Drainage structure of double-end-face grinding machine

By designing components such as drainage tank, support box and hopper in the double-end grinder, the drainage blockage caused by debris precipitation in the grinding wastewater is solved, and a cleaning process without shutdown is achieved, and production efficiency is improved.

CN222037855UActive Publication Date: 2024-11-22XINXIANG SKAIF MASCH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421195056.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-29
Publication Date
2024-11-22
Estimated Expiration
2034-05-29

AI Technical Summary

Technical Problem

The debris in the grinding wastewater generated by the double-end grinder during the working process are prone to precipitation, resulting in blockage of the external drainage mechanism and affecting production efficiency.

Method used

A drainage structure including a drainage tank, a receiving box and a connecting hopper is designed. Through components such as adapter pipe, fixing plate, bristles, water outlet pipe and conveying pipe, debris deposits in the grinding wastewater are introduced into the connecting hopper and conveyed through the transfer pipe. The pipes and external screw barrels are rotated and cleaned to avoid shutdown operations.

Benefits of technology

It effectively prevents blockage of external drainage mechanisms, reduces the blockage caused by debris generated by grinding during drainage, improves production efficiency, and reduces downtime during cleaning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222037855U_ABST
    Figure CN222037855U_ABST
Patent Text Reader

Abstract

The utility model discloses a drainage structure of a double-end-face grinding machine, and relates to the related technical field of machining. The device comprises a drainage tank, a receiving box body and a receiving hopper, an adapter is fixedly communicated with a short edge of the top of the drainage tank, the receiving box body is fixedly communicated with the top end of the adapter, a fixing plate is fixed in the middle of one side, far away from the receiving box body, of the inner wall of the drainage tank, and two sides of the fixing plate are fixed on the inner wall of the drainage tank. Bristles are evenly fixed to the end, close to the bearing box body, of the fixing plate, a receiving hopper is fixed to the position, corresponding to the fixing plate, of the bottom of the drainage box, and the output end of the receiving hopper is fixedly communicated with a conveying pipe. Through the arrangement of the drainage box, the receiving box body, the receiving hopper and the receiving barrel, the problems that when a drainage structure of a double-end-face grinding machine works, chippings generated by grinding are precipitated, an external drainage mechanism is prone to being blocked, and when grinding chippings precipitated in waste water of the grinding machine are cleaned, shutdown work is needed, and the production efficiency is affected are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field related to mechanical processing, and particularly relates to a drainage structure of a double-end surface grinding machine. Background Art

[0002] The double-end face grinder is a two-face grinder, but in fact it is a grinder that can grind and polish both sides of the workpiece to be polished at the same time. Its working principle is simple, that is, the upper and lower grinding discs and the middle sun gear of the double-sided grinder rotate at the same time, and the carrier carries the workpiece to be ground and performs reciprocating sun gear motion between the two grinding discs, which can complete the grinding, grinding and polishing of both sides of workpieces of various materials. During the processing of the double-end face grinder, grinding wastewater will be generated, and the grinding wastewater will contain grinding debris. When the grinding debris is transported with the grinding wastewater, it needs to be discharged to the external environment through a drainage device, but it still has the following disadvantages in actual use:

[0003] When the drainage structure of the double-end grinder is working, when wastewater passes through it, the grinding debris contained in the wastewater will precipitate in the external drainage mechanism. After precipitation, the flow rate of wastewater in the external drainage mechanism will decrease, causing the external drainage mechanism to be blocked;

[0004] When the double-end surface grinder is working, a certain amount of grinding debris will accumulate in the drainage structure. Under the action of the grinding debris, it is easy to cause the drainage waterway to be blocked during use. At this time, the machine needs to be stopped to remove the debris generated by grinding, which affects the production efficiency. Utility Model Content

[0005] The purpose of the utility model is to provide a drainage structure for a double-end surface grinder. By arranging a drainage box, a receiving box body, a material receiving hopper and a material receiving barrel, the problem that the drainage structure of the double-end surface grinder is prone to blockage of the external drainage mechanism due to the precipitation of debris produced by grinding during operation, and the need to stop the machine when cleaning the grinding debris precipitated in the waste water of the grinder affects production efficiency is solved.

[0006] In order to solve the above technical problems, the utility model is realized by the following technical solutions:

[0007] The utility model discloses a drainage structure of a double-end surface grinding machine, comprising a drainage box, a receiving box body and a receiving hopper, a short side position of the top of the drainage box is fixedly connected with a transfer pipe, the top of the transfer pipe is fixedly connected with the receiving box body, a fixed plate is fixed in the middle of a side of the inner wall of the drainage box away from the receiving box body, both sides of the fixed plate are fixed on the inner wall of the drainage box, bristles are evenly fixed on one end of the fixed plate close to the receiving box body, a receiving hopper is fixed at the bottom of the drainage box corresponding to the position of the fixed plate, the output end of the receiving hopper is fixedly connected with a conveying pipe, a switch valve is fixed on the peripheral side of the conveying pipe, when working, water is passed through the drainage box, so that most of the grinding debris in the grinding waste water is precipitated, and the grinding debris is guided to the receiving hopper, the grinding debris in the grinding waste water is precipitated through the receiving hopper, and the grinding waste water is conveyed to the drainage box through the receiving box body and the transfer pipe.

[0008] Furthermore, a discharge port is provided at the bottom of the drainage box below the fixed plate, and the discharge port corresponds to the position of the receiving hopper. An end of the drainage box above the fixed plate away from the receiving box body is fixedly connected with an outlet pipe. The drainage box guides the debris into the receiving hopper through the discharge port, and discharges the water in the drainage box through the outlet pipe.

[0009] Furthermore, a base is fixed at the bottom of the drainage box corresponding to the position of the receiving box body, and a guide plate is fixed on the top of the base. When the drainage box is working, the corresponding grinding debris is transported through the base and the guide plate.

[0010] Furthermore, a mounting plate is fixed to the upper portion of the outer side of the receiving box body, the top of the mounting plate is flush with the top of the receiving box body, and the receiving box body is installed at the position for wastewater transportation through the mounting plate.

[0011] Furthermore, a fixing plate is fixed to the lower part of the peripheral side of the delivery pipe, an outer screw barrel is fixed to the outer side of the delivery pipe at the bottom end of the fixing plate, and the delivery pipe fixes the outer screw barrel through the fixing plate.

[0012] Furthermore, the peripheral side of the outer screw barrel is threadedly connected to a receiving barrel, and an internal thread is provided on the upper part of the receiving barrel. When the outer screw barrel is working, it is threadedly connected to the outer screw barrel through the internal thread.

[0013] The utility model has the following beneficial effects:

[0014] The utility model solves the problem that the debris generated by grinding in the drainage structure of the double-end surface grinder is easily blocked by the blockage of the external drainage mechanism when the double-end surface grinder is working by arranging a drainage box and a receiving box body. After the fine waste in the wastewater is settled, the wastewater contacts the fixed plate and is further blocked by the bristles, so that the fine waste in the wastewater is further blocked, so that the wastewater is transported to the outlet pipe and output through the outlet pipe, so that when the double-end surface grinder is working, the wastewater discharged by the external drainage mechanism and the debris generated by grinding is less, and it is not easy to cause the blockage of the external drainage mechanism.

[0015] The utility model solves the problem that the drainage structure of the double-end surface grinder needs to stop working to clean the grinding debris precipitated in the waste water of the grinder during operation, which affects the production efficiency. The fine and broken waste materials generated by grinding in the double-end surface grinder are guided into the receiving box along with the waste water, and then guided into the drainage box through the transfer tube, and then guided into the discharge port through the base and the guide plate in the drainage box, and then guided into the receiving hopper through the discharge port, and then guided into the conveying pipe through the receiving hopper, and then guided into the outer screw barrel through the conveying pipe, and then guided into the receiving barrel through the outer screw barrel. After working in the receiving barrel for a certain period of time, the switch valve is closed, the receiving barrel is unscrewed from the outer screw barrel, the ground fine and broken waste materials are dumped and cleaned, and then screwed back into the outer screw barrel, so that there is no need to stop working to clean the grinding debris precipitated in the waste water of the grinder, and the impact on work efficiency is smaller. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a stereoscopic diagram of the assembly structure of the drainage structure of a double-end surface grinding machine;

[0017] Figure 2 This is a three-dimensional diagram of the drainage box structure;

[0018] Figure 3 To undertake the three-dimensional diagram of the box structure;

[0019] Figure 4 It is a three-dimensional diagram of the receiving hopper structure;

[0020] Figure 5 It is a three-dimensional diagram of the receiving barrel structure.

[0021] Reference numerals:

[0022] 1. Drain box; 101. Base; 102. Guide plate; 103. Fixed plate; 104. Brush; 105. Water outlet pipe; 106. Discharge port; 2. Receiving box body; 201. Transfer tube; 202. Mounting plate; 3. Receiving hopper; 301. Delivery pipe; 302. Switch valve; 303. Fixed plate; 304. External screw barrel; 4. Receiving barrel; 401. Internal thread. DETAILED DESCRIPTION

[0023] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0024] See also Figure 1-4 As shown, the utility model is a drainage structure of a double-end surface grinder, including a drainage box 1, a receiving box body 2 and a receiving hopper 3. A transfer pipe 201 is fixedly connected at a short side position on the top of the drainage box 1. When the drainage box 1 is working, the grinding wastewater in the double-end surface grinder is transferred, and the drainage box 1 and the receiving box body 2 are connected through the transfer pipe 201. The top of the transfer pipe 201 is fixedly connected with the receiving box body 2. The receiving box body 2 transports the grinding wastewater in the double-end surface grinder to it for receiving. A fixed plate 103 is fixed in the middle of a side of the inner wall of the drainage box 1 away from the receiving box body 2. Both sides of the fixed plate 103 are fixed on the inner wall of the drainage box 1. The fixed plate 103 is evenly connected to the end of the fixed plate 103 close to the receiving box body 2. Brushes 104 are fixed on the fixed plate 103. When the fixed plate 103 is working, the fine grinding waste contained in the conveyed grinding waste water is blocked, and when the waste water is conveyed, the brushes 104 cooperate to further prevent the fine waste from moving above the fixed plate 103. A receiving hopper 3 is fixed on the bottom of the drainage box 1 corresponding to the position of the fixed plate 103. When the receiving hopper 3 is working, the waste in the grinding waste water is received and guided into the conveying pipe 301. The output end of the receiving hopper 3 is fixedly connected to the conveying pipe 301. The peripheral side of the conveying pipe 301 is fixed with a switch valve 302. The conveying pipe 301 guides the waste in the grinding waste water into the outer screw barrel 304, and the on-off of the conveying pipe 301 is controlled by the switch valve 302.

[0025] Among them Figure 1 , 2 As shown, a discharge port 106 is provided at the bottom of the drainage box 1 below the fixed plate 103, and the discharge port 106 corresponds to the position of the receiving hopper 3. An end of the drainage box 1 above the fixed plate 103 away from the receiving box body 2 is fixedly connected with a water outlet pipe 105. When the fixed plate 103 is working, the grinding waste in the drainage box 1 is guided to the receiving hopper 3 through the discharge port 106, and the water is discharged through the water outlet pipe 105.

[0026] Among them Figure 1 , 2 As shown, a base 101 is fixed at the bottom of the drainage box 1 corresponding to the position of the receiving box body 2, and a guide plate 102 is fixed on the top of the base 101. When the drainage box 1 is working, the base 101 cooperates with the guide plate 102 to guide the fine grinding waste in the double-end surface grinder to the discharge port 106 during the wastewater transportation process.

[0027] Among them Figure 1 , 3As shown, a mounting plate 202 is fixed to the upper portion of the outer side of the receiving box body 2, and the top of the mounting plate 202 is flush with the top of the receiving box body 2. When the receiving box body 2 is working, it is installed at the wastewater conveying position of the double-end surface grinder through the mounting plate 202.

[0028] Among them Figure 1 , 4 As shown, a fixed disk 303 is fixed to the lower part of the circumference of the delivery tube 301, and an outer screw barrel 304 is fixed to the outer side of the delivery tube 301 at the bottom of the fixed disk 303. When the delivery tube 301 is working, the outer screw barrel 304 is fixed by the fixed disk 303 and is threadedly connected to the receiving barrel 4 through the outer screw barrel 304.

[0029] Among them Figure 1 , 4 As shown in , 5, the peripheral side of the outer screw barrel 304 is threadedly connected with the receiving barrel 4, and the upper part of the receiving barrel 4 is provided with an internal thread 401. The receiving barrel 4 is threadedly connected to the peripheral side of the outer screw barrel 304 through the internal thread 401, and the solid grinding waste in the grinding wastewater is received through the receiving barrel 4.

[0030] The specific working principle of the utility model is as follows: when working, first align the receiving box body 2 with the wastewater conveying position, then align the outlet pipe 105 with the external drainage position, then insert the mounting bolts into the mounting plate 202, and then screw the mounting bolts into the mounting structure outside the wastewater conveying position, and then the wastewater can be conveyed, so that the finely crushed waste generated by grinding in the double-end grinder is guided into the receiving box body 2 along with the wastewater, and then guided into the drainage box 1 through the transfer pipe 201, and then the finely crushed grinding waste in the wastewater is guided to the discharge port 106 through the base 101 and the guide plate 102 in the drainage box 1, and then the finely crushed grinding waste in the wastewater is guided into the discharge port 106 through the discharge port 10 6 is guided to the receiving hopper 3, and then guided to the conveying pipe 301 through the receiving hopper 3, guided to the outer screw barrel 304 through the conveying pipe 301, and guided to the receiving barrel 4 through the outer screw barrel 304. After working in the receiving barrel 4 for a certain period of time, the switch valve 302 is closed, the receiving barrel 4 is screwed off from the outer screw barrel 304, the ground fine waste is dumped and cleaned, and then screwed back to the outer screw barrel 304. After the fine waste in the wastewater is precipitated, the wastewater contacts the fixed plate 103 and is further blocked by the bristles 104, so that the fine waste in the wastewater is further blocked, so that the wastewater is transported to the outlet pipe 105 and output through the outlet pipe 105.

[0031] The above are only preferred embodiments of the present invention and do not limit the present invention. Any modification to the technical solutions recorded in the aforementioned embodiments and any equivalent replacement of some of the technical features therein, any modification, equivalent replacement, and improvement made are all within the protection scope of the present invention.

Claims

1. A drainage structure for a double-end surface grinding machine, comprising a drainage box (1), a receiving box body (2) and a receiving hopper (3), characterized in that: A transfer tube (201) is fixedly connected to a short side position of the top of the drainage box (1), and the top of the transfer tube (201) is fixedly connected to a receiving box body (2). A fixing plate (103) is fixed to the middle of a side of the inner wall of the drainage box (1) away from the receiving box body (2), and both sides of the fixing plate (103) are fixed to the inner wall of the drainage box (1). Brushes (104) are evenly fixed to one end of the fixing plate (103) close to the receiving box body (2). A receiving hopper (3) is fixed to the bottom of the drainage box (1) corresponding to the position of the fixing plate (103), and the output end of the receiving hopper (3) is fixedly connected to a conveying pipe (301), and a switch valve (302) is fixed to the peripheral side of the conveying pipe (301).

2. The drainage structure of a double-end surface grinding machine according to claim 1, characterized in that: A discharge port (106) is provided at the bottom of the drainage box (1) below the fixed plate (103), and the discharge port (106) corresponds to the position of the receiving hopper (3). An end of the drainage box (1) above the fixed plate (103) away from the receiving box body (2) is fixedly connected to a water outlet pipe (105).

3. The drainage structure of a double-end surface grinding machine according to claim 2, characterized in that: A base (101) is fixed at the bottom of the drainage box (1) corresponding to the position of the receiving box body (2), and a guide plate (102) is fixed at the top of the base (101).

4. The drainage structure of a double-end surface grinding machine according to claim 1, characterized in that: A mounting plate (202) is fixed to the upper portion of the outer side of the receiving box body (2), and the top end of the mounting plate (202) is flush with the top end of the receiving box body (2).

5. The drainage structure of a double-end surface grinding machine according to claim 1, characterized in that: A fixed disk (303) is fixed to the lower part of the peripheral side of the delivery tube (301), and an outer screw barrel (304) is fixed to the outer side of the delivery tube (301) at the bottom end of the fixed disk (303).

6. The drainage structure of a double-end surface grinding machine according to claim 5, characterized in that: The peripheral side of the outer screw barrel (304) is threadedly connected to a material receiving barrel (4), and an internal thread (401) is formed in the upper portion of the material receiving barrel (4).