Improved quick assembly oxygen lance of European smelting furnace

By using a 40mm diameter lead screw and two-stage flange connection in Ouye furnace oxygen gun, the locking failure caused by bolt wear and difficulty in connecting the oxygen gun is solved, and a faster and more convenient oxygen gun installation is achieved.

CN221940543UActive Publication Date: 2024-11-01XINJIANG BAYI IRON & STEEL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420883223.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-26
Publication Date
2024-11-01
Estimated Expiration
2034-04-26

AI Technical Summary

Technical Problem

During the installation process of Ouye Furnace oxygen gun, the locking failure occurs due to wear and rust of fine bolts, and it is difficult to connect the oxygen gun with the oxygen metal hose, the space is small and the force is large, resulting in a long installation time and a large amount of labor.

Method used

A lead screw structure with a diameter of 40mm is used to replace the traditional bolt connection, and the oxygen gun is divided into two-stage flange connections. The adjustment angle and stress relief of the oxygen gun and the oxygen metal hose are achieved through the lead screw and flange.

Benefits of technology

It solves the problem of bolt locking failure, simplifies the connection process between the oxygen gun and the oxygen metal hose, and improves installation efficiency and convenience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221940543U_ABST
    Figure CN221940543U_ABST
Patent Text Reader

Abstract

The utility model discloses an improved European smelting furnace fast assembly oxygen lance which comprises a tuyere large sleeve and an oxygen lance body, two sides of the outer end face of the tuyere large sleeve are respectively provided with a lead screw with the diameter of 40mm along the axial direction of the tuyere large sleeve, a fixed seat is arranged between the two lead screws, and a flange and a central through hole are arranged in the center of the fixed seat. The oxygen lance body is divided into a front part and a rear part and penetrates through the central through hole, and the front part and the rear part of the oxygen lance body are connected through the flange. According to the utility model, the problem of bolt wear failure can be solved, and meanwhile, the oxygen lance and the oxygen metal hose can be more conveniently connected.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to an improved Ouye furnace quick-assembly oxygen gun. Background Art

[0002] Ouye furnace is a non-blast furnace ironmaking equipment. Its principle is to use fuel combustion under high temperature conditions to generate a large amount of heat energy, reduce and melt iron ore, and react with flux, fluxing agent, etc. at high temperature to separate iron and molten steel. The biggest feature of Ouye furnace is that it can directly use low-grade iron ore and has high production efficiency. Its process flow mainly includes charge pretreatment, iron ore reduction melting, molten steel separation, slag treatment and metallurgical reaction kinetics. Ouye furnace is widely used in my country and other countries and is one of the important metallurgical equipment. Ouye furnace tuyere oxygen gun is a spare part for connecting important energy media such as oxygen hose. Through the clamping device of the oxygen gun, the oxygen tuyere small sleeve is pressed against the mounting surface of the large sleeve pressure plate through the fastening bolts on the oxygen gun crossbeam, which plays a fixing and supporting role.

[0003] During the installation of the original oxygen gun, the fastening bolts need to be screwed into the bolt connection holes on the large sleeve pressure plate. Since the M18 fine-thread bolts are used for connection, wear easily leads to locking failure. The on-site environment also causes the bolts to rust, and the resistance is also greater. When it reaches a certain level, the bolts are stuck and the guiding function disappears. In addition, during the docking process between the on-site oxygen gun and the oxygen metal soft connection, the space is small, the force is large, the installation is difficult, the time is long, and the labor is large. Summary of the invention

[0004] The utility model aims to provide an improved Ouye furnace quick-assembly oxygen lance, which can solve the problem of bolt wear failure and can more conveniently connect the oxygen lance and the oxygen metal hose.

[0005] The technical solution adopted by the utility model is an improved Ouye furnace quick-assembly oxygen gun, comprising a tuyere sleeve and an oxygen gun body, a lead screw with a diameter of 40 mm is respectively arranged on both sides of the outer end surface of the tuyere sleeve along its axial direction, a fixing seat is arranged between the two lead screws, a flange and a central through hole are arranged at the center of the fixing seat, the oxygen gun body is divided into front and rear two parts and passes through the central through hole, and the front and rear two parts of the oxygen gun body are connected by the flange.

[0006] The utility model is improved on the basis of the original oxygen lance. The tightening fixation between the oxygen lance and the oxygen tuyere small sleeve is changed from bolts to a 40mm diameter screw structure, and the oxygen lance is changed to a two-stage flange connection, so as to achieve the purpose of adjusting the angle and eliminating stress during the connection process between the rear part and the oxygen metal soft connection. BRIEF DESCRIPTION OF THE DRAWINGS

[0007] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0008] Figure 2 It is the front view of the utility model. Implementation

[0009] An improved Ouye furnace quick assembly oxygen lance, such as Figure 1 , 2 As shown, it includes a large air inlet sleeve 4 and an oxygen lance body 5. A lead screw 1 with a diameter of 40 mm is respectively arranged on both sides of the outer end surface of the large air inlet sleeve 4 along its axial direction. A fixing seat 2 is arranged between the two lead screws 1. A flange 3 and a central through hole are arranged in the center of the fixing seat 2. The oxygen lance body 5 is divided into two parts, front and rear, and passes through the central through hole. The front and rear parts of the oxygen lance body are connected by the flange 3. By setting the lead screw 1, the bolt locking failure problem caused by the traditional bolt connection is eliminated. By dividing the oxygen lance body 5 into two parts and connecting them through the flange 3, the connection problem between the oxygen lance body and the oxygen metal hose is solved, and the angle is easy to adjust and stress is eliminated.

Claims

1. An improved Ouye furnace quick assembly oxygen lance, comprising a tuyere sleeve and an oxygen lance body, characterized in that: A lead screw with a diameter of 40 mm is arranged along the axial direction on both sides of the outer end surface of the large air inlet sleeve, a fixing seat is arranged between the two lead screws, a flange and a central through hole are arranged at the center of the fixing seat, the oxygen gun body is divided into front and rear parts and passes through the central through hole, and the front and rear parts of the oxygen gun body are connected by the flange.