High-strength door frame of wind power generation tower drum

By setting the inner and outer edge components between the door frame of the wind power tower and the tower, and using filling concrete joints to fill the door frame, the problem of the decrease in the door frame strength caused by welding connection defects is solved, and the high strength of the door frame of the wind power tower is achieved. Improved safety.

CN221957426UActive Publication Date: 2024-11-05JIANGSU SHUOYING NEW ENERGY TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420444673.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-07
Publication Date
2024-11-05
Estimated Expiration
2034-03-07

AI Technical Summary

Technical Problem

The welding connection of existing wind power tower door frames has defects such as air holes and unwelded penetration, which leads to a decrease in the strength of the weld, making it difficult to ensure the stability and safety of the door frame.

Method used

Design a high-strength door frame for wind power towers. By setting the inner and outer edge components between the door frame and the tower, the filling concrete joints are used to enhance the connection strength, and the door frame is ensured by the combination of welding and filling concrete. A secure connection of the tower.

Benefits of technology

By filling concrete joints, the connection strength between the door frame and the tower is enhanced, cracks caused by welding defects are avoided, and the strength improvement and safety guarantee of the door frame are achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221957426U_ABST
    Figure CN221957426U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of wind power generation towers, in particular to a high-strength door frame of a wind power generation tower, which comprises a door frame arranged in a door opening, the door opening is arranged on the surface of the tower, one end of the door frame is provided with an outer edge, the other end of the door frame is provided with an inner edge component, and the surface of the outer edge is provided with a filling port; the method has the beneficial effects that the four inner edge assemblies are welded to the inner wall of the door frame, the inner edge assemblies are welded to the tower drum after being welded to the door frame, then the outer edge assemblies are welded to the tower drum, and after welding is completed, concrete is poured into a gap between the door frame and the door opening through the pouring opening; and after pouring is completed, air injection is conducted on all welding seams, so that even if cracks occur at the welding positions, the door frame can still be fixed through concrete, and the effect of reinforcing the strength of the door frame is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of wind power generation towers, in particular to a high-strength door frame of a wind power generation tower. Background Art

[0002] The wind power tower, also known as the wind turbine tower, is the key supporting structure of the wind turbine generator set. At the same time, a large number of components required for the wind turbine generator set will be installed in the tower. In order to facilitate the maintenance of the components in the tower, a door opening is generally reserved at the bottom of the wind power tower. When the wind power tower is erected, a door frame will be installed at the door opening, and a door will be installed on the door frame to facilitate maintenance personnel to enter the tower for maintenance.

[0003] In the prior art, the method of installing the door frame in the door opening reserved by the wind power tower is generally to place the door frame into the door opening and then weld the door frame, and then spray paint on the welded part for corrosion protection after welding.

[0004] However, in the prior art, the connection between the door frame and the tower is only based on welding, which may leave defects such as pores and incomplete penetration. These defects may cause cracks in the weld, thereby reducing the strength of the door frame. Utility Model Content

[0005] The utility model aims to provide a high-strength door frame for a wind power tower to solve the problems raised in the above-mentioned background technology.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a high-strength door frame for a wind power tower, comprising: a door frame, wherein the door frame is arranged in a door opening, the door opening is opened on the surface of the tower, an outer edge is arranged at one end of the door frame, an inner edge component is arranged at the other end of the door frame, and a pouring port is opened on the surface of the outer edge.

[0007] Preferably, a fixed positioning plate is fixed to the bottom end of the door frame, and the fixed positioning plate is movably inserted in the first positioning groove, and the first positioning groove is provided at the bottom end of the inner wall of the door opening.

[0008] Preferably, a movable positioning plate mounting groove is opened at the top of the door frame, a movable positioning plate is movably inserted in the movable positioning plate mounting groove, one end of the movable positioning plate extending into the movable positioning plate mounting groove is fixed with a spring, the other end of the spring is fixed to the inner wall of the groove body of the movable positioning plate mounting groove, one end of the movable positioning plate extending out of the movable positioning plate mounting groove is movably inserted in the movable positioning groove, and the movable positioning groove is opened at the top of the inner wall of the door opening.

[0009] Preferably, the inner edge components are provided in four groups.

[0010] Preferably, the outer edge and inner edge components are respectively against the inner and outer sides of the tower wall.

[0011] Preferably, the movable positioning plate and the fixed positioning plate are both rectangular block structures, and the movable positioning groove and the first positioning groove are both rectangular groove bodies.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] The high-strength door frame of a wind power tower proposed by the utility model has an inner edge component and a door frame in a separated state before the door frame is installed into the door opening. After the door frame is installed into the door opening, workers carry four groups of inner edge components into the interior of the tower, and then weld the four groups of inner edge components to the inner wall of the door frame. During welding, half of the inner edge component covers the surface of the door frame, and the other half covers the inner wall of the tower. After the inner edge component and the door frame are welded together, the inner edge component and the tower are welded together, and then the outer edge and the tower are also welded together. After welding is completed, concrete is poured into the gap between the door frame and the door opening through the pouring port. After the pouring is completed, air is sprayed on the welds at various locations. In this way, even if cracks occur at the welding positions, the door frame can still be fixed by the concrete, thereby achieving the effect of strengthening the strength of the door frame. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the structure of the utility model;

[0015] Figure 2 This is a schematic diagram of the cross-sectional structure of the utility model;

[0016] Figure 3 for Figure 2 A schematic diagram of the structure enlargement in the middle;

[0017] Figure 4 This is a schematic diagram of the inner structure of the tower.

[0018] In the figure: tower 1, door frame 2, outer edge 3, fixed positioning plate 4, first positioning groove 5, movable positioning plate mounting groove 6, spring 7, movable positioning plate 8, movable positioning groove 9, injection port 10, inner edge component 11, door opening 12. DETAILED DESCRIPTION

[0019] In order to make the purpose and technical solution of the utility model clearly and completely described, and the advantages more clearly understood, the embodiments of the utility model are further described in detail in conjunction with the accompanying drawings. It should be understood that the specific embodiments described here are part of the embodiments of the utility model, not all of the embodiments, and are only used to explain the embodiments of the utility model, and are not used to limit the embodiments of the utility model. All other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] Embodiment 1

[0021] See also Figure 1-Figure 4 The utility model provides a technical solution: a high-strength door frame of a wind power tower, comprising: a door frame 2, wherein the door frame 2 is arranged in a door opening 12, the door opening 12 is opened on the surface of the tower 1, an outer edge 3 is arranged at one end of the door frame 2, an inner edge component 11 is arranged at the other end of the door frame 2, a pouring port 10 is opened on the surface of the outer edge 3, four groups of inner edge components 11 are arranged, and the outer edge 3 and the inner edge components 11 are respectively against the inner and outer sides of the wall of the tower 1.

[0022] In actual use, before the door frame 2 is installed into the door opening 12, the inner edge component 11 and the door frame 2 are in a separated state. After the door frame 2 is installed into the door opening 12, the worker carries four groups of inner edge components 11 into the interior of the tower 1, and then welds the four groups of inner edge components 11 to the inner wall of the door frame 2. During welding, half of the inner edge component 11 covers the surface of the door frame 2, and the other half covers the inner wall of the tower 1. After the inner edge component 11 and the door frame 2 are welded together, the inner edge component 11 and the tower 1 are welded together, and then the outer edge 3 and the tower 1 are also welded together. After welding is completed, concrete is poured into the gap between the door frame 2 and the door opening 12 through the pouring port 10. After the pouring is completed, the welds are sprayed with air. In this way, even if cracks occur at the welding points, the door frame 2 can still be fixed by concrete, thereby achieving the effect of strengthening the strength of the door frame 2.

[0023] Embodiment 2

[0024] On the basis of Example 1, in order to facilitate the positioning of the door frame 2 in the door opening 12, a fixed positioning plate 4 is fixed at the bottom end of the door frame 2, and the fixed positioning plate 4 is movably inserted in the first positioning groove 5. The first positioning groove 5 is opened at the bottom end of the inner wall of the door opening 12, and a movable positioning plate mounting groove 6 is opened at the top of the door frame 2. A movable positioning plate mounting groove 6 is opened, and a movable positioning plate 8 is movably inserted in the movable positioning plate mounting groove 6. A spring 7 is fixed to one end of the movable positioning plate 8 extending into the movable positioning plate mounting groove 6, and the other end of the spring 7 is fixed to the inner wall of the movable positioning plate mounting groove 6. One end of the movable positioning plate 8 extending out of the movable positioning plate mounting groove 6 is movably inserted in the movable positioning groove 9. The movable positioning groove 9 is opened at the top end of the inner wall of the door opening 12. The movable positioning plate 8 and the fixed positioning plate 4 are both rectangular block structures, and the movable positioning groove 9 and the first positioning groove 5 are both rectangular groove bodies.

[0025] In order to prevent the door frame 2 from moving around during welding and pouring concrete, the door frame 2 needs to be positioned. When installing the door frame 2 into the door opening 12, the movable positioning plate 8 is first pressed completely into the movable positioning plate mounting groove 6, so that the spring 7 is compressed by the inner wall of the movable positioning plate mounting groove 6 and the movable positioning plate 8. Then, after the door frame 2 is placed in the door opening 12, the fixed positioning plate 4 is inserted into the first positioning groove 5, and the movable positioning plate 8 is released. When the movable positioning plate mounting groove 6 is aligned with the movable positioning groove 9, one end of the movable positioning plate 8 is pushed out of the movable positioning plate mounting groove 6 by the spring 7 and inserted into the movable positioning groove 9. Because the movable positioning plate 8 and the fixed positioning plate 4 are both rectangular block structures, and the movable positioning groove 9 and the first positioning groove 5 are both rectangular groove bodies, the door frame 2 cannot be displaced horizontally in the door opening 12, thereby achieving the effect of positioning the door frame 2 in the door opening 12.

[0026] In actual use, before the door frame 2 is installed into the door opening 12, the inner edge component 11 and the door frame 2 are in a separated state. After the door frame 2 is installed into the door opening 12, the worker carries four sets of inner edge components 11 into the interior of the tower 1, and then welds the four sets of inner edge components 11 to the inner wall of the door frame 2. During welding, half of the inner edge component 11 covers the surface of the door frame 2, and the other half covers the inner wall of the tower 1. After the inner edge component 11 and the door frame 2 are welded together, the inner edge component 11 and the tower 1 are welded together, and then the outer edge 3 and the tower 1 are also welded together. After welding is completed, concrete is poured into the gap between the door frame 2 and the door opening 12 through the pouring port 10. After the pouring is completed, the welds are sprayed with air. In this way, even if cracks occur at the welding position, the door frame 2 can still be fixed by the concrete, thereby achieving the effect of strengthening the door frame 2. In order to prevent the door frame 2 from moving around during welding and pouring concrete, the door frame 2 needs to be positioned. When installing the door frame 2 into the door opening 12, the movable positioning plate 8 is first completely pressed into the movable positioning plate mounting groove 6, so that the spring 7 is compressed by the inner wall of the movable positioning plate mounting groove 6 and the movable positioning plate 8. Then, after the door frame 2 is placed in the door opening 12, the fixed positioning plate 4 is inserted into the first positioning groove 5, and the movable positioning plate 8 is released. When the movable positioning plate mounting groove 6 is aligned with the movable positioning groove 9, one end of the movable positioning plate 8 is pushed out of the movable positioning plate mounting groove 6 by the spring 7 and inserted into the movable positioning groove 9. Because the movable positioning plate 8 and the fixed positioning plate 4 are both rectangular block structures, and the movable positioning groove 9 and the first positioning groove 5 are both rectangular groove bodies, the door frame 2 cannot be displaced horizontally in the door opening 12, thereby achieving the effect of positioning the door frame 2 in the door opening 12.

[0027] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A high-strength door frame for a wind power tower, comprising: The door frame (2) is characterized in that: the door frame (2) is arranged in a door opening (12), the door opening (12) is opened on the surface of the tower (1), one end of the door frame (2) is provided with an outer edge (3), the other end of the door frame (2) is provided with an inner edge component (11), and the surface of the outer edge (3) is provided with a pouring port (10).

2. A high-strength door frame for a wind power tower according to claim 1, characterized in that: A fixed positioning plate (4) is fixed at the bottom end of the door frame (2), and the fixed positioning plate (4) is movably inserted in a first positioning groove (5), and the first positioning groove (5) is provided at the bottom end of the inner wall of the door opening (12).

3. The high-strength door frame for a wind power tower according to claim 1, characterized in that: A movable positioning plate mounting groove (6) is provided at the top of the door frame (2), a movable positioning plate (8) is movably inserted in the movable positioning plate mounting groove (6), one end of the movable positioning plate (8) extending into the movable positioning plate mounting groove (6) is fixed with a spring (7), the other end of the spring (7) is fixed to the inner wall of the movable positioning plate mounting groove (6), one end of the movable positioning plate (8) extending out of the movable positioning plate mounting groove (6) is movably inserted in the movable positioning groove (9), and the movable positioning groove (9) is provided at the top of the inner wall of the door opening (12).

4. The high-strength door frame for a wind power tower according to claim 1, characterized in that: The inner edge components (11) are provided in four groups.

5. The high-strength door frame for a wind power tower according to claim 1, characterized in that: The outer edge (3) and the inner edge assembly (11) respectively abut against the inner and outer sides of the wall of the tower (1).

6. A high-strength door frame for a wind power tower according to claim 3, characterized in that: The movable positioning plate (8) and the fixed positioning plate (4) are both rectangular block structures, and the movable positioning groove (9) and the first positioning groove (5) are both rectangular groove bodies.