Climbing frame lifting device

By setting cross beams and attachment components on the climbing frame, connecting them to the top surface of the floor slab, shortening the cantilever height of the climbing frame, the problem of cantilever height limitation in the existing technology is solved, and the applicability and stability of the climbing frame in high-rise buildings is achieved. .

CN221972964UActive Publication Date: 2024-11-08CREGC ARCHITECTURAL & CONSTR ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420548081.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-20
Publication Date
2024-11-08
Estimated Expiration
2034-03-20

AI Technical Summary

Technical Problem

The existing climbing frame cantilever height cannot exceed 6m, making it difficult to be suitable for buildings with floor heights greater than 6m.

Method used

A climbing frame lifting device is designed. By setting cross beams in the width direction of the climbing frame and setting attachment parts along the length direction of the beam, the attachment parts are connected to the top surface of the floor slab and the climbing frame to shorten the cantilever height of the climbing frame, which is suitable for Buildings with higher floor heights. The attachment parts include columns, oblique braces and H-type connectors, which are connected by I-steel members and steel plates to improve the stability and bending resistance of the structure.

Benefits of technology

The cantilever height reduction of the climbing frame is achieved, making it suitable for buildings with higher floor heights, solving the problem of cantilever height limitation in the prior art, and improving the applicability and safety of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972964U_ABST
    Figure CN221972964U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of house building auxiliary devices, in particular to a climbing frame lifting device. A climbing frame lifting device comprises a cross beam arranged in the width direction of a climbing frame, the cross beam is connected with a plurality of attachment parts, the attachment parts are arranged at intervals in the length direction of the cross beam, the bottoms of the attachment parts are connected to the top face of a floor, and the attachment parts can be connected to the climbing frame. The cross beam is arranged and connected to the multiple attachment parts, one ends of the attachment parts are connected to the cross beam, the other ends of the attachment parts are connected to the top face of the built topmost floor slab, all the attachment parts can be connected to the climbing frame, lifting attachment is provided for the climbing frame, and therefore the cantilever length of the climbing frame can be reduced; therefore, the climbing frame can be suitable for buildings with higher floor height, and the problems that the height of a cantilever of an existing climbing frame cannot exceed the specified height and the existing climbing frame is difficult to be suitable for buildings with floor height larger than the specified height in the prior art are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction auxiliary devices, in particular to a climbing frame lifting device. Background Art

[0002] Climbing frame is a modern construction equipment, mainly used in high-rise and super high-rise construction projects, replacing the traditional scaffolding system. It can rise or fall layer by layer according to the construction progress of the building, providing a safe and convenient working platform for construction workers.

[0003] During the construction process, the climbing frame is attached to the periphery of the main structure of the building to provide protection. However, existing technical regulations stipulate that the cantilever height of the climbing frame cannot exceed 6m, so the climbing frame is difficult to apply to buildings with floor heights greater than 6m. Utility Model Content

[0004] The utility model aims to solve the problem in the prior art that the cantilever height of the existing climbing frame cannot exceed the specified height and is difficult to be applied to buildings with floor heights greater than the specified height, and provides a climbing frame lifting device.

[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0006] A climbing frame lifting device comprises a crossbeam arranged along the width direction of the climbing frame, the crossbeam is connected to a plurality of attachment components, the plurality of attachment components are arranged at intervals along the length direction of the crossbeam, the bottom of the attachment component is connected to the top surface of the floor slab, and the top of the attachment component can be connected to the climbing frame.

[0007] The length direction of the beam is parallel to the plane where the floor slab is located. The floor slab is the highest floor slab built under construction. The attachment component is arranged on the top surface of the highest floor that has been built, and the height at which the attachment component is connected to the climbing frame is higher than the height of the floor. The attachment component can be connected to the climbing frame, and the attachment component is arranged on the top surface of the floor slab, and the attachment component is used to connect the climbing frame. When the attachment component is connected to the climbing frame, the distance from the predetermined position of the upper floor slab to be built to the connection point of the climbing frame is shortened, and the cantilever height of the climbing frame can be shortened, so that the climbing frame can be suitable for buildings with higher floor heights.

[0008] As a preferred embodiment of the present invention, the attachment component includes a column and a diagonal brace, the two ends of the column are respectively connected to the cross beam and the top surface of the floor slab, the two ends of the diagonal brace are respectively connected to the top of the column and the top surface of the floor slab, and the length direction of the column is perpendicular to the length direction of the cross beam.

[0009] The columns are perpendicular to the beams and can support the beams, while the diagonal braces can reinforce them.

[0010] As a preferred solution of the utility model, an H-shaped connector is provided at the top of the attachment component, the two grooves of the H-shaped connector are respectively connected to the top of the column and the crossbeam, the outer side wall of the H-shaped connector is connected to the diagonal brace, and the bolts pass through the wing plate of the H-shaped connector and the through hole of the crossbeam to be connected to the climbing frame.

[0011] The wing plates of the H-type connector are two parallel plates. By connecting the attachment component and the crossbeam through the H-type connector, the upper and lower positions of the attachment component and the crossbeam can be aligned, which is beneficial to improving the stability of the structure.

[0012] As a preferred embodiment of the present invention, the columns and the diagonal braces are both I-beam components, both ends of the diagonal braces are connected to the H-shaped connector and the top surface of the floor slab via steel plates, the bottom surface of the columns is connected to the top surface of the floor slab via steel plates, and the steel plates are provided with through holes for fixing.

[0013] The columns and diagonal braces are both I-beam components with good bending resistance, which is conducive to improving the stability of the structure. The two ends of the diagonal brace are connected by a steel plate, and the steel plate has a through hole reserved for fixing the diagonal brace, which is conducive to improving the stability of the structure.

[0014] As a preferred solution of the utility model, the floor slab is provided with a sleeve, and the sleeve is arranged corresponding to the through hole reserved in the steel plate.

[0015] The top surface of the floor slab is provided with sleeves corresponding to the through holes, which is convenient for determining the positions of the diagonal braces and the columns, and is also convenient for fixing the columns and the diagonal braces to the top surface of the floor slab.

[0016] As a preferred solution of the utility model, it also includes an anti-overturning plate, which is connected to the side wall of the wing plate of the H-shaped connector, and one side of the anti-overturning plate abuts against the cross beam.

[0017] The anti-overturning plate is connected to the side wall of the wing plate of the H-type connector, and one side of the anti-overturning plate is in contact with the crossbeam, so the plane where the anti-overturning plate is located coincides with the plane where the wing plate of the H-type connector is located. Anti-overturning plates are arranged around the H-type connector to increase the stiffness of the crossbeam force point at the attachment point of the climbing frame, increase the anti-deformation ability, and facilitate the characterization of the overall structural problem.

[0018] As a preferred solution of the utility model, it also includes a heightening member, and the heightening member is arranged between the H-shaped connecting member and the climbing frame.

[0019] Because the climbing frame needs to be connected to a fixed position to be used as an attachment for the climbing frame to be lifted. Therefore, when the connection position is at a certain distance from the H-shaped steel plate, it can be connected through a heightening piece to ensure that the climbing frame is effectively attached and firmly attached, forming a reliable lifting force transmission support, which is beneficial to the integrity and stability of the lifting structure.

[0020] As a preferred solution of the utility model, when the column includes at least two I-beams with overlapping axes, two adjacent I-beams are connected by steel pipe fasteners, and wooden wedge components are filled between the steel pipe fasteners and the I-beams.

[0021] By connecting two adjacent I-beams with fasteners, the axes of the upper and lower I-beams can be kept as close as possible; and a wooden wedge component is provided between the steel pipe fastener and the I-beam, which can keep the steel pipe fastener and the I-beam as close as possible, thereby improving the stability of the structure.

[0022] As a preferred solution of the utility model, one of the cross beams comprises two channel steels, the openings of the two channel steels are opposite to each other, and a stiffening pad is arranged between the two channel steels.

[0023] The openings of the two channel steels face opposite directions, and the backs of the two channel steels are connected by stiffening pads arranged at intervals. By setting the channel steel as a crossbeam, the bending resistance of the crossbeam can be improved, which is conducive to improving the stability of the structure.

[0024] In summary, due to the adoption of the above technical solution, the beneficial effects of the utility model are:

[0025] A climbing frame lifting device is provided, which is provided with a cross beam, and the cross beam is connected to a plurality of attachment components, one end of the attachment component is connected to the cross beam, and the other end is connected to the top surface of the topmost floor slab that has been built, and the attachment components can be connected to the climbing frame to provide lifting attachment for the climbing frame, thereby being able to reduce the cantilever length of the climbing frame, so that the climbing frame can be suitable for buildings with higher floor heights, solving the problem in the prior art that the cantilever height of the existing climbing frame cannot exceed 6m and is difficult to be used in buildings with floor heights greater than 6m. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 is a structural schematic diagram of a climbing frame lifting device in Example 1;

[0027] Figure 2 yes Figure 1 The enlarged view of point A in the middle;

[0028] Figure 3 is a schematic diagram of diagonal braces connecting floor slabs in Example 1;

[0029] Figure 4 is a schematic diagram of a column connected to a floor slab in Example 1;

[0030] Figure 5 is a front view of the crossbeam in Example 1;

[0031] Figure 6 is a side view of the crossbeam in Example 1;

[0032] Figure 7 is a schematic diagram of the position of the anti-overturning plate in Example 1;

[0033] Figure 8 It is a connection diagram of the climbing frame lifting device and the climbing frame machine position in Example 1.

[0034] Icons: 1-column, 2-diagonal brace, 3-crossbeam, 301-channel steel, 302-stiffening pad, 4-sleeve, 5-climbing frame position, 6-heightening piece, 7-steel pipe fastener, 8-floor slab, 9-H-type connector, 10-anti-overturning plate. DETAILED DESCRIPTION

[0035] The utility model is described in detail below in conjunction with the accompanying drawings.

[0036] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0037] Example 1

[0038] like Figure 1 As shown, a climbing frame lifting device includes a cross beam 3 arranged along the width direction of the climbing frame, and the cross beam 3 is connected to a plurality of attachment components, and the plurality of attachment components are arranged at intervals along the length direction of the cross beam 3, and the bottom of the attachment component is connected to the top surface of the floor 8, and the attachment component can be connected to the climbing frame.

[0039] like Figure 1 As shown, the attachment component includes a column 1 and a diagonal brace 2. The two ends of the column 1 are respectively connected to the cross beam 3 and the top surface of the floor 8. The two ends of the diagonal brace 2 are respectively connected to the top of the column 1 and the top surface of the floor 8. The length direction of the column 1 is perpendicular to the length direction of the cross beam 3. The column 1 is made of 16# I-beam. The end of the bottom of the column 1 connected to the floor 8 is welded with a 400×300×10mm steel plate, and three elliptical holes are opened on the steel plate, as shown in FIG. Figure 4 As shown, an H-shaped connector 9 is welded on the top of the column 1, and the column 1 is connected to the steel brace 2 and the steel beam 3 through the H-shaped connector 9. Figure 1-2 The diagonal brace 2 is made of 16# I-beam, and the end of the diagonal brace 2 connected to the floor 8 is welded with a 400×300×10mm steel plate, and three elliptical holes are opened on the steel plate, as shown in FIG. Figure 3 As shown; a section of 400×500×10mm steel plate is welded to the top and connected to the H-shaped connector 9, and 4 round holes are opened on the steel plate. Figure 2As shown, the two grooves of the H-shaped connector 9 are respectively connected to the top of the column 1 and the crossbeam 3, the outer wall of the H-shaped connector 9 is connected to the diagonal brace 2, and the bolts pass through the wing plate of the H-shaped connector 9 and the gap between the two channel steels 301 to connect to the climbing frame.

[0040] The columns 1 and the diagonal braces 2 are both I-beam components, and both ends of the diagonal braces 2 are connected to the H-shaped connector 9 and the top surface of the floor slab 8 through steel plates. Figure 4 As shown, the bottom surface of the column 1 is connected to the top surface of the floor 8 through a steel plate, and the steel plates are all reserved with through holes for fixing. The H-shaped connector 9 uses two 400×600×20mm steel plates, and the two steel plates are reserved with elliptical holes for connecting the climbing frame hanging points, and 4 round holes are reserved for connecting the steel diagonal brace 2, and the upper end of the diagonal brace is welded with a 500×180×20mm steel plate. The floor is provided with a sleeve 4, and the sleeve 4 is set corresponding to the reserved through hole of the steel plate. The sleeves 4 of the column 1 and the diagonal brace 2 are both connected to the 400×300×10mm steel plate, and three positive wire sleeves are connected to one side of each steel plate. The column 1 is also provided with a sleeve 4, and the sleeve 4 of the column 1 is set on the 400×400×10mm steel plate, and 6 300mm long C25 short bars are welded on one side of the steel plate.

[0041] like Figure 7 As shown, it also includes an anti-overturning plate 10, which is connected to the side wall of the wing plate of the H-shaped connector 9, and one side of the anti-overturning plate 10 abuts against the crossbeam 3. In this embodiment, the anti-overturning plate 10 is 500x600x20mm, and an elliptical hole is reserved for connecting the climbing frame position. It is made by welding 6 180mm long C25 short steel bars between the steel plates.

[0042] like Figure 8 As shown, it also includes a heightening member 6, which is arranged between the H-shaped connecting member 9 and the climbing frame.

[0043] like Figure 1 As shown, when the column 1 includes at least two I-beams with overlapping axes, two adjacent I-beams are connected by a steel pipe fastener 7, and a wooden wedge component is filled between the steel pipe fastener 7 and the I-beam.

[0044] Figure 5-Figure 6 As shown, one cross beam 3 comprises two 16# channel steels 301, the openings of the two channel steels 301 are opposite to each other, and a stiffening pad 302 is arranged between the two channel steels 301. The size of the stiffening pad 302 is 160×10×40 mm, and the distance between two adjacent stiffening pads 302 is 1 m.

[0045] When designing the structure of the climbing frame lifting device, MIDAS modeling is used to perform structural verification to ensure that the specifications, strength, and structural layout of the steel components meet the requirements of safe construction and are reliable in force.

[0046] When installing the climbing frame lifting device, follow the steps below:

[0047] S1. Positioning and installation of embedded parts of column 1 and embedded parts of diagonal brace 2:

[0048] According to the detailed drawings, the embedded parts of column 1 and brace 2 are positioned and installed. The embedded parts are precisely positioned and fixed firmly. The embedded parts of brace 2 are isolated with φ35PVC sleeves. The embedded parts can be used in a cyclic manner in the later stage. The plate reinforcement is located above the embedded plate. The embedded parts of column 1 are located above the inner and outer extension plate reinforcement of the beam body as positioning support. The outer extension reinforcement of the structural plate is extended to the outer side of the beam and tied with the beam stirrups or waist reinforcement. The embedded sleeve is fixed to the beam reinforcement by spot welding. The embedded sleeves are sealed with tape to prevent concrete from entering the sleeves.

[0049] S2. Concrete pouring of the same-layer structural slab and vertical structural reinforcement construction

[0050] After the number and position of embedded parts of column 1 and brace 2 are verified to be correct, a concealed acceptance inspection is organized and the bottom slab concrete is poured. On-site technicians will stand by during the pouring process to correct the deviation. When pouring concrete near embedded parts, the pouring speed should be slowed down to reduce the impact on embedded parts, and vibration control should be strengthened at the embedded parts to prevent contact disturbance. After the bottom slab concrete is poured, the vertical structural reinforcement of the 1 / 2 super-high-rise high and low sections will be constructed.

[0051] S3, Positioning and installation of embedded parts of beam 3

[0052] According to the detailed drawing, after the reinforcement of the vertical components of the 1 / 2 super-high-rise section is constructed to form a skeleton, the embedded parts of the beam 3 are positioned and buried. In order to prevent the vertical components from being disturbed by mold closing and correction, and to ensure that the disturbance can be eliminated within a controllable range, the welding method of the embedded plate and the beam 3 is preferred in the later stage (if the on-site installation error is easy to control, bolt connection can be used to ensure that the center of the steel column and the center of the embedded plates on both sides of the beam are in a straight line), and the embedded parts are reinforced.

[0053] S4, 1 / 2 super high-rise vertical components concrete pouring

[0054] Carry out the reinforcement of the vertical wall column formwork in the lower half of the super-high-rise building, and after the concealed inspection (focusing on the positioning and fixing of embedded parts) is accepted, pour concrete. The pouring height should be 500mm higher than 1 / 2 of the super-high-rise building to ensure that the crossbeam support of the steel truss conversion device has a certain force guarantee. When pouring concrete near the embedded parts, the pouring speed should be slowed down to reduce the impact on the embedded parts. Avoid the vibrator touching the embedded parts during pouring to prevent the embedded parts from shifting. The embedded parts are wrapped with film or tape to effectively isolate them.

[0055] S5. Install column 1 and diagonal brace 2

[0056] When installing column 1, use M30 high-strength screws with "double nuts + heightening parts" to connect the column 1 connector with the embedded parts. The middle part of the adjacent frame column is connected to column 1 with a steel pipe to improve the overall anti-deformation ability and reduce vertical deflection.

[0057] When installing the diagonal brace 2, connect the diagonal brace 2 connector with the bottom plate diagonal brace 2 embedded parts and H-type connector 9. The connection method uses M30 high-strength screws with "double nuts + heightening parts". During construction, first hoist the diagonal brace 2 to the corresponding position, align the reserved hole of the top connector of the diagonal brace 2 with the connection hole of the H-type connector 9 above the column 1, insert the high-strength screw into the alignment connection hole, screw in a nut at each end of the screw (do not tighten it yet), then adjust the reserved hole of the bottom connector, align it with the hole of the bottom plate embedded part sleeve, screw in the high-strength screw and tighten the double nuts, add the remaining nuts on each side of the top connection screw of the H-type connector 9, tighten the connection to complete.

[0058] S6. Install beam 3 and weld stiffening pad 302

[0059] Place the beam 3 in the connection groove of the H-type connector 9, and fill the gap between the beam 3 and the H-type connector 9 with wooden wedges, and insert the wooden wedges evenly on the left and right to prevent eccentricity. The exposed steel plates of the two ends and the vertical structure embedded parts are welded symmetrically at the same time, and the welds are uniform and full (bolt connection can be adopted, and long strip bolt holes are opened on the connection plate to eliminate disturbance errors). The flaw detection should meet the requirements; a stiffening connection plate is welded on the left side of each H-type connector 9 to increase the stiffness of the stress point of the beam 3 at the machine attachment point and increase the deformation resistance. After the construction is completed, the climbing frame machine support and hanging point are fixed to the beam 3 with M30 high-strength screws equipped with "double nuts + connection heightening parts". The climbing frame machine support and guide rail are attached to the steel beam through the stiffening plate connecting elliptical holes, and the hanging point is attached to the steel beam through the H-type connector 9 connector.

[0060] S7. Inspection and acceptance of truss conversion device

[0061] After the steel truss support conversion device is installed, its bolt connection parts and welding positions are fully inspected, the relevant installation dimensions and deviations are reviewed, and corrections are made.

[0062] S8, installation of the support and suspension point foundation conditions for the climbing frame

[0063] After the steel truss lifting conversion device has been inspected and accepted, the climbing frame machine position attachment is installed and the hanging point wire rope is set. If the beam 3 is far away from the outer edge of the vertical structure or the front and rear positions of the vertical structure in the same span are inconsistent, the climbing frame heightening parts are installed to play the role of attachment connection transition and heightening parts.

[0064] S9. Acceptance before climbing frame lifting

[0065] After the installation of the climbing frame foundation conditions is completed, an acceptance inspection is carried out before lifting. Only after the inspection and acceptance is qualified can the next construction process be started. The focus is on checking the main contents such as the concrete strength of the connection between the supporting structure and the engineering structure, lifting equipment, anti-fall and anti-tilt devices, clearance of building obstacles, load monitoring system, and the presence of on-site operation command personnel.

[0066] S10. Raise the climbing frame to the protective height of the working layer

[0067] After the steel truss conversion device installation acceptance and climbing frame lifting acceptance are qualified, the climbing frame is lifted to a protective height of no less than 1.5m at the working level to provide building facade protection for the construction of the 1 / 2 super-high-rise upper section.

[0068] S11, 1 / 2 super high-rise upper section construction

[0069] After lifting the climbing frame to the upper half height, the super-high-rise upper section structure construction is carried out to ensure that the cantilever on the climbing frame does not exceed 6m and meet the requirements of work protection and climbing frame construction specification acceptance.

[0070] S12. Restoration of the normal structural attachment and lifting construction procedures of the climbing frame

[0071] According to the construction progress of the process operation, resume the normal lifting procedure of the climbing frame.

[0072] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A climbing frame lifting device, characterized in that: It comprises a crossbeam (3) arranged along the width direction of the climbing frame, the crossbeam (3) is connected to a plurality of attachment components, the plurality of attachment components are arranged at intervals along the length direction of the crossbeam (3), the bottom of the attachment component is connected to the top surface of the floor slab (8), and the attachment component can be connected to the climbing frame.

2. A climbing frame lifting device according to claim 1, characterized in that: The attachment component comprises a column (1) and a diagonal brace (2), the two ends of the column (1) are respectively connected to the cross beam (3) and the top surface of the floor slab (8), the two ends of the diagonal brace (2) are respectively connected to the top of the column (1) and the top surface of the floor slab (8), and the length direction of the column (1) is perpendicular to the length direction of the cross beam (3).

3. A climbing frame lifting device according to claim 2, characterized in that: An H-shaped connector (9) is provided at the top of the attachment component, and the two grooves of the H-shaped connector (9) are respectively connected to the top of the column (1) and the crossbeam (3), and the outer wall of the H-shaped connector (9) is connected to the diagonal brace (2), and the bolts pass through the wing plate of the H-shaped connector (9) and the through hole of the crossbeam to connect to the climbing frame.

4. A climbing frame lifting device according to claim 3, characterized in that: The columns (1) and the diagonal braces (2) are both I-beam components, both ends of the diagonal braces (2) are connected to the H-shaped connector (9) and the top surface of the floor slab (8) via steel plates, the bottom surface of the columns (1) is connected to the top surface of the floor slab (8) via steel plates, and the steel plates are both provided with through holes for fixing.

5. A climbing frame lifting device according to claim 4, characterized in that: The floor slab is provided with a sleeve (4), and the sleeve (4) is arranged corresponding to the through hole reserved in the steel plate.

6. A climbing frame lifting device according to claim 3, characterized in that: It also comprises an anti-overturning plate (10), wherein the anti-overturning plate (10) is connected to the side wall of the wing plate of the H-shaped connecting member (9), and one side of the anti-overturning plate (10) abuts against the cross beam (3).

7. A climbing frame lifting device according to claim 3, characterized in that: It also comprises a heightening member (6), wherein the heightening member (6) is arranged between the H-shaped connecting member (9) and the climbing frame.

8. A climbing frame lifting device according to any one of claims 2 to 7, characterized in that: When the column (1) comprises at least two I-beams with overlapping axes, two adjacent I-beams are connected via a steel pipe fastener (7), and a wooden wedge component is filled between the steel pipe fastener (7) and the I-beam.

9. A climbing frame lifting device according to any one of claims 1 to 7, characterized in that: One of the cross beams (3) comprises two channel steels (301), the openings of the two channel steels (301) are opposite to each other, and a stiffening pad (302) is arranged between the two channel steels (301).