Modular electric energy meter system and test connection tool thereof
By designing the connection components for modular power meter, the problem of difficult to obtain accurate communication data by modular power meter management module and metering module testing and connection tooling is solved, and the consistency of communication status between modules and Accurate data acquisition simplifies the testing process.
Patent Information
- Application Number
- CN202420279572.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-05
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-02-05
AI Technical Summary
The existing testing and connection tooling for the management module and the metering module for modular power meters is difficult to obtain accurate communication data, which affects the normal communication status between modules.
A connection component including Class 1 connectors and Class 2 connectors is designed to electrically connect with the management module and metering module of the module meter, and to lead the interactive data between the modules through the lead-out position. , ensure data interoperability and achieve consistency of communication status.
The test connection tooling can accurately obtain communication data between modules without affecting the normal communication of the module, simplifying the testing process, improving testing efficiency, and being simple in structure and easy to industrial production.
Smart Images

Figure CN221976971U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of modular electric energy meter testing, and in particular relates to a modular electric energy meter system and a testing connection tooling thereof. Background Art
[0002] The smart IoT meter is a newly launched modular energy meter, including a management module and a metering module. The metering module is mainly used for metering and clocking. The management core data is synchronized with the metering module data in real time. The management core is responsible for the management of the entire meter. The management module and the metering module are electrically connected. The data exchange between the management module and the metering module is through SPI communication and UART serial communication. The metering module is responsible for real-time acquisition of voltage, current, clock and other information. These information will be transmitted to the management module in real time. The management module analyzes the data obtained to realize the meter function (such as event recording, data freezing, etc.). Therefore, the data exchange quality, data exchange frequency, data exchange lag, missing items, etc. between the management module and the metering module are related to whether the meter function is normal. When the meter function is abnormal, it is particularly important to monitor the interaction data between the management module and the metering module for analyzing the problem. Therefore, when there is a problem with the operation of the meter, it is particularly important to accurately monitor the communication data between the two modules without affecting the normal working state of the meter.
[0003] Since the management module and the metering module of the electric energy meter are both provided with interfaces that can be connected to each other for communication, the connection method for the interaction between the management module and the metering module of the electric energy meter is usually to directly connect the management module and the metering module of the electric energy meter. Such a connection method can ensure that the management module and the metering module of the electric energy meter communicate normally, and the communication state is consistent with the actual working conditions. However, such a connection will make it difficult to obtain the signals transmitted by the management module and the metering module of the electric energy meter during normal communication; therefore, in the prior art, the management module and the metering module are often connected respectively through different test connection toolings, and the communication data sent to the other party is exported from the test connection tooling at the management module / metering module end, and then imported into the test connection tooling at the metering module / management module end after analysis to complete the communication between the management module and the metering module; however, such a separate import and export method has a greater impact on the normal communication of the management module and the metering module, and it is difficult to obtain more accurate communication data of the management module and the metering module under the state of normal communication. Utility Model Content
[0004] The purpose of the utility model is to provide a modular electric energy meter system and a test connection tool thereof, which are used to solve the problem that the existing test connection tool used for correspondingly connecting the management module and the metering module of the electric energy meter is difficult to obtain relatively accurate communication data when the management module and the metering module are in a normal communication state.
[0005] In order to achieve the above-mentioned object, the utility model provides a test connection tool for a modular electric energy meter system, including a connection component; the connection component includes a Class 1 connection piece and a Class 2 connection piece; the Class 1 connection piece and the Class 2 connection piece are respectively used to electrically connect to a management module and a metering module of the modular electric energy meter, so as to connect the metering module and the management module of the modular electric energy meter;
[0006] The connection component also includes a lead-out position, which is the same electrical network as the electrical network corresponding to the corresponding Class 1 connector and Class 2 connector, and is used to lead out the interactive data of the metering module and the management module transmitted through the Class 1 connector and Class 2 connector.
[0007] Furthermore, the lead-out position is also used to connect a corresponding test component of a corresponding electrical network.
[0008] Furthermore, the connection component also includes a basic component; the Class 1 connection component, the Class 2 connection component and the lead-out position in the connection component are arranged on the basic component.
[0009] Furthermore, the connection component includes at least one group of lead-out bits, and the group of lead-out bits includes a plurality of lead-out bits.
[0010] Furthermore, the Class 1 connectors, Class 2 connectors and lead-out positions on the connection assembly are all arranged on the surface of the basic component; the lead-out position is arranged outside the area where the Class 1 connectors and Class 2 connectors are located on the surface of the basic component.
[0011] Furthermore, the basic component is a printed circuit board; the type 1 connector and the type 2 connector on the basic component are respectively located on the upper and lower surfaces of the basic component.
[0012] Furthermore, the lead-out position and the type 1 connector and the type 2 connector corresponding to the same electrical network are connected via a printed circuit on the printed circuit board.
[0013] Furthermore, a group of lead-out positions includes lead-out positions corresponding to electrical networks corresponding to different type 1 connectors and type 2 connectors.
[0014] Furthermore, the lead-out position is a welding hole.
[0015] The above-mentioned technical scheme of the utility model provides a new test connection tooling of modular electric energy meter system, and its beneficial effects include: for modular electric energy meter including management module and metering module electrically connected through Class 1 connector and Class 2 connector, a connection component including Class 1 connector and Class 2 connector is provided, and the connection component can make the communication state between the metering module and the management module consistent with the communication state under actual working conditions, so as to ensure the normal communication between the metering module and the management module; and according to the lead-out position of the same electrical network corresponding to the set Class 1 connector and Class 2 connector, it is equivalent to interconnecting the data of the corresponding Class 1 connector, Class 2 connector and lead-out position, so that on the basis of ensuring the normal communication between the metering module and the management module, the interactive data of the metering module and the management module transmitted through the Class 1 connector and the Class 2 connector can be led out; therefore, the test connection tooling is convenient for obtaining the communication data under the state of normal communication between the management module and the metering module, and can also ensure that the acquired communication data is relatively accurate, and has a simple structure and is easy for industrial production.
[0016] The utility model also provides a modular electric energy meter system, including a modular electric energy meter and a test connection tool; the modular electric energy meter includes a management module and a metering module that are electrically connected through a Class 1 connector and a Class 2 connector;
[0017] The test connection tooling includes a connection assembly; the connection assembly includes a Class 1 connection piece and a Class 2 connection piece; the Class 1 connection piece and the Class 2 connection piece are respectively used to electrically connect to the management module and the metering module of the modular electric energy meter, so as to connect the metering module and the management module of the modular electric energy meter;
[0018] The connection component also includes a lead-out position, which is the same electrical network as the electrical network corresponding to the corresponding Class 1 connector and Class 2 connector, and is used to lead out the interactive data of the metering module and the management module transmitted through the Class 1 connector and Class 2 connector.
[0019] Furthermore, the lead-out position is also used to connect a corresponding test component of a corresponding electrical network.
[0020] Furthermore, the connection component also includes a basic component; the Class 1 connection component, the Class 2 connection component and the lead-out position in the connection component are arranged on the basic component.
[0021] Furthermore, the connection component includes at least one group of lead-out bits, and the group of lead-out bits includes a plurality of lead-out bits.
[0022] Furthermore, the Class 1 connectors, Class 2 connectors and lead-out positions on the connection assembly are all arranged on the surface of the basic component; the lead-out position is arranged outside the area where the Class 1 connectors and Class 2 connectors are located on the surface of the basic component.
[0023] Furthermore, the basic component is a printed circuit board; the type 1 connector and the type 2 connector on the basic component are respectively located on the upper and lower surfaces of the basic component.
[0024] Furthermore, the lead-out position and the type 1 connector and the type 2 connector corresponding to the same electrical network are connected via a printed circuit on the printed circuit board.
[0025] Furthermore, a group of lead-out positions includes lead-out positions corresponding to electrical networks corresponding to different type 1 connectors and type 2 connectors.
[0026] Furthermore, the lead-out position is a welding hole.
[0027] The above-mentioned technical scheme of the utility model provides a new modular electric energy meter system, and its beneficial effects include: for a modular electric energy meter including a management module and a metering module electrically connected through a Class 1 connector and a Class 2 connector, a test connection tooling including a connection component of a Class 1 connector and a Class 2 connector is provided, and the connection component can make the communication state between the metering module and the management module consistent with the communication state under actual working conditions, thereby ensuring normal communication between the metering module and the management module; and according to the lead-out bits of the same electrical network corresponding to the set Class 1 connector and the Class 2 connector, it is equivalent to interconnecting the data of the corresponding Class 1 connector, the Class 2 connector and the lead-out bits, so that on the basis of ensuring the normal communication between the metering module and the management module, the interactive data of the metering module and the management module transmitted through the Class 1 connector and the Class 2 connector can be derived; therefore, the test connection tooling is convenient for obtaining the communication data under the state of normal communication between the management module and the metering module, and can also ensure that the acquired communication data is relatively accurate, and has a simple structure and is easy for industrial production. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a side view of a test connection tool for a modular electric energy meter system in an embodiment of the test connection tool for a modular electric energy meter system of the utility model;
[0029] Figure 2 A top view of one of the upper and lower surfaces of a basic component in an embodiment of a test connection tooling for a modular electric energy meter system of the utility model;
[0030] Figure 3 A top view of the other of the upper and lower surfaces of the basic component in the test connection tooling embodiment of the modular electric energy meter system of the utility model;
[0031] In the figure, 1 is a type 1 connector (socket), 2 is a type 2 connector (pin), 3 is a basic component (printed circuit board), 4 is a lead-out position (solder hole), and b refers to the distance between two groups of type 2 connectors. DETAILED DESCRIPTION
[0032] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments.
[0033] Example of test connection tooling for modular electric energy meter system
[0034] This embodiment provides a technical solution for a test connection tool for a modular electric energy meter system, wherein the test connection tool comprises a connection component; Figure 1 The connection components include Class 1 connectors and Class 2 connectors; the Class 1 connectors and Class 2 connectors are respectively used for corresponding electrical connections with the management module and the metering module of the modular electric energy meter to connect the metering module and the management module of the modular electric energy meter.
[0035] The connection component also includes a lead-out position, which corresponds to the same electrical network as its corresponding Class 1 connector and Class 2 connector, and is used to lead out the interactive data of the metering module and the management module transmitted through the Class 1 connector and Class 2 connector.
[0036] The above-mentioned test connection tooling in this embodiment is equivalent to a modular electric energy meter including a management module and a metering module electrically connected through a Class 1 connector and a Class 2 connector, and a connection component including a Class 1 connector and a Class 2 connector is set. The connection component can make the communication state between the metering module and the management module consistent with the communication state under actual working conditions, thereby ensuring normal communication between the metering module and the management module; and according to the lead-out bits of the same electrical network corresponding to the set Class 1 connector and the Class 2 connector, it is equivalent to interconnecting the data of the corresponding Class 1 connector, Class 2 connector and the lead-out bits, so that on the basis of ensuring the normal communication between the metering module and the management module, the interactive data of the metering module and the management module transmitted through the Class 1 connector and the Class 2 connector can be derived; therefore, the test connection tooling is convenient for obtaining the communication data under the state of normal communication between the management module and the metering module, and can also ensure that the acquired communication data is relatively accurate, and has a simple structure and is easy for industrial production.
[0037] In this embodiment, the lead-out position is also used to connect the corresponding test components of the corresponding electrical network; thus, by directly connecting the corresponding test components to the lead-out position, the interactive data of the metering module and the management module can be directly imported into the corresponding test device through the corresponding electrical network and the test components to perform corresponding tests, thereby improving the test efficiency and simplifying the connection method required for the test.
[0038] In order to facilitate the disassembly and installation of the tooling, the connection assembly also includes a basic part; the Class 1 connector, Class 2 connector and lead-out position in the connection assembly are arranged on the basic part; specifically, in this embodiment, the Class 1 connector is a socket, the Class 2 connector is a pin, and the basic part is a printed circuit board; the Class 1 connector and the Class 2 connector in the connection assembly are both arranged on the surface of the basic part, for example, the Class 1 connector is located on the upper surface of the basic part, and the Class 2 connector is located on the lower surface of the basic part. In other embodiments, the Class 1 connector and the Class 2 connector can also be other components that can cooperate to achieve electrical connection, and the basic part can also be components of other forms and shapes, and the Class 1 connector and the Class 2 connector can be adaptively arranged on the surface of the corresponding basic part.
[0039] Figure 1 In the diagram, type 1 connectors (sockets) and type 2 connectors (pins) are presented in groups, i.e. Figure 1 The 1 in the figure is the effect formed by combining multiple Class 1 connectors. Figure 1 The 2 marked in the figure is the effect formed by combining multiple type 2 connectors. Figure 1 The structure corresponding to 1 can refer to a type 1 connector. Figure 1 The structure corresponding to 2 can refer to type 2 connectors.
[0040] Specifically, refer to Figure 1 , the basic parts of the connection components are Figure 1 The printed circuit board 3 in Figure 2 and Figure 3 As shown, the connectors arranged on the surface of the basic component include Class 1 connectors (i.e., sockets 1) and Class 2 connectors (i.e., pins 2); Class 1 connectors are located on the upper surface of the basic component, and Class 2 connectors are located on the lower surface of the basic component; in other embodiments, Class 1 connectors may be located on the lower surface of the basic component, and Class 2 connectors may be located on the upper surface of the basic component. Since the positions of the Class 1 connector and the Class 2 connector of the management module and the metering module that are electrically connected through the Class 1 connector and the Class 2 connector must correspond, and the positions of the Class 1 connector and the Class 2 connector in the connection component of this embodiment also need to correspond to the positions of the Class 2 connector and the Class 1 connector of the management module and the metering module, the positions of the Class 1 connector and the Class 2 connector in the connection component of this embodiment are also corresponding; specifically, since the metering module and the management module of the modular electric energy meter respectively correspond to two connecting connectors that are electrically connected through Class 1 connector / Class 2 connectors (usually the connecting connector corresponding to the metering module is a socket, and the connecting connector corresponding to the management module is a pin), the distance between the two groups of Class 1 connectors included in the connection component is b, and the distance between the two groups of Class 2 connectors is also b.
[0041] Figure 3 A small square in the small rectangular box corresponding to the 1 in the figure is a Class 1 connector. Figure 2 A small hollow point in the small rectangular box corresponding to the 2 in the mark is a Class 2 connector; a group consisting of multiple Class 1 connectors (sockets) and Class 2 connectors (pins) is represented by Figure 3 Multiple small squares in a small rectangular frame, Figure 2 It is presented in the form of multiple small hollow dots in a small rectangular frame. It should be noted that the small hollow dots in the small rectangular frame are only a representation of the top view of the pin, and does not mean that the small hollow dots are hole-like structures.
[0042] Furthermore, in this embodiment, if Figure 2 and Figure 3 As shown, the lead-out position is set outside the area where the Class 1 connector and the Class 2 connector are located on the surface of the basic component, which is equivalent to setting the lead-out position outside each Class 1 connector and each Class 2 connector, thereby avoiding the blocking of the Class 1 connector or the Class 2 connector when the interactive data of the metering module and the management module transmitted through the Class 1 connector and the Class 2 connector is led out from the lead-out position, resulting in the connection operation with the lead-out position being troublesome and prone to errors. Specifically, in this embodiment, the lead-out position is a welding hole; in other embodiments, the lead-out position can also be implemented in other ways that can be used to connect the test line and export data.
[0043] The connection component includes at least one group of lead-out bits, and one group of lead-out bits includes multiple lead-out bits. In order to ensure that the transmission data corresponding to the electrical connection between each Class 1 connector and its corresponding Class 2 connector can be led out through the lead-out bits and the corresponding electrical network, a group of lead-out bits includes lead-out bits corresponding to the electrical networks corresponding to different Class 1 connectors and Class 2 connectors. Specifically, when testing the interaction between the metering module and the management module, the Class 1 connector and the Class 2 connector that can transmit the same data correspond to the same electrical network, for example Figure 2 A set of 2*8PIN pins on the left side and Figure 3 In the group of 2*8PIN sockets on the left side, each socket and a pin corresponding to the same electrical network can transmit the same data; accordingly, there are 16 corresponding lead-out positions (solder holes) set for these 16 sockets and 16 pins, that is, Figure 2 Center left, Figure 3 A row of welding holes 4 on the left side of the middle lead out data transmitted between each socket and a corresponding pin; Figure 2 The right side of the 2*8PIN pins and Figure 3 The same is true for the 2*8PIN sockets on the right side. There are also 16 corresponding lead-out positions (solder holes) for these 16 sockets and 16 pins, namely Figure 2 Middle right side, Figure 3A row of welding holes 4 on the middle right; a total of 32 welding holes on the left and right sides constitute a set of lead-out positions, which correspond to 32 electrical networks corresponding to 32 sockets and 32 pins respectively, and the data transmitted between the socket and the pin can be led out from the corresponding welding holes.
[0044] In order to make full use of the surface space of the printed circuit board and reduce the wiring in the three-dimensional space, the lead-out position and the Class 1 connector and Class 2 connector corresponding to the same electrical network are connected through the printed circuit on the printed circuit board 3 ( Figure 1-Figure 3 are not shown).
[0045] Modular electric energy meter system embodiment
[0046] This embodiment also provides a technical solution for a modular electric energy meter system, including a modular electric energy meter and a test connection tool; the modular electric energy meter includes a management module and a metering module that are electrically connected through a Class 1 connector and a Class 2 connector;
[0047] Specifically, the metering module and management module of the modular electric energy meter in this embodiment correspond to two connection connectors that are electrically connected through Class 1 connectors and Class 2 connectors, and the distance between the two connection connectors is b; and the connection connector corresponding to the metering module of the modular electric energy meter is a socket, and the connection connector corresponding to the management module is a pin; in other embodiments, the metering module and management module of the modular electric energy meter may also adopt connection connectors of other structures, as long as they can be connected with the test connection tooling.
[0048] The test connection tool is the test connection tool of the modular electric energy meter system in the above-mentioned test connection tool embodiment of the modular electric energy meter system; since the application method and principle of the test connection tool in this embodiment have been described in detail in the above-mentioned test connection tool embodiment of the modular electric energy meter system, they will not be repeated here.
[0049] The utility model has the following characteristics:
[0050] 1) The test connection tooling is equivalent to a modular electric energy meter including a management module and a metering module electrically connected through a Class 1 connector and a Class 2 connector, and a connection component including a Class 1 connector and a Class 2 connector is set. The connection component can make the communication state between the metering module and the management module consistent with the communication state under actual working conditions, thereby ensuring normal communication between the metering module and the management module; and according to the lead-out bits of the same electrical network corresponding to the set Class 1 connector and the Class 2 connector, it is equivalent to interconnecting the data of the corresponding Class 1 connector, Class 2 connector and the lead-out bits, so that on the basis of ensuring the normal communication between the metering module and the management module, the interactive data of the metering module and the management module transmitted through the Class 1 connector and the Class 2 connector can be led out; therefore, the test connection tooling is convenient for obtaining the communication data under the state of normal communication between the management module and the metering module, and can also ensure that the acquired communication data is relatively accurate, and has a simple structure and is easy for industrial production.
[0051] 2) The lead-out position of the test connection tooling is also used to connect the corresponding test components of the corresponding electrical network; thus, by directly connecting the corresponding test components to the lead-out position, the interactive data of the metering module and the management module can be directly imported into the corresponding test device through the corresponding electrical network and the test components to perform the corresponding test, thereby improving the test efficiency and simplifying the connection method required for the test.
[0052] 3) The lead-out position is arranged outside the area where the Class 1 connector and the Class 2 connector are located on the surface of the basic component, which is equivalent to setting the lead-out position on the periphery of each Class 1 connector and each Class 2 connector. This can avoid the interactive data of the metering module and the management module transmitted through the Class 1 connector and the Class 2 connector being blocked by the Class 1 connector or the Class 2 connector when being led out from the lead-out position, resulting in a situation where the connection operation with the lead-out position is cumbersome and prone to errors.
[0053] It should be understood that the above specific embodiments of the present invention are only used to exemplify or explain the principles of the present invention, and do not constitute a limitation to the present invention.
Claims
1. A test connection tool for a modular electric energy meter system, characterized in that: The connecting assembly comprises a Class 1 connecting piece and a Class 2 connecting piece; the Class 1 connecting piece and the Class 2 connecting piece are respectively used to electrically connect to a management module and a metering module of a modular electric energy meter, so as to connect the metering module and the management module of the modular electric energy meter; The connection component also includes a lead-out position, which is the same electrical network as the electrical network corresponding to the corresponding Class 1 connector and Class 2 connector, and is used to lead out the interactive data of the metering module and the management module transmitted through the Class 1 connector and Class 2 connector.
2. The test connection tool for the modular electric energy meter system according to claim 1, characterized in that: The lead-out position is also used to connect a corresponding test component of a corresponding electrical network.
3. The test connection tool for the modular electric energy meter system according to claim 1 or 2, characterized in that: The connection component also includes a basic component; the type 1 connection component, the type 2 connection component and the lead-out position in the connection component are arranged on the basic component.
4. The test connection tool for the modular electric energy meter system according to claim 1 or 2, characterized in that: The connection component comprises at least one group of lead-out bits, wherein the group of lead-out bits comprises a plurality of lead-out bits.
5. The test connection tool for the modular electric energy meter system according to claim 3, characterized in that: The Class 1 connector, Class 2 connector and lead-out position on the connection assembly are all arranged on the surface of the basic component; the lead-out position is arranged outside the area where the Class 1 connector and Class 2 connector are located on the surface of the basic component.
6. The test connection tool for the modular electric energy meter system according to claim 3, characterized in that: The basic component is a printed circuit board; the type 1 connector and the type 2 connector on the basic component are respectively located on the upper and lower surfaces of the basic component.
7. The test connection tool for the modular electric energy meter system according to claim 6, characterized in that: The lead-out position is connected to the Class 1 connector and the Class 2 connector corresponding to the same electrical network through the printed circuit on the printed circuit board.
8. The test connection tool for the modular electric energy meter system according to claim 4, characterized in that: A group of lead-out positions includes lead-out positions corresponding to electrical networks corresponding to different type 1 connectors and type 2 connectors.
9. The test connection tool for the modular electric energy meter system according to any one of claims 1-2 and 5-8, characterized in that: The lead-out position is a welding hole.
10. A modular electric energy meter system, characterized in that: It includes a modular electric energy meter and a test connection tool; the modular electric energy meter includes a management module and a metering module that are electrically connected through a Class 1 connector and a Class 2 connector; The test connection tool is a test connection tool of the modular electric energy meter system according to any one of claims 1-9.