Wind power engineering construction safety risk early warning device

By introducing adjustable installation rods and warning mechanisms into the risk warning device for wind power engineering construction, the problems of height fixation and untimely warning of existing devices are solved, the functions of highly flexible equipment adjustment and emergency warning are realized, and the wind power engineering is improved security.

CN221943828UActive Publication Date: 2024-11-01TIANJIN XINYUEYING INTELLIGENT TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420601119.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2024-11-01
Estimated Expiration
2034-03-26

AI Technical Summary

Technical Problem

The risk warning device for existing wind power engineering construction is highly fixed and cannot be adjusted, resulting in inconvenience during transportation and installation, and in an emergency situation, it is impossible to quickly provide effective warnings to staff.

Method used

A safety risk warning device for wind power engineering construction was designed. By setting up a sliding chute and installation rod in the installation cylinder, combining the positioning mechanism and the warning mechanism, the height adjustment and warning functions of the monitoring probe are realized, including adjustable installation rods and positioning holes. and jacks, positioning pins, warning lights and broadcast speakers to ensure the equipment can be installed and used flexibly at different heights and quickly alert in emergencies.

Benefits of technology

It realizes flexible adjustment of the height of the monitoring probe, which is easy to transport and install, and can quickly alert staff in emergency situations to improve the safety of wind power engineering construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221943828U_ABST
    Figure CN221943828U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of risk early warning devices, and discloses a wind power engineering construction safety risk early warning device which comprises a base, a mounting cylinder fixedly connected to the upper end of the base, a sliding groove formed in the mounting cylinder, a mounting rod arranged in the sliding groove, a positioning mechanism arranged in the mounting cylinder, and a mounting plate fixedly connected to the upper end of the mounting rod. The lower end of the mounting plate is fixedly connected with a mounting seat, the lower end of the mounting seat is rotatably connected with a mounting frame, the lower end of the mounting frame is fixedly connected with a monitoring probe, a cross rod is fixedly connected in the mounting rod, and the lower end of the cross rod is provided with a warning mechanism. According to the utility model, the mounting rod is inserted into the mounting cylinder, then the base is fixed on the ground, the equipment is positioned, and then the extension position of the mounting rod can be adjusted in the mounting cylinder, so that the height of the monitoring probe can be adjusted, and in case of an emergency, the warning mechanism operates to warn the monitoring probe. Therefore, a warning effect can be achieved for surrounding people.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of risk warning devices, and more specifically to a wind power engineering construction safety risk warning device. Background Art

[0002] Wind power project refers to the construction project of wind power infrastructure. The main principle of wind power generation is to use wind power to drive the windmill blades to rotate, and then increase the rotation speed through the speed increaser, thereby prompting the generator to generate electricity. The power tower is unmanned but requires regular maintenance and inspection, so monitoring the equipment is crucial.

[0003] The shortcomings of existing technologies: During the construction of wind power projects, risk warning devices are needed to monitor the construction environment and to warn workers when encountering dangerous situations. However, the height of most existing warning devices is fixed, which makes the monitoring height unable to be changed. If a higher warning device is used, it will be more troublesome during transportation and installation. Utility Model Content

[0004] In order to overcome the above-mentioned defects of the prior art, the utility model provides a wind power project construction safety risk early warning device to solve the problems existing in the above-mentioned background technology.

[0005] The utility model provides the following technical solution: a wind power engineering construction safety risk warning device, comprising a base, the upper end of the base is fixedly connected to a mounting cylinder, a slide groove is opened in the mounting cylinder, a mounting rod is arranged in the slide groove, a positioning mechanism is arranged in the mounting cylinder, the upper end of the mounting rod is fixedly connected to a mounting plate, the lower end of the mounting plate is fixedly connected to a mounting seat, the lower end of the mounting seat is rotatably connected to a mounting frame, the lower end of the mounting frame is fixedly connected to a monitoring probe, a cross bar is fixedly connected in the mounting rod, and a warning mechanism is arranged at the lower end of the cross bar.

[0006] Preferably, the positioning mechanism comprises a socket provided on the surface of the mounting tube, a positioning hole is provided on the surface of the mounting rod, a plurality of positioning holes are provided, and positioning pins are provided in the socket and the positioning holes.

[0007] Preferably, the warning mechanism comprises a warning light fixedly connected to the lower end of the cross bar and a positioning rod, a broadcasting speaker fixedly connected to the lower end of the positioning rod, and the warning light is a red and blue alternating light.

[0008] Preferably, a positioning frame is fixedly connected to the lower end of the mounting plate, and a wind speed sensor is fixedly connected to the lower end of the positioning frame.

[0009] Preferably, a tilting frame is fixedly connected to the upper end of the mounting plate, and a solar panel is fixedly connected to the upper end of the tilting frame.

[0010] Preferably, the front end of the mounting rod is fixedly connected to an electrical box, and a battery and electrical components are arranged in the electrical box.

[0011] Technical effects and advantages of the utility model:

[0012] 1. The utility model positions the device by inserting the mounting rod into the mounting tube and then fixing the base on the ground. The extended position of the mounting rod is adjusted in the mounting tube. When the height is adjusted to a suitable height, the adjacent positioning holes are overlapped with the jacks. Then, a positioning pin is inserted therein, thereby achieving the effect of positioning the height position of the mounting rod. In this way, the height of the monitoring probe can be adjusted, and the monitoring area of ​​the monitoring probe is increased. This is not only convenient for adjusting the overall height of the device, but also convenient for transportation and installation.

[0013] 2. The utility model controls the flashing of the warning light and then produces a warning sound through the broadcasting speaker, thereby achieving the effect of quickly warning the surrounding personnel, enabling the surrounding staff to respond immediately and improving the safety factor of wind power project construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the overall structure of the utility model.

[0015] Figure 2 It is a schematic diagram of the structure of the utility model when viewed from above.

[0016] Figure 3 It is a schematic diagram of the structure in which the installation tube and the installation rod are separated in the utility model.

[0017] Figure 4 It is a structural schematic diagram of the warning mechanism in the utility model.

[0018] The accompanying drawings are marked as follows: 1. base; 2. mounting tube; 3. slide groove; 4. mounting rod; 5. mounting plate; 6. mounting seat; 7. mounting frame; 8. monitoring probe; 9. cross bar; 10. jack; 11. positioning hole; 12. positioning pin; 13. warning light; 14. positioning rod; 15. broadcasting speaker; 16. positioning frame; 17. wind speed sensor; 18. tilt frame; 19. solar panel; 20. electrical box; 21. battery; 22. electrical components. DETAILED DESCRIPTION

[0019] The technical solution of the present invention will be clearly and completely described below in conjunction with the drawings in the present invention. In addition, the forms of the various structures recorded in the following embodiments are merely illustrative. The wind power engineering construction safety risk warning device involved in the present invention is not limited to the various structures recorded in the following embodiments. All other implementations obtained by ordinary technicians in this field without making creative work belong to the scope of protection of the present invention.

[0020] The utility model provides a wind power engineering construction safety risk early warning device, comprising a base 1, the upper end of the base 1 is fixedly connected to a mounting cylinder 2, a slide groove 3 is opened in the mounting cylinder 2, a mounting rod 4 is arranged in the slide groove 3, a positioning mechanism is arranged in the mounting cylinder 2, the upper end of the mounting rod 4 is fixedly connected to a mounting plate 5, the lower end of the mounting plate 5 is fixedly connected to a mounting seat 6, the lower end of the mounting seat 6 is rotatably connected to a mounting frame 7, the lower end of the mounting frame 7 is fixedly connected to a monitoring probe 8, a cross bar 9 is fixedly connected in the mounting rod 4, and a warning mechanism is arranged at the lower end of the cross bar 9. When working, the mounting rod 4 is inserted into the mounting cylinder 2, and then the base 1 is fixed on the ground to position the equipment. Then, the extended position of the mounting rod 4 can be adjusted in the mounting cylinder 2, so that the height of the monitoring probe 8 can be adjusted, so that the monitoring area of ​​the monitoring probe 8 is increased. If an emergency situation occurs, the warning mechanism can be operated to warn the surrounding personnel. At the same time, the mounting rod 4 can be retracted in the mounting cylinder 2, which is not only convenient for adjusting the overall height of the equipment, but also convenient for transportation and installation.

[0021] Furthermore, the positioning mechanism includes a socket 10 opened on the surface of the mounting tube 2, a positioning hole 11 opened on the surface of the mounting rod 4, and a plurality of positioning holes 11 are opened. Positioning pins 12 are arranged in the socket 10 and the positioning holes 11. When working, the extension position of the mounting rod 4 is adjusted in the mounting tube 2. When it is adjusted to a suitable height, the adjacent positioning hole 11 is overlapped with the socket 10, and then the positioning pin 12 is inserted therein, thereby achieving the effect of positioning the height position of the mounting rod 4.

[0022] Furthermore, the warning mechanism includes a warning light 13 and a positioning rod 14 fixedly connected to the lower end of the cross bar 9, and a broadcasting speaker 15 fixedly connected to the lower end of the positioning rod 14. The warning light 13 is a red and blue alternating light. When working, when an emergency occurs, the warning light 13 is controlled to flash, and then a warning sound is generated through the broadcasting speaker 15, thereby achieving the effect of quickly warning the surrounding people.

[0023] Furthermore, a positioning frame 16 is fixedly connected to the lower end of the mounting plate 5, and a wind speed sensor 17 is fixedly connected to the lower end of the positioning frame 16. When working, the wind speed sensor 17 can sense the surrounding wind speed.

[0024] Furthermore, the upper end of the mounting plate 5 is fixedly connected with a tilting frame 18, and the upper end of the tilting frame 18 is fixedly connected with a solar panel 19. When working, the solar panel 19 can absorb solar energy and convert it into electrical energy.

[0025] Furthermore, the front end of the mounting rod 4 is fixedly connected to an electrical box 20, in which a battery 21 and an electrical component 22 are arranged. When working, the solar panel 19 can absorb and convert electrical energy for storage under the action of the battery 21, thereby achieving the effect of powering the equipment operation.

[0026] The working principle of the utility model is as follows: the installation rod 4 is inserted into the installation tube 2, and then the base 1 is fixed on the ground to position the equipment. The extension position of the installation rod 4 is adjusted in the installation tube 2. When it is adjusted to a suitable height, the adjacent positioning holes 11 are overlapped with the jack 10, and then the positioning pin 12 is inserted therein, thereby achieving the effect of positioning the height position of the installation rod 4. In this way, the height of the monitoring probe 8 can be adjusted to increase the monitoring area of ​​the monitoring probe 8, which is not only convenient for adjusting the overall height of the equipment, but also convenient for transportation and installation. If an emergency occurs, the warning light 13 is controlled to flash, and then the warning sound is generated by the broadcasting speaker 15, so as to achieve the effect of quickly warning the surrounding personnel, and the wind speed sensor 17 can sense the surrounding wind speed. Finally, the solar energy can be absorbed by the solar panel 19, and the electric energy absorbed and converted by the battery 21 can be stored by the solar panel 19, thereby achieving the effect of powering the equipment operation.

[0027] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, which may refer to mechanical connection or electrical connection, or internal communication between two components, or direct connection. "upper", "lower", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may change;

[0028] Secondly: In the drawings of the embodiments disclosed in the present utility model, only the structures related to the embodiments disclosed in the present utility model are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present utility model can be combined with each other;

[0029] Finally: The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model should be included in the protection scope of the present utility model.

Claims

1. A wind power project construction safety risk early warning device, comprising a base (1), characterized in that: The upper end of the base (1) is fixedly connected to a mounting tube (2), a slide groove (3) is provided in the mounting tube (2), a mounting rod (4) is provided in the slide groove (3), a positioning mechanism is provided in the mounting tube (2), the upper end of the mounting rod (4) is fixedly connected to a mounting plate (5), the lower end of the mounting plate (5) is fixedly connected to a mounting seat (6), the lower end of the mounting seat (6) is rotatably connected to a mounting frame (7), the lower end of the mounting frame (7) is fixedly connected to a monitoring probe (8), the mounting rod (4) is fixedly connected to a cross bar (9), and a warning mechanism is provided at the lower end of the cross bar (9).

2. A wind power project construction safety risk early warning device according to claim 1, characterized in that: The positioning mechanism comprises a socket (10) provided on the surface of the mounting tube (2), a positioning hole (11) provided on the surface of the mounting rod (4), a plurality of positioning holes (11) being provided, and positioning pins (12) being provided in the socket (10) and the positioning holes (11).

3. A wind power project construction safety risk early warning device according to claim 1, characterized in that: The warning mechanism comprises a warning light (13) and a positioning rod (14) fixedly connected to the lower end of the crossbar (9); a broadcasting speaker (15) is fixedly connected to the lower end of the positioning rod (14); and the warning light (13) is a red and blue alternating light.

4. A wind power project construction safety risk early warning device according to claim 1, characterized in that: The lower end of the mounting plate (5) is fixedly connected to a positioning frame (16), and the lower end of the positioning frame (16) is fixedly connected to a wind speed sensor (17).

5. A wind power project construction safety risk early warning device according to claim 4, characterized in that: The upper end of the mounting plate (5) is fixedly connected to a tilting frame (18), and the upper end of the tilting frame (18) is fixedly connected to a solar panel (19).

6. A wind power project construction safety risk early warning device according to claim 5, characterized in that: The front end of the mounting rod (4) is fixedly connected to an electrical box (20), and a storage battery (21) and an electrical component (22) are arranged in the electrical box (20).