Jacking device for lower latticed column of concrete supporting beam

By combining the connection nodes of the lattice columns and supporting beams into prefabricated components, and using a combination design of vertical steel plates, sealing plates, anchor bars and stiffening plates, the problems of high welding difficulty and safety risks were solved, achieving efficient construction progress and stability.

CN222083320UActive Publication Date: 2024-11-29CHINA CONSTR EIGHTH ENG DIV CORP LTD ZHEJIANG CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420091240.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-15
Publication Date
2024-11-29
Estimated Expiration
2034-01-15

AI Technical Summary

Technical Problem

In existing technologies, welding operations at the top of lattice columns are difficult and have high quality control requirements, which affects the progress of earthwork excavation and poses safety risks.

Method used

The connection points between the lattice columns and the supporting beams are combined into prefabricated components. A combination design of vertical steel plates, sealing plates, anchor bars, and stiffening plates is adopted, which can be directly installed on site, reducing welding operations and improving connection stability.

Benefits of technology

This greatly accelerated construction efficiency, reduced the difficulty and safety risks of welding operations, and improved construction progress and connection stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222083320U_ABST
    Figure CN222083320U_ABST
Patent Text Reader

Abstract

The utility model relates to a jacking device, belongs to the technical field of building construction, and particularly relates to a concrete support beam lower latticed column jacking device which comprises a first vertical steel plate, a second vertical steel plate arranged on the inner side of the first vertical steel plate and a sealing plate fixed on the lower side of the first vertical steel plate and the lower side of the second vertical steel plate. According to the utility model, the nodes at the connecting part of the latticed column and the supporting beam are combined into the prefabricated part, the prefabricated part can be conveniently and directly mounted on site, the site welding operation is reduced, the construction efficiency is greatly accelerated, the sealing plate is additionally arranged in the connected prefabricated part, so that the vertical load at the upper part of the supporting beam can be effectively transmitted, and the applicability at the connecting part of the trestle beam and the latticed column is stronger; the problems that the welding operation difficulty and the quality control difficulty are high, the earthwork excavation progress is affected, and certain safety risks exist due to the fact that a support is erected only after lower earthwork excavation is completed during support construction in the prior art and a worker stands on the lower portion of a support to carry and weld stiffening plates upwards are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a lattice column top supporting device at the bottom of a concrete support beam. Background Art

[0002] When there is a load requirement on the upper part of the connection between the foundation lattice column and the first-floor concrete support of the foundation pit, a jacking support shall be provided on the top of the lattice column to ensure that the support deadweight and vertical load are transferred to the lattice column.

[0003] Conventionally, a horizontal cover plate (steel plate) is set on the top of the lattice column, anchor bars are set inside the cover plate, and stiffening plates (corbel plates) are welded to the lattice column angle steel along the outer wall of the lattice column and the lower part of the cover plate. Usually, after the lower earth excavation is completed after the support construction, a bracket is erected and people stand at the bottom of the support to weld the stiffening plates upward. This method is difficult to weld and the quality control is difficult, affects the progress of earth excavation, and has certain safety risks. Utility Model Content

[0004] In order to solve the above technical problems, the utility model proposes a lattice column supporting device at the bottom of a concrete support beam, which combines the nodes at the connection between the lattice column and the support beam into a prefabricated component, which can be conveniently and directly installed on site, reducing on-site welding operations and greatly accelerating construction efficiency. Adding a sealing plate to the connection prefabricated components can effectively transfer the upper vertical load of the support beam, especially at the connection between the trestle bridge and the lattice column, which is more applicable. It solves the problem that the existing method can only be to set up a support frame after the lower earth excavation is completed during the support construction, and manually stand at the bottom of the support to support and weld the stiffening plate upward, which makes the welding operation difficult and the quality control difficult, affects the progress of earth excavation, and has certain safety risks.

[0005] The technical solution for achieving the purpose of the utility model is: a lattice column supporting device at the bottom of a concrete support beam, comprising a vertical steel plate one, a vertical steel plate two is arranged on the inner side of the vertical steel plate one, and also comprising: a sealing plate, the sealing plate is fixed to the lower sides of the vertical steel plate one and the vertical steel plate two; a plurality of through holes are opened at equal intervals on the inner side of the sealing plate, anchor bars are arranged on the inner sides of the plurality of through holes, and a plurality of stiffening plates are fixed at equal intervals on the upper side of the sealing plate at surrounding positions.

[0006] In some embodiments, the size of the sealing plate is specifically 740 mm×740 mm×20 mm.

[0007] In some embodiments, the anchor bars are specifically HRB400 16 mm model, and the length of the anchor bars is 70 mm.

[0008] In some embodiments, the height of the vertical steel plate 1 and the vertical steel plate 2 are both 300 mm.

[0009] In some embodiments, the thickness of the plurality of stiffening plates is 20 mm, they are evenly fixed around the periphery, and three are welded on each edge.

[0010] Compared with the prior art, the present invention has the following significant advantages:

[0011] First, the utility model combines the nodes of the connection parts of the lattice column and the support beam into prefabricated components, which can be conveniently and directly installed on site, reducing on-site welding operations and greatly improving construction efficiency. Adding a sealing plate to the connection prefabricated components can effectively transfer the vertical load on the upper part of the support beam, especially in the connection parts of the trestle bridge and the lattice column, which is more applicable;

[0012] Second, the utility model fixes a plurality of stiffening plates by welding, which can improve the connection effect between the vertical steel plate 1 and the sealing plate and ensure its stability;

[0013] The invention solves the problem that the existing method can only be used after the support construction is completed and the lower earth excavation is completed, a support is set up manually to stand under the support to weld the stiffening plate upward, which makes the welding operation difficult and the quality control difficult, affects the progress of earth excavation, and has certain safety risks. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] The utility model is further explained below in conjunction with the accompanying drawings and embodiments:

[0015] Figure 1 It is a schematic diagram of the overall assembly structure provided in one embodiment of the utility model.

[0016] 1. Vertical steel plate one; 2. Stiffening plate; 3. Closing plate; 4. Vertical steel plate two; 5. Through hole; 6. Anchor reinforcement. DETAILED DESCRIPTION

[0017] The utility model is described in detail below, and the technical solutions in the embodiments of the utility model are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0018] The utility model provides a lattice column supporting device at the bottom of a concrete support beam through improvement. The technical solution of the utility model is:

[0019] like Figure 1As shown, a lattice column supporting device at the bottom of a concrete support beam comprises a vertical steel plate 1, a vertical steel plate 2 4 is arranged on the inner side of the vertical steel plate 1, and also comprises a sealing plate 3, which is fixed to the lower sides of the vertical steel plate 1 and the vertical steel plate 2 4; the specific fixing method is welding fixing, which ensures stability, a plurality of through holes 5 are opened at equal intervals on the inner side of the sealing plate 3, and anchor bars 6 are arranged on the inner sides of the plurality of through holes 5, and a plurality of stiffening plates 2 are fixed at equal intervals at the upper side of the sealing plate 3 at the surrounding positions, and the plurality of stiffening plates 2 are fixed by welding, which further improves the overall stability, and combines the nodes of the connection part between the lattice column and the support beam into a prefabricated component, which can be conveniently and directly installed on site, reduces the on-site welding operation, and greatly speeds up the construction efficiency, and adds the sealing plate 3 in the connection of the prefabricated components to effectively transfer the upper vertical load of the support beam, especially in the connection part between the trestle bridge and the lattice column, which has stronger applicability.

[0020] like Figure 1 As shown, in one embodiment, the size of the sealing plate 3 is specifically 740 mm×740 mm×20 mm, and is uniformly cut and manufactured in a factory.

[0021] like Figure 1 As shown, in one embodiment, the plurality of anchor bars 6 are specifically HRB400 16 mm model, and the length of the plurality of anchor bars 6 is 70 mm. The plurality of anchor bars 6 are all made of steel bars, which is convenient for material acquisition.

[0022] like Figure 1 As shown, in one embodiment, the height of the vertical steel plate 1 and the vertical steel plate 2 4 are both 300 mm, and the height is consistent, ensuring the feasibility of the device.

[0023] like Figure 1 As shown, in one embodiment, the thickness of the plurality of stiffening plates 2 is 20 mm, and they are evenly fixed around the four sides, with three plates welded on each side. The even welding and fixing ensures the connection effect and improves the stability.

[0024] The specific working method is: make the sealing plate 3, make holes evenly at a distance of 120 mm from the edge of the sealing plate 3, and then use plug holes to weld multiple HRB400 16 mm anchor bars 6, and the length of multiple anchor bars 6 is 70 mm. After the sealing plate 3 is processed, weld the vertical steel plate 1 and the vertical steel plate 2 4 on the upper side of the sealing plate 3. The positioning dimensions of the vertical steel plate 1 and the vertical steel plate 2 4 match the position of the lattice column angle steel. The height of the vertical steel plate 1 and the vertical steel plate 2 4 is 300 mm. The welding between the vertical steel plate 1 and the vertical steel plate 2 4 and the sealing plate 3 ensures that the weld height is not less than 10 mm. The gap between the vertical steel plate 1 and the vertical steel plate 2 4 is the thickness of the angle steel. A plurality of stiffening plates 2 are welded at the angle between the vertical steel plate 1 and the vertical steel plate 2 4 and the sealing plate 3. The thickness of the plurality of stiffening plates 2 is 20 mm and they are evenly arranged around. Three are welded on each side. All components are processed as prefabricated products and transported to the site. When the first-floor support beam is constructed, the lattice column is cleaned and corrected after excavation. The prefabricated connecting component is directly inserted and installed on the upper part of the lattice column angle steel, and then the support beam reinforcement is tied and concrete is constructed. No secondary welding is required after the subsequent foundation pit excavation, and the operation is simple.

[0025] The technical means disclosed in the utility model are not limited to the technical means disclosed in the above technical means, but also include technical solutions composed of equivalent replacement of the above technical features. Matters not covered in the utility model belong to the common knowledge of those skilled in the art.

Claims

1. A lattice column supporting device for the lower part of a concrete support beam, comprising a vertical steel plate 1 (1), a vertical steel plate 2 (4) being arranged inside the vertical steel plate 1 (1), characterized in that: Also includes: A sealing plate (3), wherein the sealing plate (3) is fixed to the lower sides of the vertical steel plate 1 (1) and the vertical steel plate 2 (4); A plurality of through holes (5) are provided at equal intervals on the inner side of the sealing plate (3), anchor bars (6) are provided on the inner sides of the plurality of through holes (5), and a plurality of stiffening plates (2) are fixed at equal intervals at surrounding positions on the upper side of the sealing plate (3).

2. A lattice column supporting device for the lower part of a concrete support beam according to claim 1, characterized in that: The specific size of the sealing plate (3) is 740 mm×740 mm×20 mm.

3. The device for supporting the lower lattice column of a concrete support beam according to claim 1, characterized in that: The plurality of anchor bars (6) are specifically of HRB400 16 mm model, and the length of the plurality of anchor bars (6) is 70 mm.

4. The device for supporting the lower lattice columns of a concrete support beam according to claim 1, characterized in that: The heights of the vertical steel plate 1 (1) and the vertical steel plate 2 (4) are both 300 mm.

5. The device for supporting the lower lattice columns of a concrete support beam according to claim 1, characterized in that: The thickness of the plurality of stiffening plates (2) is 20 mm, and they are evenly fixed around the periphery, with three of them welded on each edge.