Hidden water tank iron stand

By introducing the interference fit between elastic pretension parts and foot support rods in the hidden water tank iron frame, the friction force is provided to prevent slipping, and the pre-locking function is achieved through the connection between bolts and nuts, the hidden water tank iron frame is solved. The problem of inconvenience in installation when adjusting the height has achieved convenient installation by single workers and improved installation efficiency.

CN222044374UActive Publication Date: 2024-11-22OCEANWELL XIAMEN IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323663349.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-11-22
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

When adjusting the height of the hidden water tank iron frame, due to the weight of the main frame, two workers usually need to cooperate with the lifting and locking bolts, which is inconvenient to install.

Method used

A concealed water tank iron frame with pre-tightening function is designed, using elastic pre-tightening parts to interfere with the foot support rod to provide friction to prevent the main frame from sliding off, and the pre-locking function is achieved through the connection of bolts and nuts. , allowing single workers to lock the bolts directly after adjusting the height.

Benefits of technology

It realizes convenient installation for single workers, reduces manpower demand, improves installation efficiency and safety, and avoids the risk that the main frame will naturally fall due to its own weight.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222044374U_ABST
    Figure CN222044374U_ABST
Patent Text Reader

Abstract

The utility model discloses a hidden type water tank iron stand which comprises a main body frame and two foot margin supporting rods which are arranged in a bilateral symmetry mode, the upper portions of the foot margin supporting rods are inserted into the main body frame and support the main body frame, the main body frame and the foot margin supporting rods are connected and locked through bolts and nuts, the nuts are located in the foot margin supporting rods, and the foot margin supporting rods are fixedly connected with the main body frame. A long-strip-shaped hole used for receding is formed in the position, corresponding to the bolt, of the side wall of the foot margin supporting rod, an elastic pre-tightening piece is arranged in the foot margin supporting rod, the elastic pre-tightening piece is connected with the nut, and the elastic pre-tightening piece synchronously moves along with the main body frame when the height is adjusted. The elastic pre-tightening piece is arranged in the foot margin supporting rod and is in interference fit with the foot margin supporting rod, and the friction force between the elastic pre-tightening piece and the foot margin supporting rod prevents the main body frame from naturally sliding off when the bolt is unscrewed. The main body frame has a pre-locking function due to the action of the elastic pre-tightening piece, so that the bolt can be directly tightened after the height of the main body frame is adjusted, and the installation is convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a hidden water tank iron frame, in particular to a hidden water tank iron frame with a pre-tightening function. Background Art

[0002] The height of the hidden water tank iron frame needs to be adjusted according to the site conditions during installation. The hidden water tank iron frame includes a main frame and a ground support rod. The height adjustment is to adjust the height of the main frame by telescoping the ground support rod. After adjustment, tighten the bolts to lock the ground support rod and the main frame together. However, during the adjustment process, the main frame needs to be lifted all the time, otherwise the main frame will fall naturally due to its own weight, so it is impossible or difficult for one worker to complete the installation. Therefore, after adjusting the height of the main frame, one worker needs to lift the main frame and another worker locks the bolts, which makes installation inconvenient. Utility Model Content

[0003] The utility model provides a hidden water tank iron frame with a pre-tightening function, which overcomes the shortcomings of the background technology.

[0004] The technical solution adopted by the utility model to solve its technical problems is:

[0005] The hidden water tank iron frame includes a main frame and two anchor support rods symmetrically arranged on the left and right. The upper part of the anchor support rod is inserted into the main frame and supports the main frame. The main frame and the anchor support rod are connected and locked by bolts and nuts. The nut is located in the anchor support rod. The side wall of the anchor support rod is provided with a long hole for making way corresponding to the bolt. An elastic preload is arranged in the anchor support rod. The elastic preload is connected to the nut. The elastic preload moves synchronously with the main frame when the height is adjusted. The elastic preload is placed in the anchor support rod and has an interference fit with the anchor support rod. The friction between the elastic preload and the anchor support rod prevents the main frame from sliding naturally when the bolt is unscrewed.

[0006] The elastic preload is connected to the main frame through bolts and nuts. The elastic preload has an interference fit with the anchor support rod. The friction between the two can prevent the main frame from falling due to its own weight when the bolts are not tightened. In other words, even if the bolts are loosened, the main frame will not fall automatically due to the interference fit between the elastic preload and the anchor support rod. Of course, the friction between the elastic preload and the anchor support rod can be overcome under the action of external force and drive the main frame to rise and fall. Therefore, the main frame has a pre-locking function due to the elastic preload, so that after adjusting the height of the main frame, the bolts can be tightened directly, which is convenient for installation.

[0007] In a preferred embodiment, the elastic preload member is provided with a guide protrusion on one side facing the elongated hole, and the guide protrusion extends into the elongated hole. The guide protrusion can make the elastic preload member slide more smoothly in the anchor support rod, and the elastic preload member is not easily distorted due to its own elastic deformation ability.

[0008] In a preferred embodiment, a groove is provided in the elastic preload member corresponding to the nut, and the nut is embedded in the groove, so that the installation of the nut is convenient, that is, the nut is positioned when it is placed in the groove.

[0009] In a preferred embodiment, the elastic preload member is a D-shaped hollow structure, including a vertical side and a C-shaped side, and the groove and the guide protrusion are arranged on the vertical side. The hollow structure not only has better elastic deformation force, but also has a simple structure.

[0010] In a preferred embodiment: the upper and lower parts of the C-shaped edge are provided with stopper convex blocks respectively, and in the front view projection, the stopper convex blocks are located inside the outermost end of the C-shaped edge. The stopper convex blocks can play a supporting role, that is, during the vertical sliding process of the elastic preload member, if excessive deformation occurs due to the friction between the elastic preload member and the anchor support rod, the stopper convex blocks can lean against the side wall of the anchor support rod to prevent the elastic preload member from further deformation and jamming.

[0011] In a preferred embodiment: a washer and a gasket are sleeved on the bolt, and the gasket is tightened between the bolt and the gasket and presses the gasket against the side wall of the main frame.

[0012] In a preferred embodiment, the nut is a flange nut. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0014] Figure 1 A three-dimensional exploded schematic diagram of a hidden water tank iron frame is drawn.

[0015] Figure 2 Draws Figure 1 The enlarged schematic diagram of the dotted box.

[0016] Figure 3 Draws Figure 1 Schematic diagram of the elastic preload member of the hidden water tank iron frame in the anchor support rod.

[0017] Figure 4 Draws Figure 1 The schematic cross-sectional view of the concealed water tank iron frame at the bolt position is shown. DETAILED DESCRIPTION

[0018] Please refer to Figures 1 to 4The hidden water tank iron frame includes a main frame 10 and two anchor support rods 20 symmetrically arranged on the left and right. The upper part of the anchor support rod is inserted into the main frame and supports the main frame. The main frame 10 and the anchor support rod 20 are connected and locked by bolts 30 and nuts 40. The nuts 40 are located in the anchor support rod 20. The side wall of the anchor support rod 20 is provided with a long hole 22 for making way corresponding to the bolt 30. The structure of the main frame and the anchor support rod can refer to the existing structure. An elastic preload 50 is arranged in the anchor support rod 20. The elastic preload 50 is connected to the nut 40. In this way, when the bolt 30 is turned, the nut 40 is connected to the elastic preload 50, and the elastic preload 50 is restricted in the anchor support rod 20. Therefore, when the bolt 30 is turned, the nut 40 will not rotate, and the nut can be tightened smoothly. In other words, the connection between the elastic preload and the nut can limit the rotation of the spiral. The elastic preload 50 moves vertically synchronously with the main frame 10 when adjusting the height. The elastic preload 50 is placed in the anchor support rod 20 and has an interference fit with the anchor support rod. The friction between the elastic preload 50 and the anchor support rod 20 prevents the main frame 10 from sliding down naturally when the bolt 30 is unscrewed. In this way, when adjusting the height of the main frame, the worker only needs to pull the main frame to the required height. After letting go, the main frame will not fall due to the interference fit between the elastic preload and the anchor support rod, and one worker can tighten the bolt.

[0019] Preferably, the elastic preload member 50 is provided with a guide protrusion 52 on a side facing the elongated hole, and the guide protrusion 52 extends into the elongated hole 22 .

[0020] Preferably, a groove 54 is provided in the elastic preload member 50 corresponding to the nut 40, and the nut 40 is embedded in the groove 54. In this embodiment, the nut is a hexagonal nut, and the groove is a hexagonal groove.

[0021] Preferably, the elastic preload member 50 is a D-shaped hollow structure, including a vertical edge 50-1 and a C-shaped edge 50-2, and the groove 54 and the guide protrusion 522 are arranged on the vertical edge 50-1. The C-shaped edge 50-2 can provide better and stronger deformation ability, so that the thin sheet-like C-shaped edge can be interference-fitted with the anchor support rod to generate sufficient friction.

[0022] Preferably, the upper and lower parts of the C-shaped edge 50-2 are provided with stopper protrusions 56, respectively, and in the front view projection, the stopper protrusions 56 are located inside the outermost end of the C-shaped edge. That is to say, in a normal state, the outermost end of the C-shaped edge 50-2 presses against the side wall of the anchor support rod 20, and the stopper protrusions 56 do not touch the side wall of the anchor support rod 20. Only when the elastic preload member is deformed during vertical sliding, the stopper protrusions 56 will lean against the side wall of the anchor support rod 20 to prevent the elastic preload member from further deforming.

[0023] Preferably, a washer 60 and a gasket 70 are sleeved on the bolt 30 , and the gasket 70 is tightened between the bolt 30 and the gasket 60 and presses the gasket 60 against the side wall of the main frame 10 .

[0024] Preferably, the nut 40 is a flange nut.

[0025] The above description is only a preferred embodiment of the present invention, and therefore cannot be used to limit the scope of implementation of the present invention. That is, equivalent changes and modifications made according to the patent scope of the present invention and the contents of the specification should still fall within the scope covered by the present invention.

Claims

1. A concealed water tank iron frame, comprising a main frame and two symmetrically arranged anchor rods, wherein the upper portion of the anchor rods is inserted into the main frame and supports the main frame, the main frame and the anchor rods are connected and locked by bolts and nuts, the nuts are located in the anchor rods, and the side walls of the anchor rods are provided with long holes for making way corresponding to the bolts, characterized in that: An elastic preload is provided in the anchor support rod, and the elastic preload is connected to the nut. The elastic preload moves synchronously with the main frame when the height is adjusted. The elastic preload is placed in the anchor support rod and has an interference fit with the anchor support rod. The friction between the elastic preload and the anchor support rod prevents the main frame from sliding off naturally when the bolt is unscrewed.

2. The hidden water tank iron frame according to claim 1, characterized in that: The elastic preload member is provided with a guide protrusion on one side facing the elongated hole, and the guide protrusion extends into the elongated hole.

3. The hidden water tank iron frame according to claim 2 is characterized in that: A groove is provided in the elastic preload component corresponding to the nut, and the nut is embedded in the groove.

4. The hidden water tank iron frame according to claim 3 is characterized in that: The elastic preload member is a D-shaped hollow structure, including a vertical edge and a C-shaped edge, and the groove and the guide protrusion are arranged on the vertical edge.

5. The hidden water tank iron frame according to claim 4, characterized in that: The upper and lower parts of the C-shaped edge are respectively provided with stop bulges, and in the front view projection, the stop bulges are located inside the outermost end of the C-shaped edge.

6. The hidden water tank iron frame according to claim 1, characterized in that: A washer and a gasket are sleeved on the bolt, and the gasket is stretched between the bolt and the gasket and presses the gasket against the side wall of the main frame.

7. The hidden water tank iron frame according to claim 1 or 3, characterized in that: The nut is a flange nut.