Formwork supporting device in narrow space
By using a combined structure of symmetric channel steel and force transfer screw in narrow spaces, the problem of low construction efficiency in narrow spaces is solved, and efficient formwork support and fixation in narrow spaces is achieved, with application ranges ranging from 10 cm to 35 cm. gap.
Patent Information
- Application Number
- CN202420491321.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-14
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-03-14
AI Technical Summary
In a narrow space, the construction surface of the existing building joint reinforcement device is small and it is difficult to install, reinforce and remove formwork, resulting in low construction efficiency. It requires sequential or segmented construction to ensure quality.
Design a formwork support device including upper and lower symmetric channel steel. Through a combined structure of a force transmission screw and a fixing pin, the channel steel can be fully expanded and contacted with the interior of the building component joint to provide support and fixation, and the application range is from 10 cm to 35 cm gap.
It realizes simple and firm support and fixation in a narrow space, improves construction efficiency, has a wide range of application, and solves the problem of low construction efficiency.
Smart Images

Figure CN221941940U_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of supporting devices, and in particular to a template supporting device in a narrow space. Background Art
[0002] At present, various narrow spaces are often encountered during construction. Both sides of the joints need to be reinforced before construction inside the joints. In the existing narrow spaces, double beam and double column joints, expansion joints, settlement joints, etc. are mostly reinforced with wood or steel pipes during construction.
[0003] The existing building joint reinforcement device has the following disadvantages during use: in actual construction, the construction working surface in a narrow space is very small, and it is not easy to install, reinforce and remove the template. In order to ensure the construction quality, sequential or segmented construction is often adopted, resulting in extremely low construction efficiency and inconvenience in use. Utility Model Content
[0004] In order to solve certain technical problems existing in the prior art, the purpose of the present application is to provide a formwork support device for a narrow space, in which two channel steels are fully unfolded and their two sides are respectively in contact with the two sides of the inner side of the gap between the building components. The support of the channel steels is used to support and fix the inner side of the gap between the building components, and the device is simple to use.
[0005] In order to solve the above existing technical problems, one of the purposes of this application is achieved by adopting the following technical solution:
[0006] A formwork support device in a narrow space, comprising two channel steels symmetrically arranged in an upper and lower direction, wherein an end fixing pin 1, a middle stabilizing pin, and an end fixing pin 2 are arranged between the two channel steels from left to right in sequence, a force transmission screw is arranged through the end fixing pin 1, the middle stabilizing pin, and the end fixing pin 2, the end fixing pin 1 is threadedly connected with the force transmission screw, the middle stabilizing pin and the force transmission screw are movably penetrated, the end fixing pin 2 and the force transmission screw are also movably penetrated, and the middle part of the force transmission screw is close to the position of the middle stabilizing pin A fixing sleeve is provided with two middle fixing nuts, and the two middle fixing nuts are both in contact with the middle stabilizing pin. The right end of the force transmission screw is close to the end fixing pin 2 and the position fixing sleeve is provided with two end fixing nuts 2, and the two end fixing nuts 2 are both in contact with the end fixing pin 2. The front and rear ends of the end fixing pin 1 are hinged to two support rods 1, and the other end of the support rod 1 is hinged to the corresponding channel steel. The front and rear ends of the end fixing pin 2 are hinged to two support rods 2, and the other end of the support rod 2 is hinged to the corresponding channel steel.
[0007] Furthermore, an end fixing nut 1 is fixedly provided on the left end of the force transmission screw.
[0008] Furthermore, a limiting nut is provided between the end fixing nut 1 and the end fixing pin 1, the limiting nut is threadedly connected to the force transmission screw, and the limiting nut can tighten the end fixing pin 1.
[0009] Furthermore, two stabilizing plates are provided at the front and rear ends of the middle stabilizing pin, the four stabilizing plates are cross-arranged, the two stabilizing plates on one side are superimposed, an opening is opened on the stabilizing plate, both stabilizing plates are mounted on the middle stabilizing pin through the opening, one end of the stabilizing plate is hinged to the channel steel, gaskets are provided at the front and rear ends of the middle stabilizing pin, the gaskets are pressed on the stabilizing plates, and limiting iron wires are passed through the front and rear ends of the middle stabilizing pin.
[0010] Furthermore, the longitudinal section of the channel steel is U-shaped, and the plane of the channel steel faces outwards.
[0011] Compared with the prior art, the beneficial effects of the present invention are:
[0012] (1) When in use, two channel steels are placed between the gaps of the building, and then the force transmission screw is screwed at the left end, the force transmission screw drives the end fixing pin 1 to move, the end fixing pin 1 drives the four support rods 1 to move, the four support rods 1 drive the upper and lower channel steels to move, and at the same time, the four support rods 2 are driven to move under the action of the two channel steels and the force transmission screw, thereby changing the spacing between the two channel steels until the two channel steels are fully unfolded and their two sides are respectively in contact with the two sides of the gap inside the building component, and the support of the channel steel plays a supporting and fixing role on the inside of the gap of the building component. It is simple to use and has firm support. Compared with the existing technology, it solves the technical problem that the narrow space construction working surface is very small in actual construction, it is not easy to install, reinforce and dismantle the template, and to ensure the construction quality, sequential or segmented construction is often used, resulting in extremely low construction efficiency. The application range is wide, from a gap of 10 cm to 35 cm, and the adjustable space is large. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 This is a schematic diagram of the overall structure of this application;
[0014] In the figure: 1. Channel steel; 2. End fixing pin 1; 3. Middle stabilizing pin; 4. End fixing pin 2; 5. Support rod 1; 6. Support rod 2; 7. End fixing nut 1; 8. Limiting nut; 9. End fixing nut 2; 10. Middle fixing nut; 11. Gasket; 12. Limiting wire; 13. Force transmission screw; 14. Stabilizing plate; 15. Opening. DETAILED DESCRIPTION
[0015] Below, the present application is further described in conjunction with the accompanying drawings and specific implementation methods. It should be noted that, under the premise of no conflict, the various embodiments or technical features described below can be arbitrarily combined to form a new embodiment.
[0016] In the description of the present application, it should be understood that the terms "up", "down", "left", "right", etc., indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present application.
[0017] The terms "first", "second", etc. in this application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application can be implemented in an order other than those illustrated or described herein, and the objects distinguished by "first", "second", etc. are generally of one type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and / or" in the specification and claims means at least one of the connected objects, and the character " / " generally indicates that the objects associated with each other are in an "or" relationship of a formwork support device in a narrow space.
[0018] Embodiment 1:
[0019] like Figure 1As shown, the present embodiment provides a formwork support device in a narrow space, which includes two channel steels 1 symmetrically arranged in the upper and lower parts, an end fixing pin 1 2, a middle stabilizing pin 3, and an end fixing pin 2 4 are arranged in sequence from left to right between the two channel steels 1, and a force transmission screw 13 is arranged through the end fixing pin 1 2, the middle stabilizing pin 3 and the end fixing pin 2 4, so that the end fixing pin 1 2 is threadedly connected with the force transmission screw 13, and the middle stabilizing pin 3 and the force transmission screw 13 are arranged in a movable through-arrangement manner, and the end fixing pin 2 4 and the force transmission screw 13 are also arranged in a movable through-arrangement manner, and a force transmission screw 13 is arranged in the middle part of the force transmission screw 13 near the middle. Two middle fixing nuts 10 are fixedly sleeved on the position of the intermediate stabilizing pin 3, so that the two middle fixing nuts 10 are both in contact with the middle stabilizing pin 3, two end fixing nuts 29 are fixedly sleeved on the right end of the force transmission screw 13 near the position of the end fixing pin 24, so that the two end fixing nuts 29 are both in contact with the end fixing pin 24, two support rods 15 are hinged at the front and rear ends of the end fixing pin 2, so that the other end of the support rod 15 is hinged to the corresponding channel steel 1, and two support rods 26 are hinged at the front and rear ends of the end fixing pin 24, so that the other end of the support rod 26 is hinged to the corresponding channel steel 1. When in use, two channel steels 1 are set between the gaps of the building, and then the force transmission screw 13 is screwed at the left end, the force transmission screw 13 drives the end fixing pin 2 to move, the end fixing pin 2 drives four support rods 5 to move, and the four support rods 5 drive the upper and lower channel steels 1 to move, and at the same time, the four support rods 2 6 are driven to move under the action of the two channel steels 1 and the force transmission screw 13, thereby changing the spacing between the two channel steels 1, until the two channel steels 1 are fully unfolded and their two sides are respectively in contact with the two sides of the gap inside the building component, and the support of the channel steel 1 plays a supporting and fixing role on the inside of the gap of the building component. It is simple to use and has firm support. Compared with the existing technology, it solves the technical problem that the narrow space construction working surface is very small in actual construction, it is not easy to install, reinforce and remove the template, and to ensure the construction quality, it is often used in sequence or segmented construction, resulting in extremely low construction efficiency. It has a wide range of application, and can be applied from a gap of 10 cm to 35 cm, and has a large adjustable space.
[0020] Furthermore, an end fixing nut 7 is fixedly provided on the left end of the force transmission screw 13, so that a wrench can conveniently turn the force transmission screw 13 by turning the end fixing nut 7.
[0021] Furthermore, a limiting nut 8 is provided between the end fixing nut 7 and the end fixing pin 2. The limiting nut 8 is threadedly connected to the force transmission screw 13. The limiting nut 8 can tighten the end fixing pin 2. After adjusting the distance between the two channel steels 1, the limiting nut 8 is tightened against the end fixing pin 2 by screwing the limiting nut 8.
[0022] Furthermore, two stabilizing plates 14 are provided at the front and rear ends of the middle stabilizing pin 3, and the four stabilizing plates are cross-arranged, and the two stabilizing plates 14 on one side are superimposed, and an opening 15 is provided on the stabilizing plate 14, and the two stabilizing plates 14 are sleeved on the middle stabilizing pin 3 through the opening 15, and one end of the stabilizing plate 14 is hinged to the channel steel 1, and gaskets 11 are provided at the front and rear ends of the middle stabilizing pin 3, and the gaskets 11 are pressed on the stabilizing plates 14, and limiting wires 12 are passed through the front and rear ends of the middle stabilizing pin 3. The setting of the gasket 11 can suppress the stabilizing plate 14, and the setting of the limiting wire 12 can block the gasket 11. By setting four stabilizing plates 14 and making the four stabilizing plates 14 cross each other, a stable support system can be formed between the two channel steels 1.
[0023] Furthermore, the longitudinal section of the channel steel 1 is U-shaped, and the plane of the channel steel 1 faces outwards, which is convenient for supporting building components.
[0024] The above-mentioned implementation modes are only preferred implementation modes of the present application and cannot be used to limit the scope of protection of the present application. Any non-substantial changes and substitutions made by technicians in this field on the basis of the present application shall fall within the scope of protection required by the present application.
Claims
1. A formwork support device in a narrow space, characterized in that: The invention comprises two channel steels (1) symmetrically arranged in the upper and lower parts, wherein an end fixing pin (2), a middle stabilizing pin (3) and an end fixing pin (4) are arranged in sequence from left to right between the two channel steels (1), a force transmission screw (13) is arranged between the end fixing pin (2), the middle stabilizing pin (3) and the end fixing pin (4), the end fixing pin (2) is threadedly connected with the force transmission screw (13), the middle stabilizing pin (3) and the force transmission screw (13) are arranged in a movable through-arrangement manner, the end fixing pin (4) and the force transmission screw (13) are also arranged in a movable through-arrangement manner, and the middle part of the force transmission screw (13) is fixedly sleeved near the middle stabilizing pin (3). There are two middle fixing nuts (10), and the two middle fixing nuts (10) are both in contact with the middle stabilizing pin (3). The right end of the force transmission screw (13) is fixedly sleeved with two end fixing nuts (9) near the position of the end fixing pin (4). The two end fixing nuts (9) are both in contact with the end fixing pin (4). The front and rear ends of the end fixing pin (2) are hinged with two support rods (5), and the other end of the support rod (5) is hinged with the corresponding channel steel (1). The front and rear ends of the end fixing pin (4) are hinged with two support rods (6), and the other end of the support rod (6) is hinged with the corresponding channel steel (1).
2. A formwork support device in a narrow space according to claim 1, characterized in that: The left end of the force transmission screw (13) is fixedly provided with an end fixing nut (7).
3. A formwork support device in a narrow space according to claim 2, characterized in that: A limiting nut (8) is provided between the end fixing nut (7) and the end fixing pin (2); the limiting nut (8) is threadedly connected to the force transmission screw (13); and the limiting nut (8) can tighten the end fixing pin (2).
4. A formwork support device in a narrow space according to claim 1, characterized in that: Two stabilizing plates (14) are provided at the front and rear ends of the intermediate stabilizing pin (3), the four stabilizing plates are cross-arranged, the two stabilizing plates (14) on one side are superimposed, an opening (15) is provided on the stabilizing plate (14), both of the two stabilizing plates (14) are sleeved on the intermediate stabilizing pin (3) through the opening (15), one end of the stabilizing plate (14) is hinged to the channel steel (1), the front and rear ends of the intermediate stabilizing pin (3) are provided with gaskets (11), the gaskets (11) are pressed on the stabilizing plates (14), and the front and rear ends of the intermediate stabilizing pin (3) are penetrated by limiting iron wires (12).
5. The formwork support device in a narrow space according to claim 1, characterized in that: The longitudinal section of the channel steel (1) is U-shaped, and the plane of the channel steel (1) faces outwards.
