Bare concrete hanging plate construction device
By designing an automated hoisting mechanism and using slings, pulleys and moving mechanisms, the problem of manual adjustments required for traditional hoisting has been solved, and the rapid, automated hoisting and fixing of fair-faced concrete hanging panels has been achieved, improving construction efficiency.
Patent Information
- Application Number
- CN202420211392.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-29
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-01-29
AI Technical Summary
Traditional hoisting of fair-faced concrete hanging panels requires manual adjustments to the hoisting position, resulting in slow construction progress.
A construction device including vertical keels, hanging panels, embedded connectors and hoisting mechanisms is designed. The hanging ropes, pulley blocks, lifting equipment and moving mechanisms are used to realize the automatic hoisting and fixing of the hanging panels by retracting and releasing the hanging ropes. Avoid manual adjustments.
It realizes the rapid and automated hoisting and fixing of hanging boards, improves construction efficiency, and avoids the problem of slow construction progress caused by manual adjustments.
Smart Images

Figure CN221920174U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to a construction device for a plain concrete hanging board, and in particular to a large-scale assembled plain concrete hanging board installation suitable for indoor heights of more than 4 meters, belonging to the field of building technology. Background Art
[0002] With the economic development of our country, the construction industry has developed in the direction of rapidity, high efficiency, energy saving and environmental protection, and prefabricated buildings have become the future development trend. At present, prefabricated concrete panels are increasingly used in modern building decoration projects. The components installed on site are all produced in the factory workshop and then transported to the construction site for installation.
[0003] Traditionally, the installation of exposed concrete hanging panels is mainly carried out by manual + electric hoist. This method requires the operator to constantly adjust the hoisting position according to the hoisting situation, which slows down the construction progress and seriously reduces the on-site construction efficiency. Therefore, a construction device is urgently needed to solve the above problems. Utility Model Content
[0004] In view of this, the present application provides a construction device for a bare concrete hanging board, which is used to solve the problem that the above-mentioned prior art requires manual adjustment of the hoisting position during hoisting, resulting in slow construction progress. The specific solution is:
[0005] A construction device for a plain concrete hanging plate, comprising a plurality of vertical keels, hanging plates, connecting parts pre-buried in the hanging plates, and a hoisting mechanism;
[0006] A plurality of the vertical keels are evenly installed on the installation surface of the wall, and a horizontal keel is arranged between two adjacent vertical keels;
[0007] The hoisting mechanism includes a hoisting rope, a pulley block, a hoisting device and a moving mechanism located on the side of the vertical keel and the horizontal keel facing away from the wall installation surface;
[0008] The pulley block is arranged along the installation surface of the wall, the arrangement path of the pulley block is a right angle opening downward, and the pulley block is respectively installed on each vertical keel;
[0009] The lifting rope is wound around the pulley block, one end of the lifting rope is connected to the lifting device, and the other end of the lifting rope is fixed to the vertical keel;
[0010] The moving mechanism is movably connected to the suspension rope and moves in the vertical direction as the suspension rope is expanded or contracted;
[0011] The connecting piece is detachably connected to the moving mechanism to realize the hoisting operation of the hanging plate, and the connecting piece is respectively connected to the vertical and horizontal keels to realize the installation and fixation of the hanging plate.
[0012] Preferably, the pulley block comprises a first fixed pulley, a second fixed pulley and a third fixed pulley located on the same side of the vertical keel on the same wall mounting surface;
[0013] The second fixed pulley is installed on the top of the vertical keel located on the side of the wall installation surface;
[0014] The first fixed pulley is installed on a vertical keel located in the middle of the wall installation surface, and the first fixed pulley and the second fixed pulley are located on the same horizontal line;
[0015] The third fixed pulley is located directly below the second fixed pulley;
[0016] The first fixed pulley, the second fixed pulley and the third fixed pulley are connected to form a right triangle;
[0017] The end of the lifting rope away from the lifting device is wound around the third fixed pulley, the second top fixed pulley and the first fixed pulley in sequence, and is fixed to the keel of the wall mounting surface on the side of the first fixed pulley facing away from the second fixed pulley;
[0018] The moving mechanism is movably connected to the suspension rope between the first fixed pulley and the connection between the suspension rope and the vertical keel, and a movable pulley is provided between the moving mechanism and the suspension rope;
[0019] The movable pulley is suspended on the suspension rope. When the hanging plate is detachably connected to the moving mechanism through a connecting piece, the movable pulley is detachably connected to the connecting piece, and the hanging plate to be installed is lifted by scaling the suspension rope.
[0020] Preferably, the connecting member comprises a panel fixing member arranged on the back of the hanging board, a height adjusting member arranged near the top of the hanging board, and a hanging board bottom connecting member; the hanging board bottom connecting member is installed at the bottom of the hanging board, and the hanging board bottom connecting member is detachably connected to the moving mechanism;
[0021] The hanging board surface fixing parts are half-buried on the side of the hanging board facing the keel, and the hanging board surface fixing parts are respectively connected to the vertical keels;
[0022] The elevation adjustment member abuts against the transverse keel on the top of the hanging plate installation surface to adjust the installation height of the hanging plate.
[0023] Preferably, the hanging board surface connection member includes a plurality of horizontal beams and a plurality of vertical beams;
[0024] A plurality of the horizontal beams and a plurality of the vertical beams are arranged in a grid shape and fixed on the mounting surface of the hanging plate.
[0025] Preferably, the elevation adjustment member comprises an L-shaped connecting plate with an opening facing downward and an adjustment bolt;
[0026] The L-shaped connecting plate is located below the cross beam at the top of the hanging plate, one end of the L-shaped connecting plate is located on the top of the transverse keel and is fixedly connected to the transverse keel, and the other end of the L-shaped connecting plate faces the cross beam at the top of the hanging plate;
[0027] The adjusting bolt is threadedly connected to one end of the cross beam of the L-shaped connecting plate facing the top of the hanging plate, and abuts against the bottom of the cross beam at the top of the hanging plate.
[0028] Preferably, the moving mechanism comprises a rack and moving wheels located at the bottom of the rack;
[0029] The moving wheels are installed at the bottom of the rack;
[0030] The top of the storage rack is provided with a slot matching the bottom connector of the hanging board;
[0031] The bottom connecting piece is inserted into the card slot.
[0032] Preferably, a detachable connection assembly is provided between the movable pulley and the hanging board surface connection piece;
[0033] The detachable connection assembly includes a hanging ear arranged at the bottom of the movable pulley, and a hanging ring arranged on the hanging plate surface connecting member;
[0034] The hanging rings are installed correspondingly at positions near the top of the vertical beams located near both sides of the hanging plate;
[0035] The hanging ears are located in the middle of the bottom of the movable pulley, the hanging ears are respectively connected to the two axial end surfaces of the movable pulley, and a connecting rod is arranged at the bottom of the hanging ears;
[0036] The connecting rod is horizontally connected to the bottom of the hanging ear, and both ends of the connecting rod are respectively provided with hanging buckles;
[0037] The hooks are respectively mounted on the connecting rods, and the hooks are respectively hung on the hanging rings which are arranged oppositely.
[0038] Preferably, a tightening mechanism is provided between the suspension rope and the vertical keel on which the second fixed pulley is installed;
[0039] The tightening mechanism is located below the second fixed pulley, and two ends of the tightening mechanism are detachably connected to the suspension rope between the second fixed pulley and the third fixed pulley, and the transverse keel located directly below the second fixed pulley.
[0040] Preferably, the tightening mechanism comprises: a tightening frame and hooks located at both ends of the tightening frame;
[0041] The tightening frame is arranged horizontally, and the tightening frame is located on the keel on which the first fixed pulley is installed and on the suspension rope between the first fixed pulley and the movable pulley;
[0042] The hook is located on the outside of the tightening frame, and a first threaded rod and a second threaded rod are respectively arranged between the hook and the tightening frame, and the hook is respectively hooked on the transverse keel directly below the second fixed pulley and on the suspension ropes of the second fixed pulley and the third fixed pulley;
[0043] The threads on the first threaded rod and the second threaded rod are arranged in opposite directions, the ends of the first threaded rod and the second threaded rod facing away from each other are respectively connected to the hooks, and the ends of the first threaded rod and the second threaded rod facing each other are respectively inserted into the tightening frame and threadedly connected to the tightening frame.
[0044] Preferably, the lifting equipment is a variable frequency winch.
[0045] The beneficial effects of this application include:
[0046] The lifting mechanism provided by the present application includes a lifting rope, a pulley block, a lifting device and a moving mechanism. The hanging plate to be installed is detachably connected to the moving mechanism, and the moving mechanism is movably connected to the lifting rope. The lifting rope is retracted and released by the lifting device. The moving mechanism is retracted and released, and the hanging plate to be installed is transported to or away from the installation surface of the wall. When the moving mechanism is placed at the installation point, the lifting device continues to tighten the lifting rope, and then pulls the hanging plate out of the moving mechanism, and then continues to tighten the lifting rope until the hanging plate is completely lifted, and then the bottom connecting piece of the hanging plate is inserted into the embedded U-shaped installation groove to install the bottom of the hanging plate, and the elevation of the hanging plate is slightly adjusted by rotating the adjusting bolt, and then the vertical beam and the horizontal beam of the hanging plate are respectively installed on the corresponding vertical keel and the horizontal keel to fix the hanging plate; the entire lifting process does not require manual distance adjustment in all directions, and can be achieved by tightening the lifting rope, thereby avoiding the problem in the prior art that the operator needs to constantly adjust the lifting position according to the lifting situation during lifting, resulting in slow construction progress. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] Figure 1 This is a structural schematic diagram of a construction device for a plain concrete hanging board in this application;
[0048] Figure 2 This is a lifting profit diagram in a clear water concrete hanging board construction device for this application;
[0049] Figure 3 This is a schematic diagram of the installation of a height adjustment member in a construction device for a plain concrete hanging board according to the present application;
[0050] Figure 4 This is a structural schematic diagram of a tightening mechanism in a construction device for a plain concrete hanging board in the present application;
[0051] Figure 5This is a structural schematic diagram of a hanging board in a plain concrete hanging board construction device of the present application;
[0052] Figure 6 This is a schematic diagram of the installation of a hanging plate and a top connecting piece in a construction device for a plain concrete hanging plate in the present application;
[0053] Figure 7 This is a structural schematic diagram of a connecting component in a plain concrete hanging board construction device of the present application.
[0054] List of parts and reference numerals:
[0055] 1. The mounting surface of the wall; 2. The vertical keel; 3. The hanging plate; 4. The moving mechanism; 5. The first fixed pulley; 6. The second fixed pulley; 7. The third fixed pulley; 8. The lifting equipment; 9. The horizontal keel; 10. The lifting rope; 11. The movable pulley; 12. The fixing point of the lifting rope; 13. The board surface connecting piece; 14. The first connecting end; 15. The second connecting end; 16. The adjusting bolt; 17. The limit plate; 18. The connecting frame; 19. The tightening frame; 20. The hook; 21. The first threaded rod; 22. The second threaded rod; 23. The bottom connecting piece; 24. The number beam; 25. The cross beam; 26. The hanging ring; 27. The connecting rod; 28. The hanging buckle. DETAILED DESCRIPTION
[0056] The present application is described in detail below with reference to embodiments, but the present application is not limited to these embodiments.
[0057] The present application discloses a construction device for a prefabricated hanging plate 3 of plain concrete.
[0058] According to the attached Figure 1-7 A construction device for a plain concrete hanging plate 3 is shown, comprising a plurality of vertical keels 2, hanging plates 3, connecting parts pre-buried on the hanging plates 3, and a hoisting mechanism;
[0059] A plurality of the vertical keels 2 are evenly installed on the mounting surface 1 of the wall, and a transverse keel 9 is arranged between two adjacent vertical keels 2; the transverse keel 9 is arranged close to the top of the mounting surface 1 of the wall and is fixed on the mounting surface;
[0060] The hoisting mechanism includes a hoisting rope 10, a pulley block, a hoisting device 8 and a moving mechanism 4 located on the side of the vertical keel 2 and the horizontal keel 9 facing away from the wall installation surface;
[0061] The pulley block is arranged along the installation surface 1 of the wall, the arrangement path of the pulley block is a right angle opening downward, and the pulley block is respectively installed on each vertical keel 2;
[0062] The pulley block comprises a first fixed pulley 5, a second fixed pulley 6 and a third fixed pulley 7 located on the same side of the vertical keel 2 on the same wall mounting surface;
[0063] The second fixed pulley 6 is installed on the top of the vertical keel 2 located on the side of the wall installation surface.
[0064] The first fixed pulley 5 is installed on the vertical keel 2 located in the middle of the wall installation surface, and the first fixed pulley 5 and the second fixed pulley 6 are located on the same horizontal line;
[0065] The third fixed pulley 7 is located directly below the second fixed pulley 6;
[0066] The end of the lifting rope 10 away from the lifting device 8 is wound around the third fixed pulley 7, the second top fixed pulley and the first fixed pulley 5 in sequence, and is fixed to the keel of the wall installation surface on the side of the first fixed pulley 5 facing away from the second fixed pulley 6;
[0067] In the present application, the second fixed pulley 6 is installed on a vertical keel 2 on one side of a mounting surface 1 of a wall. During installation, the first hanging board 3 is installed starting from the other side of the mounting surface 1 of the same wall, and then the other hanging boards 3 are installed in sequence from the position of the first hanging board 3 in the direction approaching the second fixed pulley 6; during the construction of the first hanging board 3, the first fixed pulley 5 is installed on the vertical keel 2 adjacent to the vertical keel 2 on the other side of the mounting surface, and the hanging rope 10 is far away
[0068] One end away from the lifting device 8 is fixed to the vertical keel 2 located on the other side of the mounting surface;
[0069] When installing the pulley block, always keep the first fixed pulley 5, the second fixed pulley 6, and the third fixed pulley 7 in the same plane, and the connecting lines therebetween form a right triangle; then install the second, third, ..., and other hanging boards 3 of the same wall in this manner;
[0070] The moving mechanism 4 is movably connected to the suspension rope 10 between the first fixed pulley 5 and the connection between the suspension rope 10 and the vertical keel 2, and a movable pulley 11 is provided between the moving mechanism 4 and the suspension rope 10;
[0071] The movable pulley 11 is suspended on the suspension rope 10. When the hanging plate 3 is detachably connected to the moving mechanism 4 through a connecting piece, the movable pulley 11 is detachably connected to the connecting piece, and the hanging plate 3 to be installed is lifted by scaling the suspension rope 10.
[0072] The lifting rope 10 is wound around the pulley block, one end of the lifting rope 10 is connected to the lifting device 8, and the other end of the lifting rope 10 is fixed to the mounting surface 1 of the same wall as the vertical keel 2 on which the second fixed pulley 6 is mounted, and to any other vertical keel 2 that is at least one vertical keel 2 away from the second fixed pulley 6;
[0073] The moving mechanism 4 is movably connected to the suspension rope 10, and moves in the vertical direction as the suspension rope 10 is scaled.
[0074] The connecting piece is detachably connected to the moving mechanism 4 to realize the hoisting operation of the hanging plate 3 , and the connecting piece is respectively connected to the vertical and horizontal keels 9 to realize the installation and fixation of the hanging plate 3 .
[0075] Further, the connecting member includes a plate surface fixing member arranged on the back of the hanging plate 3, a height adjusting member arranged near the top of the hanging plate 3, and a bottom connecting member 23 of the hanging plate 3; the bottom connecting member 23 of the hanging plate 3 is fixed to the bottom of the hanging plate 3, and the bottom connecting member 23 of the hanging plate 3 is detachably connected to the moving mechanism 4;
[0076] The panel fixing piece of the hanging plate 3 is half-buried on the side of the hanging plate 3 facing the keel.
[0077] The parts are respectively connected with the vertical keel 2;
[0078] The elevation adjustment member abuts against the transverse keel 9 on the top of the mounting surface of the hanging plate 3 to adjust the mounting height of the hanging plate 3 .
[0079] Furthermore, the panel surface connector 13 of the hanging plate 3 includes a plurality of horizontal beams 25 and a plurality of vertical beams 24;
[0080] The plurality of transverse beams 25 and the plurality of vertical beams 24 are arranged in a grid pattern and fixed on the mounting surface of the hanging plate 3 .
[0081] Furthermore, the elevation adjustment member includes an L-shaped connecting plate with an opening facing downward and an adjustment bolt 16;
[0082] The L-shaped connecting plate is located below the cross beam 25 at the top of the hanging plate 3, one end (the first connecting end 14) of the L-shaped connecting plate is located at the top of the transverse keel 9 and is fixedly connected to the transverse keel 9, and the other end (the second connecting end 15) of the L-shaped connecting plate faces the cross beam 25 at the top of the hanging plate 3;
[0083] The adjusting bolt 16 is threadedly connected to one end of the cross beam 25 of the L-shaped connecting plate facing the top of the hanging plate 3 , and abuts against the bottom of the cross beam 25 at the top of the hanging plate 3 .
[0084] The connection between the L-shaped connecting plate and the transverse keel 9 is achieved through a connecting frame 18 and a limiting plate 17 arranged on the connecting frame 18, wherein the connecting frame 18 is a channel steel with an opening downward, the connecting frame 18 is buckled on the transverse keel 9, and two limiting cavities are arranged on the top of the connecting frame 18, and the limiting cavities are composed of two limiting plates 17 arranged at intervals. The limiting plates 17 are vertically connected to the top of the connecting frame 18, and one end of the L-shaped connecting plate is inserted into the limiting cavity and fixedly connected to the connecting frame 18.
[0085] In the present application, two vertical beams 24 and a plurality of horizontal beams 25 disposed between the two vertical beams 24, the two vertical beams 24 are respectively fixed on the back side of the hanging plate 3 near the two sides; the plurality of horizontal beams 25 extend along the vertical beams 24.
[0086] The plurality of cross beams 25 are arranged at intervals in the direction, and are respectively fixed on the back of the hanging plate 3. During installation, the elevation adjustment members are respectively arranged between the cross beams 25 at the top of the hanging plate 3 and the transverse keels 9 arranged on the top of the installation surface 1 close to the wall.
[0087] Furthermore, the moving mechanism 4 includes a rack and moving wheels located at the bottom of the rack;
[0088] The moving wheels are installed at the bottom of the rack;
[0089] The top of the storage rack is provided with a slot that matches the bottom connector 23 of the hanging plate 3; in the present application, the bottom connector 23 is a plate-like structure, and the cross-sectional size and shape of the bottom connector 23 match the slot;
[0090] The bottom connecting member 23 is inserted into the slot. In the present application, the slot has the same size as the U-shaped slot pre-buried at the bottom of the wall mounting surface.
[0091] Furthermore, a detachable connection assembly is provided between the movable pulley 11 and the board surface connection member 13 of the hanging board 3;
[0092] The detachable connection assembly includes a hanging ear arranged at the bottom of the movable pulley 11, and a hanging ring 26 arranged on the board surface connection member 13 of the hanging plate 3;
[0093] The hanging ring 26 is installed correspondingly at a position close to the top of the vertical beam 24 located near both sides of the hanging plate 3;
[0094] The lug is located at the middle position of the bottom of the movable pulley 11, and the lug is respectively connected to the two axial end surfaces of the movable pulley 11, and a connecting rod 27 is provided at the bottom of the lug;
[0095] The connecting rod 27 is horizontally connected to the bottom of the hanging ear, and hooks 28 are respectively provided at both ends of the connecting rod 27;
[0096] The hooks 28 are rotatably connected to the connecting rods 27 , and the hooks 28 are respectively hung on two oppositely arranged hanging rings 26 on the same hanging plate 3 .
[0097] In the present application, the hanging ring 26 is fixedly connected to two vertical beams 24 arranged near the two sides of the same hanging plate 3 , and the hanging ring 26 is installed near the top of the vertical beam 24 .
[0098] Furthermore, a tightening mechanism is provided between the suspension rope 10 and the vertical keel 2 on which the second fixed pulley 6 is installed;
[0099] The tightening mechanism is located below the second fixed pulley 6 , and two ends of the tightening mechanism are detachably connected to the suspension rope 10 between the second fixed pulley 6 and the third fixed pulley 7 , and the transverse keel 9 located directly below the second fixed pulley 6 .
[0100] Furthermore, the tightening mechanism includes: a tightening frame 19 and hooks 20 located at both ends of the tightening frame 19;
[0101] The tightening frame 19 is arranged horizontally, and the tightening frame 19 is located on the keel on which the first fixed pulley 5 is installed and on the suspension rope 10 between the first fixed pulley 5 and the movable pulley 11;
[0102] The hook 20 is located outside the tightening frame 19, and a first threaded rod 21 and a second threaded rod 22 are respectively arranged between the hook 20 and the tightening frame 19. The hook 20 is respectively hooked on the transverse keel 9 directly below the second fixed pulley 6 and the suspension rope 10 of the second fixed pulley 6 and the third fixed pulley 7;
[0103] The threads on the first threaded rod 21 and the second threaded rod 22 are arranged in opposite directions, and the opposite ends of the first threaded rod 21 and the second threaded rod 22 are respectively connected to the hooks 20, and the opposite ends of the first threaded rod 21 and the second threaded rod 22 are respectively inserted into the tightening frame 19 and threadedly connected to the tightening frame 19.
[0104] Since the threads of the first threaded rod 21 and the second threaded rod 22 are arranged in opposite directions, when adjusting the distance between the suspension rope 10 and the transverse keel 9, it is only necessary to rotate the tightening piece to simultaneously tighten or unscrew the first threaded rod 21 and the second threaded rod 22, thereby driving the two hooks 20 connected to the first threaded rod 21 and the second threaded rod 22 to drive the suspension rope 10 and the transverse keel 9 to move to adjust the horizontal distance between the two.
[0105] In the present application, the tightening member is a hollow square frame structure, and the moving wheel is a universal wheel.
[0106] Furthermore, the lifting device 8 is a variable frequency winch.
[0107] Furthermore, the suspension rope 10 is a steel wire rope.
[0108] Embodiment 1
[0109] 1. Arrange the hanging panels 3 on the unit wall installation surface according to the actual size of each wall installation surface (elevation), and determine the size of the unit hanging panels 3.
[0110] 2. Processing of various components, including processing of various hanging plates 3, vertical keels 2, transverse keels 9, connecting pieces on hanging plates 3, detachable connecting components, and moving mechanisms 4.
[0111] 3. Install the embedded parts (hanging plate 3 board surface connecting parts 13) and each keel.
[0112] 3.1 Install the embedded parts on the installation surface (or back side) of the hanging plate 3 according to the requirements of the design position;
[0113] 3.2 Weld the vertical keel 2 and the horizontal keel 9 to the installation surface 1 (elevation) of the wall respectively.
[0114] In this embodiment, the plain concrete hanging board 3 is a prefabricated hanging board, the largest plate is 1980*4240mm, and the thickness of the prefabricated hanging board 3 is 80mm; the hanging board surface connecting member 13 is a steel frame structure, specifically a lattice steel frame structure consisting of a steel cross beam 25 and a steel vertical beam 24 fixedly connected; the vertical beam 24 is made of C12 hot-dip galvanized channel steel, and the cross beam 25 is made of C10 hot-dip galvanized channel steel, with a cross bar arranged every 950mm, and a dead weight of about 1500kg. After being manufactured and formed in the processing plant, it is transported to the construction site by a flatbed truck, and is used for on-site installation after the cross-sectional dimensions and surface appearance are measured and accepted.
[0115] Then, the hanging plate is placed on the mobile operating platform on the processing site with the front side facing upwards, and the construction personnel weld the bottom connecting piece 23 located at the bottom of the hanging plate on the side or the lower part of the platform. In this embodiment, the bottom connecting piece 23 is a plate-shaped structure;
[0116] The installation of the hoisting mechanism, the first fixed pulley 5, the second fixed pulley 6 and the third fixed pulley 7 are respectively installed on the vertical keel 2, wherein the mounting seat is specifically:
[0117] First, weld two 12# channel steels with the openings facing outward to the vertical keel above the hanging plate 3, and then connect two 350*300*10mm steel plates with M16*150 hot-dip galvanized bolts to form a mounting seat;
[0118] Then, the first fixed pulley 5, the second fixed pulley 6 and the third fixed pulley 7 are welded to the bottom of the steel plate respectively.
[0119] As a fixing point for lifting equipment and lifting ropes 12.
[0120] In this embodiment, the lifting rope 10 is a 15.5 mm steel wire rope (6*7 steel core steel wire rope); the lifting equipment 8 is a 5 t variable frequency speed regulating lifting device (5 t winch), which is arranged in a safe area directly in front of the third fixed pulley 7 and is reliably fixed to the ground.
[0121] After the lifting device 8 is installed and fixed, one end of the lifting rope 10 (wire rope) is fixed to the lifting device 8, and the other end of the lifting rope 10 (wire rope) is passed through the third fixed pulley 7 along the roller of the pulley, and then passed through the second fixed pulley 6 along the third fixed pulley 7, and then passed through the first fixed pulley 5 along the second fixed pulley 6, and the end is fixed to the keel above the lifting hanging plate 3.
[0122] One of the movable pulleys 11 is placed along the wire rope at a fixed point between the first fixed pulley 5 and the end of the wire rope.
[0123] 4. Install each hanging board
[0124] Transport the hanging plate with the required number to the bottom of the lifting point, start the motor of the lifting equipment 8 to make the hanging plate 3 reach the required height, and during the lifting process, connect the hanging ring 26 on the board surface connecting piece 13 of the hanging plate 3 to the movable pulley 11 through a detachable connecting component, and insert the bottom connecting piece 23 at the bottom of the hanging plate 3 into the slot of the moving mechanism 4, wherein the slot is formed by a U-shaped bent galvanized steel plate, and one end of the top connecting piece is fixedly connected to the top beam 25 by bolts, and the other end of the top connecting piece is abutted against the bottom of the transverse keel 9 above the hanging plate 3 by an adjusting bolt 16; adjust the height of the hanging plate 3 by using a Φ16 stainless steel bolt through the adjusting bolt 16.
[0125] A tightening mechanism is arranged on the side of the lifting device 8 facing the wall mounting surface, and the tightening mechanism is located between the second directional pulley and the transverse keel 9 above the hanging plate 3. One end of the tightening mechanism is clamped with the hanging rope on the second directional pulley, and the other end of the tightening mechanism is clamped with the transverse keel 9. The distance between the hanging plate and the wall mounting surface is adjusted by the horizontal mechanism to ensure the flatness of the hanging plate 3 installation.
[0126] Detailed treatment between adjacent panels
[0127] Different forms of aluminum alloy strips are used to seal the separation joints between the hanging panels, the corners and the ends to improve the integrity and visual effect of the plain concrete hanging panels.
[0128] Maintenance of clear water hanging board
[0129] Before construction, wipe the dust off the surface of the decorative board with a rag, stir the primer evenly before rolling, do not dilute, use a medium-haired roller during construction, and try to spread the primer evenly. The second rolling should be at least 15 minutes apart. Before rolling the intermediate paint, make sure the primer is completely dry. When applying the topcoat, stir the intermediate paint evenly before rolling, and add ≤10% water for dilution if necessary.
[0130] Installation requirements for siding include:
[0131] (1) The joints of the exposed concrete slabs should be straight and even;
[0132] (2) The installation quality and dimensional deviation of the exposed concrete hanging board project can be inspected and accepted on the basis of the node connection structure inspection and acceptance and the joint inspection. The construction and installation dimensional deviation and inspection method of the exposed concrete hanging board 3 should meet the design requirements.
[0133] (3) The surface quality of the hanging board project should comply with the design and specification requirements.
[0134] The use of the construction device involved in this application not only speeds up the construction progress but also ensures the quality of the project.
[0135] The above are only a few embodiments of the present application and do not constitute any form of limitation to the present application. Although the present application is disclosed as above with preferred embodiments, it is not intended to limit the present application. Any technician familiar with the profession, without departing from the scope of the technical solution of the present application, using the technical content disclosed above to make slight changes or modifications are equivalent to equivalent implementation cases and fall within the scope of the technical solution.
[0136] The above are only a few embodiments of the present application and do not constitute any form of limitation to the present application. Although the present application is disclosed as above with preferred embodiments, it is not intended to limit the present application. Any technician familiar with the profession, without departing from the scope of the technical solution of the present application, using the technical content disclosed above to make slight changes or modifications are equivalent to equivalent implementation cases and fall within the scope of the technical solution.
Claims
1. A construction device for a plain concrete hanging board, characterized in that: It includes a number of vertical keels, hanging plates, connectors embedded in the hanging plates, and a hoisting mechanism; A plurality of the vertical keels are evenly installed on the installation surface of the wall, and a horizontal keel is arranged between two adjacent vertical keels; The hoisting mechanism includes a hoisting rope, a pulley block, a hoisting device and a moving mechanism located on the side of the vertical keel and the horizontal keel facing away from the wall installation surface; The pulley block is arranged along the installation surface of the wall, the arrangement path of the pulley block is a right angle opening downward, and the pulley block is respectively installed on each vertical keel; The lifting rope is wound around the pulley block, one end of the lifting rope is connected to the lifting device, and the other end of the lifting rope is fixed to the vertical keel; The moving mechanism is movably connected to the suspension rope and moves in the vertical direction as the suspension rope is expanded or contracted; The connecting piece is detachably connected to the moving mechanism to realize the hoisting operation of the hanging plate, and the connecting piece is respectively connected to the vertical and horizontal keels to realize the installation and fixation of the hanging plate.
2. A construction device for a bare concrete hanging board according to claim 1, characterized in that: The pulley block includes a first fixed pulley, a second fixed pulley and a third fixed pulley located on the same side of the vertical keel on the same wall mounting surface; The second fixed pulley is installed on the top of the vertical keel located on the side of the wall installation surface; The first fixed pulley is installed on a vertical keel located in the middle of the wall installation surface, and the first fixed pulley and the second fixed pulley are located on the same horizontal line; The third fixed pulley is located directly below the second fixed pulley; The first fixed pulley, the second fixed pulley and the third fixed pulley are connected to form a right triangle; The end of the lifting rope away from the lifting device is wound around the third fixed pulley, the second top fixed pulley and the first fixed pulley in sequence, and is fixed to the keel of the wall mounting surface on the side of the first fixed pulley facing away from the second fixed pulley; The moving mechanism is movably connected to the suspension rope between the first fixed pulley and the connection between the suspension rope and the vertical keel, and a movable pulley is provided between the moving mechanism and the suspension rope; The movable pulley is suspended on the suspension rope. When the hanging plate is detachably connected to the moving mechanism through a connecting piece, the movable pulley is detachably connected to the connecting piece, and the hanging plate to be installed is lifted by scaling the suspension rope.
3. A construction device for hanging boards of plain concrete according to claim 2, characterized in that: The connecting member includes a board surface fixing member arranged on the back of the hanging board, a height adjusting member arranged near the top of the hanging board, and a hanging board bottom connecting member; the hanging board bottom connecting member is installed at the bottom of the hanging board, and the hanging board bottom connecting member is detachably connected to the moving mechanism; The hanging board surface fixing parts are half-buried on the side of the hanging board facing the keel, and the hanging board surface fixing parts are respectively connected to the vertical keels; The elevation adjustment member abuts against the transverse keel on the top of the hanging plate installation surface to adjust the installation height of the hanging plate.
4. A construction device for hanging a plain concrete board according to claim 3, characterized in that: The hanging board surface connecting member includes a plurality of horizontal beams and a plurality of vertical beams; A plurality of the horizontal beams and a plurality of the vertical beams are arranged in a grid shape and fixed on the mounting surface of the hanging plate.
5. A construction device for hanging a plain concrete board according to claim 4, characterized in that: The elevation adjustment member comprises an L-shaped connecting plate with a downward opening and an adjustment bolt; The L-shaped connecting plate is located below the cross beam at the top of the hanging plate, one end of the L-shaped connecting plate is located on the top of the transverse keel and is fixedly connected to the transverse keel, and the other end of the L-shaped connecting plate faces the cross beam at the top of the hanging plate; The adjusting bolt is threadedly connected to one end of the cross beam of the L-shaped connecting plate facing the top of the hanging plate, and abuts against the bottom of the cross beam at the top of the hanging plate.
6. A construction device for hanging boards of plain concrete according to claim 3, characterized in that: The moving mechanism includes a rack and moving wheels located at the bottom of the rack; The moving wheels are installed at the bottom of the rack; The top of the storage rack is provided with a slot matching the bottom connector of the hanging board; The bottom connecting piece is inserted into the card slot.
7. A construction device for hanging boards of plain concrete according to claim 3, characterized in that: A detachable connection assembly is provided between the movable pulley and the hanging board surface connection piece; The detachable connection assembly includes a hanging ear arranged at the bottom of the movable pulley, and a hanging ring arranged on the hanging plate surface connecting member; The hanging rings are installed correspondingly at positions near the top of the vertical beams located near both sides of the hanging plate; The hanging ears are located in the middle of the bottom of the movable pulley, the hanging ears are respectively connected to the two axial end faces of the movable pulley, and a connecting rod is arranged at the bottom of the hanging ears; The connecting rod is horizontally connected to the bottom of the hanging ear, and both ends of the connecting rod are respectively provided with hanging buckles; The hooks are respectively mounted on the connecting rods, and the hooks are respectively hung on the hanging rings which are arranged oppositely.
8. The device for constructing a plain concrete hanging board according to claim 1, characterized in that: A tightening mechanism is provided between the suspension rope and the vertical keel on which the second fixed pulley is installed; The tightening mechanism is located below the second fixed pulley, and two ends of the tightening mechanism are detachably connected to the suspension rope between the second fixed pulley and the third fixed pulley, and the transverse keel located directly below the second fixed pulley.
9. A construction device for hanging a plain concrete board according to claim 8, characterized in that: The tightening mechanism comprises: a tightening frame and hooks located at both ends of the tightening frame; The tightening frame is arranged horizontally, and the tightening frame is located on the keel on which the first fixed pulley is installed and on the suspension rope between the first fixed pulley and the movable pulley; The hook is located on the outside of the tightening frame, and a first threaded rod and a second threaded rod are respectively arranged between the hook and the tightening frame, and the hook is respectively hooked on the transverse keel directly below the second fixed pulley and on the suspension ropes of the second fixed pulley and the third fixed pulley; The threads on the first threaded rod and the second threaded rod are arranged in opposite directions, the ends of the first threaded rod and the second threaded rod facing away from each other are respectively connected to the hooks, and the ends of the first threaded rod and the second threaded rod facing each other are respectively inserted into the tightening frame and threadedly connected to the tightening frame.
10. The device for constructing a plain concrete hanging board according to claim 1, characterized in that: The lifting equipment is a variable frequency winch.