Electric heating steam boiler
By introducing pressure, water level and sampling and sewage discharge monitoring systems into the electric heating steam boiler, safety accidents and steam quality problems caused by inadequate monitoring in the existing technology are solved, and efficient and safe operation of steam boilers is achieved.
Patent Information
- Application Number
- CN202323580637.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-26
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2033-12-26
AI Technical Summary
Due to inadequate monitoring of existing electric heating steam boilers, the water level in the boiler is too low or the pressure is too high, which may cause safety accidents and affect the quality of the outlet steam.
An electric heating steam boiler is designed, including pressure monitoring components, sampling components, sewage discharge components and water level monitoring components. Real-time monitoring and automatic adjustment are achieved through liquid level sensors and pressure controllers. The heating components are heated efficiently using electric heating components to ensure the furnace. The internal water level and pressure are within a safe range, and the water supply quality is monitored through sampling and sewage outlets.
It realizes efficient and safe operation of the boiler, ensures the quality of the export steam, and avoids safety accidents through real-time monitoring and automatic control.
Smart Images

Figure CN222068479U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of boilers, in particular to an electric heating steam boiler. Background Art
[0002] Traditional steam boilers usually use coal or gas, which has problems such as low efficiency and environmental pollution. Therefore, electric heating steam boilers have appeared on the market. Electric heating steam boilers are electric steam boilers. Simply put, they are steam boilers heated by electricity. Specifically, they refer to a pressure vessel equipment that converts electric heat into thermal energy to heat water to produce steam. However, due to inadequate monitoring of existing electric heating steam boilers, safety accidents may occur due to low water level in the boiler or excessive pressure in the furnace. At the same time, the failure to discharge waste in the furnace in time will also affect the quality of the exported steam. Utility Model Content
[0003] The utility model proposes an electric heating steam boiler to solve the problems that the existing electric heating steam boiler may cause safety accidents due to low water level in the boiler or excessive pressure in the furnace due to inadequate monitoring, and the quality of outlet steam may be affected if sewage is not discharged in time in the furnace.
[0004] The technical solution adopted by the utility model to solve the above technical problems is:
[0005] An electric heating steam boiler comprises a furnace body, a pressure monitoring component, a sampling component, a sewage discharge component, a water level monitoring component and a plurality of heating components. The furnace body is horizontally arranged, and the plurality of heating components are respectively inserted into the middle side wall of the furnace body along the width direction. The middle part of the heating component is fixed to the inside of the furnace body through a support frame. A pressure gauge pipe seat is provided on the front side of the upper part of the furnace body, and the pressure monitoring component is connected to the pressure gauge pipe seat. A main steam pipe seat is provided in the middle part of the upper part of the furnace body, and the main steam pipe seat is connected to the main steam pipeline. A water supply pipe seat is provided on the rear side of the upper part of the furnace body, and the water supply pipe seat is connected to the water supply pipeline. A sampling interface pipe seat is provided on the rear side of the middle part of the furnace body, and the sampling component is connected to the sampling interface pipe seat. A water level gauge pipe seat is provided on the front side of the middle part of the furnace body, and the water level monitoring component is connected to the water level gauge pipe seat. The sewage discharge component is arranged at the bottom end of the furnace body, and the pressure monitoring component, the sampling component, the sewage discharge component, the water level monitoring component and the heating component are respectively electrically connected to a controller.
[0006] Furthermore, the water level monitoring component includes two water level gauges and two liquid level sensors. A group of water level gauge pipe sockets are respectively provided on the left and right sides of the furnace body. Each group of water level gauge pipe sockets is connected to a water level gauge. The water level gauge is connected to a liquid level sensor, and the liquid level sensor is electrically connected to the controller.
[0007] Furthermore, the water level gauge is a plate-type water level gauge, and the liquid level sensor is an electrode-type liquid level sensor.
[0008] Furthermore, the pressure monitoring assembly includes a "T"-shaped connecting pipe, an intermediate pressure controller, two side pressure controllers and two pressure gauges, the end of the vertical section of the "T"-shaped connecting pipe is connected to the pressure gauge pipe seat, the intermediate pressure controller is connected to the middle of the horizontal section of the "T"-shaped connecting pipe, the side pressure controllers are symmetrically connected to both sides of the horizontal section of the "T"-shaped connecting pipe, the pressure gauges are respectively connected to the ends of the horizontal section of the "T"-shaped connecting pipe, and the intermediate pressure controller and the side pressure controller are respectively electrically connected to the controller.
[0009] Furthermore, safety valve pipe seats are provided on both the front and rear sides of the upper part of the furnace body, and the safety valve pipe seats are connected to the safety valve.
[0010] Furthermore, the sampling assembly includes a sampling tube and a sampling cooler, one end of the sampling tube is connected to the sampling interface tube seat, the middle part of the sampling tube is coiled inside the sampling cooler, the lower part of the sampling cooler is provided with a cooling medium inlet, the upper part of the sampling cooler is provided with a cooling medium outlet, and the other end of the sampling tube is arranged outside the sampling cooler.
[0011] Furthermore, the sewage discharge assembly includes a sewage discharge pipe and a base, the base is fixedly connected to the lower end of the furnace body, and a plurality of sewage discharge pipe seats are evenly distributed in the lower part of the furnace body, and the sewage discharge pipe seats are respectively connected to the sewage discharge pipe.
[0012] Furthermore, the heating assembly includes an electric heating element, a wiring terminal, two heating tube sockets and two flange covers. The electric heating element is arranged inside the furnace body. A heating tube socket is provided on the outside of the end of the electric heating element. The heating tube socket is fixedly connected to the outer wall of the furnace body. The outer end of the heating tube socket is fixedly connected to the flange cover. The end of the electric heating element is inserted into the flange cover. The wiring terminal is arranged on the outside of the flange cover and connected to the end of the electric heating element.
[0013] Furthermore, a secondary gas valve pipe seat is provided on the rear side of the upper portion of the furnace body, and the secondary gas valve pipe seat is connected to the secondary steam pipeline.
[0014] Furthermore, a manhole is provided on the upper portion of the furnace body.
[0015] Compared with the prior art, the utility model has the following beneficial effects:
[0016] The utility model provides an efficient and safe electric heating steam boiler, the heating component inside of which can fully heat the boiler water until it boils by electric heating to generate high-temperature steam. The pressure monitoring component can monitor the pressure in the furnace in real time, and automatically control and adjust the working state of the heating component through the controller. The water level monitoring component can monitor the water in the boiler and adjust the water supply state of the boiler in time. The boiler water sampling port and sewage outlet on the boiler can monitor the water supply quality, realize the function of adding medicine and sewage discharge, and ensure the quality of the exported steam. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0018] Figure 2 yes Figure 1 Left view of
[0019] Figure 3 yes Figure 1 A top view of
[0020] Figure 4 yes Figure 1 AA view in . DETAILED DESCRIPTION
[0021] In order to make the technical problems, technical solutions and beneficial effects solved by the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.
[0022] Specific implementation method 1: Combination Figures 1 to 4 The present embodiment is described. An electrically heated steam boiler described in the present embodiment comprises a furnace body 1, a pressure monitoring component, a sampling component, a sewage discharge component, a water level monitoring component and a plurality of heating components. The furnace body 1 is horizontally arranged. The plurality of heating components are respectively inserted into the middle side wall of the furnace body 1 along the width direction. The middle of the heating component is fixedly connected to the inside of the furnace body 1 through a support frame 12. A pressure gauge pipe seat 101 is arranged on the front side of the upper part of the furnace body 1. The pressure monitoring component is connected to the pressure gauge pipe seat 101. A main steam pipe seat 102 is arranged in the middle of the upper part of the furnace body 1. The main A steam pipe seat 102 is connected to the main steam pipeline, a water supply pipe seat 103 is provided on the rear side of the upper part of the furnace body 1, and the water supply pipe seat 103 is connected to the water supply pipeline. A sampling interface pipe seat 104 is provided on the rear side of the middle part of the furnace body 1, and the sampling component is connected to the sampling interface pipe seat 104. A water level gauge pipe seat 105 is provided on the front side of the middle part of the furnace body 1, and the water level monitoring component is connected to the water level gauge pipe seat 105. A sewage discharge component is arranged at the bottom end of the furnace body 1, and the pressure monitoring component, the sampling component, the sewage discharge component, the water level monitoring component and the heating component are electrically connected to the controller respectively.
[0023] Specific implementation method 2: Combination Figures 1 to 4 This embodiment is described. The water level monitoring assembly in this embodiment includes two water level gauges 2 and two liquid level sensors 3. A set of water level gauge pipe seats 105 are respectively provided on the left and right sides of the furnace body 1. Each set of water level gauge pipe seats 105 is respectively connected to a water level gauge 2. The water level gauge 2 is connected to a liquid level sensor 3, and the liquid level sensor 3 is electrically connected to the controller. The undisclosed technical features in this embodiment are the same as those in the specific embodiment 1.
[0024] The water level meter 2 can measure the water level in the furnace body 1 in real time. The liquid level sensor 3 reads the water level information of the water level meter 2 and transmits the information to the controller. When the water level information read by the liquid level sensor 3 is lower than the established minimum water level value, the controller controls the water supply pipe to supply water to the furnace body 1. When the water level information read by the liquid level sensor 3 reaches the established maximum water level value, the controller controls the water supply pipe to close and stop supplying water.
[0025] The two water level gauges 2 are provided to prevent the liquid surface in the furnace from tilting left and right, which would result in inaccurate water level measurement.
[0026] Specific implementation method three: Combination Figures 1 to 4 To explain this embodiment, the water level gauge 2 in this embodiment is a plate-type water level gauge, and the liquid level sensor 3 is an electrode-type liquid level sensor. The undisclosed technical features in this embodiment are the same as those in the second embodiment.
[0027] Specific implementation method four: Combination Figures 1 to 4 To explain this embodiment, the pressure monitoring assembly described in this embodiment includes a "T"-shaped connecting pipe 4, an intermediate pressure controller 5, two side pressure controllers 6 and two pressure gauges 7. The end of the vertical section of the "T"-shaped connecting pipe 4 is connected to the pressure gauge pipe seat 101, the intermediate pressure controller 5 is connected to the middle of the horizontal section of the "T"-shaped connecting pipe 4, the side pressure controllers 6 are symmetrically connected to both sides of the horizontal section of the "T"-shaped connecting pipe 4, and the pressure gauges 7 are respectively connected to the ends of the horizontal section of the "T"-shaped connecting pipe 4. The intermediate pressure controller 5 and the side pressure controller 6 are electrically connected to the controllers respectively. The technical features not disclosed in this embodiment are the same as those in the first embodiment.
[0028] The pressure gauge 7 measures the pressure value in the furnace, reads the pressure information through the pressure controller 6, and transmits the information to the controller, which automatically adjusts the working state of the heating component according to the received pressure information. When the read pressure information value is higher than the set value, the controller controls the heating component to stop heating and reduce the pressure in the furnace, thereby ensuring that the pressure in the furnace is within a safe range.
[0029] The "T"-shaped connecting pipe 4 connects the two pressure gauges 7 to prevent the pressure on the left and right sides of the furnace from being unbalanced, resulting in inaccurate measurement.
[0030] Specific implementation method five: Combination Figures 1 to 4 To explain this embodiment, the front and rear sides of the upper part of the furnace body 1 described in this embodiment are both provided with a safety valve pipe seat 106, and the safety valve pipe seat 106 is connected to the safety valve. The undisclosed technical features in this embodiment are the same as those in the first embodiment.
[0031] A spring-loaded full-open safety valve is installed on the top of the boiler. When the boiler is operating at overpressure, the safety valve will trip and work to ensure that the boiler will be safely shut down under abnormal circumstances.
[0032] Specific implementation method six: Combination Figures 1 to 4 This embodiment is described. The sampling assembly of this embodiment includes a sampling tube 8 and a sampling cooler 9. One end of the sampling tube 8 is connected to the sampling interface tube seat 104. The middle part of the sampling tube 8 is coiled inside the sampling cooler 9. The lower part of the sampling cooler 9 is provided with a cooling medium inlet 901. The upper part of the sampling cooler 9 is provided with a cooling medium outlet 902. The other end of the sampling tube 8 is arranged outside the sampling cooler 9. The undisclosed technical features in this embodiment are the same as those in the first specific embodiment.
[0033] The water quality in the furnace is sampled and tested through the sampling tube 8 to monitor the water quality. If the quality is found to be unqualified, the furnace is treated with chemicals and discharged through the sewage discharge component to ensure the quality of the outlet steam.
[0034] Specific implementation method seven: Combination Figures 1 to 4 This embodiment is described. The sewage discharge assembly in this embodiment includes a sewage discharge pipe 10 and a base 11. The base 11 is fixed to the lower end of the furnace body 1. A plurality of sewage discharge pipe seats 107 are evenly distributed at the lower part of the furnace body 1. The sewage discharge pipe seats 107 are respectively connected to the sewage discharge pipe 10. The undisclosed technical features in this embodiment are the same as those in the first embodiment.
[0035] The base 11 is provided to provide installation space for the sewage pipe 10 and the sewage pipe seat 107 .
[0036] Specific implementation method eight: Combination Figures 1 to 4 This embodiment is described. The heating assembly in this embodiment includes an electric heating element 13, a terminal block 15, two heating tube sockets 14 and two flange covers 16. The electric heating element 13 is arranged inside the furnace body 1. The outer side of the end of the electric heating element 13 is provided with a heating tube socket 14. The heating tube socket 14 is fixedly connected to the outer side wall of the furnace body 1. The outer end of the heating tube socket 14 is fixedly connected with a flange cover 16. The end of the electric heating element 13 is inserted into the flange cover 16. The terminal block 15 is arranged on the outer side of the flange cover 16 and connected to the end of the electric heating element 13. The technical features not disclosed in this embodiment are the same as those in the first embodiment.
[0037] The boiler is sealed by the connection terminal 15 and the flange cover 16. The boiler water is heated by the electric heating element 13 until it boils and generates high-temperature steam.
[0038] Specific implementation method nine: Combination Figures 1 to 4 To explain this embodiment, the rear side of the upper part of the furnace body 1 is provided with a secondary gas valve pipe seat 108, and the secondary gas valve pipe seat 108 is connected to the secondary steam pipeline. The undisclosed technical features in this embodiment are the same as those in the first embodiment.
[0039] The auxiliary steam pipe can be used as a backup steam pipe and connected as needed.
[0040] Specific implementation method ten: Combination Figures 1 to 4 This embodiment is described. In this embodiment, the upper part of the furnace body 1 is provided with a manhole 109. The undisclosed technical features in this embodiment are the same as those in the first embodiment.
[0041] The main steam pipe seat 102, the water supply pipe seat 103, the auxiliary gas valve pipe seat 108, the sampling interface pipe seat 104, and the sewage pipe 10 are all provided with electric control valves, which are automatically switched on and off and adjusted by the controller.
[0042] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. An electrically heated steam boiler, characterized in that: It comprises a furnace body (1), a pressure monitoring component, a sampling component, a sewage discharge component, a water level monitoring component and a plurality of heating components. The furnace body (1) is arranged horizontally. The plurality of heating components are respectively inserted into the middle side wall of the furnace body (1) along the width direction. The middle of the heating components is fixedly connected to the inside of the furnace body (1) through a support frame (12). A pressure gauge pipe seat (101) is arranged on the front side of the upper part of the furnace body (1). The pressure monitoring component is connected to the pressure gauge pipe seat (101). A main steam pipe seat (102) is arranged in the middle of the upper part of the furnace body (1). The main steam pipe seat (102) is connected to the main steam pipe seat (102). The furnace body (1) is connected to a steam pipeline, a water supply pipe seat (103) is provided on the rear side of the upper part of the furnace body (1), and the water supply pipe seat (103) is connected to the water supply pipeline. A sampling interface pipe seat (104) is provided on the rear side of the middle part of the furnace body (1), and the sampling component is connected to the sampling interface pipe seat (104). A water level gauge pipe seat (105) is provided on the front side of the middle part of the furnace body (1), and the water level monitoring component is connected to the water level gauge pipe seat (105). A sewage discharge component is arranged at the bottom end of the furnace body (1), and the pressure monitoring component, the sampling component, the sewage discharge component, the water level monitoring component and the heating component are respectively electrically connected to the controller.
2. The electrically heated steam boiler according to claim 1, characterized in that: The water level monitoring component comprises two water level gauges (2) and two liquid level sensors (3); a group of water level gauge pipe seats (105) are respectively provided on the left and right sides of the furnace body (1); each group of water level gauge pipe seats (105) is respectively connected to a water level gauge (2); the water level gauge (2) is connected to a liquid level sensor (3); and the liquid level sensor (3) is electrically connected to a controller.
3. The electrically heated steam boiler according to claim 2, characterized in that: The water level meter (2) is a plate-type water level meter, and the liquid level sensor (3) is an electrode-type liquid level sensor.
4. The electrically heated steam boiler according to claim 1, characterized in that: The pressure monitoring component comprises a "T"-shaped connecting pipe (4), an intermediate pressure controller (5), two side pressure controllers (6) and two pressure gauges (7); the end of the vertical section of the "T"-shaped connecting pipe (4) is connected to the pressure gauge pipe seat (101); the intermediate pressure controller (5) is connected to the middle of the horizontal section of the "T"-shaped connecting pipe (4); the side pressure controllers (6) are symmetrically connected to both sides of the horizontal section of the "T"-shaped connecting pipe (4); the pressure gauges (7) are respectively connected to the ends of the horizontal section of the "T"-shaped connecting pipe (4); and the intermediate pressure controller (5) and the side pressure controller (6) are respectively electrically connected to the controller.
5. The electrically heated steam boiler according to claim 1, characterized in that: Safety valve pipe seats (106) are provided on both the front and rear sides of the upper part of the furnace body (1), and the safety valve pipe seats (106) are connected to the safety valve.
6. The electrically heated steam boiler according to claim 1, characterized in that: The sampling assembly comprises a sampling tube (8) and a sampling cooler (9); one end of the sampling tube (8) is connected to a sampling interface tube seat (104); the middle portion of the sampling tube (8) is coiled inside the sampling cooler (9); a cooling medium inlet (901) is provided at the lower portion of the sampling cooler (9); a cooling medium outlet (902) is provided at the upper portion of the sampling cooler (9); and the other end of the sampling tube (8) is arranged outside the sampling cooler (9).
7. The electrically heated steam boiler according to claim 1, characterized in that: The sewage discharge assembly comprises a sewage discharge pipe (10) and a base (11); the base (11) is fixedly connected to the lower end of the furnace body (1); a plurality of sewage discharge pipe seats (107) are evenly distributed at the lower part of the furnace body (1); the sewage discharge pipe seats (107) are respectively connected to the sewage discharge pipe (10).
8. The electrically heated steam boiler according to claim 1, characterized in that: The heating assembly comprises an electric heating element (13), a wiring terminal (15), two heating tube sockets (14) and two flange covers (16); the electric heating element (13) is arranged inside the furnace body (1); a heating tube socket (14) is arranged outside the end of the electric heating element (13); the heating tube socket (14) is fixedly connected to the outer wall of the furnace body (1); the outer end of the heating tube socket (14) is fixedly connected to the flange cover (16); the end of the electric heating element (13) is inserted into the flange cover (16); the wiring terminal (15) is arranged outside the flange cover (16) and connected to the end of the electric heating element (13).
9. The electrically heated steam boiler according to claim 1, characterized in that: A secondary gas valve pipe seat (108) is provided on the rear side of the upper part of the furnace body (1), and the secondary gas valve pipe seat (108) is connected to the secondary steam pipeline.
10. The electrically heated steam boiler according to claim 1, characterized in that: A manhole (109) is provided on the upper part of the furnace body (1).