Train remote observation system based on multi-channel redundant architecture communication technology
Through multi-channel redundant architecture communication technology, the problems of single signal feedback form, insufficient coverage distance and unstable power supply of the train remote observation system are solved. It realizes real-time detection and multi-mode transmission of track areas outside the train's line of sight, improving railway efficiency. Transportation safety and reliability.
Patent Information
- Application Number
- CN202420665481.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-02
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-04-02
AI Technical Summary
The existing train remote observation system has a single signal feedback form, insufficient signal coverage distance, and lack of redundant power supply, resulting in untimely and unstable information transmission during emergencies, affecting safe train operation.
Using multi-channel redundant architecture communication technology, multiple signal transmission and redundant power supply systems are constructed through 4G/5G signal transmission antennas, leaked cables, radio frequency signal transmitters, radar camera modules, photovoltaic power generation panels and battery packs to realize train control Real-time detection of track areas beyond line-of-sight and multi-mode transmission of alarm information ensure timely, stable and reliable transmission of information.
It improves the timeliness, stability and reliability of the identification and alarm of the train remote observation system, ensures that vehicles and ground dispatching centers can receive alarm information in a timely manner, and improves the safety and reliability of railway transportation.
Smart Images

Figure CN221893094U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of rail transportation, and in particular to a train remote observation system based on multi-channel redundant architecture communication technology. Background Art
[0002] With the continuous growth of the operating mileage of urban rail transit in China, train operation safety has also become a top priority. In recent years, train collisions and derailment accidents caused by foreign objects invading the track limits have occurred frequently at home and abroad. Due to the long railway operating lines and complex geographical conditions along the way, various natural disasters and emergencies are almost unpredictable. Especially at the entrances and exits of tunnels, bends adjacent to mountains, sections of roads crossing railways, and mountainous areas, debris flows and landslides may occur. At the same time, illegal destruction or crossing of railway perimeter guardrails, animals staying along the railway, and other phenomena that infringe on the railway lines have also caused many serious accidents. In 2011, four social personnel on the Shenzhen-Guangzhou Line climbed over the railway guardrails to take a shortcut and broke into the track. Although the train driver braked urgently, the train still collided with people due to its high speed, resulting in 2 deaths and 1 injury; in 2016, a train in the Hangzhou-Nanjing section collided with a national second-level protected animal, the serow, causing the serow to die and the train body to malfunction, affecting subsequent travel. In 2019, the Shanghai-Guilin railway was derailed in Jiangxi due to a landslide caused by rain, which caused all vehicles on and off the line to be interrupted. Due to the above geographical conditions and human factors, when an emergency occurs, the safety of train operations is seriously challenged.
[0003] With the continuous deepening of the information reform of the railway system and the fourth major speed-up of railways, new challenges have been brought to the safe operation of railways. The original manual inspection technical means can no longer achieve the effective purpose of safety prevention. New detection equipment is needed to assist driving. By detecting natural disasters and sudden intrusions in advance, it can help drivers better avoid and judge risks and improve the safety and reliability of railway transportation.
[0004] Therefore, the ability to accurately detect emergencies such as natural disasters and foreign objects invading the railway perimeter is the key to ensuring the safe operation of trains. The traditional vehicle-mounted obstacle detection system has a limited detection distance (less than 200 meters) for obstacles on curves and out of sight, and the braking distance of trains with a speed of more than 80 km / h is greater than 200 meters, so other means are needed for auxiliary detection.
[0005] The main problems with mainstream technologies are:
[0006] 1. The alarm feedback form is single. Generally, the train remote observation system only feeds back the alarm data to the ground dispatching center, and then the dispatching center remotely reminds the train driver to take braking measures. This method takes a long time to feedback the signal and is greatly affected by human factors. Once the transmission link in the middle deviates, it causes information omissions, and the consequences are disastrous. Some train remote observation systems only transmit alarm information to nearby trains. Once the communication with the vehicle is abnormal, the system will fail immediately. Such a single alarm method does not have the effect of redundant communication feedback to prevent omissions;
[0007] 2. The transmission distance of train-to-ground signals is limited, and the signals are easily interfered with. Some ground observation systems directly transmit alarm signals to nearby trains, but when the distance between the two exceeds 150 meters, or in tunnels, culverts, mountainous areas, etc., the train cannot stably receive information from the observation system, and the braking distance of trains with a speed of more than 80km / h is greater than 200 meters, which will seriously affect the practicality and reliability of the system;
[0008] 3. The power supply of the trackside equipment of the remote observation system is not redundant. The current train trackside remote observation system mostly relies on municipal power supply. Once the power supply is interrupted, the overall observation and monitoring function will be paralyzed. The risk factor is high and it does not have the function of multiple energy replenishment to prevent power outages.
[0009] In summary, the trackside observation systems currently available on the market have shortcomings such as a single signal feedback form, insufficient signal coverage distance, and unstable system power supply.
[0010] In view of this, a train remote observation system based on multi-channel redundant architecture communication technology is proposed. Utility Model Content
[0011] The utility model aims to provide a train remote observation system with a multi-channel redundant architecture communication technology to solve the problems pointed out in the background technology.
[0012] The above technical objectives of the utility model are achieved through the following technical solutions:
[0013] A train remote observation system based on multi-channel redundant architecture communication technology, including an analysis and processing host, a 4G / 5G signal transmission antenna, a leakage cable, a radio frequency signal transmitter, a radar camera module, a photovoltaic panel, a power transmission cable and a battery pack. The 4G / 5G signal transmission antenna, the leakage cable and the radar camera module are connected to the analysis and processing host, the leakage cable is connected to the radio frequency signal transmitter, the radar camera module includes a high-definition camera and a millimeter wave radar component, the power transmission cable is connected to the battery pack and the photovoltaic panel, and the battery pack is electrically connected to the analysis and processing host.
[0014] In a preferred embodiment, the distance between the analysis and processing host and the radio frequency signal transmitter is 3 km.
[0015] In a preferred embodiment, a repeater is further included, and the repeater is connected to the leaking cable.
[0016] In a preferred embodiment, it further comprises a first mounting pole, the leakage cable is connected to the first mounting pole, and the radio frequency signal transmitter is arranged on the top of the first mounting pole.
[0017] In a preferred embodiment, it also includes a supporting platform, a steel box, a second mounting rod and a top bracket, the steel box and the second mounting rod are arranged on the supporting platform, the top bracket is arranged on the top of the second mounting rod, the radar camera module is arranged on the top bracket, the battery pack is arranged in the steel box, the photovoltaic panel is arranged on the second mounting rod, and the 4G / 5G signal transmission antenna is arranged on the top of the steel box.
[0018] In a preferred embodiment, an internal protective shell is provided inside the steel box.
[0019] In a preferred embodiment, the steel box is provided with a first interface integration group and a second interface integration group.
[0020] In a preferred embodiment, the first interface integration group and the second interface integration group are respectively provided with a radio frequency device connection port, the leakage cable is connected to the radio frequency device connection port, the first interface integration group is provided with a municipal power grid interface, and the second interface integration group is provided with a fiber optic cable interface.
[0021] In a preferred embodiment, the sides of the steel box body are provided with side guard plates, the side guard plates are provided with side cable clips, the top of the steel box body is provided with a top guard plate, the top guard plate is provided with a mounting rod reserved groove and a top cable clip.
[0022] Compared with the prior art, the utility model discloses a train remote observation system based on multi-channel redundant architecture communication technology, which installs trackside sensing equipment and analysis equipment at key locations such as railway curves, tunnel entrances, and areas prone to collapse, to make real-time judgments on the safety of track areas outside the train's sight range, and transmits the alarm results in advance to the passing vehicles and the ground dispatching center in multiple ways, thereby reserving sufficient time for vehicle braking and solving the problems of timeliness, stability, and reliability of identification and alarm of the trackside observation system.
[0023] The system is arranged on both sides of the track through a supporting mechanism. The equipment on both sides can detect foreign objects intrusion in the front and rear directions of the track. The system perception and detection range is 200 meters, and the on-site data transmission range can reach 3 kilometers in front and back. The data can be synchronously transmitted to the remote ground dispatching center. The system consists of a radar-vision fusion perception system (millimeter wave radar, camera, analysis and processing host), a signal transmission system, and a trackside support mechanism.
[0024] The perception and detection system includes a camera-based sensing device, a radar-based sensing device, and an analysis and processing host that provides edge computing capabilities; the camera-based sensing device is responsible for collecting track video data within 200 meters of the sensor; the radar-based sensing device includes obstacle perception detection in multiple directions and azimuth positioning.
[0025] The signal transmission system adopts a multi-channel redundant design. Channel 1: Access the public network through the 4G / 5G module and antenna on the analysis and processing host. When the analysis and processing host identifies an intrusion obstacle, it transmits the image and warning information to the application software of the dispatch center through the public network, which is reviewed and confirmed by the dispatch center. Channel 2: Communicate with the signal receiving terminal on the nearby train through the 4G / 5G module and antenna on the analysis and processing host, and transmit the image and warning information to the vehicle control system. Channel 3: Leakage cables are laid 3 km before and after the detection point for signal transmission, and a repeater for leakage cable signal reinforcement is placed every 150 m. Once the perception detection system issues an alarm, the signal is immediately sent to the train receiving terminal through the leakage cable of 6 km before and after. When the vehicle approaches the alarm section (3 km from the monitoring point, the total length is 6 km before and after the monitoring point), the vehicle is connected to the signal coverage range of the alarm section, and the alarm information sending system sends the alarm information to the vehicle's signal receiving fusion terminal (transmission time 50 ms), and then transmits it to the on-board control center, and finally displays the alarm information on the train display in the form of text / picture / video. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 This is a front view structural schematic diagram of the utility model;
[0027] Figure 2 This is a schematic diagram of the rear view structure of the steel box body of the utility model;
[0028] Figure 3 For the utility model Figure 1 A partial cross-section at the center is an enlarged structural diagram;
[0029] Figure 4 It is a schematic diagram of the enlarged structure of the top guard plate of the utility model in a top view and a side view.
[0030] In the picture
[0031] 1. Support platform; 2. Support legs; 3. Steel box; 4. Internal protective shell; 5. Analysis and processing host; 6. 4G / 5G signal transmission antenna; 7. Leakage cable; 8. First mounting pole; 9. RF signal transmitter; 10. Box door; 11. Battery pack; 12. Photovoltaic panel; 13. Transmission cable; 14. Second mounting pole; 15. Top bracket; 16. Radar camera module; 17. Repeater; 18. First interface integration group; 19. Second interface integration group; 20. Side guard plate; 21. Side cable bayonet; 22. Top guard plate; 23. Mounting pole reserved slot; 24. Top cable bayonet; 25. RF device connection port; 26. Municipal power grid interface; 27. Fiber optic cable interface. DETAILED DESCRIPTION
[0032] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0033] This specific embodiment is merely an explanation of the present invention and is not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to the present embodiment as needed, but such modifications are protected by patent law as long as they are within the scope of the claims of the present invention.
[0034] A train remote observation system based on multi-channel redundant architecture communication technology, including an analysis and processing host, a 4G / 5G signal transmission antenna, a leakage cable, a radio frequency signal transmitter, a radar camera module, a photovoltaic panel, a power transmission cable and a battery pack. The 4G / 5G signal transmission antenna, the leakage cable and the radar camera module are connected to the analysis and processing host, the leakage cable is connected to the radio frequency signal transmitter, the radar camera module includes a high-definition camera and a millimeter wave radar component, the power transmission cable is connected to the battery pack and the photovoltaic panel, and the battery pack is electrically connected to the analysis and processing host.
[0035] Furthermore, the distance between the analysis and processing host and the radio frequency signal transmitter is 3 km.
[0036] Furthermore, it also includes a repeater, and the repeater is connected to the leaking cable.
[0037] Furthermore, it also includes a first mounting rod, the leakage cable is connected to the first mounting rod, and the radio frequency signal transmitter is arranged on the top of the first mounting rod.
[0038] Furthermore, it also includes a supporting platform, a steel box, a second mounting rod and a top bracket, the steel box and the second mounting rod are arranged on the supporting platform, the top bracket is arranged on the top of the second mounting rod, the radar camera module is arranged on the top bracket, the battery pack is arranged in the steel box, the photovoltaic panel is arranged on the second mounting rod, and the 4G / 5G signal transmission antenna is arranged on the top of the steel box.
[0039] Furthermore, an internal protective shell is provided inside the steel box.
[0040] Furthermore, the steel box body is provided with a first interface integration group and a second interface integration group.
[0041] Furthermore, the first interface integration group and the second interface integration group are respectively provided with a radio frequency device connection port, the leakage cable is connected to the radio frequency device connection port, the first interface integration group is provided with a municipal power grid interface, and the second interface integration group is provided with an optical cable interface.
[0042] Furthermore, the sides of the steel box body are provided with side guard plates, the side guard plates are provided with side cable clips, the top of the steel box body is provided with a top guard plate, the top guard plate is provided with a mounting rod reserved groove and a top cable clip.
[0043] The following is a description with reference to the accompanying drawings:
[0044] See also Figure 1-4 , a train remote observation system based on multi-channel redundant architecture communication technology, including a support platform 1, four corners of the bottom of the support platform 1 are respectively fixedly connected with support leg frames 2, the front end of the top of the support platform 1 is fixedly connected with a steel box 3, the top of the steel box 3 is installed with an analysis and processing host 5 (containing a 4G / 5G card), the rear end of the top of the support platform 1 is vertically fixedly connected with a second mounting rod 14, the top of the second mounting rod 14 is fixedly connected with a top bracket 15, radar camera modules 16 are respectively installed on both sides of the top of the top bracket 15, the radar camera module 16 includes a high-definition camera and a millimeter-wave radar component, the radar camera module 16 is provided with a casing for waterproofing and dustproofing on the outside, a first interface integration group 18 is provided on one side of the bottom of the rear end of the steel box 3, a second interface integration group 19 is provided on the other side of the bottom of the rear end of the steel box 3, the bottom of the steel box 3 is fixedly connected with an internal protective shell 4, and redundant communication devices are provided on both sides of the support platform 1;
[0045] See also Figure 1-4A train remote observation system based on multi-channel redundant architecture communication technology also includes a redundant communication device, which includes two groups of first mounting poles 8, which are respectively arranged on the trackside about three kilometers away from the monitoring point (that is, the straight-line distance between the support platform 1 and the first mounting pole 8 is three kilometers), and a radio frequency signal transmitter 9 is installed on the top of the first mounting pole 8, and two groups of 4G / 5G signal transmission antennas 6 are installed on the top of the steel box 3. The bottom of the rear end of the second interface integration group 19 is provided with an optical fiber cable interface 27 (enabled when the monitoring point has optical fiber access conditions);
[0046] A radio frequency device connection port 25 is respectively arranged at the middle position of the rear end of the first interface integration group 18 and the second interface integration group 19. A leakage cable 7 is arranged between the bottom end of the first mounting rod 8 and the radio frequency device connection port 25. The leakage cable 7 is buried underground and radiates signals outward. A repeater 17 is arranged on the ground every 150 meters along the leakage cable 7 and connected to the leakage cable for relaying the leakage cable to enhance the signal strength of the leakage cable. A box door 10 is movably hinged on one side of the front end of the steel box body 3. The first mounting rod 8 is symmetrically distributed about the vertical center line of the support platform 1. Redundant reminders reduce the probability of information omission and improve the safety of train travel.
[0047] Specifically, Figure 1 and Figure 3 As shown, the analysis and processing host 5 transmits the intrusion alarm signal wirelessly through the 4G / 5G signal transmission antenna 6, and sends the alarm signal to the train signal receiving terminal and the ground dispatching center at the same time. After receiving the alarm information, the train signal receiving terminal or the ground dispatching center promptly notifies the train control system or the train driver. At the same time, considering the problems of signal interference and weak signal strength in mountainous areas or tunnels, the redundantly designed leakage cable 7 covers 3km on each side. The leakage cable itself sends an alarm signal to the outside world. Trains within this range can receive the alarm signal of the leakage cable, and the repeater 17 set at intervals is used for signal enhancement. In addition, a radio frequency signal transmitter 9 is installed at the end of the leakage cable. The warning signal is fed back to the radio frequency signal transmitter 9 at the top of the first mounting pole 8 through the leakage cable 7. The radio frequency signal transmitter 9 continuously transmits the signal, and the signal can be transmitted to the train three kilometers away, further improving the signal transmission distance.
[0048] The system adopts a redundant power supply method to ensure the power supply stability of the trackside observation system. Multiple battery packs 11 are installed at the bottom of the inner protective shell 4, and photovoltaic panels 12 are installed obliquely at the front and rear ends of the second mounting rod 14. A transmission cable 13 is installed between the bottom of the photovoltaic panel 12 and the rear end of the first interface integration group 18. The battery pack 11, photovoltaic panel 12, and transmission cable 13 are electrically connected. The bottom of the rear end of the first interface integration group 18 is provided with a municipal power grid interface 26, and the municipal power grid interface 26 and the analysis and processing host 5 are electrically connected. Multiple energy supply methods can avoid temporary paralysis of the equipment;
[0049] Specifically, Figure 1 and Figure 2 As shown, the power supply cable is connected to the municipal power grid interface 26. When the municipal power supply is interrupted, it automatically switches to the battery pack 11 for power supply, buying time for the municipal power grid maintenance. Under normal circumstances, the photovoltaic panel 12 replenishes the battery pack 11 through the transmission cable 13, which can reduce the energy consumption of the municipal power grid and play a role in energy conservation and emission reduction.
[0050] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that the process, method, article or terminal device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or terminal device. In the absence of further restrictions, the elements defined by the sentence "include..." or "comprise..." do not exclude the existence of other elements in the process, method, article or terminal device including the elements. In addition, in this article, "greater than", "less than", "exceed" and the like are understood to exclude the number itself; "above", "below", "within" and the like are understood to include the number itself.
[0051] The above description of the embodiments is to facilitate the understanding and use of the present invention by ordinary technicians in the technical field. It is obvious that those familiar with the technical field can easily make various modifications to the embodiments and apply the general principles described here to other embodiments without creative work. Therefore, the present invention is not limited to the above embodiments. Improvements and modifications made by those skilled in the art based on the disclosure of the present invention without departing from the scope of the present invention should be within the scope of protection of the present invention.
Claims
1. A train remote observation system based on multi-channel redundant architecture communication technology, characterized in that: It includes an analysis and processing host, a 4G / 5G signal transmission antenna, a leakage cable, a radio frequency signal transmitter, a radar camera module, a photovoltaic power generation panel, a power transmission cable and a battery pack. The 4G / 5G signal transmission antenna, the leakage cable and the radar camera module are connected to the analysis and processing host, the leakage cable is connected to the radio frequency signal transmitter, the radar camera module includes a high-definition camera and a millimeter wave radar component, the power transmission cable connects the battery pack and the photovoltaic power generation panel, and the battery pack is electrically connected to the analysis and processing host.
2. According to claim 1, a train remote observation system based on multi-channel redundant architecture communication technology is characterized in that: The distance between the analysis and processing host and the radio frequency signal transmitter is 3 km.
3. According to claim 1, a train remote observation system based on multi-channel redundant architecture communication technology is characterized in that: It also includes a repeater station, and the repeater station is connected to the leaking cable.
4. According to claim 1, a train remote observation system based on multi-channel redundant architecture communication technology is characterized in that: It also includes a first mounting rod, the leakage cable is connected to the first mounting rod, and the radio frequency signal transmitter is arranged on the top of the first mounting rod.
5. A train remote observation system based on multi-channel redundant architecture communication technology according to any one of claims 1 to 4, characterized in that: It also includes a supporting platform, a steel box, a second mounting rod and a top bracket, the steel box and the second mounting rod are arranged on the supporting platform, the top bracket is arranged on the top of the second mounting rod, the radar camera module is arranged on the top bracket, the battery pack is arranged in the steel box, the photovoltaic panel is arranged on the second mounting rod, and the 4G / 5G signal transmission antenna is arranged on the top of the steel box.
6. According to claim 5, a train remote observation system based on multi-channel redundant architecture communication technology is characterized in that: An internal protective shell is arranged inside the steel box body.
7. According to claim 5, a train remote observation system based on multi-channel redundant architecture communication technology is characterized in that: The steel box body is provided with a first interface integration group and a second interface integration group.
8. The train remote observation system based on multi-channel redundant architecture communication technology according to claim 7 is characterized in that: The first interface integration group and the second interface integration group are respectively provided with a radio frequency device connection port, the leakage cable is connected to the radio frequency device connection port, the first interface integration group is provided with a municipal power grid interface, and the second interface integration group is provided with an optical cable interface.
9. The train remote observation system based on multi-channel redundant architecture communication technology according to claim 5 is characterized in that: The sides of the steel box body are provided with side guard plates, and the side guard plates are provided with side cable clips. The top of the steel box body is provided with a top guard plate, and the top guard plate is provided with a mounting rod reserved groove and a top cable clip.
Citation Information
Cited By
Train remote observation system based on multi-channel redundant architecture communication technology
CN118306444A
