Hydraulic engineering pipeline multi-stage connecting mechanism

By using the misaligned splicing design of components such as positioning racks, fixed ring sleeves, connecting snap rings, and sealing rings in the water conservancy pipeline connection structure, the problems of leakage and weak connections in the existing water conservancy pipeline connection structure are solved, and a more efficient Sealing and stability.

CN221897343UInactive Publication Date: 2024-10-25JIANGXI HAIYING CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420701094.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-08
Publication Date
2024-10-25
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing water conservancy pipeline connection structure is prone to water leakage and weak connections after long-term use, and the sealing ring is easy to fall off.

Method used

A multi-level connection mechanism for water conservancy engineering pipelines is designed. It uses components such as positioning racks, fixed ring sleeves, connecting snap rings, arc plates and sealing rings to achieve the fixation and sealing of the pipeline main body through dislocation and splicing. Combined with rotation The valve plate and through-channel prevent liquid from flowing out.

Benefits of technology

It improves the sealing performance of pipe joints, prevents the sealing ring from falling off, facilitates disassembly and installation, prevents liquid from flowing out, and enhances the stability and safety of the connection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221897343U_ABST
    Figure CN221897343U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of hydraulic engineering, in particular to a hydraulic engineering pipeline multi-stage connecting mechanism which comprises pipeline bodies and a connecting valve used for connecting the two pipeline bodies, and the two sides of the outer wall of the connecting valve are fixedly communicated with connecting sleeves. The connecting snap ring is fixed on the outer side of the pipeline main body, the connecting snap ring is fixed on the outer side of the pipeline main body, the opposite sides of the two pipeline main bodies are communicated with the inner wall of the connecting sleeve, the connecting sleeve is provided with a fixing part for fixedly connecting the pipeline main bodies, and the connecting valve is provided with a plugging part. The arc-shaped plate and the sealing ring can be inserted into the inner wall of the connecting sleeve, so that the sealing ring can integrally seal the joint of the connecting sleeve and the pipeline main body, and finally, the connecting clamping ring and the outer connecting ring are fixed; therefore, the sealing performance of the sealing ring on the joint of the connecting sleeve and the pipeline body is improved, and meanwhile the sealing ring can be prevented from falling off.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water conservancy projects, in particular to a multi-stage connection mechanism for water conservancy project pipelines. Background Art

[0002] Water conservancy projects require the construction of different types of hydraulic structures such as dams, dikes, spillways, sluices, water inlets, channels, ferries, rafts and fishways to achieve their goals. Water conservancy projects often require the use of pipelines, which are devices connected by pipes, pipe connectors and valves for transporting gas, liquid or fluid with solid particles.

[0003] The existing water conservancy pipelines often use flanges to fix and connect two pipes. When the water conservancy pipeline needs to be disassembled, if there is liquid in the two pipes, the liquid will often flow out during the disassembly process, which will affect the disassembly and assembly of the pipeline by personnel. At the same time, when the flange is used for connection, only a layer of sealing ring is often provided on the opposite side of the flange for sealing. This sealing ring structure is prone to water leakage after long-term use, and the connection is not firm and easy to fall off. Therefore, the existing water conservancy pipeline connection structure still has certain shortcomings.

[0004] In summary, it is necessary to invent a multi-stage connection mechanism for water conservancy project pipelines. Utility Model Content

[0005] To this end, the utility model provides a multi-stage connection mechanism for water conservancy engineering pipelines to solve the problem that the sealing ring structure is prone to water leakage after long-term use, the connection is not firm, and it is easy to fall off.

[0006] In order to achieve the above-mentioned purpose, the utility model provides the following technical solutions: a multi-stage connection mechanism for water conservancy project pipelines, including a pipeline main body and a connecting valve for connecting two pipeline main bodies, both sides of the outer wall of the connecting valve are fixedly connected with connecting sleeves, and the opposite sides of the two pipeline main bodies are connected to the inner wall of the connecting sleeve, the connecting sleeve is provided with a fixing component for fixing the pipeline main body, and the connecting valve is provided with a blocking component.

[0007] Preferably, the fixing component comprises positioning racks, which are arranged on the inner wall of the connecting sleeve in a circular array, and the outer wall of the insertion end of the pipe body is fixed with a fixing ring.

[0008] Preferably, tooth grooves a are provided at side ends of the outer wall of the fixing ring sleeve and at positions corresponding to the positioning racks, and the outer walls of the positioning racks are slidably connected to the tooth grooves a at the corresponding positions.

[0009] Preferably, a connecting clamp is provided on the outer wall of the pipe body and located outside the connecting sleeve. The connecting clamp is a two-stage structure, and locking fixing strips are fixed to both ends of the connecting clamp.

[0010] Preferably, locking holes are provided on the outer walls of two adjacent locking and fixing strips, the two locking and fixing strips are fixed by bolts and the locking holes, and an arc plate is fixed on the outer wall of the connecting clamp and on one end close to the connecting sleeve.

[0011] Preferably, the outer wall of the arc plate is in contact with the outer wall of the pipe body, and a sealing ring is fixed to the outer wall of the arc plate for sealing. A tooth groove b is provided at the top of the outer wall of the sealing ring and at a position corresponding to the positioning rack, and the outer wall of the positioning rack is slidably connected to the tooth groove b.

[0012] Preferably, an outer connecting ring is fixed to the side end of the outer wall of the connecting sleeve and away from the connecting valve, screw holes are provided at corresponding positions on the side opposite to the outer connecting ring, and fixing bolts are fixed between the screw holes.

[0013] Preferably, water grooves are provided on both sides of the outer wall of the connecting valve and at positions corresponding to the connecting sleeve, and the blocking component includes a valve plate, and the upper and lower ends of the outer wall of the valve plate are rotatably connected to the upper and lower sides of the inner wall of the water groove through a rotating shaft.

[0014] Preferably, a valve stem is fixed to the upper end of the rotating shaft, and the end of the valve stem away from the valve plate extends to the top of the outer wall of the connecting valve and is fixed with a handle. The connecting valve is provided with a rotating groove at a position corresponding to the valve stem, and the valve stem is rotatably connected to the inner wall of the rotating groove.

[0015] The beneficial effects of the utility model are:

[0016] In the utility model, by fixing the fixing ring sleeve at the insertion end of the pipeline body, the fixing ring sleeve and the positioning rack can be displaced after the pipeline body is inserted into the inner wall of the connecting sleeve, so that the connecting sleeve and the pipeline body can be fixed, and then the connecting clamp ring can be taken out, and then the connecting clamp ring is fixed to the outer side of the pipeline body, and the arc plate and the sealing ring can be inserted into the inner wall of the connecting sleeve, so that the sealing ring can perform an overall seal on the connection between the connecting sleeve and the pipeline body, and finally the connecting clamp ring is fixed to the outer connecting ring, so as to improve the sealing performance of the sealing ring on the connection between the connecting sleeve and the pipeline body, and also avoid the sealing ring from falling off, which is convenient for personnel to use;

[0017] In the utility model, when a person disassembles a single pipe body, the valve stem can be rotated by holding the handle to rotate the valve plate, so that the valve plate closes the water channel, thereby preventing liquid from flowing out of the pipe body at the other end. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the overall structure of the utility model in the front view direction;

[0019] Figure 2 For this utility model Figure 1 The enlarged structural diagram at A in the middle;

[0020] Figure 3 It is a partial structural schematic diagram of the connecting valve and the connecting sleeve in the utility model from the side view direction;

[0021] Figure 4 It is a three-dimensional structural schematic diagram of the connecting clamp ring, arc plate and sealing ring in the utility model;

[0022] Figure 5 It is a three-dimensional structural schematic diagram of the fixing ring sleeve in the utility model.

[0023] In the figure: 100, connecting valve; 110, valve stem; 120, valve plate; 200, connecting sleeve; 210, outer connecting ring; 220, positioning rack; 300, pipeline body; 310, fixing ring sleeve; 400, connecting clamp ring; 410, arc plate; 420, sealing ring; 430, locking fixing strip. DETAILED DESCRIPTION

[0024] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0025] See attached Figure 1-5The utility model provides a multi-stage connection mechanism for a water conservancy project pipeline, including a pipeline body 300 and a connecting valve 100 for connecting two pipeline bodies 300. The connecting valve 100 is provided to connect the two pipeline bodies 300 through a connecting sleeve 200. Both sides of the outer wall of the connecting valve 100 are fixedly connected with connecting sleeves 200. The opposite sides of the two pipeline bodies 300 are connected with the inner wall of the connecting sleeve 200. The connecting sleeve 200 is provided with a fixing component for fixing the pipeline body 300. The fixing component includes a positioning rack 220. The positioning rack 220 is arranged on the inner wall of the connecting sleeve 200 in an annular array. The positioning rack 220 is arranged at the front end of the inner wall of the connecting sleeve 200 and does not completely penetrate the inner wall of the connecting sleeve 200. The outer wall of the insertion end of the pipeline body 300 is fixed with a fixing rack 220. The fixing ring sleeve 310 has a tooth groove a at the side end of the outer wall of the fixing ring sleeve 310 and at the corresponding position of the positioning rack 220. The outer wall of the positioning rack 220 is slidably connected to the tooth groove a at the corresponding position. Preferably, the fixing ring sleeve 310 can be fixed to the front insertion end of the pipeline body 300 by screws, etc. When the personnel need to connect the pipeline body 300 with the connecting sleeve 200, the fixing ring sleeve 310 can be fixed to the insertion end of the pipeline body 300 first, and then the fixing ring sleeve 310 is aligned with the positioning rack 220 so that the end of the pipeline body 300 is inserted into the inner wall of the connecting sleeve 200. After the insertion is completed, the positioning rack 220 will be staggered with the fixing ring sleeve 310. Then the personnel can rotate the connecting valve 100 to make the positioning rack 220 and the fixing ring sleeve 310 staggered, so that the connecting sleeve 200 can be fixed to the pipeline body 300.

[0026] The outer wall of the pipeline body 300 and the outer side of the connecting sleeve 200 are provided with a connecting clamp 400. The connecting clamp 400 is a two-stage structure. Both ends of the connecting clamp 400 are fixed with locking fixing strips 430. The outer walls of the two adjacent locking fixing strips 430 are provided with locking holes. The two locking fixing strips 430 are fixed by bolts and locking holes. Specifically, when the personnel rotates the connecting valve 100 so that the positioning rack 220 and the fixing ring sleeve 310 are misaligned, the connecting clamp 400 can be taken out, and the personnel can assemble the connecting clamp 400 up and down. The connecting ring 400 is fixed to the outer side of the pipe body 300 by means of a connection, and then the connecting ring 400 can be fixed to the outer wall of the pipe body 300 by locking the fixing strip 430 and the bolts, and the inner walls of the connecting ring 400 and the arc plate 410 can be fixed with rubber pads to improve the stability of fixing with the outer wall of the pipe body 300, and the outer wall of the connecting ring 400 and one end close to the connecting sleeve 200 are fixed with the arc plate 410, and the outer wall of the arc plate 410 is in contact with the outer wall of the pipe body 300, and the outer wall of the arc plate 410 is fixed with a sealing ring 420 for sealing. 0, a tooth groove b is provided at the top of the outer wall of the sealing ring 420 and at the position corresponding to the positioning rack 220, and the outer wall of the positioning rack 220 is slidably connected with the tooth groove b. Specifically, the arc plate 410 is provided to support the sealing ring 420, and the sealing ring 420 is provided to be inserted into the inner wall of the connecting sleeve 200, so as to seal the gap between the arc plate 410 and the connecting sleeve 200, thereby achieving the function of sealing the connection between the connecting sleeve 200 and the pipeline body 300, and the tooth groove b is provided to facilitate the connection with the positioning rack 220. The outer connecting ring 210 is fixed to the side of the outer wall of the connecting sleeve 200 and away from the connecting valve 100. The connecting clamp 400 is provided with screw holes at corresponding positions on the side opposite to the outer connecting ring 210. Fixing bolts are fixed between the screw holes. The outer connecting ring 210 is provided to be fixed to the side of the outer wall of the connecting clamp 400 by bolts, thereby further improving the stability between the connecting sleeve 200 and the pipeline body 300 and preventing the connecting sleeve 200 and the pipeline body 300 from being loosened during use.

[0027] A plugging component is provided on the connecting valve 100. Water grooves are provided on both sides of the outer wall of the connecting valve 100 and at positions corresponding to the connecting sleeve 200. The plugging component includes a valve plate 120. The upper and lower ends of the outer wall of the valve plate 120 are rotatably connected to the upper and lower sides of the inner wall of the water groove through a rotating shaft. A valve stem 110 is fixed to the upper end of the rotating shaft. The end of the valve stem 110 away from the valve plate 120 extends to the top of the outer wall of the connecting valve 100 and is fixed with a handle. The connecting valve 100 is provided with a rotating groove at a position corresponding to the valve stem 110, and the valve stem 110 is rotatably connected to the inner wall of the rotating groove. Specifically, when personnel need to disassemble the pipeline body 300 at one end of the connecting valve 100, the valve stem 110 can be rotated by the handle so that the valve stem 110 drives the valve plate 120 to rotate, and the valve plate 120 can close the water groove, thereby preventing the liquid in the pipeline body 300 at the other end from being discharged from the connecting valve 100 and the connecting sleeve 200.

[0028] The use process of the utility model is as follows: first, when the personnel need to install the pipe body 300, they can first confirm the insertion end of the pipe body 300, then sleeve the fixing ring sleeve 310 on the outer wall of the insertion end of the pipe body 300, and then fix the fixing ring sleeve 310 on the outer wall of the insertion end of the pipe body 300 by screws, and then insert one end of the pipe body 300 into the inner wall of the connecting sleeve 200, and align the fixing ring sleeve 310 with the positioning rack 220 and then insert it. After the pipe bodies 300 at both ends are inserted, the positioning rack 220 will be separated from the fixing ring sleeve 310, and then the personnel can rotate the connecting valve 100 to make the positioning rack 220 and the fixing ring sleeve 310 misaligned;

[0029] After completion, the personnel can remove the connecting clamp ring 400, and fix the sealing ring 420 on the arc plate 410 in advance, and then fix the two connecting clamp rings 400 to the outside of the pipeline body 300 by splicing, and then adjust the position of the sealing ring 420 so that the sealing ring 420 can mesh with the positioning rack 220, and then insert the arc plate 410 and the sealing ring 420 into the inner wall of the connecting sleeve 200, so that the sealing ring 420 can seal the connection between the connecting sleeve 200 and the pipeline body 300. After completion, the bolts can be removed and first tightened by locking The fixing bar 430 fixes the two connecting clamps 400 so that the connecting clamps 400 can be fixed on the outer wall of the pipe body 300, and then the connecting clamps 400 and the outer connecting ring 210 are fixed by bolts and screw holes, so as to improve the fixing effect of the connecting sleeve 200 and the pipe body 300. After the connecting sleeve 200 and the pipe body 300 are fixed, the personnel can rotate the valve stem 110 by the handle to rotate the valve plate 120, so that the water channel is opened, and then the pipe body 300 conveys the water flow.

[0030] The above is only a preferred embodiment of the utility model. Any person skilled in the art may modify the utility model by using the above technical solution or modify it into an equivalent technical solution. Therefore, any simple modification or equivalent replacement based on the technical solution of the utility model shall fall within the scope of protection claimed by the utility model.

Claims

1. A multi-stage connection mechanism for a water conservancy project pipeline, comprising a pipeline body (300), characterized in that: A connecting valve (100) is also provided for connecting two pipeline bodies (300), wherein both sides of the outer wall of the connecting valve (100) are fixedly connected with connecting sleeves (200), and opposite sides of the two pipeline bodies (300) are connected with the inner wall of the connecting sleeve (200), and the connecting sleeve (200) is provided with a fixing component for fixing the pipeline body (300), and the connecting valve (100) is provided with a blocking component.

2. A multi-stage connection mechanism for water conservancy engineering pipelines according to claim 1, characterized in that: The fixing component comprises positioning racks (220), and the positioning racks (220) are arranged on the inner wall of the connecting sleeve (200) in a circular array. The outer wall of the insertion end of the pipe body (300) is fixed with a fixing ring (310).

3. A multi-stage connection mechanism for water conservancy engineering pipelines according to claim 2, characterized in that: The outer wall side ends of the fixing ring sleeve (310) and the positions corresponding to the positioning rack (220) are provided with tooth grooves a connected thereto, and the outer walls of the positioning rack (220) are slidably connected to the tooth grooves a at the corresponding positions.

4. A multi-stage connection mechanism for water conservancy engineering pipelines according to claim 3, characterized in that: A connecting clamp (400) is provided on the outer wall of the pipe body (300) and located outside the connecting sleeve (200). The connecting clamp (400) is a two-stage structure, and locking fixing strips (430) are fixed at both ends of the connecting clamp (400).

5. A multi-stage connection mechanism for water conservancy engineering pipelines according to claim 4, characterized in that: The outer walls of two adjacent locking and fixing strips (430) are each provided with a locking hole, and the two locking and fixing strips (430) are fixed by bolts and the locking holes. The outer wall of the connecting clamp (400) and one end close to the connecting sleeve (200) are each fixed with an arc plate (410).

6. A multi-stage connection mechanism for water conservancy engineering pipelines according to claim 5, characterized in that: The outer wall of the arc-shaped plate (410) is in contact with the outer wall of the pipe body (300), and a sealing ring (420) is fixed to the outer wall of the arc-shaped plate (410) for sealing. A tooth groove b is provided at the top of the outer wall of the sealing ring (420) and at a position corresponding to the positioning rack (220), and the outer wall of the positioning rack (220) is slidably connected to the tooth groove b.

7. A multi-stage connection mechanism for water conservancy engineering pipelines according to claim 6, characterized in that: An external connection ring (210) is fixed to the side end of the outer wall of the connection sleeve (200) and away from the connection valve (100), and screw holes are provided at corresponding positions on the side opposite to the external connection ring (210) of the connection clamp ring (400), and fixing bolts are fixed between the screw holes.

8. A multi-stage connection mechanism for water conservancy engineering pipelines according to claim 1, characterized in that: Water channels are provided on both sides of the outer wall of the connecting valve (100) and at positions corresponding to the connecting sleeve (200). The blocking component comprises a valve plate (120). The upper and lower ends of the outer wall of the valve plate (120) are rotatably connected to the upper and lower sides of the inner wall of the water channel via a rotating shaft.

9. A multi-stage connection mechanism for water conservancy engineering pipelines according to claim 8, characterized in that: A valve stem (110) is fixed to the upper end of the rotating shaft, and one end of the valve stem (110) away from the valve plate (120) extends to the top of the outer wall of the connecting valve (100) and is fixed with a handle. The connecting valve (100) is provided with a rotating groove at a position corresponding to the valve stem (110), and the valve stem (110) is rotatably connected to the inner wall of the rotating groove.