Highway tunnel construction disaster forecasting and prevention and control device

By using prevention and control monitoring components mounted on mobile carts during highway tunnel construction, including humidity, temperature sensors, real-time cameras and other equipment, real-time monitoring and analysis of the tunnel environment solves the problem of the lack of temperature and humidity sensor monitoring in the existing technology. , improving construction safety and protection effects.

CN221896658UActive Publication Date: 2024-10-25CHINA RAILWAY NO 5 ENGINEERING GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420623796.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-28
Publication Date
2024-10-25
Estimated Expiration
2034-03-28

AI Technical Summary

Technical Problem

The existing highway tunnel construction lacks sensing and monitoring equipment for temperature and humidity inside the tunnel, resulting in the inability to monitor and predict potential construction disasters in real time.

Method used

A highway tunnel construction disaster prediction and prevention and control device is designed, including a mobile cart, a base plate, a limit slat, and a prevention and control monitoring component. The component is equipped with a humidity sensor, a temperature sensor, a signal receiver, a warning device, and a vibration sensor. Sensors, data analyzers and real-time cameras monitor and analyze environmental parameters in the tunnel in real time and issue alerts to prevent potential disasters.

Benefits of technology

It realizes real-time monitoring of temperature and humidity in the tunnel and alarms for abnormal conditions, improves construction safety and protection effects, and ensures the stability of the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221896658U_ABST
    Figure CN221896658U_ABST
Patent Text Reader

Abstract

The utility model discloses a highway tunnel construction disaster forecasting and prevention and control device, and relates to the highway tunnel prevention and control equipment technical field, the highway tunnel construction disaster forecasting and prevention and control device comprises a mobile cart, a bottom plate and a limiting strip plate, the middle part of the top of the mobile cart is provided with the bottom plate, the front end of the top of the bottom plate is provided with the limiting strip plate, and the top of the bottom plate is provided with a prevention and control monitoring assembly; a humidity sensor and a temperature sensor are used for sensing and testing the temperature and humidity in a tunnel, a signal receiver is used for importing a signal into a data processing box by using a data importing rod, and a positioning rod and a protective top plate are used for protecting the vibration sensor. The vibration sensor can analyze data through the data analyzer when sensing shaking in the tunnel, the prevention and control effect is achieved, the real-time camera can monitor conditions in the tunnel in real time, an alarm is given out through the alarm when abnormal conditions are monitored, and the protection effect is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of highway tunnel prevention and control equipment, in particular to a highway tunnel construction disaster forecasting and prevention and control device. Background Art

[0002] The protective cover of the existing construction trolley is usually a fixed structure fixed on the trolley body, which results in the work content being limited to the projects that can be implemented within the protective cover, such as only being able to realize the drilling and charging operations of the face excavation, etc., and being unable to implement the construction operations on the inner wall of the tunnel, such as arch frame installation, initial support spraying and anchoring, etc. For this reason, the technical personnel in this field have made improvements and movably arranged the protective cover on the trolley, so that after the protective cover is moved to one end, the arch frame installation, initial support spraying and anchoring, etc. can be implemented at the other end of the trolley. However, when other operations need to be performed away from the face, the protective cover moves away from the face with the trolley, and cannot provide protection for the drilling and charging operations of the face excavation, resulting in the protective cover and the trolley not being able to fully play their functions. Therefore, further improvements are needed.

[0003] The patent with the publication number CN219974528U proposes a protective cover for rock burst prevention in tunnel construction, which includes a protective cover body, telescopic legs, leg shells, telescopic rods, leg cylinders, locking pin shafts, side wall sections, arch sections, and foot plates. The protective cover body consists of an arch section and two symmetrically distributed side wall sections, and the side wall sections are hinged on the arch section; the telescopic legs are arranged on the side wall sections; wherein the arch section and the side wall section both include a single-section structure or a combination structure of at least two sections hinged in sequence. The hinged connection relationship is used to form a structure with adjustable lateral dimensions, so as to make adaptive adjustments to the specific dimensions of the tunnel excavation, ensure that the whole is as close to the tunnel wall as possible, and improve the reliability of protection. The single-section and at least two-section structures of the arch section and the side wall section can be selected according to the size of the tunnel section. When the tunnel cross-section is small, both the crown section and the side wall section can adopt a single-section structure; when the tunnel cross-section is large, one of the crown section and the side wall section can adopt a single-section structure, and the other can adopt a multi-section structure of at least two sections; when the tunnel cross-section is larger, both the crown section and the side wall section can adopt a combined structure of at least two sections hinged in sequence, and the protective cover uses telescopic legs to form an independent support structure, so as to be transported to a set position, such as the face, by a trolley, and then supported independently on the tunnel floor by the legs, so as to be separated from the trolley and provide protection for the face operation alone, so as to give full play to the respective functions of the protective cover and the tunnel construction trolley. However, the following problems still exist in the patent:

[0004] During construction, existing highway tunnels are not equipped with good monitoring equipment to sense the temperature and humidity inside the tunnel.

[0005] In view of the above problems, it is necessary to design a highway tunnel construction disaster forecasting and prevention and control device to overcome the above problems. Utility Model Content

[0006] The main purpose of the utility model is to provide a highway tunnel construction disaster forecasting and prevention device, which can effectively solve the problems in the background technology.

[0007] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0008] A highway tunnel construction disaster forecasting and prevention and control device comprises a mobile cart, a bottom plate and a limiting strip plate, wherein the bottom plate is installed at the middle of the top of the mobile cart, the limiting strip plate is installed at the front end of the top of the bottom plate, and a prevention and control monitoring component is arranged on the top of the bottom plate;

[0009] The prevention and control monitoring component includes a data processing box arranged in the middle of the top of the bottom plate, a data import rod is arranged on the right side of the data processing box, a signal receiver is arranged on the right side of the data import rod, a humidity sensor is arranged behind the signal receiver, a temperature sensor is arranged on the front of the signal receiver, an alarm is arranged at the right end of the top of the signal receiver, a prevention and control box is installed on the top of the data processing box, an installation door is installed on the front of the prevention and control box, a monitoring window is arranged in the middle of the front of the installation door, an auxiliary handle is arranged at the front end of the right side of the prevention and control box, positioning rods are installed at the front and rear ends of the middle of the top of the prevention and control box, a protective top plate is installed on the top of the two positioning rods, data analyzers are arranged on the left and right ends of the top of the prevention and control box, vibration sensors are arranged on the top of the two data analyzers, an alarm is arranged at the upper end of the right side of the prevention and control box, a mounting plate is installed in the middle of the right side of the prevention and control box, and a real-time camera is arranged on the right side of the mounting plate.

[0010] As a preferred solution of the present utility model, the signal receiver is electrically connected to the humidity sensor, and the signal receiver is electrically connected to the temperature sensor.

[0011] As a preferred solution of the utility model, the signal receiver and the alarm are detachably connected, the signal receiver is electrically connected to the data import rod, and the data import rod is electrically connected to the data processing box.

[0012] As a preferred solution of the utility model, the control box is detachably connected to the two positioning rods, and the two positioning rods are detachably connected to the protective top plate.

[0013] As a preferred solution of the present utility model, the control box and the installation door are detachably connected, the control box and the auxiliary handle are detachably connected, and the installation door and the monitoring window are non-detachably connected.

[0014] As a preferred solution of the utility model, the control box is electrically connected to the two data analyzers, the data analyzer is electrically connected to the vibration sensor, the mounting plate is detachably connected to the real-time camera, and the real-time camera is electrically connected to the alarm.

[0015] Beneficial Effects

[0016] Compared with the prior art, the utility model has the following beneficial effects:

[0017] 1. The highway tunnel construction disaster forecasting and prevention and control device uses humidity sensors and temperature sensors to sense and test the temperature and humidity in the tunnel. The signal is imported into the data processing box through the signal receiver using the data import rod. The positioning rod and the protective top plate have a protective effect on the use of the vibration sensor. When the vibration sensor senses shaking in the tunnel, the data analyzer analyzes its data to achieve a prevention and control effect. The real-time camera can monitor the situation in the tunnel in real time, and the alarm will be issued through the alarm when abnormalities are detected, thereby improving the protection effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0019] Figure 2 It is a schematic diagram of the structure of the temperature sensor of the utility model;

[0020] Figure 3 It is a structural schematic diagram of a vibration sensor of the utility model.

[0021] In the figure: 1. Mobile cart; 2. Bottom plate; 3. Limiting strip; 4. Control and monitoring component; 401. Data processing box; 402. Data import rod; 403. Signal receiver; 404. Humidity sensor; 405. Temperature sensor; 406. Alarm; 407. Control box; 408. Monitoring window; 409. Installation door; 410. Auxiliary handle; 411. Positioning rod; 412. Protective top plate; 413. Data analyzer; 414. Vibration sensor; 415. Installation plate; 416. Real-time camera; 417. Alarm. DETAILED DESCRIPTION

[0022] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.

[0023] like Figure 1-3 As shown, the highway tunnel construction disaster forecasting and prevention and control device includes a mobile cart 1, a bottom plate 2 and a limiting strip plate 3. The bottom plate 2 is installed in the middle of the top of the mobile cart 1, the limiting strip plate 3 is installed at the front end of the top of the bottom plate 2, and the top of the bottom plate 2 is provided with a prevention and control monitoring component 4;

[0024] The control and monitoring assembly 4 includes a data processing box 401 arranged in the middle of the top of the bottom plate 2, a data import rod 402 is arranged on the right side of the data processing box 401, a signal receiver 403 is arranged on the right side of the data import rod 402, a humidity sensor 404 is arranged behind the signal receiver 403, a temperature sensor 405 is arranged on the front of the signal receiver 403, an alarm 406 is arranged on the right end of the top of the signal receiver 403, a control box 407 is installed on the top of the data processing box 401, an installation door 409 is installed on the front of the control box 407, and a A monitoring window 408 is provided, an auxiliary handle 410 is provided at the front end of the right side of the control box 407, positioning rods 411 are installed at the front and rear ends of the middle of the top of the control box 407, and a protective top plate 412 is installed on the top of the two positioning rods 411, data analyzers 413 are provided at the left and right ends of the top of the control box 407, and vibration sensors 414 are provided on the top of the two data analyzers 413, an alarm 417 is provided at the upper end of the right side of the control box 407, a mounting plate 415 is installed in the middle of the right side of the control box 407, and a real-time camera 416 is provided on the right side of the mounting plate 415;

[0025] The signal receiver 403 is electrically connected to the humidity sensor 404, the signal receiver 403 is electrically connected to the temperature sensor 405, the signal receiver 403 is detachably connected to the alarm 406, the signal receiver 403 is electrically connected to the data import rod 402, the data import rod 402 is electrically connected to the data processing box 401, the control box 407 is detachably connected to the two positioning rods 411, the two positioning rods 411 are detachably connected to the protective top plate 412, the control box 407 is detachably connected to the installation door 409, the control box 407 is detachably connected to the auxiliary handle 410, the installation door 409 is non-detachably connected to the monitoring window 408, the control box 407 is electrically connected to the two data analyzers 413, the data analyzer 413 is electrically connected to the vibration sensor 414, the mounting plate 415 is detachably connected to the real-time camera 416, and the real-time camera 416 is electrically connected to the alarm 417;

[0026] Among them, the temperature and humidity in the tunnel are sensed and tested by the humidity sensor 404 and the temperature sensor 405, and the signal is introduced into the data processing box 401 by the data import rod 402 through the signal receiver 403. The positioning rod 411 and the protective top plate 412 have a protective effect on the use of the vibration sensor 414. When the vibration sensor 414 senses shaking in the tunnel, its data can be analyzed by the data analyzer 413 to achieve a prevention and control effect. The real-time camera 416 can monitor the situation in the tunnel in real time, and an alarm can be issued through the alarm 417 when an abnormality is detected, thereby improving the protection effect.

[0027] It should be noted that the utility model is a disaster forecasting and prevention device for highway tunnel construction. When in use, the mobile cart 1 is easy to move and use. The temperature and humidity in the tunnel are sensed by the humidity sensor 404 and the temperature sensor 405. The signal is imported into the data processing box 401 by the data import rod 402 through the signal receiver 403. The alarm 406 can issue a prompt when the humidity sensor 404 and the temperature sensor 405 sense an abnormality. The protective top plate 412 is installed to protect the vibration sensor 414 by two positioning rods 411. The vibration sensor 414 can import the signal into the prevention and control box 407 through the data analyzer 413 when the prevention and control box 407 shakes, so that the staff can know the situation in the tunnel remotely. The real-time camera 416 can be used to monitor the situation in the tunnel in real time to achieve a protective effect, and the alarm 417 can be used to monitor the abnormality and warn the staff.

[0028] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.

Claims

1. A highway tunnel construction disaster forecasting and prevention device, comprising a mobile cart (1), a base plate (2) and a limiting strip plate (3), characterized in that: A bottom plate (2) is installed in the middle of the top of the mobile cart (1), a limiting strip (3) is installed at the front end of the top of the bottom plate (2), and a prevention and control monitoring component (4) is arranged on the top of the bottom plate (2); The control and monitoring component (4) comprises a data processing box (401) arranged in the middle of the top of the base plate (2); a data import rod (402) is arranged on the right side of the data processing box (401); a signal receiver (403) is arranged on the right side of the data import rod (402); a humidity sensor (404) is arranged behind the signal receiver (403); a temperature sensor (405) is arranged on the front of the signal receiver (403); an alarm (406) is arranged at the right end of the top of the signal receiver (403); a control box (407) is installed on the top of the data processing box (401); a mounting door (409) is installed on the front of the control box (407); the middle of the front of the mounting door (409) is provided. A monitoring window (408) is provided at the top of the control box (407); an auxiliary handle (410) is provided at the front end of the right side of the control box (407); positioning rods (411) are installed at the front and rear ends of the middle of the top of the control box (407); a protective top plate (412) is installed on the top of the two positioning rods (411); data analyzers (413) are provided at the left and right ends of the top of the control box (407); vibration sensors (414) are provided on the top of the two data analyzers (413); an alarm (417) is provided at the upper end of the right side of the control box (407); a mounting plate (415) is installed in the middle of the right side of the control box (407); and a real-time camera (416) is provided on the right side of the mounting plate (415).

2. The highway tunnel construction disaster prediction and prevention device according to claim 1 is characterized by: The signal receiver (403) is electrically connected to the humidity sensor (404), and the signal receiver (403) is electrically connected to the temperature sensor (405).

3. The highway tunnel construction disaster prediction and prevention device according to claim 1 is characterized by: The signal receiver (403) and the alarm (406) are detachably connected, the signal receiver (403) and the data import rod (402) are electrically connected, and the data import rod (402) and the data processing box (401) are electrically connected.

4. The highway tunnel construction disaster prediction and prevention device according to claim 1 is characterized by: The control box (407) is detachably connected to the two positioning rods (411), and the two positioning rods (411) are detachably connected to the protective top plate (412).

5. The highway tunnel construction disaster prediction and prevention device according to claim 1 is characterized by: The control box (407) and the installation door (409) are detachably connected, the control box (407) and the auxiliary handle (410) are detachably connected, and the installation door (409) and the monitoring window (408) are non-detachably connected.

6. The highway tunnel construction disaster prediction and prevention device according to claim 1 is characterized by: The control box (407) is electrically connected to the two data analyzers (413), the data analyzer (413) is electrically connected to the vibration sensor (414), the mounting plate (415) is detachably connected to the real-time camera (416), and the real-time camera (416) is electrically connected to the alarm (417).