Constructed wetland drainage structure
By designing an artificial wetland drainage structure, using components such as leakage grids, baffles, ball valves, hoops, collars and activated carbon, the problem of purifying the sediment in the water is solved and the effective removal and cleaning of water is achieved.
Patent Information
- Application Number
- CN202420109338.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-17
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-01-17
AI Technical Summary
There is silt and sand in the purified water, and it needs to be precipitated after drainage before use. It is difficult for the prior art to effectively remove fine sand.
An artificial wetland drainage structure was designed, including connecting pipes, sand cleaning pipes, leakage grids, baffles, ball valves, hoop rings, collars, grooves, sediment boxes and activated carbons. Large silt and sand are filtered through the leakage grids and baffles. Control the water flow, fix the pipe with the hoop ring, and realize the pipe disassembly, and the activated carbon in the deposition box adsorbs residual sediment.
Effectively removes silt and sand in the water, ensuring the water flow is clean, and the pipes and sediment boxes can be cleaned and replaced regularly, achieving complete purification of water.
Smart Images

Figure CN221940251U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of drainage structures, and in particular to an artificial wetland drainage structure. Background Art
[0002] Artificial wetlands are swamp-like surfaces that are artificially constructed and controlled. Sewage and sludge are distributed in a controlled manner on the artificially constructed wetlands. In the process of sewage and sludge flowing in a certain direction, the technology mainly utilizes the physical, chemical and biological synergistic effects of soil, artificial media, plants and microorganisms to treat sewage and sludge.
[0003] Its mechanisms of action include adsorption, retention, filtration, redox, precipitation, microbial decomposition, transformation, plant shading, residue accumulation, transpiration water and nutrient absorption and the action of various animals.
[0004] However, the purified water contains a small amount of sediment and needs to be settled after drainage before it can be used. Summary of the invention
[0005] In view of the shortcomings of the prior art, the purpose of this application is to provide an artificial wetland drainage structure to solve the problem that the purified water contains silt and needs to be precipitated before use after drainage.
[0006] The above-mentioned purpose of the present application is achieved through the following technical solutions: an artificial wetland drainage structure, comprising a substrate laid at the bottom of the artificial wetland, a connecting pipe located above the substrate is arranged on one side of the artificial wetland, a sand cleaning pipe is fixedly connected to the side of the connecting pipe away from the artificial wetland, a sleeve is clamped at one end of the sand cleaning pipe close to the connecting pipe, a net is fixedly connected to the outer ring of the sleeve, a baffle fixedly connected to the inside of the sand cleaning pipe is arranged on the side of the net away from the connecting pipe, the side of the baffle is in contact with the inner wall of the sand cleaning pipe, and the height of the baffle is lower than the sand cleaning pipe.
[0007] By adopting the above technical scheme, water flows from the artificial wetland into the connecting pipe, and then into the sand cleaning pipe through the connecting pipe. When the sand cleaning pipe is close to the connecting pipe, the water flows through the mesh, and the mesh blocks the larger sediment outside the sand cleaning pipe. The water flows through the mesh and flows to the baffle behind the mesh, and the baffle blocks the fine sediment downstream of the water flow, thereby achieving the purpose of cleaning the sediment.
[0008] Furthermore, a ball valve is provided on the side of the connecting pipe close to the sand cleaning pipe, the ball valve is rotatably connected to a rotating column, the end of the rotating column away from the ball valve is fixedly connected to a rotating handle, the rotating column is located at the center of the bottom surface of the rotating handle, the end of the rotating column away from the rotating handle is fixedly connected to a sphere, the sphere is located inside the ball valve, the ball valve is sleeved on the outside of the connecting pipe, the sphere is provided with a through hole, the opening of the through hole faces the sand cleaning pipe, and the rotating handle is located above the ball valve.
[0009] By adopting the above technical solution, when the water in the artificial wetland flows into the connecting pipe, the rotating handle rotates, the rotating column drives the ball to rotate, and the ball rotates around the center of the rotating column. When the ball rotates to the point where the through hole opening faces the inner wall of the connecting pipe, the water flow will be blocked by the ball. When the ball continues to rotate to the point where the through hole opening faces the sand cleaning pipe, the water flow continues to flow, thereby achieving the purpose of controlling the water flow.
[0010] Furthermore, a hoop is provided at the connection between the connecting pipe and the sand cleaning pipe, and the connecting pipe and the sand cleaning pipe are fixedly connected by the hoop, the hoop consists of two semicircles, and both ends of the semicircular section of the hoop outside the hoop are fixedly connected to a connecting plate, the connecting plate is provided with a threaded hole, and the threaded hole is threadedly connected with a bolt, and the two semicircles are connected by the bolt through the threaded hole, and the hoop is sleeved at the connection between the connecting pipe and the sand cleaning pipe.
[0011] By adopting the above technical solution, when the bolts are tightened, the two semicircles slowly approach each other, the inner diameter of the hoop becomes smaller, and the connecting pipe and the sand cleaning pipe inside the hoop are gradually pressed by the hoop, and the connecting pipe and the sand cleaning pipe are fixedly connected. When the bolts are loosened, the inner diameter of the hoop becomes larger, the connecting pipe and the sand cleaning pipe are no longer pressed by the hoop, and the connecting pipe and the sand cleaning pipe are no longer fixedly connected, and the sand cleaning pipe can be disassembled to clean the inside of the sand cleaning pipe.
[0012] Furthermore, a groove is provided in the sand cleaning pipe, and the groove is located at one end of the sand cleaning pipe close to the connecting pipe. The ring is clamped with the sand cleaning pipe through the groove. The ring has a notch, and the cross-section of the notch is fixedly connected to a platform toward the inside of the ring. The platforms are provided with screw holes, and the screw holes are threadedly connected to screws. The outer diameter of the ring in a natural state is larger than the groove, and the inner diameter of the groove is larger than the outer diameter of the ring when tightened.
[0013] By adopting the above technical solution, the two platforms are close to each other when the screw is tightened, and the outer diameter of the ring will become smaller when the platforms are close to each other. When the outer diameter of the ring becomes smaller, the ring can be put into the groove. Then, the screw is loosened, the outer diameter of the ring becomes larger, and the ring is pressed against the inner side of the groove, thereby being clamped in the groove.
[0014] Furthermore, a connecting pipe is fixedly connected to one end of the sand cleaning pipe away from the connecting pipe, and a water outlet is provided at one end of the connecting pipe away from the sand cleaning pipe. A sedimentation box is provided below the water outlet, and the sedimentation box opens toward the water outlet of the connecting pipe, and activated carbon is contained in the sedimentation box.
[0015] By adopting the above technical solution, water flows through the sand cleaning pipe into the connecting pipe, flows from the water outlet of the connecting pipe to the sedimentation box, and contacts the activated carbon after flowing into the sedimentation box, and the activated carbon absorbs the residual sand in the water.
[0016] Furthermore, a box door is provided on one side of the sedimentation box close to the sand cleaning pipe, and cushion strips are provided around the box door.
[0017] By adopting the above technical solution, when the activated carbon in the sedimentation box needs to be replaced or the sedimentation box needs to be cleaned, the box door can be opened for replacement and cleaning, and the pads around the box door can prevent the box door from leaking.
[0018] Furthermore, a water outlet pipe is provided at the bottom of the side of the sedimentation box away from the box door, and a water reservoir is provided below the side of the water outlet pipe away from the sedimentation box.
[0019] By adopting the above technical solution, water flows into the sedimentation box, passes through the activated carbon, and then flows into the outlet pipe, and then passes through the outlet pipe to the water reservoir, where the water can be stored.
[0020] Furthermore, a water pump is provided on a side of the water reservoir away from the sedimentation box, and a water pumping pipe of the water pump is located inside the water reservoir.
[0021] By adopting the above technical solution, when the water in the water reservoir is needed, the water pump can be started to quickly pump out the water for use.
[0022] In summary, the present application includes at least one of the following beneficial technical effects.
[0023] 1. When water flows through the mesh, the mesh can block larger sediment, but there is still fine sediment that will pass through the mesh. At this time, the baffle can block the fine sediment downstream of the water flow. When the water flows through the connecting pipe and continues to flow to the sedimentation box, the remaining sediment in the water flow will be adsorbed by the activated carbon, thereby achieving the purpose of cleaning the sediment.
[0024] 2. The collar is clamped in the groove in the sand cleaning pipe. When the screw is tightened, the two platforms are close to each other. When the platforms are close to each other, the diameter of the collar becomes smaller. When the collar becomes smaller, it can be put into the groove. Then, the screw is loosened, and the diameter of the collar becomes larger so that it is clamped in the groove.
[0025] 3. A hoop is provided at the connection between the connecting pipe and the sand cleaning pipe. The hoop consists of two semicircles. The semicircular section of the hoop is fixedly connected to a connecting plate at one end outside the hoop. The connecting plate is provided with a threaded hole. The two semicircles are connected by bolts through the threaded hole. The hoop is sleeved at the connection between the connecting pipe and the sand cleaning pipe. When the bolts are tightened, the two semicircles slowly move closer, the diameter of the hoop becomes smaller, and the connecting pipe and the sand cleaning pipe located in the hoop are gradually pressed by the hoop. At this time, the connecting pipe and the sand cleaning pipe are fixedly connected. When the bolts are loosened, the diameter of the hoop becomes larger, and the connecting pipe and the sand cleaning pipe lose their fixed connection. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is the overall structure diagram of the embodiment;
[0027] Figure 2It is a schematic diagram of the ball valve structure;
[0028] Figure 3 is a schematic diagram of a hoop structure;
[0029] Figure 4 It is a diagram of the structure of the ring and the groove.
[0030] Figure numerals: 1. artificial wetland; 101. matrix; 2. connecting pipe; 3. ball valve; 301. turning handle; 302. rotating column; 303. sphere; 4. hoop; 401. connecting plate; 402. bolt; 403. threaded hole; 5. sand cleaning pipe; 501. collar; 502. net; 503. platform; 504. screw; 505. screw hole; 506. groove; 507. baffle; 6. connecting pipe; 601. water outlet; 7. sedimentation box; 701. activated carbon; 702. box door; 703. pad; 704. water outlet pipe; 8. reservoir; 9. pump; 901. pumping pipe. DETAILED DESCRIPTION
[0031] The present application is further described in detail below with reference to the accompanying drawings.
[0032] Example, see Figure 1 A drainage structure for an artificial wetland includes a substrate 101 laid at the bottom of an artificial wetland 1, a connecting pipe 2 located above the substrate 101 is arranged on one side of the artificial wetland 1, the connecting pipe 2 is fixedly connected to a sand cleaning pipe 5 at one end away from the artificial wetland 1, a sleeve 501 is clamped inside the sand cleaning pipe 5, the outer ring of the sleeve 501 is fixedly connected to a leakage net 502, a baffle 507 fixedly connected to the inside of the sand cleaning pipe is arranged on the side of the leakage net 502 away from the connecting pipe 2, the side of the baffle 507 is in contact with the inner wall of the sand cleaning pipe 5, the height of the baffle 507 is lower than the sand cleaning pipe 5, and the end of the sand cleaning pipe 5 away from the connecting pipe 2 is fixedly connected to a The connecting pipe 6 has a water outlet 601 at one end of the connecting pipe 6 away from the sand removal pipe 5. There is a sedimentation box 7 directly below the water outlet 601. The sedimentation box 7 opens toward the water outlet 601. A large amount of activated carbon 701 is contained in the sedimentation box 7. A water outlet pipe 704 is provided at the bottom of the sedimentation box 7. When the water of the artificial wetland 1 flows into the connecting pipe 2, it flows into the sand removal pipe 5 through the connecting pipe 2, flows into the sand removal pipe 5 through the leakage net 502, and flows into the sand removal pipe 5 through the leakage net 502. The leakage net 502 blocks the larger sediment. The water flow continues to flow and flows to the baffle 507. Most of the sediment in the water flow is blocked, and the water flows over the baffle 507. The water flow continues to flow into the connecting pipe 6, passes through the water outlet 601 of the connecting pipe 6, and flows from the water outlet 601 to the sedimentation box 7. After the water flows into the sedimentation box 7, the residual sediment in the water is adsorbed by the activated carbon 701. After adsorption, the water flows out from the water outlet pipe 704, and the sediment is completely cleaned, achieving the purpose of cleaning the sediment.
[0033] In order to regularly clean the sand cleaning pipe 5, in this embodiment, a ball valve 3 is provided on the side of the connecting pipe 2 close to the sand cleaning pipe 5, the ball valve 3 is rotatably connected to a rotating column 302, and the end of the rotating column 302 away from the ball valve 3 is fixedly connected to a rotating handle 301, the rotating column 302 is located at the center of the bottom surface of the rotating handle 301, and the end of the rotating column 302 away from the rotating handle is fixedly connected to a ball 303, the ball 303 is located inside the ball valve 3, the ball valve 3 is sleeved on the outside of the connecting pipe 2, the ball 303 is provided with a through hole, the through hole opening faces the sand cleaning pipe 2, the rotating handle 301 is located above the ball valve 3, a hoop 4 is provided at the connection between the connecting pipe 2 and the sand cleaning pipe 5, the connecting pipe 2 and the sand cleaning pipe 5 are fixedly connected through the hoop 4, refer to Figure 3 The hoop ring 4 is composed of two semicircles, and both ends of the semicircular section of the hoop ring 4 outside the hoop ring 4 are fixedly connected to the connecting plate 401, and the connecting plate 401 is provided with a threaded hole 403, and the threaded hole 403 is threadedly connected with a bolt 402, and the two semicircles are connected by the bolt 402 through the threaded hole 403. The hoop ring 4 is sleeved at the connection between the connecting pipe 2 and the sand cleaning pipe 5. When the bolt 402 is tightened, the two semicircles slowly move closer, and the inner diameter of the hoop ring 4 becomes smaller. At this time, the connecting pipe 2 and the sand cleaning pipe 5 sleeved in the hoop ring 4 are gradually pressed by the hoop ring 4. When the bolt 402 is tightened until it stops, the connecting pipe 2 and the sand cleaning pipe 5 are fixedly connected by the hoop ring 4. When it is necessary to clean the sand cleaning pipe 5, the rotating handle 301 is rotated. At this time, the ball 303 is brought by the rotating column 302 to rotate around the center of the screw 302. When the ball rotates to the point where the openings at both ends of the through hole face the ball valve, the water flow is blocked by the ball 303. Then, the bolt 402 is loosened to increase the diameter of the hoop 4, and the connecting pipe 2 and the sand cleaning pipe 5 are no longer pressed by the hoop 4. At this time, the sand cleaning pipe 5 can be separated from the connecting pipe 2, and the purpose of regularly cleaning the sand cleaning pipe 5 can be achieved.
[0034] In order to replace the leakage net 502 when it is damaged, a groove 506 is provided on the inner side of the sand cleaning pipe 5 in this embodiment. The groove 506 is located at one end of the sand cleaning pipe 5 close to the connecting pipe 2. Figure 4 The groove 506 is clamped with the collar 501. The collar 501 has a notch. Two sections of the notch are fixedly connected to a platform 503 facing the inside of the collar. The platform 503 is provided with a screw hole 505. The screw hole 505 is connected with a screw 504. The outer diameter of the collar 501 in a natural state is larger than the outer diameter of the sand cleaning pipe 5. The inner diameter of the groove 506 is larger than the outer diameter of the collar 501 when tightened. When the screw 504 is tightened, the two platforms 503 are close to each other. When the platforms 503 are close to each other, the diameter of the collar 501 becomes smaller. When the collar 501 becomes smaller, it can be placed in the groove 506. Then, the screw 504 is loosened, and the outer diameter of the collar 501 becomes larger, thereby pressing against the inner diameter of the groove 506. The purpose of clamping the collar 501 in the groove 506 is achieved.
[0035] In order to regularly replace the activated carbon 701, the present embodiment provides a box door 702 on the side of the sedimentation box 7 away from the water outlet pipe 704. One side of the box door 702 is rotatably connected to the sedimentation box 7. The periphery of the box door 702 is fixedly connected with pads 704. When the activated carbon 701 in the sedimentation box 7 needs to be replaced, the box door 702 can be opened for replacement. The pads 704 around the box door 702 can prevent the box door from leaking.
[0036] The embodiments of this specific implementation method are all preferred embodiments of the present application, and are not intended to limit the protection scope of the application. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. An artificial wetland drainage structure, characterized in that: The invention comprises a substrate (101) laid at the bottom of an artificial wetland (1), a connecting pipe (2) located above the substrate (101) is arranged on one side of the artificial wetland (1), a sand cleaning pipe (5) is fixedly connected to the side of the connecting pipe (2) away from the artificial wetland (1), a sleeve (501) is clamped on the end of the sand cleaning pipe (5) close to the connecting pipe (2), a leakage net (502) is fixedly connected to the outer ring of the sleeve (501), a baffle (507) fixedly connected to the inside of the sand cleaning pipe (5) is arranged on the side of the leakage net (502) away from the connecting pipe (2), the side of the baffle (507) is in contact with the inner wall of the sand cleaning pipe (5), and the height of the baffle (507) is lower than that of the sand cleaning pipe (5).
2. According to claim 1, the artificial wetland drainage structure is characterized in that: A ball valve (3) is provided on a side of the connecting pipe (2) close to the sand cleaning pipe (5), and the ball valve (3) is rotatably connected to a rotating column (302). An end of the rotating column (302) away from the ball valve (3) is fixedly connected to a rotating handle (301), and the rotating column (302) is located at the center of the bottom surface of the rotating handle (301). An end of the rotating column (302) away from the rotating handle (301) is fixedly connected to a sphere (303), and the sphere (303) is located inside the ball valve (3). The ball valve (3) is sleeved on the outside of the connecting pipe (2), and the sphere (303) is provided with a through hole (304), and the opening of the through hole (304) faces the sand cleaning pipe (5). The rotating handle (301) is located above the ball valve (3).
3. The artificial wetland drainage structure according to claim 1, characterized in that: A hoop ring (4) is provided at the connection between the connecting pipe (2) and the sand cleaning pipe (5). The connecting pipe (2) and the sand cleaning pipe (5) are fixedly connected by the hoop ring (4). The hoop ring (4) consists of two semicircles. Both ends of the semicircular section of the hoop ring (4) outside the hoop ring (4) are fixedly connected to a connecting plate (401). The connecting plate (401) is provided with a threaded hole (403). A bolt (402) is threadedly connected to the threaded hole (403). The two semicircles are connected by the bolt (402) through the threaded hole (403). The hoop ring (4) is sleeved at the connection between the connecting pipe (2) and the sand cleaning pipe (5).
4. The artificial wetland drainage structure according to claim 1, characterized in that: The sand cleaning pipe (5) has a groove (506), and the groove (506) is located at one end of the sand cleaning pipe (5) close to the connecting pipe (2). The collar (501) is clamped on the sand cleaning pipe (5) by the groove (506). The collar (501) has a notch, and the cross section of the notch is fixedly connected to a platform (503) facing the inner side of the collar (501). The platform (503) is provided with a screw hole (505), and the screw hole (505) is threadedly connected to a screw (504). When the screw (504) in the collar (501) is not tightened, the diameter of the screw (504) is equal to that of the sand cleaning pipe (5), and the diameter of the groove (506) is smaller than that of the sand cleaning pipe (5) and larger than that of the collar (501) when it is tightened.
5. The artificial wetland drainage structure according to claim 1, characterized in that: One end of the sand cleaning pipe (5) away from the connecting pipe (2) is fixedly connected to a connecting pipe (6), and one end of the connecting pipe (6) away from the sand cleaning pipe (5) is provided with a water outlet (601), and a sedimentation box (7) is provided below the water outlet (601), and one end of the sedimentation box (7) is open toward the water outlet (601) of the connecting pipe (6), and the sedimentation box (7) contains activated carbon (701).
6. The artificial wetland drainage structure according to claim 5, characterized in that: A box door (702) is provided on one side of the sedimentation box (7) close to the sand cleaning pipe (5), and one side of the box door (702) is rotatably connected to the sedimentation box (7). A cushion strip (703) is fixedly connected to the periphery of the box door (702).
7. The artificial wetland drainage structure according to claim 5, characterized in that: A water outlet pipe (704) is provided at the bottom of the side of the sedimentation box (7) away from the box door (702), and a water reservoir (8) is provided below the side of the water outlet pipe (704) away from the sedimentation box (7).
8. The artificial wetland drainage structure according to claim 7, characterized in that: A water pump (9) is provided on the side of the water reservoir (8) away from the sedimentation box (7), and a water pumping pipe (901) of the water pump (9) is located inside the water reservoir (8).
