Piping treatment structure of foundation pit support
By combining water blocking and drainage technology in the foundation pit support structure, and using leakage plugging devices and drainage pipes to control the groundwater level, the problem of pipe surge during foundation pit construction is solved, and the safety and cost reduction of foundation pit construction are achieved.
Patent Information
- Application Number
- CN202420253848.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-01
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-02-01
AI Technical Summary
In foundation pit support construction, the existing technology is difficult to effectively deal with the pipe surge phenomenon, resulting in the subsidence of the foundation pit and the instability of the enclosure structure. The existing methods such as the drainage method and the water stop method have safety risks and high engineering costs.
Using a structure that combines water plugging and drainage, by setting up support piles and water stop curtains on the inner wall of the foundation pit, and laying spaced leakage plugging devices on the water stop curtains, the groundwater level is controlled by using L-shaped drainage pipes and sand filter components. Combined with grouting sealing and water collection well systems, stable groundwater discharge is achieved.
Effectively control the groundwater level of the soil layer of the foundation pit, keep the foundation pit in a waterless operating environment, reduce the project cost, improve construction safety, and avoid ground subsidence and instability of the enclosure structure.
Smart Images

Figure CN221972414U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of foundation pit support construction, and in particular to a pipe burst treatment structure for foundation pit support. Background Art
[0002] With the development of society, underground space is also being developed on a large scale, such as subways, underground parking garages and underground tunnels. Urban underground space is a huge and rich spatial resource. The amount of resources that can be developed in urban underground space is the product of the area available for development, the reasonable development depth and the appropriate utilization coefficient. If the underground space is reasonably developed, it will be of great significance to expand urban space and realize intensive urban development. When the underground space is fully utilized, a large number of foundation pit projects need to be constructed during the construction process, and foundation pit support structures need to be used for protection. The upper layer of the soil around the foundation pit support structure is relatively permeable backfill soil, silt, sand, gravel layer, pebble layer, etc. The upper layer of soil has a large permeability coefficient, high water content, and rich groundwater connections in all directions; the lower layer is relatively impermeable layers such as clay, residual soil layer and weathered rock.
[0003] With the increase in urban building density, when new high-rise and large buildings are built and expanded near existing buildings, there are more and more underground foundation operations next to existing buildings. In the construction of the above-mentioned underground foundation pit support structure, pipe bursts are prone to occur. The reason for the pipe burst is that after the foundation pit is excavated, if precipitation is not allowed outside the foundation pit, under the seepage action of a certain hydraulic gradient, there are weak parts in the local impermeable layer or the surrounding structure, and the micro-particles in the soil flow or flow out with the water, resulting in pipe bursts. The structural performance of the soil has changed, and the mechanical parameters of the soil and the original exploration parameters will also change. The designed foundation pit support structure may not necessarily guarantee the safety performance of the original foundation pit, which will eventually lead to subsidence of the ground outside the foundation pit, instability of the surrounding (support) structure, and collapse of the foundation pit project.
[0004] Dealing with pipe bursts is a difficult and dangerous operation. In the prior art, the methods for dealing with pipe bursts basically include drainage and water stopping methods. When using the drainage method to drain groundwater, it is necessary to pump out the soil around the excavated foundation pit to lower the groundwater level. However, during the process of pumping out groundwater, the underground soil structure is changed, which may cause the ground in the adjacent area to sink. If there are many buildings near the proposed area and the distance is close, this method will bring greater risks to the adjacent buildings.
[0005] When the water-stopping method is used, support piles and water-stopping curtains are set up in the construction excavation area to stop and plug water. If the groundwater is relatively abundant, the water level changes greatly, and the surrounding drainage is not smooth, the groundwater level may rise rapidly during the rainy season, and the risk of foundation pit support collapse is also high, so the cost standard of water-stopping and plugging projects has to be increased. Therefore, the existing technology has not yet provided an effective structure and method for pipe burst treatment of foundation pit support. Utility Model Content
[0006] The present application provides a pipe burst treatment structure for foundation pit support, which adopts a combination of water blocking and drainage to better control the groundwater level in the outer soil layer of the foundation pit, keep the underground foundation pit in a waterless working environment, ensure the safety of the construction process, and reduce the project cost.
[0007] The present application provides a pipe burst treatment structure for foundation pit support, comprising: a support and water blocking structure arranged in the foundation pit and a drainage structure arranged in the foundation pit;
[0008] The support and water blocking structure includes: support piles and water-stopping curtains arranged along the inner wall of the foundation pit, and the water-stopping curtain is located on the outer layer of the support piles;
[0009] The drainage structure comprises: a plurality of plugging devices arranged on the water-stop curtain at set intervals, and each of the plugging devices is installed at a piping leakage point with a large seepage volume;
[0010] The support and water blocking structure also includes grouting and blocking at multiple pipe burst leakage points between any two adjacent plugging devices; wherein,
[0011] Each of the leak-stopping devices comprises: an L-shaped drainage pipe and a fixing frame assembly for fixing the drainage pipe on the water-stop curtain; wherein,
[0012] The horizontal section of the drainage pipe passes through the water-stop curtain and the support piles and then extends to the permeable soil layer of the foundation pit, and one end of the horizontal section of the drainage pipe located in the permeable soil layer is wrapped with a sand filter assembly;
[0013] The vertical section of the drainage pipe is parallel to the outer wall of the water-stop curtain. After the vertical section of the drainage pipe drains and discharges the groundwater, the water head pressure of the groundwater in the outer soil layer of the foundation pit is kept stable.
[0014] In the present application, the water blocking effect is achieved by supporting the water blocking structure and grouting to block the pipe leakage points; the rising groundwater overflow is discharged by using a drainage pipe, which can better control the groundwater level in the outer soil layer of the foundation pit to be in a stable state. The water blocking and drainage are combined to keep the underground foundation pit in a waterless working environment, ensure the safety of the construction process, and reduce the project cost.
[0015] In a specific possible implementation scheme, the multiple leak-stopping devices arranged at set intervals on the water-stop curtain are:
[0016] Any two adjacent plugging devices are arranged on the water-stop curtain at intervals of 10m to 15m. Multiple plugging devices are arranged at intervals to ensure better drainage of groundwater.
[0017] In a specific implementation method, multiple piping leakage points between any two adjacent plugging devices are plugged by grouting with water-soluble polyurethane plugging agent or epoxy grouting consolidation material to avoid the phenomenon of piping expansion and seepage, and to discharge groundwater in a centralized manner.
[0018] In a specific possible implementation scheme, the pipe burst treatment structure of the foundation pit support further includes a drainage ditch and a water collection well;
[0019] The drainage ditches are provided with a plurality of them, and the plurality of drainage ditches are connected to the water collection well. The fine infiltration water is collected into the water collection well through the drainage ditches.
[0020] In a specific possible implementation manner, the vertical section of the drainage pipe is located directly above the drainage ditch;
[0021] The groundwater discharged by the drainage pipe overflows to the drainage ditch, and the overflowing groundwater is collected in the water collection well through the drainage ditch.
[0022] In a specific embodiment, the sand filter assembly is a geotextile wrapped around the horizontal section of the drainage pipe. The geotextile is used to filter sediment to prevent drainage blockage.
[0023] In a specific possible implementation scheme, the top of the vertical section of the drainage pipe is 1000 mm to 2500 mm higher than the plane of the bottom plate of the foundation pit; or,
[0024] The top of the vertical section of the drainage pipe is level with the groundwater level of the outer soil layer of the foundation pit. When the groundwater level is 1500mm higher than the bottom plate, the water head pressure of the groundwater is relatively large, and pipe bursts and leakage are prone to occur. The vertical section of the drainage pipe is controlled between 1000mm and 1500mm, which effectively solves the problem of increased water head pressure caused by the increase of groundwater level and inability to discharge quickly.
[0025] In a specific implementation scheme, when the top of the vertical section of the drainage pipe is level with the groundwater level of the outer soil layer of the foundation pit,
[0026] The water head pressure of the groundwater in the outer soil layer of the foundation pit does not cause pipe bursts and leakage in the foundation pit. When the groundwater level is between 1000mm and 2500mm higher than the bottom plate, the top of the vertical section of the drainage pipe can be designed to be level with the groundwater level. When the groundwater level increases, the drainage pipe overflows and discharges the groundwater, ensuring that the water head pressure of the groundwater in the outer soil layer of the foundation pit is stable.
[0027] In a specific implementation scheme, the fixing frame components are arranged at intervals along the height direction of the vertical section of the drainage pipe, and the fixing frame components arranged at intervals are fixedly connected to the water-stop curtain. The drainage pipe is fixed to ensure the stability of overflow discharge.
[0028] In a specific possible implementation scheme, the vertical section of the drainage pipe is perpendicular to the plane of the bottom plate of the foundation pit;
[0029] The horizontal section and the vertical section of the drainage tube are both hard PVC tubes with a diameter of 25 mm, 32 mm or 40 mm. The material is easy to obtain, the cost is low, and it is durable and not easy to damage. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 A schematic diagram of the structure of the pipe burst treatment structure for the foundation pit support provided in the embodiment of the present application;
[0031] Figure 2 A schematic diagram of the structure of the drainage tube provided in an embodiment of the present application;
[0032] Figure 3 A flowchart of the steps of the piping treatment method provided in an embodiment of the present application.
[0033] Figure Number:
[0034] Impermeable soil layer - 100;
[0035] Permeable soil layer - 200;
[0036] Fill layer - 300, ground surface - 310, groundwater level - 320;
[0037] Base plate - 400;
[0038] Support and water blocking structure-500, fixed frame assembly-510, pipe leakage point-520, geotextile-530, drainage ditch-540, drainage pipe-550, horizontal section-551, vertical section-552, elbow joint-553, penetration hole-554. DETAILED DESCRIPTION
[0039] In order to make the objectives, technical solutions and advantages of the present disclosure more clearly understood, the present disclosure is further described in detail below in combination with specific embodiments and with reference to the accompanying drawings.
[0040] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in one or more embodiments of this specification should be understood by people with ordinary skills in the field to which this disclosure belongs. The "first", "second" and similar words used in one or more embodiments of this specification do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word cover the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0041] In order to facilitate the understanding of the pipe burst treatment structure of the foundation pit support provided in the embodiment of the present application, its application scenario is first explained. After the foundation pit is excavated, if precipitation is not allowed outside the foundation pit, under the seepage effect of a certain hydraulic gradient, there are weak parts in the local impermeable layer or the surrounding structure, and the sand particles in the soil will flow out with the water, resulting in pipe bursts. Eventually, the ground outside the foundation pit sinks, the surrounding structure becomes unstable, and a collapse accident occurs. At present, the treatment methods for the pipe burst phenomenon generally adopt drainage methods and water-stopping methods. When the drainage method is used to drain the groundwater, the soil around the excavated foundation pit needs to be pumped and drained to lower the groundwater level. However, in the process of pumping and draining the groundwater, the underground soil structure is changed, which may cause the ground in the adjacent area to sink. If there are many buildings near the proposed area and the distance is close, this method may bring greater risks to the adjacent buildings.
[0042] When the water-stopping method is used on the foundation pit support structure, support piles and water-stopping curtains are set in the construction excavation area to stop and plug water. If the groundwater is relatively abundant and the water level changes greatly, if the surrounding drainage is not smooth, the groundwater level may rise rapidly during the rainy season, and the risk of foundation pit support collapse is also high. In addition, the water-stopping and water-plugging standards are raised, and the project cost is high. In view of this, the present application provides a pipe burst treatment structure for foundation pit support, which combines water plugging and drainage structures to better control the groundwater level in the outer soil layer of the foundation pit, keep the underground foundation pit in a waterless working environment, ensure the safety of the construction process, and reduce the project cost.
[0043] refer to Figure 1The pipe burst treatment structure of the foundation pit support provided in the embodiment of the present application adopts the combination of the water blocking structure and the drainage structure to ensure that the groundwater level 320 in the outer soil layer of the foundation pit is in a stable head state; because the groundwater level 320 is about 1500mm higher than the bottom plate 400, pipe burst leakage is prone to occur; for this reason, the pipe burst treatment structure of the foundation pit support in the present application adopts the support water blocking structure 500 to support and protect the foundation pit while ensuring the water blocking performance. The support water blocking structure 500 includes: support piles and water-stopping curtains arranged along the inner wall of the foundation pit, and the water-stopping curtain is located on the outer layer of the support piles. Support piles and water-stopping curtains are arranged on the wall of the foundation pit to form a water-blocking structure, and the drainage structure is arranged by using multiple leakage blocking devices arranged on the water-stopping curtain at set distances to ensure the dual stability of water blocking and drainage.
[0044] The outer soil layers of the foundation pit are, from bottom to top, impermeable soil layers 100 (clay, residual soil layers, weathered rocks, etc.), permeable soil layers 200 (silt, sand, gravel layers, pebbles, etc.), and fill layers 300; the top of the fill layer 300 is the ground 310. In the rainy season, due to sufficient water infiltration, the groundwater in the outer soil layers of the foundation pit surges, causing the groundwater level 320 to rise, thereby increasing the water head pressure of the groundwater, and then generating pipe burst leakage points 520. The pipe burst leakage points 520 form pipe burst leakage points 520 with larger leakage and pipe burst leakage points with smaller leakage according to the density of the soil layer structure and the density of the concrete structure. Each plugging device is installed on a pipe burst leakage point 520 with a larger seepage amount, and multiple pipe burst leakage points with smaller seepage amounts between any two adjacent plugging devices are plugged.
[0045] It can be seen that the plugging device can be used to efficiently discharge groundwater at the pipe burst leakage point 520 with a large leakage volume, and multiple pipe burst leakage points with a small leakage volume can be sealed by grouting to prevent the leakage points from expanding. Specifically, the multiple plugging devices arranged on the water-stop curtain at a set distance are: any two adjacent plugging devices are arranged on the water-stop curtain with an interval of 10m to 15m. By arranging multiple plugging devices at intervals, better drainage of groundwater is guaranteed. Multiple pipe burst leakage points with a small leakage volume between any two adjacent plugging devices are grouting-sealed with a water-soluble polyurethane plugging agent or an epoxy grouting consolidation material. By applying the plugging agent to seal, the phenomenon of pipe burst expansion and seepage is avoided, and the groundwater is discharged in a centralized manner.
[0046] Combination Figure 1 and Figure 2 As shown in the figure, after completing a good water blocking structure, the drainage structure is used to ensure that the groundwater in the outer soil layer of the foundation pit is drained and discharged when the groundwater increases in the rainy season, so that its head pressure is in a stable state.
[0047] Each plugging device is higher than the plane of the bottom plate 400, and a drainage ditch 540 is provided on the bottom plate 400 for draining fine seepage water; the pipe burst treatment structure of the foundation pit support also includes a water collection well; a plurality of drainage ditches 540 are provided, and the plurality of drainage ditches 540 are connected to the water collection well. Fine seepage water is collected and collected in the water collection well through the drainage ditch 540.
[0048] Each plugging device includes: an L-shaped drainage pipe 550, and a fixing frame assembly 510 for fixing the drainage pipe 550 on the water-stop curtain; wherein, the L-shaped drainage pipe 550 is arranged at intervals of 10 to 15 m, and at the junction between the supporting piles, or at the water-stop curtain formed by mixing plain cement slurry and soil between the supporting piles, a larger pipe leakage point 520 is selected, and mechanical holes are drilled with a drilling thickness controlled at 200 mm to 350 mm, and a horizontal section 551 of the hard drainage pipe 550 is inserted, and the horizontal section 551 of the drainage pipe 550 is sealed with quick-hardening cement.
[0049] The fixing frame assembly 510 is used to fix the drainage pipe 550 on the outer wall of the water-stop curtain to ensure the stability of overflow drainage. The fixing frame assembly 510 is fixedly connected to the water-stop curtain through an expansion bolt, and the fixing frame assembly 510 is provided with a plurality of mounting rings for fixing the drainage pipe 550, so as to ensure that the vertical section 552 of the drainage pipe 550 is parallel to the water-stop curtain, and the vertical section 552 of the drainage pipe 550 is perpendicular to the bottom plate 400.
[0050] Specifically, the horizontal section 551 of the drainage pipe 550 passes through the support piles and the water-stop curtain and extends to the permeable soil layer 200 of the foundation pit. The horizontal section 551 of the drainage pipe 550 is located at one end of the permeable soil layer 200 and is wrapped with a sand filter assembly; the sand filter assembly is a geotextile 530 wrapped on the horizontal section 551 of the drainage pipe 550. The geotextile 530 is used to filter sediment to prevent drainage blockage.
[0051] The vertical section 552 of the drainage pipe 550 is parallel to the outer wall of the water-stop curtain. The vertical section 552 of the drainage pipe 550 drains and discharges the groundwater to maintain a stable head pressure of the groundwater in the outer soil layer of the foundation pit.
[0052] When preparing and installing the drainage pipe 550, by locating the pipe burst leakage point 520 with a large leakage, the horizontal section 551 of the drainage pipe 550 is extended to the permeable soil layer 200 through the support pile and the water-stop curtain through mechanical drilling, and the horizontal section 551 of the drainage pipe 550 is exposed inside the foundation pit to achieve connection with the vertical section 552 of the drainage pipe 550. The outer soil layer of the foundation pit remains in its original state, and the groundwater and the original soil layer structure are not changed. In this application, the horizontal section 551 and the vertical section 552 of the drainage pipe 550 are both: hard PVC pipes with a diameter of 25mm, 32mm or 40mm. It is convenient to obtain materials, low cost, durable and not easy to damage. In addition, in order to achieve convenience and accuracy of installation, the horizontal section 551 and the vertical section 552 of the drainage pipe 550 are connected by two separate PVC pipes through an elbow joint 553, thereby achieving convenience of installation and ensuring high stability.
[0053] At the same time, in order to increase the high efficiency of drainage, a plurality of penetration holes 554 can be opened around the horizontal section 551 of the drainage pipe 550, and the penetration holes 554 are wrapped by the geotextile 530 to ensure sufficient entry of groundwater.
[0054] The vertical section 552 of the drainage pipe 550 is located directly above the drainage ditch 540; the groundwater discharged by the drainage pipe 550 overflows into the drainage ditch 540. The overflowing groundwater is collected into the water collection well through the drainage ditch 540.
[0055] When adjusting the drainage discharge height in the specific steps, the top of the vertical section 552 of the drainage pipe 550 is 1000mm to 2500mm higher than the plane of the bottom plate 400; or, the top of the vertical section 552 of the drainage pipe 550 is level with the groundwater level 320 of the outer soil layer of the foundation pit. When the groundwater level 320 is 1500mm higher than the bottom plate 400, the water head pressure of the groundwater is relatively large, and it is easy to cause pipe bursts and leakage. The vertical section 552 of the drainage pipe 550 is controlled between 1000mm and 1500mm, which effectively solves the problem of increased water head pressure caused by the increase of the groundwater level 320 and the inability to discharge quickly. When the top of the vertical section 552 of the drainage pipe 550 is level with the groundwater level 320 of the outer soil layer of the foundation pit, the water head pressure of the groundwater in the outer soil layer of the foundation pit will not cause pipe bursts and leakage in the foundation pit. When the groundwater level 320 is higher than the bottom plate 400 and is between 1000 mm and 2500 mm, the top of the vertical section 552 of the drainage pipe 550 can be designed to be level with the groundwater level 320. When the groundwater level 320 increases, under the action of the water pressure of the groundwater, the drainage pipe 550 overflows and discharges the groundwater, thereby ensuring that the head pressure of the groundwater in the outer soil layer of the foundation pit is stable.
[0056] In a specific embodiment of the present application, the foundation pit is adjacent to the main urban roads to the north and west, and to the mountain to the east. The foundation pit support system consists of a cap beam, support piles, and a water-stop curtain between the piles. During construction, in order to reduce the amount of seepage in the side walls of the foundation pit and reduce the groundwater flow between construction foundations, a drainage pipe 550 is inserted into the side walls of the foundation pit, and then sealed, and the height of the drainage pipe 550 is raised to discharge the seepage water in the side walls of the foundation pit and keep the groundwater level around the foundation pit from changing significantly. During construction, vehicles can pass normally on the main urban roads adjacent to the north and west of the foundation pit, no large cracks occur on the adjacent ground, and there is no large flow of underground seepage water in the foundation pit, so the construction is safe and economical.
[0057] It can be seen that the application can achieve water stopping of the side wall of the foundation pit and maintain a dry construction environment in the underground part. At the same time, the groundwater level 320 of the soil around the foundation pit is kept in a safe range, and the soil structure performance does not change significantly. In addition, a drainage ditch 540 is set around the inner side of the foundation pit for drainage, the pipe 550 is provided with a fixed frame assembly 510 for stable drainage, and the end of the drainage pipe 550 is punched with a permeable hole 554 and wrapped with a geotextile 530 water filter device, which can achieve an ideal drainage effect.
[0058] In the present application, the water blocking effect is achieved by supporting the water blocking structure and grouting to block the pipe leakage points; the rising groundwater overflow is discharged by using a drainage pipe, and the drainage structure can better control the groundwater level in the outer soil layer of the foundation pit, and control the water level to be in a stable state, thereby realizing the combination of water blocking and drainage, keeping the underground foundation pit in a waterless working environment, ensuring the safety of the construction process, and reducing the project cost.
[0059] refer to Figure 3 As shown in , the pipe burst treatment method in the present application comprises the following steps:
[0060] S1. A support and water blocking structure is set up on the side wall of the foundation pit; under the support and water blocking function, a dry construction environment is maintained in the underground area.
[0061] S2. Select larger piping leakage points at intervals of 10m to 15m and mechanically drill holes, and grout the smaller piping leakage points in between; drain the groundwater from the larger piping leakage points through drainage pipes.
[0062] S3, the horizontal section of the drainage pipe is perforated circumferentially and then wrapped with geotextile, and inserted into the permeable soil layer along the mechanical holes; a hard PVC pipe is used as the drainage pipe, and the geotextile is filtered to avoid bringing out sediment.
[0063] S4. Use quick-hardening cement to seal the horizontal section of the drainage pipe and perform water blocking operations.
[0064] S5. Use a fixing frame assembly to fix the vertical section of the drainage pipe. The vertical section of the drainage pipe is 1000mm to 2500mm higher than the plane of the bottom plate; or, the vertical section of the drainage pipe is level with the groundwater level of the outer soil layer of the foundation pit. Keep the groundwater level of the soil around the foundation pit within a safe range, and the soil structure performance will not change significantly.
[0065] Through the above methods, the groundwater level in the outer soil layer of the foundation pit can be better controlled to be in a stable state, realizing the drainage structure; combining water blocking and drainage to keep the underground foundation pit in a waterless working environment, ensuring the safety of the construction process and reducing the project cost.
[0066] Those skilled in the art should understand that the discussion of any of the above embodiments is merely illustrative and is not intended to imply that the scope of the present disclosure (including the claims) is limited to these examples. Based on the concept of the present disclosure, the technical features in the above embodiments or different embodiments may be combined, the steps may be implemented in any order, and there are many other variations of different aspects of one or more embodiments of the present specification as above, which are not provided in detail for the sake of simplicity.
[0067] In addition, to simplify the description and discussion, and in order not to obscure one or more embodiments of the present specification, known power / ground connections of other components may or may not be shown in the provided figures. In addition, the device may be shown in the form of a block diagram so as to avoid obscuring one or more embodiments of the present specification, and this also takes into account the fact that the details of the implementation of these block diagram devices are highly dependent on the platform on which one or more embodiments of the present specification are to be implemented (i.e., these details should be fully within the scope of understanding of those skilled in the art). Where specific details are set forth to describe exemplary embodiments of the present disclosure, it is apparent to those skilled in the art that one or more embodiments of the present specification may be implemented without these specific details or with variations in these specific details. Therefore, these descriptions should be considered illustrative rather than restrictive.
[0068] One or more embodiments of this specification are intended to cover all such substitutions, modifications and variations that fall within the broad scope of the appended claims. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of one or more embodiments of this specification should be included in the scope of protection of this disclosure.
Claims
1. A pipe burst treatment structure for foundation pit support, comprising a support and water blocking structure arranged in the foundation pit and a drainage structure arranged in the foundation pit; It is characterized in that The support and water blocking structure includes: support piles and water-stopping curtains arranged along the inner wall of the foundation pit, and the water-stopping curtain is located on the outer layer of the support piles; The drainage structure comprises: a plurality of plugging devices arranged on the water-stop curtain at set intervals, and each of the plugging devices is installed at a piping leakage point with a large seepage volume; The support and water blocking structure also includes grouting and blocking at multiple pipe burst leakage points between any two adjacent plugging devices; wherein, Each of the leak-stopping devices comprises: an L-shaped drainage pipe and a fixing frame assembly for fixing the drainage pipe on the water-stop curtain; wherein, The horizontal section of the drainage pipe passes through the water-stop curtain and the support piles and then extends to the permeable soil layer of the foundation pit, and one end of the horizontal section of the drainage pipe located in the permeable soil layer is wrapped with a sand filter assembly; The vertical section of the drainage pipe is parallel to the outer wall of the water-stop curtain. After the vertical section of the drainage pipe drains and discharges the groundwater, the water head pressure of the groundwater in the outer soil layer of the foundation pit is kept stable.
2. The pipe burst treatment structure for foundation pit support according to claim 1, It is characterized in that When multiple leak-proof devices are arranged on the water-stop curtain at set intervals, Any two adjacent leak-stopping devices are arranged on the water-stopping curtain at an interval of 10m to 15m.
3. The pipe burst treatment structure for foundation pit support according to claim 1, It is characterized in that The piping leakage point between any two adjacent plugging devices is plugged by grouting with a water-soluble polyurethane plugging agent or an epoxy grouting consolidation material.
4. The pipe burst treatment structure for foundation pit support according to claim 1, It is characterized in that The pipe burst treatment structure of the foundation pit support also includes a drainage ditch and a water collection well; A plurality of drainage ditches are provided, and the plurality of drainage ditches converge and are connected to the water collection well.
5. The pipe burst treatment structure for foundation pit support according to claim 4, It is characterized in that The vertical section of the drainage pipe is located directly above the drainage ditch; The groundwater drained by the drainage pipe overflows into the drainage ditch.
6. The pipe burst treatment structure for foundation pit support according to claim 1, It is characterized in that The sand filter assembly is a geotextile wrapped around the horizontal section of the drainage pipe.
7. The pipe burst treatment structure for foundation pit support according to claim 6, It is characterized in that The top of the vertical section of the drainage pipe is 1000 mm to 2500 mm higher than the plane of the bottom plate of the foundation pit; or, The top of the vertical section of the drainage pipe is flush with the water level of the groundwater in the outer soil layer of the foundation pit.
8. The pipe burst treatment structure for foundation pit support according to claim 7, It is characterized in that When the top of the vertical section of the drainage pipe is level with the groundwater level of the outer soil layer of the foundation pit, The water head pressure of the groundwater in the outer soil layer of the foundation pit does not cause pipe gushing or leakage in the foundation pit.
9. The pipe burst treatment structure for foundation pit support according to claim 1, It is characterized in that The fixing frame assemblies are arranged at intervals along the height direction of the vertical section of the drainage pipe, and the fixing frame assemblies arranged at intervals are fixedly connected to the water-stop curtain.
10. The pipe burst treatment structure for foundation pit support according to claim 1, It is characterized in that The vertical section of the drainage pipe is perpendicular to the plane of the bottom plate of the foundation pit; The horizontal section and the vertical section of the drainage tube are both hard PVC tubes with a diameter of 25 mm, 32 mm or 40 mm.