to the busbar system installation section in the high and low voltage cabinets, so that the busbar can be smoothly pulled to the installation section along a specific path, which can ensure the accuracy of the direction and position of the busbar and reduce the adjustment time during installation. At the same time, by pulling the busbar inside the box 500, the busbar is not easy to fall and injure workers during installation, and the design of the clamping component 110 can make the box 500 easy to install quickly, and also make its disassembly process faster and more convenient. The staff can quickly install the box 500 on the front side of the installation section, reducing installation time and labor costs.
[0035] An upper docking box 600 is installed in the middle of the sleeve box 500 . The upper surface of the upper docking box 600 is recessed downward to form a docking groove 700 . An adsorption magnetic sheet 120 is installed at the lower part of the docking groove 700 .
[0036] A support plate 800 is installed in the middle below the sleeve box 500, and an insertion block 900 is installed below the support plate 800. The material of the insertion block 900 is iron, and the adsorption magnetic sheet 120 is made of a ferrite magnet.
[0037] Example 2: Please refer to Figure 1 , Figure 2 as well as Figure 4 According to the further description of the first embodiment, when multiple busbars need to be installed, Figure 2As shown, the insertion block 900 at the support plate 800 below the sleeve box 500 at the upper traction device is embedded in the docking groove 700 of the upper docking box 600 below it, and the insertion block 900 can magnetically adsorb the adsorption iron sheet in the docking groove 700. The magnetic adsorption can prevent multiple groups of traction devices from shaking, thereby facilitating the combined connection of multiple groups of traction devices. After the connection is completed, the operation according to the first embodiment can be performed to install other busbars.
[0038] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A high and low voltage cabinet busbar through-cabinet traction device, comprising: A busbar inlet (100) and a traction rope (200), wherein a traction rope (200) is arranged in the middle of the busbar inlet (100), characterized in that: a fixing frame (300) is respectively installed on the upper and lower left sides of the busbar inlet (100), and a plurality of guide pulleys (400) are symmetrically installed between the two fixing frames (300); A sleeve box (500) is installed on the left side of the two fixing frames (300), a side clamping rod (130) is installed on the upper and lower left sides of the sleeve box (500), and an assembly clamping component (110) is provided at the left end of each of the two side clamping rods (130); The clamping component (110) includes a shrinkage cavity (1101), a lifting plate (1102) and an elastic clamping block (1103). A shrinkage cavity (1101) is respectively opened inside the left end of the two side clamping rods (130). A lifting plate (1102) is installed on the upper left side of the upper side clamping rod (130), and a hollow block (1107) is installed on the lower left side. An elastic clamping block (1103) is arranged below the hollow block (1107), and an inner connecting plate (1104) is arranged in the middle of the hollow block (1107). A compression spring (1105) is respectively arranged on the front and rear sides of the shrinkage cavity (1101), and a center rod (1106) is respectively arranged in the middle of the two compression springs (1105).
2. A high and low voltage cabinet busbar through-cabinet traction device as claimed in claim 1, characterized in that: The upper end of the center rod (1106) passes through the contraction cavity (1101) and is connected to the lifting plate (1102), and its lower end is connected to the inner connecting plate (1104). The lower part of the inner connecting plate (1104) is connected to the elastic clamp block (1103). The upper ends of the two compression springs (1105) are connected to the inner wall of the contraction cavity (1101), and their lower ends are connected to the inner connecting plate (1104).
3. A high and low voltage cabinet busbar through-cabinet traction device as claimed in claim 2, characterized in that: The two groups of clamping parts (110) are installed in a mirror image, and the two elastic clamping blocks (1103) are installed with rubber anti-skid pads on the side away from the hollow block (1107), and a finger groove is respectively provided on the front and rear surfaces of the lifting plate (1102).
4. A high and low voltage cabinet busbar through-cabinet traction device as claimed in claim 3, characterized in that: The left end of the traction rope (200) passes through between the two fixing frames (300) and passes out of the sleeve box (500) to the left side thereof. A bearing is installed in the middle of each of the introduction pulleys (400), and a fixing rod is installed in the middle of each of the bearings.
5. A high and low voltage cabinet busbar through-cabinet traction device as claimed in claim 4, characterized in that: The front and rear sides of each fixing rod are respectively connected to the inner side of the fixing frame (300); the introduction pulley (400) is a flat groove pulley; the length and width of the right end of the busbar inlet (100) are greater than the length and width of the left end thereof.
6. A high and low voltage cabinet busbar through-cabinet traction device as claimed in claim 5, characterized in that: The sleeve (500) is made of stainless steel, the inner lining of the sleeve (500) is made of smooth nitrile rubber, the size of the inner lining of the sleeve (500) is 2 mm larger than the busbar size, and the compression spring (1105) is a stainless steel spring.
7. A high and low voltage cabinet busbar through-cabinet traction device as claimed in claim 6, characterized in that: An upper docking box (600) is installed in the middle of the upper part of the sleeve box (500), the upper surface of the upper docking box (600) is recessed downward to form a docking groove (700), and an adsorption magnetic sheet (120) is installed at the lower part of the docking groove (700).
8. A high and low voltage cabinet busbar through-cabinet traction device as claimed in claim 7, characterized in that: A support plate (800) is installed in the middle below the sleeve box (500), and an insertion block (900) is installed below the support plate (800). The insertion block (900) is made of iron, and the adsorption magnetic sheet (120) is made of a ferrite magnet.