Anti-blocking and anti-backfilling device for grouting drilling

By designing anti-blocking and anti-backfill devices for grouting drilling holes with lifting mechanisms, slag conveying pipes, slag coupling plates and movable baffles, the problems of waste slag backfill and blockage in grouting drilling are solved, and the effective discharge of waste slag and Improved grouting effect.

CN222066681UActive Publication Date: 2024-11-26KUNMING ENG & RES INST OF NONFERROUS METALLURGY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420638838.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-29
Publication Date
2024-11-26
Estimated Expiration
2034-03-29

AI Technical Summary

Technical Problem

The existing grouting drilling devices are prone to poor drilling results due to waste slag backfilling and blockage during the drilling process, and soil or waste slag may enter through the grouting drill pipe and cause blockage.

Method used

A grouting drilling anti-blocking and anti-backfilling device including lifting mechanism, slag conveying pipe, slag connecting plate, slag pushing impeller and movable baffle is designed. The waste slag is brought out through the slag conveying pipe and accumulated in the slag connecting plate. , use the waste slag conveying mechanism to discharge waste slag, and use the movable baffle to prevent soil or waste slag from entering the grouting drill rod.

Benefits of technology

It effectively avoids waste slag backfill and blockage problems, improves grouting effect, and ensures the continuity and efficiency of the drilling process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222066681U_ABST
    Figure CN222066681U_ABST
Patent Text Reader

Abstract

The utility model provides an anti-blocking and anti-backfilling device for grouting drilling, which comprises a rack and a grouting drill rod, a lifting mechanism is arranged on the rack, the grouting drill rod is connected with the lifting mechanism, the upper portion of the grouting drill rod is connected with external slurry supply equipment through a pipeline, a slurry outlet is arranged on the lower portion of the grouting drill rod, and a drill bit is arranged at the lower end of the grouting drill rod. The device is characterized in that a slag conveying pipe connected with the grouting drill rod in a sleeved mode is arranged on the machine frame, the lower end of the slag conveying pipe is provided with an opening which is a slurry outlet and a slag inlet, a slag receiving disc is arranged at the upper end of the slag conveying pipe, one side of the slag receiving disc is connected with a slag discharging groove through a waste slag conveying mechanism, and a movable baffle is arranged at the position of the slurry outlet in the lower portion of the grouting drill rod. The movable baffle is arranged in the slag receiving disc, so that waste slag brought out by the grouting drill rod is accumulated in the slag receiving disc, conveyed into the slag discharging groove through the waste slag conveying mechanism and then discharged, the phenomenon that the waste slag is backfilled into a drill hole due to collapse at the drill hole is avoided, the movable baffle only allows the slurry outlet to discharge slurry, the phenomenon that mud and the waste slag flow backwards into the grouting drill rod through the slurry outlet to cause blockage is avoided, and the grouting effect is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to an anti-blocking and anti-backfilling device, in particular to an anti-blocking and anti-backfilling device for grouting drilling, and belongs to the technical field of design and manufacture of solid waste treatment and ecological restoration devices. Background Art

[0002] Acidic waste residue refers to solid waste with a pH value greater than 2 and less than 6. When disposing of sites with acidic waste residue, the acidic waste residue can be neutralized by injecting lime water into the site through a grouting drilling device. During the drilling process of the grouting drilling device, the threads on the grouting drill rod will drive the waste residue in the hole upward and discharge it. The discharged waste residue usually accumulates around the top of the hole. Once the grouting drill rod is pulled out, it will collapse, causing the waste residue to backfill the hole and affect the drilling effect. At the same time, when the grouting drill rod is drilling, soil or waste residue may enter the grouting drill rod through the grouting port on the grouting drill rod, causing the grouting drill rod to be blocked and affecting the grouting effect. Therefore, it is necessary to improve the existing technology. Summary of the invention

[0003] In order to solve the problem of waste backfilling and clogging of grouting drill rods in existing grouting drilling holes, the utility model provides a grouting drilling hole anti-clogging and anti-backfilling device.

[0004] The utility model is completed by the following technical scheme: a grouting drilling anti-blocking and anti-backfilling device, comprising a frame with a lifting mechanism on it, and a grouting drill rod connected to the lifting mechanism, the upper part of the grouting drill rod is connected to an external slurry supply device through a pipeline, and the lower part is provided with a slurry outlet, and the lower end of the grouting drill rod is provided with a drill bit, which is characterized in that a slag conveying pipe sleeved with the grouting drill rod is provided on the frame, the lower end of the slag conveying pipe is open, and the open end is both a slurry outlet and a slag inlet, and a slag receiving pan is provided at the upper end of the slag conveying pipe, and one side of the slag receiving pan is connected to a slag discharge trough through a waste slag conveying mechanism, and A movable baffle is provided at the slurry outlet at the lower part of the grouting drill rod, so that when the grouting drill rod moves downward and rotates to drill a hole driven by the lifting mechanism, the slurry is transported to the borehole through the pipeline, and the waste slag brought out by the grouting drill rod is accumulated in the slag receiving tray through the slag conveying pipe. Then, the waste slag in the slag receiving tray is discharged to the outside through the slag discharge trough by the waste slag conveying mechanism, so as to avoid the waste slag from backfilling into the borehole due to collapse at the borehole. The movable baffle at the slurry outlet at the lower part of the grouting drill rod can effectively prevent soil or waste slag from entering the grouting drill rod through the slurry outlet, causing blockage of the grouting drill rod.

[0005] The slag receiving pan is composed of a circular horizontal bottom plate and a vertical side plate surrounding the edge of the circular horizontal bottom plate. The top of the slag receiving pan is set to be open, a first through hole is opened in the center of the circular horizontal bottom plate, and a discharge port is opened on the vertical side plate. The discharge port is connected to the inner end of the slag discharge trough, and the outer end of the slag discharge trough extends obliquely downward to the outside so that the waste slag from the drilling hole can be carried out by the grouting drill rod through the slag receiving pan and discharged outward through the slag discharge trough.

[0006] The slag conveying pipe is configured as a vertical pipe, the upper end of which is connected to the first through hole on the circular horizontal bottom plate of the slag receiving pan, and the lower end is matched with the drill hole. A connecting plate is provided between the slag conveying pipe and the frame. The inner diameter of the slag conveying pipe is adapted to the outer diameter of the grouting drill rod so that all the waste slag brought out by the grouting drill rod can enter the slag receiving pan through the slag conveying pipe.

[0007] The waste slag conveying mechanism comprises: a turntable arranged on a circular horizontal bottom plate of a slag receiving plate, a through slot is provided on the turntable and on a vertical side plate of the slag receiving plate at a position connected to the slag discharge chute, a slag pushing impeller is provided on the through slot, and a driving member connected to the turntable and the slag pushing impeller is provided on the outer side of the slag receiving plate, wherein:

[0008] The turntable is a horizontal disk with a second through hole at the center, the outer diameter of the horizontal disk is adapted to the inner diameter of the slag receiving plate, and a gear ring is provided at the outer edge of the turntable, and an annular groove coaxial with the second through hole is provided at the bottom of the turntable, through which the turntable is slidably connected with an annular track provided on the circular horizontal bottom plate of the slag receiving plate, and the second through hole is connected with the first through hole;

[0009] The slag pushing impeller comprises a wheel shaft, a plurality of vertical blades arranged on the wheel shaft and evenly spaced around the wheel shaft, the lower end of the wheel shaft of the slag pushing impeller passes through the bearing on the circular horizontal bottom plate of the slag receiving plate, and is connected to the driven gear, and the driven gear is meshed with the gear ring on the outer edge of the rotating plate;

[0010] The driving member includes a power machine arranged outside the vertical side plate of the slag receiving plate, the driving shaft of the power machine passes through the seat bearing arranged on the outer wall of the vertical side plate and is connected to the driving gear, and the driving gear is meshed with the gear ring on the outer edge of the rotating plate;

[0011] The waste slag brought out by the grouting drill rod during operation can be sent to the turntable through the slag conveying pipe, the first through hole and the second through hole, and then the driving gear, the turntable, the driven gear and the slag pushing impeller are driven by the power machine to rotate in sequence, so as to continuously push the waste slag on the turntable into the slag discharge trough to realize uninterrupted discharge of the waste slag.

[0012] The movable baffle is vertically arranged at the slurry outlet at the lower end of the grouting drill rod, and its shape is adapted to the shape of the slurry outlet. The upper end of the movable baffle is hinged to the upper end of the slurry outlet through a horizontal hinge shaft, and the lower end is suspended. A boss is provided on the inner side of the lower end of the slurry outlet to prevent the lower end of the movable baffle from swinging inward, so that the movable baffle can be prevented from swinging inward toward the slurry outlet by the boss, and can only swing outward around the horizontal hinge shaft to discharge slurry, effectively preventing soil and waste residue from entering the grouting drill rod through the slurry outlet and causing blockage.

[0013] The utility model has the following advantages and effects: by adopting the above scheme, the waste slag brought out by the grouting drill rod is accumulated in the slag receiving tray through the slag conveying pipe, and then the waste slag in the slag receiving tray is sent to the slag discharge trough and discharged outside through the waste slag conveying mechanism, thereby avoiding the backfill problem caused by the collapse of the waste slag at the drilling site. When drilling, the slurry outlet on the grouting drill rod is blocked by a movable baffle to prevent the waste slag from entering the grouting drill rod through the slurry outlet, causing blockage and affecting the overall grouting effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a three-dimensional diagram of the utility model;

[0015] Figure 2 It is a cross-sectional view of the utility model;

[0016] Figure 3 for Figure 2 AA view;

[0017] Figure 4 for Figure 2 B is a partial enlarged view;

[0018] Figure 5 for Figure 2 A partial enlarged view of C. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. Example

[0020] like Figure 1-Figure 5The utility model provides a grouting drilling anti-blocking and anti-backfilling device, comprising a frame 5 on which a lifting mechanism 7 is arranged, and a grouting drill rod 6 connected to the lifting mechanism 7 and rising or falling with the lifting mechanism 7, wherein the upper part of the grouting drill rod 6 is connected to an external slurry supply device through a pipeline 8, and a slurry outlet 15 is arranged at the lower part, and a drill bit is arranged at the lower end of the grouting drill rod 6, wherein: a slag conveying pipe 1 sleeved with the grouting drill rod 6 is arranged on the frame 5, and the lower end of the slag conveying pipe 1 is open, which is both a slurry outlet and a slag inlet, and a slag receiving pan 3 is arranged at the upper end of the slag conveying pipe 1, and one side of the slag receiving pan 3 is connected to a slag discharge trough 10 through a waste slag conveying mechanism. A movable baffle 26 is provided at the slurry outlet 15, so that when the grouting drill rod 6 moves downward and rotates to drill the hole under the drive of the lifting mechanism 7, the slurry is transported to the borehole through the pipeline 8, and the waste slag brought out by the grouting drill rod 6 is accumulated in the slag receiving tray 3 through the slag conveying pipe 1, and then the waste slag in the slag receiving tray 3 is discharged through the slag discharge trough 10 by the waste slag conveying mechanism, so as to avoid the waste slag from backfilling into the borehole due to collapse at the borehole, and the movable baffle 26 at the slurry outlet 15 at the lower part of the grouting drill rod 6 effectively prevents soil or waste slag from entering the grouting drill rod 6 through the slurry outlet 15, causing the grouting drill rod 6 to be blocked;

[0021] The slag receiving pan 3 is formed by a circular horizontal bottom plate and a vertical side plate around the edge of the circular horizontal bottom plate. The top of the slag receiving pan 3 is set to be open. A first through hole 14 is opened in the center of the circular horizontal bottom plate. A discharge port 21 is opened on the vertical side plate. The discharge port 21 is connected to the inner end of the slag discharge trough 10. The outer end of the slag discharge trough 10 extends obliquely downward to the outside, so that the slag from the drilling hole can be carried out by the grouting drill rod 6 through the slag receiving pan 3, and the slag can be discharged outward through the slag discharge trough 10.

[0022] The slag conveying pipe 1 is set as a vertical pipe, the upper end of which is connected to the first through hole 14 on the circular horizontal bottom plate of the slag receiving pan 3, and the lower end is matched with the drill hole. A connecting plate 11 is provided between the slag conveying pipe 1 and the frame 5. The inner diameter of the slag conveying pipe 1 is adapted to the outer diameter of the grouting drill rod 6, so that the waste slag brought out by the grouting drill rod 6 can all enter the slag receiving pan 3 through the slag conveying pipe 1;

[0023] The waste slag conveying mechanism includes: a turntable 4 arranged on a circular horizontal bottom plate of a slag receiving plate 3, a through slot 19 is provided on the turntable 4 and on a vertical side plate of the slag receiving plate 3 at a connection with the slag discharge trough 10, a slag pushing impeller 9 is provided on the through slot 19, and a driving member 2 connected to the turntable 4 and the slag pushing impeller 9 is provided on the outer side of the slag receiving plate 3, wherein:

[0024] The turntable 4 is set as a horizontal disk with a second through hole 17 at the center. The outer diameter of the horizontal disk is adapted to the inner diameter of the slag receiving pan 3, and a gear ring 18 is provided at the outer edge of the turntable 4. An annular groove 24 coaxial with the second through hole 17 is provided at the bottom of the turntable 4. The turntable 4 is slidably connected with an annular track 25 provided on the circular horizontal bottom plate of the slag receiving pan 3 through the annular groove 24, and the second through hole 17 is connected with the first through hole 14.

[0025] The slag pushing impeller 9 includes a wheel shaft 13, a plurality of vertical blades 12 arranged on the wheel shaft 13 and evenly spaced around the wheel shaft 13, the lower end of the wheel shaft 13 of the slag pushing impeller 9 passes through the bearing on the circular horizontal bottom plate of the slag receiving plate 3, and is connected to the driven gear 20, and the driven gear 20 is meshed with the gear ring 18 on the outer edge of the rotating plate 4;

[0026] The driving member 2 includes a power machine 23 disposed on the outer side of the vertical side plate of the slag receiving plate 3. The driving shaft of the power machine 23 passes through the seat bearing 22 disposed on the outer wall of the vertical side plate and is connected to the driving gear 16. The driving gear 16 is meshed with the gear ring 18 on the outer edge of the rotating disk 4.

[0027] In order to deliver the waste slag brought out by the grouting drill rod 6 during operation to the turntable 4 through the slag conveying pipe 1, the first through hole 14, and the second through hole 19, and then drive the driving gear 16, the turntable 4, the driven gear 20, and the slag pushing impeller 9 to rotate in sequence through the power machine 23, and continuously push the waste slag on the turntable 4 into the slag discharge trough 10, so as to realize the uninterrupted discharge of the waste slag;

[0028] The movable baffle 26 is vertically arranged at the slurry outlet 15 at the lower end of the grouting drill rod 6, and its shape is adapted to the shape of the slurry outlet 15. The upper end of the movable baffle 26 is hinged to the upper end of the slurry outlet 15 through a horizontal hinge shaft 27, and the lower end is suspended. A boss 28 is provided on the inner side of the lower end of the slurry outlet 15 to prevent the lower end of the movable baffle 26 from swinging inward, so that the movable baffle 26 can be prevented from swinging inward toward the slurry outlet 15 by the boss 28, and can only swing outward around the horizontal hinge shaft 27 to discharge slurry, effectively preventing soil and waste residue from entering the grouting drill rod 6 through the slurry outlet 15 and causing blockage.

[0029] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0030] The preferred embodiments of the utility model disclosed above are only used to help explain the utility model. The preferred embodiments do not describe all the details in detail, nor do they limit the utility model to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the utility model, so that technicians in the relevant technical field can well understand and use the utility model. The utility model is limited only by the claims and their full scope and equivalents.

Claims

1. A grouting drilling anti-blocking and anti-backfilling device, comprising a frame with a lifting mechanism on it, and a grouting drill rod connected to the lifting mechanism, the upper part of the grouting drill rod is connected to an external grout supply device through a pipeline, the lower part is provided with a grout outlet, and the lower end of the grouting drill rod is provided with a drill bit, characterized in that A slag conveying pipe which is sleeved with the grouting drill rod is provided on the frame. The lower end of the slag conveying pipe is open, which is both a slurry outlet and a slag inlet. A slag receiving pan is provided at the upper end of the slag conveying pipe. One side of the slag receiving pan is connected to the slag discharge trough through a waste slag conveying mechanism, and a movable baffle is provided at the slurry outlet at the lower part of the grouting drill rod.

2. The grouting drilling anti-blocking and anti-backfilling device according to claim 1 is characterized in that The slag receiving pan is composed of a circular horizontal bottom plate and a vertical side plate surrounding the edge of the circular horizontal bottom plate. The top of the slag receiving pan is set to be open. A first through hole is opened in the center of the circular horizontal bottom plate, and a discharge port is opened on the vertical side plate. The discharge port is connected to the inner end of the slag discharge trough, and the outer end of the slag discharge trough extends obliquely downward to the outside.

3. The grouting drilling anti-blocking and anti-backfilling device according to claim 1 is characterized in that The slag conveying pipe is configured as a vertical pipe, the upper end of which is connected to the first through hole on the circular horizontal bottom plate of the slag receiving plate, and the lower end is matched with the drill hole. A connecting plate is provided between the slag conveying pipe and the frame, and the inner diameter of the slag conveying pipe is adapted to the outer diameter of the grouting drill rod.

4. The grouting drilling anti-blocking and anti-backfilling device according to claim 1 is characterized in that The waste slag conveying mechanism comprises: a turntable arranged on a circular horizontal bottom plate of a slag receiving plate, a through slot is provided on the turntable and on a vertical side plate of the slag receiving plate at a position connected to the slag discharge chute, a slag pushing impeller is provided on the through slot, and a driving member connected to the turntable and the slag pushing impeller is provided on the outer side of the slag receiving plate, wherein: The turntable is a horizontal disk with a second through hole at the center, the outer diameter of the horizontal disk is adapted to the inner diameter of the slag receiving plate, and a gear ring is provided at the outer edge of the turntable, and an annular groove coaxial with the second through hole is provided at the bottom of the turntable, through which the turntable is slidably connected with an annular track provided on the circular horizontal bottom plate of the slag receiving plate, and the second through hole is connected with the first through hole; The slag pushing impeller comprises a wheel shaft, a plurality of vertical blades arranged on the wheel shaft and evenly spaced around the wheel shaft, the lower end of the wheel shaft of the slag pushing impeller passes through the bearing on the circular horizontal bottom plate of the slag receiving plate, and is connected to the driven gear, and the driven gear is meshed with the gear ring on the outer edge of the rotating plate; The driving member comprises a power machine arranged outside the vertical side plate of the slag receiving plate, the driving shaft of the power machine passes through the seat bearing arranged on the outer wall of the vertical side plate and is connected to the driving gear, and the driving gear is meshed with the gear ring on the outer edge of the turntable.

5. The grouting drilling anti-blocking and anti-backfilling device according to claim 1 is characterized in that The movable baffle is vertically arranged at the slurry outlet at the lower end of the grouting drill rod, and its shape is adapted to the shape of the slurry outlet. The upper end of the movable baffle is hinged to the upper end of the slurry outlet through a horizontal hinge shaft, and the lower end is suspended in the air. A boss is provided on the inner side of the lower end of the slurry outlet to prevent the lower end of the movable baffle from swinging inward.