Foldable fast-assembly roof crane
By designing a foldable quick-install roof crane, the folding structure of tower head, crane arm and legs is used to solve the problems of difficulty and time-consuming assembly of traditional roof cranes, and the rapid installation and efficient building top assembly are achieved. Improve the work efficiency of construction projects.
Patent Information
- Application Number
- CN202420549311.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-21
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-21
AI Technical Summary
The assembly of roof cranes in traditional tower cranes is difficult and time-consuming, which reduces the working efficiency of construction projects.
Design a foldable quick-install roof crane that quickly unfolds and assembles on the top of the building through the folding structure of the tower head, boom and leg, including slewing support, boom, lifting mechanism and pulling arm mechanism , realize rapid installation and use.
The whole assembly is in the factory, with a small transportation volume and a small footprint on-site installation, which reduces assembly time and improves installation and disassembly efficiency.
Smart Images

Figure CN222007120U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of cranes, in particular to a foldable quick-install roof crane. Background Art
[0002] Nowadays, tower cranes are widely used in construction projects, especially high-rise and super-high-rise tower cranes. After the building structure is completed, the tower crane generally needs to be dismantled with a roof crane. Traditional roof cranes are designed to be modular, and all parts are hoisted to the top of the building in batches and assembled before use. Generally, the top of the building is narrow and has many equipment, which makes the assembly of the roof crane very difficult and time-consuming, reducing work efficiency. Utility Model Content
[0003] In order to solve the above problems, that is, to solve the problems raised by the above background technology, the utility model proposes a foldable quick-install roof crane, which is made by folding the tower head backwards and retracting it onto the slewing upper support, removing the front end section of the boom, folding the root section of the boom backwards and retracting it onto the slewing upper support, folding the legs upwards, pressing against and fixing them to the slewing upper support, and after the whole is hoisted to the top of the building, unfolding them in sequence, connecting the boom, and putting on the pulling arm and lifting wire rope, so as to achieve the purpose of quick installation and use. It includes a slewing lower support, The outer wall of the slewing lower support is connected to the support leg through a pin shaft, the top of the slewing lower support is connected to the slewing support through a high-strength bolt, the top of the slewing support is installed with a slewing upper support and a slewing mechanism, one end of the slewing upper support is hinged with a boom, a pulley is installed at the end of the boom, a lifting mechanism is installed near the root node of the boom, the lifting mechanism is connected to the pulley through a lifting wire rope, a tower head is installed at the top of the slewing upper support, and the top of the tower head is connected to the boom through a pulling arm.
[0004] The utility model is further configured as follows: the tower head includes a tower head rear pull rod and a tower head front support rod, the top end of the tower head rear pull rod is hinged to the top end of the tower head front support rod, the bottom end of the tower head rear pull rod is hinged to the top left side of the rotating upper support, the bottom end of the tower head front support rod is hinged to the top right side of the rotating upper support, and a support rod is hinged between the tower head rear pull rod and the tower head front support rod.
[0005] The utility model is further configured as follows: the arm includes an arm pulley block, an arm mechanism, an arm wire rope and an arm pull rod; the arm mechanism is installed on the front support rod of the tower head; the arm mechanism is connected to the arm pulley block through the arm wire rope; the arm pulley block is connected to the end section of the boom through the arm pull rod.
[0006] The utility model is further configured as follows: the pulley is connected with a hook via a lifting wire rope.
[0007] The utility model is further configured as follows: the slewing mechanism is installed on one side of the slewing upper support, and the slewing mechanism output shaft is meshed with the outer teeth of the slewing support through a pinion.
[0008] The beneficial technical effects of the utility model are as follows: the quick-install roof crane adopts a folding form and is assembled together in a factory, with a novel structure; the transportation volume is small, saving transportation costs; the on-site installation occupies a small area; the installation and disassembly is convenient and quick, reducing the assembly time and improving the efficiency of the installation and disassembly work. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] Figure 1 Shown is a front view of the utility model.
[0010] Figure 2 A top view of the utility model is shown.
[0011] Figure 3 A slewing bearing side view is shown.
[0012] Figure 4 The first folding process diagram of the fast-installed roof crane is shown.
[0013] Figure 5 The second folding process diagram of the fast-installed roof crane is shown.
[0014] Figure 6 The third folding process diagram of the fast-installed roof crane is shown.
[0015] Figure 7 The fourth folding process diagram of the fast-installed roof crane is shown.
[0016] Figure numerals: 1. slewing lower support, 2. support leg, 3. slewing support, 4. slewing upper support, 5. slewing mechanism, 6. boom, 7. pulley, 8. hook, 9. lifting mechanism, 10. lifting wire rope, 11. tower head rear pull rod, 12. tower head front support rod, 13. support rod, 14. arm pulley block, 15. arm pull mechanism, 16. arm pull wire rope, 17. arm pull rod. DETAILED DESCRIPTION
[0017] Please refer to the attached Figure 1-7 Those skilled in the art should understand that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.
[0018] The utility model proposes a foldable quick-install roof crane, including a slewing lower support 1, the outer wall of which is connected to a leg 2 through a pin shaft, and the leg 2 is installed on the foundation of the building as a support member of the roof crane. The top of the slewing lower support 1 is connected to a slewing support 3 through a high-strength bolt to form a slewing support assembly, and the high-strength bolt is connected to a high-strength nut through a washer. A slewing upper support 4 and a slewing mechanism 5 are installed on the top of the slewing support 3, and the slewing mechanism 5 is installed on one side of the slewing upper support 4. The output shaft of the slewing mechanism 5 is meshed with the outer teeth of the slewing support 3 through a pinion. When the motor of the slewing mechanism 5 rotates, the pinion rotates to drive the slewing support 3, the slewing upper support 4, etc. to rotate, thereby realizing a slewing action. One end of the slewing upper support 4 is hinged with a boom 6, and the root section of the boom 6 is connected to the slewing upper support 4 through a rotating shaft. A pulley 7 is installed at the end of the boom 6, and the pulley 7 is connected to a hook 8 through a lifting wire rope 10. One end of the lifting wire rope 10 is fixed on the drum of the lifting mechanism 9, and the other end is connected to the hook 8 through the pulley 7. After the lifting mechanism 9 is powered on, the lifting drum rotates, and the lifting wire rope 10 is wound and released, driving the hook 8 to move up and down to achieve the function of lifting objects. The root section, middle section and end section of the boom 6 are connected by high-strength bolts, washers and high-strength nuts to form an integral boom 6. By increasing or decreasing the number of middle sections of the boom 6, booms 6 of different lengths can be formed to meet the use requirements of different projects. A lifting mechanism 9 is installed near the root node of the boom 6, and the lifting mechanism 9 is connected to the pulley 7 through a lifting wire rope 10. A tower head is installed on the top of the rotating upper support 4, and the top of the tower head is connected to the boom 6 through a pulling arm.
[0019] The tower head includes a tower head rear tie rod 11 and a tower head front strut 12. The top end of the tower head rear tie rod 11 is hinged to the top end of the tower head front strut 12, the bottom end of the tower head rear tie rod 11 is hinged to the top left side of the rotating upper support 4, and the bottom end of the tower head front strut 12 is hinged to the top right side of the rotating upper support 4, forming a triangular structure to withstand the luffing tension when the boom 6 changes its luffing height. A support rod 13 is hinged between the tower head rear tie rod 11 and the tower head front strut 12.
[0020] The arm pulley includes an arm pulley block 14, an arm pulley mechanism 15, an arm pulley wire rope 16 and an arm pull rod 17. The arm pulley mechanism 15 is installed on the tower head front support rod 12. The arm pulley mechanism 15 is connected to the arm pulley block 14 through the arm pulley wire rope 16. One end of the arm pulley wire rope 16 is fixed to the arm pulley mechanism 15, and is wound through the arm pulley block 14. Finally, the rope end is connected to the rear end ring of the arm pull rod 17 through a rope clamp. The arm pulley block 14 is connected to the end section of the boom 6 through the arm pull rod 17. The arm pulley mechanism 15 is powered on and rotated. The arm pulley mechanism 15 reel changes the distance between the arm pulley blocks 14 by winding the arm pulley wire rope 16, thereby realizing the pitching action of the boom 6.
[0021] Disassembly process:
[0022] S1, start the lifting mechanism 9, release the lifting wire rope 10, drop the hook 8 and remove it, and receive the lifting wire rope 10 on the drum of the lifting mechanism 9;
[0023] S2, start the arm pulling mechanism 15, release the arm pulling wire rope 16, put the boom 6 into a horizontal position, remove the arm pulling pulley block 14, remove the end section and middle section of the boom 6, and keep the root section of the boom 6;
[0024] S3, connect the arm wire rope 16 to the front end of the root section of the boom 6, start the arm pulling mechanism 15, wind the arm wire rope 16 with the drum of the arm pulling mechanism 15, pull the root section of the boom 6 upward, and install the mounting and disassembly support rod between the root section of the boom 6 and the support leg 2;
[0025] S4, remove the pin at the connection between the tower head rear tie rod 11 and the slewing upper support 4, push the tower head rear tie rod 11 to tilt inward, start the arm pulling mechanism 15 to release the rope, and lower the tower head front support rod 12 downward until the tower head rear tie rod 11 and the tower head front support rod 12 are folded and placed on the slewing upper support 4;
[0026] S5, remove the installation support rod, start the arm pulling mechanism 15 to wind the rope, pull up the root section of the boom 6, and then retract it to the slewing upper support 4;
[0027] S6, supporting the support rod 13 on the upper part of the base frame and the front support rod 12 of the tower head to prevent the whole from tipping over;
[0028] S7, remove the pin shaft on the lower side of the leg 2, turn the leg 2 upward and fix it, and complete the whole process of disassembling and folding.
[0029] The installation process is the reverse process of the disassembly process.
[0030] Although the present invention has been described with reference to preferred embodiments, various modifications may be made thereto and parts thereof may be replaced with equivalents without departing from the scope of the present invention. In particular, the various technical features mentioned in the various embodiments may be combined in any manner as long as there is no structural conflict. The present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.
[0031] In the description of the present invention, the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" and the like indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings, which are only for the convenience of description, and do not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0032] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.
[0033] The term "comprise" or any other similar term is intended to cover a non-exclusive inclusion, such that a process, article, or apparatus / device that includes a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, article, or apparatus / device.
[0034] So far, the technical solution of the present invention has been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.
Claims
1. A foldable quick-install roof crane, comprising a slewing lower support (1), characterized in that: The outer wall of the slewing lower support (1) is connected to a support leg (2) via a pin shaft, the top of the slewing lower support (1) is connected to a slewing support (3) via high-strength bolts, the top of the slewing support (3) is installed with a slewing upper support (4) and a slewing mechanism (5), one end of the slewing upper support (4) is hinged with a boom (6), the end of the boom (6) is installed with a pulley (7), a lifting mechanism (9) is installed near the root node of the boom (6), the lifting mechanism (9) is connected to the pulley (7) via a lifting wire rope (10), a tower head is installed at the top of the slewing upper support (4), and the top of the tower head is connected to the boom (6) via a pull arm.
2. A foldable quick-install roof crane according to claim 1, characterized in that: The tower head comprises a tower head rear tie rod (11) and a tower head front strut (12), the top end of the tower head rear tie rod (11) is hinged to the top end of the tower head front strut (12), the bottom end of the tower head rear tie rod (11) is hinged to the top left side of the rotating upper support (4), the bottom end of the tower head front strut (12) is hinged to the top right side of the rotating upper support (4), a support rod (13) is hinged between the tower head rear tie rod (11) and the tower head front strut (12), and a pulling arm mechanism (15) is installed on the tower head front strut (12).
3. A foldable quick-install roof crane according to claim 1, characterized in that: The arm pulley comprises an arm pulley block (14), an arm pulley mechanism (15), an arm pulley wire rope (16) and an arm pull rod (17); the arm pulley mechanism (15) is connected to the arm pulley block (14) via the arm pulley wire rope (16); and the arm pulley block (14) is connected to the end section of the boom (6) via the arm pull rod (17).
4. The foldable quick-install roof crane according to claim 1, characterized in that: The pulley (7) is connected to a hook (8) via a lifting wire rope (10).
5. The foldable quick-install roof crane according to claim 1, characterized in that: The slewing mechanism (5) is installed on one side of the slewing upper support (4), and the output shaft of the slewing mechanism (5) is meshed with the external teeth of the slewing support (3) through a pinion.