Building construction ventilation device
By using air pumps and water pumps in conjunction with the design of sprinkler heads in building construction ventilation devices, water mist diffusion technology is used to reduce dust concentration, solve dust problems during the construction process, and improve construction efficiency and worker health.
Patent Information
- Application Number
- CN202420733381.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-09
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-04-09
AI Technical Summary
During the construction process, indoor dust concentration is high, resulting in low construction efficiency and health problems for workers. The existing ventilation devices are not effective.
Design a ventilation device for building construction, including a box, an air pump, a water pump and a nozzle. The water pump sprays water mist through the nozzle, and the air pump blows away the water mist to reduce the dust concentration. Combined with the water storage chamber and the adjustment component, it ensures that the air pump discharges Wind spreads effectively.
Effectively reduce indoor dust concentration, reduce health damage to workers, improve construction efficiency, and enhance ventilation effects.
Smart Images

Figure CN221897908U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction ventilation, in particular to a building construction ventilation device. Background Art
[0002] Building construction refers to production activities during the implementation stage of engineering construction. A large amount of dust is easily generated during the construction process. When indoor construction is carried out, the indoor air circulation speed is slow. The large amount of dust generated by the operation is not conducive to the health of the workers. When the dust concentration is too high, it is inconvenient for the workers to carry out their construction work, affecting the construction efficiency. Based on this, it is necessary to provide a construction ventilation device. Utility Model Content
[0003] The technical solution of the utility model to solve the above technical problems is as follows:
[0004] A building construction ventilation device, comprising:
[0005] A box body, wherein the box body is provided with a water storage chamber, and the water storage chamber has an opening;
[0006] A bracket, the bracket being connected to the first surface of the box;
[0007] An air pump, the air pump having an air suction end and an air outlet end, and a first end of the air pump is rotatably connected to the bracket;
[0008] a water pump, the water pump being connected to the first surface of the housing, the water pump and the bracket being spaced apart from each other, the water pump having a water pumping end and a water outlet end, the water pumping end of the water pump passing through the opening and being arranged in the water storage chamber, and the water outlet end of the water pump being arranged facing away from the first surface of the housing; and
[0009] A nozzle is connected to the water outlet of the water pump, and the air outlet of the air pump is arranged facing the nozzle.
[0010] In one embodiment, the level of the spray head is lower than the level of the air pump.
[0011] In one embodiment, a water inlet hole is opened on the outer surface of the box body, and the water inlet hole is connected to the water storage chamber.
[0012] In one embodiment, a sealing block is further included, and the sealing block is movably abutted against the inner wall of the water inlet hole.
[0013] In one embodiment, the sealing block is a silicone sealing block.
[0014] In one embodiment, it also includes an adjustment component, which includes a fixed rod and a sliding rod. A sliding groove is provided on a side of the air pump facing the box body. The first end of the fixed rod is connected to the first surface of the box body, and the second end of the fixed rod is provided with an adjustment groove. The first end of the sliding rod is slidably set in the adjustment groove, and the second end of the sliding rod is movably abutted against the inner wall of the sliding groove.
[0015] In one embodiment, it further comprises a plurality of protrusions, each of which is connected to the inner side wall of the slide groove, and each of the protrusions is arranged at intervals from each other, and the second end of the sliding rod is movably abutted against the outer side surface of the protrusion.
[0016] In one embodiment, it also includes a fixing bolt, and the outer surface of the fixing rod is provided with a plurality of first threaded holes, and the first threaded holes are spaced apart from each other, and the fixing bolt is movably connected to the inner wall of the first threaded hole, and the fixing bolt is movably abutted against the outer surface of the sliding rod.
[0017] In one embodiment, a plurality of second threaded holes are formed on the outer surface of the sliding rod, and the second threaded holes are spaced apart from each other. The fixing bolt passes through the first threaded hole and is movably connected to the inner wall of the second threaded hole.
[0018] In one embodiment, it further includes an anti-slip cover, which is movably disposed on the outer surface of the second end of the sliding rod.
[0019] The beneficial effects of the utility model are as follows: a water storage chamber is provided in the box body, the water storage chamber has an opening, the air pump and the water pump are arranged on the first surface of the box body at intervals, the water pump has a pumping end and a water outlet end, the water pumping end of the water pump is arranged in the water storage chamber through the opening, the water outlet end of the water pump is arranged facing away from the first surface of the box body, a nozzle is arranged on the water outlet end of the water pump, and the air outlet end of the air pump is arranged facing the nozzle. In this way, when the user is working indoors, the water pumping end of the water pump can pump water in the water storage chamber into the nozzle by turning on the air pump and the water pump, so that the nozzle can reduce the concentration of indoor dust by spraying water, and the air outlet end of the air pump is arranged facing the nozzle, so that the air pump can diffuse the water mist sprayed by the nozzle, thereby effectively reducing the concentration of indoor dust. In this way, the building construction ventilation device can effectively ventilate and reduce dust in the indoor environment, thereby reducing the damage of dust to the body of workers during construction, and improving the construction efficiency of workers. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 A schematic diagram of the structure of a building construction ventilation device according to an embodiment;
[0021] Figure 2A partial structural schematic diagram of a building construction ventilation device according to an embodiment;
[0022] Figure 3 A partial structural schematic diagram of a building construction ventilation device according to an embodiment.
[0023] In the accompanying drawings, 10, building construction ventilation device; 100, box body; 110, water storage chamber; 111, opening; 112, water inlet hole; 120, sealing block; 200, bracket; 300, air pump; 310, slide groove; 320, protrusion; 400, water pump; 500, nozzle; 600, adjustment component; 610, fixing rod; 611, first threaded hole; 620, sliding rod; 622, second threaded hole; 630 fixing bolt. DETAILED DESCRIPTION
[0024] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present invention can be combined with each other. The technical solution of the present invention will be further described below in conjunction with the drawings of the embodiments of the present invention, and the present invention is not limited to the following specific implementation methods.
[0025] It should be understood that the same or similar numbers in the drawings of the embodiments correspond to the same or similar parts. In the description of the present utility model, it should be understood that if there are terms such as "upper", "lower", "front", "back", "left", "right", "top", "bottom" and the like indicating the orientation or positional relationship, they are based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, the terms describing the positional relationship in the drawings are only used for illustrative purposes and cannot be understood as a limitation on this patent. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0026] like Figure 1 , Figure 2 and Figure 3 As shown, in one embodiment, a building construction ventilation device 10 is provided, comprising: a box body 100, a bracket 200, an air pump 300, a water pump 400 and a nozzle 500;
[0027] The housing 100 is provided with a water storage chamber 110, and the water storage chamber 110 has an opening 111. The bracket 200 is connected to the first surface of the housing 100. The air pump 300 has an air suction end and an air outlet end. The first end of the air pump 300 is rotatably connected to the bracket 200. The water pump 400 is connected to the first surface of the housing 100, and the water pump 400 and the bracket 200 are arranged at intervals from each other. The water pump 400 has a water pumping end and a water outlet end. The water pumping end of the water pump 400 passes through the opening 111 and is arranged in the water storage chamber 110. The water outlet end of the water pump 400 is arranged to face away from the first surface of the housing 100. The nozzle 500 is connected to the water outlet end of the water pump 400, and the air outlet end of the air pump 300 is arranged to face the nozzle 500.
[0028] It should be noted that the box body 100 is a rectangular box-shaped structure, and a water storage chamber 110 is opened in the box body 100. The water storage chamber 110 has an opening 111, and the opening 111 is set through the outer surface of the box body 100. The bracket 200 is connected to the outer surface of the box body 100. In this embodiment, two brackets 200 are provided, and the two brackets 200 are arranged at intervals from each other, and the bracket 200 and the opening 111 are arranged at intervals from each other. The air pump 300 has an air suction end and an air outlet end. The first end of the air pump 300 is rotatably connected to the bracket 200, and the water pump 400 is connected to the first surface of the box body 100, and the water pump 400 is connected to the bracket 200. The water pump 400 is arranged at an interval from each other, and has a water pumping end and a water outlet end. The user can connect to the water pumping end of the water pump 400 through an external pipeline device, so that the water pump 400 can be arranged in the water storage chamber 110 through the opening 111 through the external pipeline, and then the water pump 400 can pump out the water in the water storage chamber 110. The water outlet end of the water pump 400 is arranged to face away from the first surface of the box body 100, and the nozzle 500 is connected to the water outlet end of the water pump 400. In this way, when the user drives the wind pump 300 to rotate, the wind pump 300 blows air toward the top of the nozzle 500, and the water mist sprayed by the water pump 400 through the nozzle 500 can be blown away and diffused by the wind flow.
[0029] In this embodiment, a mounting rod is provided on the surface of the two brackets 200 facing each other. A mounting hole is opened on one side of the air pump 300, and the mounting hole is set through both sides of the air pump 300, so that the air pump 300 can be mounted on the outer surface of the mounting rod, and then the air pump 300 can be rotated on the bracket 200. It should be understood that the rotating installation of the air pump 300 is a prior art, which is blocked in the figure and not shown. The setting of the air pump 300 belongs to the technology that can be known to people in this field, and no cumbersome description is given in this embodiment.
[0030] In one embodiment, Figure 1 , Figure 2 and Figure 3As shown, the level of the nozzle 500 is lower than the level of the air pump 300 .
[0031] Specifically, the horizontal height of the nozzle 500 is lower than the horizontal height of the wind pump 300. When the user drives the water pump 400, the pumping end of the water pump 400 pumps the water in the water storage chamber 110 to the nozzle 500 and sprays it toward the top of the first surface of the box body 100. The horizontal height of the nozzle 500 is lower than the height of the wind pump 300. This can prevent the horizontal height of the nozzle 500 from being too high, resulting in the wind being unable to spread to the water spraying area of the nozzle 500, and further ensure that the wind pump 300 can diffuse the water mist sprayed by the nozzle 500 into the room, thereby absorbing the dust in the room, which has good practicality.
[0032] In one embodiment, Figure 1 and Figure 2 As shown, a water inlet hole 112 is opened on the outer surface of the box body 100 , and the water inlet hole 112 is connected to the water storage chamber 110 .
[0033] Specifically, a water inlet hole 112 is opened on the outer surface of the box body 100, and the water inlet hole 112 penetrates into the water storage chamber 110, so that the water inlet hole 112 is connected with the water storage chamber 110. In this way, when the water in the water storage chamber 110 is too little, the operator can pour water into the water storage chamber 110 through the water inlet hole 112, which is convenient for the operator to add water and thus improves the working efficiency.
[0034] In one embodiment, Figure 1 and Figure 2 As shown, a sealing block 120 is also included, and the sealing block 120 is movably abutted against the inner wall of the water inlet hole 112.
[0035] Specifically, a sealing block 120 is also provided in the construction ventilation device 10. The sealing block 120 is movably abutted against the inner wall of the water inlet hole 112, so that the sealing block 120 can movably seal the water inlet hole 112. In this way, indoor dust can be prevented from falling into the water storage chamber 110 through the water inlet hole 112 to pollute the water, and impurities in the water in the water storage chamber 110 can be prevented from causing loss of the water pump 400, thereby having good practicality.
[0036] In one embodiment, Figure 1 and Figure 2 As shown, the sealing block 120 is a silicone sealing block 120 .
[0037] Specifically, silicone has good aging resistance, elasticity and flexibility. The sealing block 120 is made of silicone material, which can improve the sealing effect of the sealing block 120 on the water inlet hole 112, thereby better preventing indoor dust from falling into the water storage chamber 110 through the water inlet hole 112 and polluting the water, thereby ensuring that the construction ventilation device 10 can work normally.
[0038] In one embodiment, Figure 1 , Figure 2 and Figure 3 As shown, it also includes an adjustment component 600, which includes a fixed rod 610 and a sliding rod 620. The air pump 300 is provided with a slide groove 310 on a side facing the box body 100. The first end of the fixed rod 610 is connected to the first side of the box body 100, and the second end of the fixed rod 610 is provided with an adjustment groove. The first end of the sliding rod 620 is slidably set in the adjustment groove, and the second end of the sliding rod 620 is movably abutted against the inner wall of the slide groove 310.
[0039] Specifically, the construction ventilation device 10 is also provided with an adjustment component 600, which includes a fixed rod 610 and a sliding rod 620. A slide groove 310 is provided on the side of the air pump 300 facing the box body 100, and the first end of the fixed rod 610 is connected to the first side of the box body 100. An adjustment groove is provided on the second end of the fixed rod 610, and the first end of the sliding rod 620 is slidably set in the adjustment groove. In this way, when the operator needs to adjust the air outlet area of the air pump 300, the air pump 300 can be rotated to the required position, and the sliding rod 620 can be slid to make the sliding rod 620 abut against the inner wall of the slide groove 310, so that the air pump 300 can be fixed at the position required by the operator, thereby improving the applicability of the construction ventilation device 10.
[0040] In one embodiment, Figure 2 As shown, it also includes a plurality of protrusions 320 , each of which is connected to the inner wall of the slide groove 310 , and each of the protrusions 320 is spaced apart from each other, and the second end of the sliding rod 620 is movably abutted against the outer surface of the protrusion 320 .
[0041] Specifically, a plurality of protrusions 320 are further provided in the building construction ventilation device 10, each protrusion 320 is connected to the inner wall of the slide groove 310, and each protrusion 320 is spaced apart from each other. In the embodiment, the cross-sectional area of each protrusion 320 gradually decreases from one end close to the slide groove 310 to the end away from the slide groove 310, so that there is a gap between two adjacent protrusions 320, so that the second end of the sliding rod 620 can abut against the outer surface of the protrusion 320 through the gap between the two protrusions 320, thereby improving the stability of the sliding rod 620 when abutting against the air pump 300.
[0042] In one embodiment, Figure 1 and Figure 2As shown, it also includes a fixing bolt. The outer surface of the fixing rod 610 is provided with a plurality of first threaded holes 611. The first threaded holes 611 are spaced apart from each other. The fixing bolt is movably connected to the inner wall of the first threaded hole 611, and the fixing bolt is movably abutted against the outer surface of the sliding rod 620.
[0043] Specifically, a fixing bolt is also provided in the construction ventilation device 10, and a plurality of first threaded holes 611 are opened on the outer surface of the adjusting rod, and the first threaded holes 611 are spaced apart from each other. In this way, when the operator slides the sliding rod 620 to the required position, the fixing bolt can be connected to the inner wall of the first threaded hole 611, and then the fixing bolt passes through the first threaded hole 611 and abuts against the outer surface of the sliding rod 620, so that the sliding rod 620 can be fixed at the position required by the operator. In this way, the stability of the abutment between the sliding rod 620 and the air pump 300 is improved.
[0044] In one embodiment, Figure 1 and Figure 2 As shown, a plurality of second threaded holes 622 are formed on the outer surface of the sliding rod 620 , and the second threaded holes 622 are spaced apart from each other. The fixing bolt passes through the first threaded hole 611 and is movably connected to the inner wall of the second threaded hole 622 .
[0045] Specifically, a plurality of second threaded holes 622 are provided on the outer surface of the sliding rod 620, and the second threaded holes 622 are spaced apart from each other, and each second threaded hole 622 is movably aligned with a first threaded hole 611. In this way, when an operator fixes the sliding rod 620, the fixing bolt can be passed through the first threaded hole 611 and connected to the inner wall of the second threaded hole 622, so that the fixing bolt can fix the sliding rod 620 at the position required by the operator, thereby improving the applicability of the construction ventilation device 10.
[0046] In one embodiment, an anti-slip cover (not shown) is further included, and the anti-slip cover is movably disposed on the outer surface of the second end of the sliding rod 620.
[0047] Specifically, an anti-slip sleeve is also provided in the construction ventilation device 10, and the anti-slip sleeve is slidably arranged on the outer surface of the second end of the sliding rod 620. The anti-slip sleeve can increase the friction between the sliding rod 620 and the protrusion 320, so that the sliding rod 620 can firmly fix the air pump 300 at the position required by the operator, thereby improving the stability of the sliding rod 620 when connected to the air pump 300.
[0048] Obviously, the above embodiments of the utility model are only examples for clearly explaining the utility model, and are not intended to limit the implementation methods of the utility model. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made on the basis of the above description. It is not necessary and impossible to list all the implementation methods here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the utility model should be included in the protection scope of the claims of the utility model.
Claims
1. A building construction ventilation device, characterized in that: include: A box body, wherein the box body is provided with a water storage chamber, and the water storage chamber has an opening; A bracket, the bracket being connected to the first surface of the box; An air pump, the air pump having an air suction end and an air outlet end, and a first end of the air pump is rotatably connected to the bracket; A water pump, the water pump is connected to the first surface of the box body, and the water pump and the bracket are arranged at a distance from each other, the water pump has a water pumping end and a water outlet end, the water pumping end of the water pump passes through the opening and is arranged in the water storage cavity, and the water outlet end of the water pump is arranged away from the first surface of the box body; and A nozzle is connected to the water outlet of the water pump, and the air outlet of the air pump is arranged facing the nozzle.
2. The building construction ventilation device according to claim 1, characterized in that: The level of the nozzle is lower than the level of the air pump.
3. The building construction ventilation device according to claim 1, characterized in that: A water inlet hole is provided on the outer surface of the box body, and the water inlet hole is communicated with the water storage cavity.
4. The building construction ventilation device according to claim 3, characterized in that: It also includes a sealing block, which is movably abutted against the inner wall of the water inlet hole.
5. The building construction ventilation device according to claim 4, characterized in that: The sealing block is a silicone sealing block.
6. The building construction ventilation device according to claim 1, characterized in that: It also includes an adjustment component, which includes a fixed rod and a sliding rod. A sliding groove is provided on a side of the air pump facing the box body. The first end of the fixed rod is connected to the first surface of the box body. The second end of the fixed rod is provided with an adjustment groove. The first end of the sliding rod is slidably set in the adjustment groove, and the second end of the sliding rod is movably abutted against the inner wall of the sliding groove.
7. The building construction ventilation device according to claim 6, characterized in that: It also includes a plurality of protrusions, each of which is connected to the inner side wall of the slide slot, and each of the protrusions is arranged at intervals from each other, and the second end of the sliding rod is movably abutted against the outer side surface of the protrusion.
8. The building construction ventilation device according to claim 7, characterized in that: It also includes a fixing bolt, the outer surface of the fixing rod is provided with a plurality of first threaded holes, the first threaded holes are spaced apart from each other, the fixing bolt is movably connected to the inner wall of the first threaded hole, and the fixing bolt is movably abutted against the outer surface of the sliding rod.
9. The building construction ventilation device according to claim 8, characterized in that: A plurality of second threaded holes are formed on the outer surface of the sliding rod, and the second threaded holes are spaced apart from each other. The fixing bolts pass through the first threaded holes and are movably connected to the inner side walls of the second threaded holes.
10. The building construction ventilation device according to claim 9, characterized in that: It also includes an anti-slip cover, which is movably arranged on the outer surface of the second end of the sliding rod.