Insulation resistance testing device for three-phase assembly
By designing an automated three-phase assembly insulation resistance testing device, the power source drives the test platform and the lifting and lowering of the probe, the automatic testing of the three-phase assembly is realized, solving the problems of manual wiring operation and safety hazards, and improving the test Efficiency and safety.
Patent Information
- Application Number
- CN202323397641.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-13
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2033-12-13
AI Technical Summary
In the insulation resistance test of three-phase assembly of electrical equipment, due to the large number of conductors and the troublesome manual wiring operation, resulting in high labor intensity, low testing efficiency, and safety hazards.
A three-phase assembly insulation resistance testing device is designed, including frame, base plate, partition, linear track, test platform and test components. The test platform slide and probe lift are driven by the power source to achieve automatic contact connection and reduce manual labor Wiring operation and partitioning the manual position from the test position through partitions to improve safety.
Automatic testing of the insulation resistance of the three-phase assembly is realized, the operation steps are optimized, the working efficiency is improved, and the operation safety is ensured through partition separation, avoiding accidental electric shock accidents.
Smart Images

Figure CN221946098U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to an insulation resistance testing device, in particular to a three-phase assembly insulation resistance testing device. Background Art
[0002] The insulation performance also has a certain impact on the life of electrical equipment, so insulation testing is an important task in electrical equipment inspection. Insulation resistance is an important indicator for judging insulation performance. For any electrical equipment, ensuring that it has a sufficiently high insulation resistance between phases and to the ground is one of the important indicators for the safe operation of electrical equipment. Therefore, measuring the insulation resistance of electrical equipment is a very important process.
[0003] like Figure 1 As shown, a three-phase assembly of an electric vehicle includes an insulating base, a three-phase power line conductor arranged on the insulating base, and a plurality of control line conductors. When performing insulation resistance testing on the above three-phase assembly, each conductor is usually manually connected to a resistance tester and then tested. Due to the large number of conductors, the wiring operation is cumbersome, resulting in high labor intensity and low test efficiency. At the same time, there are certain safety hazards in the manual wiring operation. Utility Model Content
[0004] In order to overcome the shortcomings of the background technology, the utility model provides a three-phase assembly insulation resistance testing device.
[0005] The technical solution adopted by the utility model is: a three-phase assembly insulation resistance test device, including a frame, the frame is provided with a bottom plate, a resistance tester, and also includes:
[0006] A partition plate is located above the bottom plate and divides the bottom plate into front and rear sides. A first conducting groove for conducting the front and rear sides is also provided at the bottom of the partition plate;
[0007] The linear track is fixedly mounted on the bottom plate and runs through the guide grooves front and back;
[0008] A test platform, used for positioning and installing the three-phase assembly, which is slidably arranged on a linear track and connected to a first power source capable of driving it to slide forward and backward, and the test platform has a manual position located in front of the partition and a test position located in the rear of the partition;
[0009] The test assembly is arranged at the rear side of the partition, and comprises a test board, the test board is connected to a second power source capable of driving the test board to move up and down, and the test board is also provided with a plurality of probes, and the probes are connected to the resistance tester through wires;
[0010] When the test platform is in the test position, the probes on the test assembly are aligned with the three-phase assembly on the test platform.
[0011] The test platform is formed with a plurality of positioning holes for positioning and installing the three-phase assembly.
[0012] The test platform is provided with a direction indicating structure for indicating the installation direction of the three-phase assembly.
[0013] The bottom plate is also provided with an in-place detection sensor for detecting whether the test platform reaches the test position.
[0014] The frame also includes a plurality of sealing plates, and a closed cavity is formed behind the partition plates.
[0015] The beneficial effect of the utility model is as follows: when adopting the above scheme, during testing, first the first power source drives the test platform to move to the manual position on the front side of the partition, and the three-phase assembly is placed on the test platform manually. Then the first power source drives the test platform to move to the test position on the rear side of the partition, and the test component moves to contact and connect with the three-phase assembly to perform an insulation resistance test. After the test is completed, the first power source finally drives the test platform to move to the manual position on the front side of the partition, and the three-phase assembly to be tested is removed and replaced manually.
[0016] The automatic insulation resistance test can be realized by simply placing the three-phase assembly on the test platform. No wiring operation is required, which optimizes the operation steps and improves work efficiency. At the same time, the manual position and the test position are separated by a partition, and the safety of manual operation can be guaranteed to avoid accidental electric shock accidents, which is safer and more reliable. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a structural schematic diagram of the three-phase assembly.
[0018] Figure 2 It is a structural schematic diagram of a three-phase assembly insulation resistance testing device according to an embodiment of the utility model.
[0019] Figure 3 This is a schematic diagram of the structure of the three-phase assembly insulation resistance testing device after the frame is removed according to an embodiment of the utility model.
[0020] Figure 4 It is a schematic diagram of a partial structure of a three-phase assembly insulation resistance testing device according to an embodiment of the utility model.
[0021] Figure 5 It is a structural schematic diagram of a test platform according to an embodiment of the utility model. DETAILED DESCRIPTION
[0022] The embodiments of the utility model are further described below in conjunction with the accompanying drawings.
[0023] As shown in the figure, a three-phase assembly insulation resistance testing device includes a frame, on which a base plate 1, a resistance tester 2, a partition 3, a linear track 4, a test platform 5, and a test component 7 are provided.
[0024] The partition plate 3 is located above the bottom plate 1 , and the partition plate 3 can separate the space above the bottom plate 1 into front and rear sides. A first conducting groove 31 for conducting the front and rear sides is also provided at the bottom of the partition plate 3 .
[0025] The linear track 4 is fixedly mounted on the bottom plate 1 and penetrates the conducting groove 31 from front to back.
[0026] The test platform 5 is used for positioning and installing the three-phase assembly 10, and is slidably arranged on the linear track 4. The test platform 5 is connected to a first power source 6, which can be a cylinder, and can push the test platform 5 to slide forward and backward along the linear track 4. The test platform 5 has a manual position located in front of the partition 3 and a test position located behind the partition 3. Among them, the test platform 5 is formed with a plurality of positioning holes 51, and the layout of the positioning holes 51 is adapted to the pin positions on the insulating base of the three-phase assembly 10. The three-phase assembly 10 can be positioned and installed by inserting the pins of the three-phase assembly 10 into the positioning holes 51, so as to facilitate subsequent testing. At the same time, a direction indicating structure 52 for indicating the installation direction of the three-phase assembly 10 is also formed on the test platform 5. The direction indication structure can use a date stamp indicating arrow. The three-phase assembly usually has a mark such as date, model, etc. at the designated position of the insulating base. When installing the three-phase assembly on the test platform, you only need to align the mark with the arrow direction to ensure that the three-phase assembly is accurately installed on the test platform without mis-installation. The direction indication structure can also use an anti-mistake installation hole, and a corresponding anti-mistake installation shaft is set on the three-phase assembly. Only when the shaft hole corresponds can the three-phase assembly be installed on the test platform without mis-installation. The direction indication structure can greatly improve the installation speed of the three-phase assembly, improve work efficiency, and ensure accurate installation.
[0027] The test assembly 7 is arranged at the rear side of the partition 3 and corresponds to the test position of the test platform. The test assembly 7 includes a test board 71, which is connected to a second power source 72. The second power source 72 also uses a cylinder to drive the test board 71 to move up and down. The test board 71 is also provided with a plurality of probes 73, and the probes 73 are connected to the resistance tester 2 through wires. The number of probes is consistent with the number and layout of conductors on the three-phase assembly. When the test platform 5 is in the test position, the probes 73 on the test assembly 7 are aligned with the three-phase assembly 10 on the test platform 5.
[0028] The resistance tester 2 is an existing instrument and can be used for insulation resistance testing. The resistance tester 2 is placed on the base plate 1 .
[0029] Of course, the rack is also equipped with conventional and necessary structures such as display screens, key switches, etc.
[0030] During the test, the first power source first drives the test platform to move to the manual position on the front side of the partition, and the three-phase assembly is placed on the test platform manually. Then the first power source drives the test platform to move to the test position on the rear side of the partition, and the test component moves to contact and connect with the three-phase assembly to perform an insulation resistance test. After the test is completed, the first power source finally drives the test platform to move to the manual position on the front side of the partition, and the three-phase assembly to be tested is removed and replaced manually.
[0031] The automatic insulation resistance test can be realized by simply placing the three-phase assembly on the test platform. No wiring operation is required, which optimizes the operation steps and improves work efficiency. At the same time, the manual position and the test position are separated by a partition, and the safety of manual operation can be guaranteed to avoid accidental electric shock accidents, which is safer and more reliable.
[0032] In addition, the bottom plate 1 is also provided with an in-place detection sensor 8 for detecting whether the test platform 5 reaches the test position. The in-place detection sensor 8 specifically adopts a photoelectric sensor to further ensure smooth and reliable operation.
[0033] The rack further comprises a plurality of sealing plates 8, and a closed cavity is formed behind the partition plate 3, and the test assembly 7 is further isolated by the sealing plates 8 to improve safety. Of course, the sealing plates 8 can be opened to facilitate maintenance and necessary wiring operations.
[0034] In the description of the present invention, it should be noted that the terms "center", "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0035] In the description of the present utility model, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances. In addition, in the description of the present utility model, unless otherwise specified, "plurality" means two or more.
[0036] Technical personnel should note: Although the utility model has been described according to the above specific implementation methods, the utility model concept of the utility model is not limited to this utility model. Any modification using the utility model concept will be included in the scope of protection of this patent right.
Claims
1. A three-phase assembly insulation resistance test device, comprising a frame, on which a bottom plate (1) and a resistance tester (2) are provided, characterized in that: Also includes: A partition (3) is located above the bottom plate (1) and divides the bottom plate (1) into front and rear sides. A first conductive groove (31) for conductive connection between the front and rear sides is also provided at the bottom of the partition (3); A linear track (4) is fixedly mounted on the bottom plate (1) and penetrates the guide groove (31) from front to back; A test platform (5) is used for positioning and installing the three-phase assembly (10), which is slidably arranged on a linear track (4) and is connected to a first power source (6) capable of driving it to slide forward and backward, and the test platform (5) has a manual position located in front of the partition (3) and a test position located in the rear of the partition (3); A test assembly (7) is arranged on the rear side of the partition (3), and comprises a test board (71). The test board (71) is connected to a second power source (72) capable of driving the test board (71) to move up and down. The test board (71) is also provided with a plurality of probes (73). The probes (73) are connected to the resistance tester (2) via wires. When the test platform (5) is located at the test position, the probe (73) on the test assembly (7) is aligned with the three-phase assembly (10) on the test platform (5).
2. The three-phase assembly insulation resistance test device according to claim 1, characterized in that: A plurality of positioning holes (51) for positioning and installing the three-phase assembly (10) are formed on the test platform (5).
3. The three-phase assembly insulation resistance test device according to claim 1, characterized in that: A direction indicating structure (52) for indicating the installation direction of the three-phase assembly (10) is formed on the test platform (5).
4. The three-phase assembly insulation resistance test device according to claim 1, characterized in that: The base plate (1) is also provided with an in-position detection sensor (8) for detecting whether the test platform (5) has reached a test position.
5. The three-phase assembly insulation resistance test device according to claim 1, characterized in that: The frame also includes a plurality of sealing plates (8), and a closed cavity is formed behind the partition plate (3).
