Self-discharge synchronous voltage test circuit of locomotive storage battery comprehensive tester
By designing a self-discharge synchronous voltage test circuit on the locomotive, using high-power constant temperature heating elements and conversion switches for current discharge, combined with passive digital display meter and current shunt, the accurate detection of locomotive battery failure is achieved, and the existing solution is solved The problems of inaccurate detection and large workload in the technology have improved the quality of maintenance and operational reliability.
Patent Information
- Application Number
- CN202323468593.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-19
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2033-12-19
AI Technical Summary
The existing comprehensive locomotive battery tester cannot accurately detect battery failures, such as backwardness, insufficient capacity, short circuit, circuit breaker, etc., resulting in inaccurate detection results, large workload, and affect the quality of locomotive maintenance, and frequent battery failures.
A self-discharge synchronous voltage test circuit was designed, and the battery pack with uniform distribution was installed on the locomotive, and the discharge of different sizes of currents was achieved by using high-power constant temperature heating elements and conversion switches, combining passive digital display meter and shunt , display voltage and current in real time, and intuitively detect battery failures.
Accurate detection of faults such as backwardness, insufficient capacity, short circuits, and circuit breakers have been achieved, which reduces the waste of operating time and human resources, improves the quality management of locomotive maintenance, and ensures the quality of battery operation after maintenance.
Smart Images

Figure CN222014412U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to a test circuit of a locomotive battery comprehensive tester, in particular to a self-discharge synchronous voltage test circuit of the locomotive battery comprehensive tester. Background Art
[0002] Since the diesel locomotive was put into use, the measurement method of the locomotive battery installed has mainly remained at the static voltage detection and internal resistance detection of a single battery. Some railway bureau locomotive sections use self-discharge (using closed battery switches to start the oil pump motor, turn on the headlights and auxiliary lights, etc.) type single-cell voltage asynchronous measurement. Since the non-load voltage change of the battery is extremely small, the capacity caused by asynchronous discharge increases over time, resulting in uncertain results due to the decrease in measured voltage. In addition, when using an internal resistance meter to measure the internal resistance of the battery, the contact resistance formed by each clamping changes greatly, resulting in a single-cell voltage measurement result that cannot guide on-site production. The battery internal resistance testers of each locomotive section are in a "dormant" state, and locomotive failures caused by battery failures occur intermittently every year. In addition, due to the large number of battery manufacturers and uneven quality, battery failures have been on an upward trend over the years.
[0003] At present, the existing locomotive battery comprehensive tester in each locomotive depot is a portable battery internal resistance tester, which uses the basic principle of Ohm's law in physics that "resistance equals voltage divided by current" to perform microcomputer calculation and measurement of internal resistance value. The general structure is: tester host, test circuit, test alligator clip. However, since the test end of the instrument adopts an alligator clip clamping method, it is clamped on the battery terminal for measurement. Due to the influence of the main factors such as the surface oxide layer, fine dust, different contact surface shapes, and the increase in internal resistance of the battery voltage inside the instrument as the test time increases, the measurement results of the same single cell are different each time, and there is a large difference between the test data of the battery measured at the beginning and the test data of the battery measured at the end, which leads to complicated workloads for front-line operators and inaccurate values.
[0004] The disadvantages of the existing locomotive battery comprehensive tester are:
[0005] ① Unable to directly detect battery faults such as lagging, insufficient capacity, short circuit, and open circuit;
[0006] ②The test results are inaccurate and the test data are not instructive;
[0007] ③The detection workload is complicated, time-consuming and laborious;
[0008] ④ Locomotive failures caused by battery failures continue to occur every year, affecting the locomotive maintenance quality management level of each locomotive depot.
[0009] The existing locomotive battery comprehensive tester has the above disadvantages during use. In view of the above situation, technical innovation is carried out on the basis of the existing locomotive battery comprehensive tester. Utility Model Content
[0010] The purpose of the utility model is to provide a self-discharge synchronous voltage test circuit of a locomotive battery comprehensive tester, which has a reasonable structure and can intuitively detect backward, insufficient capacity, short circuit and open circuit battery faults, effectively ensure the operating quality of the battery after maintenance and delivery, greatly improve the technical prevention level of locomotive status maintenance, abandon a large amount of manpower and work time waste, and improve the locomotive maintenance quality management level of each locomotive section.
[0011] The purpose of the utility model is achieved as follows: a self-discharge synchronous voltage test circuit of a locomotive battery comprehensive tester, including batteries evenly distributed on the locomotive, the positive and negative electrodes of the batteries are connected in series to form a battery pack, the positive electrode wiring of the batteries in the first box of the battery pack is connected to the shunt and four parallel lines in sequence, wherein the fourth parallel line is connected to a digital display total voltmeter, the third parallel line is connected to a third high-power constant temperature heating element and a third conversion switch in sequence, the second parallel line is connected to a second high-power constant temperature heating element and a second conversion switch in sequence, the first parallel line is connected to a first high-power constant temperature heating element and a first conversion switch in sequence, the output lines of the digital display total voltmeter, the third conversion switch, the second conversion switch and the first conversion switch connected in parallel are connected to the negative electrode of the battery in the last box of the battery pack, and the digital display voltmeter is connected between the positive and negative electrodes of each box of batteries in the battery pack.
[0012] The utility model uses a high-power constant temperature and very safe (not prone to fire accidents) PTC type heating power element (1-3R), and realizes the conversion of different powers through three conversion switches (1-3K) to discharge the locomotive battery with different currents. The passive digital display (V1-V12) with intuitive readings temporarily clamped on each box of batteries synchronously displays the battery voltage in real time. At the same time, the main circuit discharge current can be displayed through a digital display voltmeter connected in parallel with the shunt (FL) to intuitively display the relative size of the discharge power. For batteries with quality hazards, the terminal voltage drops rapidly, even to zero or a negative number, so it can be judged that the box of batteries has quality hazards, and the whole box can be replaced in a targeted manner to minimize the operation time. It can intuitively detect battery faults such as backwardness, insufficient capacity, short circuit, and open circuit, which can effectively ensure the operating quality of the battery after the inspection and delivery, greatly improve the technical defense level of locomotive status repair, abandon a large amount of manpower and work time waste, and improve the locomotive maintenance quality management level of each locomotive section.
[0013] The utility model abandons the shortcomings of the battery test instruments currently used in various locomotive depots, such as inaccurate test data, time-consuming and labor-consuming, and achieves the purpose of self-discharge synchronous voltage test that cannot be achieved by all current test instruments. Therefore, the comprehensive tester has low cost, simple structure, easy manufacturing, low failure rate, safety and reliability, energy saving and environmental protection, and achieves the purpose of easy operation for operators.
[0014] The utility model has a reasonable structure and can intuitively detect battery faults such as lagging, insufficient capacity, short circuit and open circuit, effectively ensuring the operating quality of the battery after the maintenance and delivery, greatly improving the technical prevention level of locomotive condition maintenance, eliminating a large amount of manpower and work-hour waste, and improving the locomotive maintenance quality management level of each locomotive section. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The utility model will be further described below in conjunction with the accompanying drawings. Figure 1 This is a test circuit schematic diagram of the utility model. DETAILED DESCRIPTION
[0016] A self-discharge synchronous voltage test circuit for a locomotive battery comprehensive tester, such as Figure 1 As shown, the locomotive includes evenly distributed storage batteries 1 installed, the positive and negative electrodes of the storage batteries 1 are connected in series to form a storage battery pack, the positive electrode of the storage battery 1 in the first box of the storage battery pack is connected to the shunt 2 and four parallel lines in sequence, wherein the fourth parallel line is connected to the digital display total voltmeter 3, the third parallel line is connected to the third high-power constant temperature heating element 4 and the third conversion switch 5 in sequence, the second parallel line is connected to the second high-power constant temperature heating element 6 and the second conversion switch 7 in sequence, the first parallel line is connected to the first high-power constant temperature heating element 8 and the first conversion switch 9 in sequence, the output line of the digital display total voltmeter 3, the third conversion switch 5, the second conversion switch 7 and the first conversion switch 9 connected in parallel is connected to the negative electrode of the storage battery 1 in the last box of the storage battery pack, and the digital display voltmeter 10 is connected between the positive and negative electrodes of the storage battery 1 in each box of the storage battery pack. The digital display voltmeter 10 is connected between the positive and negative electrodes of the shunt 2. The digital display total voltmeter 3 and the digital display voltmeter 10 are both passive digital display voltmeters. The first high-power constant temperature heating element 8, the second high-power constant temperature heating element 6, and the third high-power constant temperature heating element 4 are all PTC type heating power elements, and their powers are 1.5KW respectively. The number of batteries 1 evenly arranged in the battery pack is 12 boxes, and each box of batteries 1 has a total of 4 single cells, each cell has a voltage of 8V, and the total voltage of the battery pack is 96V.
Claims
1. A self-discharge synchronous voltage test circuit of a locomotive battery comprehensive tester, comprising evenly distributed batteries (1) installed on a locomotive, wherein the positive and negative electrodes of the batteries (1) are sequentially connected in series to form a battery pack, and wherein: The positive poles of the batteries (1) in the first box of the battery pack are connected in sequence to the shunt (2) and four parallel lines, wherein the fourth parallel line is connected to the digital display total voltmeter (3), the third parallel line is connected in sequence to the third high-power constant temperature heating element (4) and the third conversion switch (5), the second parallel line is connected in sequence to the second high-power constant temperature heating element (6) and the second conversion switch (7), and the first parallel line is connected in sequence to the first high-power constant temperature heating element (8) and the first conversion switch (9), the output lines of the digital display total voltmeter (3), the third conversion switch (5), the second conversion switch (7) and the first conversion switch (9) connected in parallel are connected to the negative poles of the batteries (1) in the last box of the battery pack, and the digital display voltmeter (10) is connected between the positive and negative poles of each box of batteries (1) in the battery pack.
2. The self-discharge synchronous voltage test circuit of a locomotive battery comprehensive tester according to claim 1 is characterized in that: A digital voltmeter (10) is connected between the positive and negative electrodes of the shunt (2).
3. The self-discharge synchronous voltage test circuit of a locomotive battery comprehensive tester according to claim 1 is characterized in that: The digital display total voltmeter (3) and the digital display voltmeter (10) are both passive digital display voltmeters.
4. The self-discharge synchronous voltage test circuit of a locomotive battery comprehensive tester according to claim 1 is characterized in that: The first high-power constant-temperature heating element (8), the second high-power constant-temperature heating element (6), and the third high-power constant-temperature heating element (4) are all PTC-type heating power elements, and their powers are 1.5 kW respectively.
5. The self-discharge synchronous voltage test circuit of a locomotive battery comprehensive tester according to claim 1 is characterized in that: The number of storage batteries (1) evenly distributed in the storage battery group is 12 boxes, each box of storage batteries (1) has a total of 4 single cells, each cell has a voltage of 8V, and the total voltage of the storage battery group is 96V.
