Hydroelectric pipeline fixing frame
By designing a detachable water and electricity pipeline support frame and locking positioner, the safety hazards when adding water and electricity pipelines in the later stage of the building are solved, and the stable pressing and flexible adjustment of the pipeline is achieved, ensuring the standardization and safety of installation .
Patent Information
- Application Number
- CN202420077322.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-12
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-01-12
AI Technical Summary
In the later stage of installing water and electricity pipelines in the building, due to the need to add pipelines, the existing fixed frames have safety hazards and cannot effectively support and manage pipelines.
A supporting arm of a water and electricity pipeline including a fixed seat, a support frame and a removable water and electricity pipeline support arm is designed. The end of the support arm is equipped with a locking positioner. By strengthening the combination of the connector and the locking positioner, the pressing of the water and electricity pipeline is achieved. and stretch for easy installation and adjustment.
It realizes stable compression and support of the water and electricity pipelines during installation and adjustment, ensures safety and standardization, and facilitates the expansion and adjustment of later circuits.
Smart Images

Figure CN222102944U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of fixing frames, and more specifically to a water and electricity pipeline fixing frame. Background Art
[0002] The installation of water and electricity pipelines on buildings is something that needs to be considered when constructing buildings, such as the direction of the water and electricity pipelines, the installation layout of the water and electricity pipelines, and the specific number of installations. However, in the later supervision process, people found that often in the later stages, buildings will have requirements for adding water and electricity pipelines. At this time, they can only lay fixed frames for the lines, or install the water and electricity pipelines on the buildings through external methods. However, this will pose serious safety hazards.
[0003] Therefore, it is necessary to propose a water and electricity pipeline fixing frame that solves the above problems. Utility Model Content
[0004] The utility model provides a water and electricity pipeline fixing frame to overcome at least one defect (shortcoming) of the prior art.
[0005] In order to solve the above technical problems, the technical solution of the utility model is as follows: a water and electricity pipeline fixing frame, comprising a fixing seat, a support frame and a water and electricity pipeline supporting arm;
[0006] The support frame is arranged on a fixing seat, and the water and electricity pipeline support arm is detachably arranged on the support frame;
[0007] The end of the water and electricity pipeline support arm is provided with a locking locator for pressing and supporting the line. When the locking locator is pressed on the top of the water and electricity pipeline support arm, the locking locator presses the water and electricity pipeline above the water and electricity pipeline support arm. When the locking locator is reversely set at the end of the water and electricity pipeline support arm, the end of the locking locator is connected to the end of the water and electricity pipeline support arm through a reinforcing connector. When folded, the water and electricity pipeline can be pressed. When extended, more water and electricity pipelines can be set at the same time. The reinforced connector can position the locking locator when it is in the extended state, which is simple and convenient.
[0008] Further, the locking positioner includes a positioning column, a locking arm and a positioning nut;
[0009] The outer side of the positioning column is provided with an external thread, and the locking arm is detachably sleeved on the positioning column;
[0010] The positioning nuts are respectively arranged at both ends of the positioning column to lock the locking arm. Through the locking positioner, the water and electricity pipelines can be compressed when in use, and can also be stretched out to support more water and electricity pipelines.
[0011] Furthermore, the water and electricity pipeline support arm is provided with a locking block and a positioning hole;
[0012] After the locking pressure block passes through the positioning hole, it is pressed onto the positioning column. The positioning column can be pressed by setting the locking pressure block and the positioning hole.
[0013] Furthermore, the locking arm is provided with a first groove for the water and electricity pipeline to pass through, and the first groove can be used to press the water and electricity pipeline.
[0014] Furthermore, the water and electricity pipeline support arm is provided with a positioning locking hole for the positioning column to pass through and a second groove for the water and electricity pipeline to pass through. The water and electricity pipeline can be limited by the second groove provided on the water and electricity pipeline support arm.
[0015] Furthermore, the reinforced connector is a connecting steel cable, a connecting hole is provided at the end of the locking arm, a positioning ring is provided at the end of the water and electricity pipeline support arm, one end of the connecting steel cable is connected to the connecting hole, and the other end is connected to the positioning ring. The setting of the connecting steel cable can be used to position the locking arm.
[0016] Furthermore, the support frame is provided with a mounting hole, and the water and electricity pipeline support arm is provided with a limiting hole. The limiting hole on the water and electricity pipeline support arm is locked to the mounting hole of the support frame by screws. Through the setting of the mounting hole and the limiting hole, the supporting position of the water and electricity pipeline support arm can be easily adjusted.
[0017] Furthermore, the fixing seat, support frame, water and electricity pipeline support arm and locking locator are all made of stainless steel or metal materials. In actual applications, the fixing seat, support frame, water and electricity pipeline support arm and locking locator can also be made of other materials, which are all within the protection scope of the present utility model.
[0018] Compared with the prior art, the beneficial effects of the technical solution of the utility model are:
[0019] The water and electricity pipeline fixing frame disclosed by the utility model can press the water and electricity pipelines when folded, and can set more water and electricity pipelines at the same time when extended. The reinforced connector can position the locking locator when it is extended, which is simple and convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a structural schematic diagram of a water and electricity pipeline fixing frame in the utility model when a single-side water and electricity pipeline supporting arm is arranged.
[0021] Figure 2 It is a structural schematic diagram of the utility model in which the water and electricity pipeline support arms are arranged on both sides of the support frame.
[0022] Figure 3 It is a structural schematic diagram of the locking positioner in the utility model.
[0023] Figure 4 It is a structural schematic diagram of the fixing seat in the utility model.
[0024] In the figure, 1 is a fixing seat, 2 is a supporting frame, 3 is a water and electricity pipeline supporting arm, 4 is a locking locator, 5 is a positioning column, 6 is a locking arm, 7 is a positioning nut, 8 is a locking block, 9 is a positioning hole, 10 is a first groove, 11 is a positioning locking hole, 12 is a second groove, 13 is a connecting steel cable, 14 is a connecting hole, 15 is a positioning ring, 16 is a mounting hole, and 17 is a limiting hole. DETAILED DESCRIPTION
[0025] The drawings are only used for illustrative purposes and should not be construed as limitations on this patent. In order to better illustrate this embodiment, some parts of the drawings may be omitted, enlarged, or reduced, and do not represent the size of the actual product. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted.
[0026] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation" and "connection" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, which can be said to be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances. The technical solution of the present invention is further explained below in conjunction with the accompanying drawings and embodiments.
[0027] like Figure 1-2 As shown, a water and electricity pipeline fixing frame includes a fixing seat 1, a support frame 2 and a water and electricity pipeline supporting arm 3; the support frame is arranged on the fixing seat, and the water and electricity pipeline supporting arm is detachably arranged on the support frame; a locking locator 4 for pressing and supporting is provided at the end of the water and electricity pipeline supporting arm, when the locking locator is pressed on the top of the water and electricity pipeline supporting arm, the locking locator presses the water and electricity pipeline above the water and electricity pipeline supporting arm, and when the locking locator is reversely arranged at the end of the water and electricity pipeline supporting arm, the end of the locking locator is connected to the end of the water and electricity pipeline supporting arm through a reinforcing connector, when folded, the water and electricity pipeline can be pressed, and when extended, more water and electricity pipelines can be arranged at the same time, and the reinforcing connector can position the locking locator when it is in the extended state, which is simple and convenient.
[0028] like Figure 3-4As shown, the locking locator includes a positioning column 5, a locking arm 6 and a positioning nut 7; an external thread is provided on the outer side of the positioning column, and the locking arm is detachably mounted on the positioning column; the positioning nuts are respectively arranged at both ends of the positioning column to lock the locking arm, and the water and electricity pipeline can be compressed when in use through the locking locator, or it can be stretched out to support more water and electricity pipelines, wherein a locking block 8 and a positioning hole 9 are provided on the water and electricity pipeline support arm; after the locking block passes through the positioning hole, it is pressed on the positioning column, and the positioning column can be pressed by the setting of the locking block and the positioning hole, and the locking arm is provided with a first groove 10 for the water and electricity pipeline to pass through, and the setting of the first groove can be used to press the water and electricity pipeline, wherein a positioning locking hole 11 for the positioning column to pass through and a second groove 12 for the water and electricity pipeline to pass through are provided on the water and electricity pipeline support arm, and the water and electricity pipeline can be limited by the second groove provided on the water and electricity pipeline support arm.
[0029] In the utility model, the reinforced connector is a connecting steel cable 13, a connecting hole 14 is provided at the end of the locking arm, a positioning ring 15 is provided at the end of the water and electricity pipeline support arm, one end of the connecting steel cable is connected to the connecting hole, and the other end is connected to the positioning ring. Through the setting of the connecting steel cable, it can be used to position the locking arm, a mounting hole 16 is provided on the support frame, and a limiting hole 17 is provided on the water and electricity pipeline support arm. The limiting hole on the water and electricity pipeline support arm is locked on the mounting hole of the support frame by screws. Through the setting of the mounting hole and the limiting hole, the supporting position of the water and electricity pipeline support arm can be easily adjusted. The fixing seat, support frame, water and electricity pipeline support arm and locking locator are all made of stainless steel or metal materials. In actual applications, the fixing seat, support frame, water and electricity pipeline support arm and locking locator can also be made of other materials, which are all within the protection scope of the utility model.
[0030] Example
[0031] In this embodiment, when water pipes or electric wires are being laid, the installation height of each water and electricity pipeline support arm can be set according to the needs of the floor. After the line is installed, the locking locator is pressed onto the line to strengthen the fixation, so that the line layout will be more standardized and neat.
[0032] When it is necessary to add pipes or lines at a later stage, the locking locator can be removed and installed in reverse. At this time, the new line can pass through the locking locator. The locking locator can play a supporting role, which can simplify the installation and construction needs and ensure safety. Of course, in actual applications, the line can be re-positioned by means of binding tape, etc., which is all achievable.
[0033] In the figure, the description of the positional relationship is only for illustrative purposes and cannot be understood as a limitation of this patent; obviously, the above embodiments of the utility model are only examples for clearly illustrating the utility model, and are not limitations on the implementation methods of the utility model. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made on the basis of the above description. It is not necessary and impossible to list all the implementation methods here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the utility model should be included in the scope of protection of the claims of the utility model.
Claims
1. A water and electricity pipeline fixing frame, comprising a fixing seat, a supporting frame and a water and electricity pipeline supporting arm, characterized in that: The support frame is arranged on a fixing seat, and the water and electricity pipeline support arm is detachably arranged on the support frame; The end of the water and electricity pipeline support arm is provided with a locking locator for pressing and supporting the line. When the locking locator is pressed on the top of the water and electricity pipeline support arm, the locking locator presses the water and electricity pipeline above the water and electricity pipeline support arm. When the locking locator is reversely set at the end of the water and electricity pipeline support arm, the end of the locking locator is connected to the end of the water and electricity pipeline support arm through a reinforced connector.
2. The water and electricity pipeline fixing frame according to claim 1, characterized in that: The locking positioner comprises a positioning column, a locking arm and a positioning nut; The outer side of the positioning column is provided with an external thread, and the locking arm is detachably sleeved on the positioning column; The positioning nuts are respectively arranged at the two ends of the positioning column to lock the locking arm.
3. The water and electricity pipeline fixing frame according to claim 2 is characterized in that: The water and electricity pipeline support arm is provided with a locking block and a positioning hole; After the locking pressing block passes through the positioning hole, it is pressed onto the positioning column.
4. The water and electricity pipeline fixing frame according to claim 2, characterized in that: The locking arm is provided with a first groove for the water and electricity pipeline to pass through.
5. The water and electricity pipeline fixing frame according to claim 4, characterized in that: The water and electricity pipeline support arm is provided with a positioning locking hole for the positioning column to pass through and a second groove for the water and electricity pipeline to pass through.
6. The water and electricity pipeline fixing frame according to claim 2, characterized in that: The reinforced connector is a connecting steel cable, a connecting hole is provided at the end of the locking arm, a positioning ring is provided at the end of the water and electricity pipeline support arm, one end of the connecting steel cable is connected to the connecting hole, and the other end is connected to the positioning ring.
7. The water and electricity pipeline fixing frame according to claim 1, characterized in that: The support frame is provided with a mounting hole, and the water and electricity pipeline support arm is provided with a limiting hole. The limiting hole on the water and electricity pipeline support arm is locked on the mounting hole of the support frame by means of screws.
8. The water and electricity pipeline fixing frame according to claim 1, characterized in that: The fixing seat, the supporting frame, the water and electricity pipeline supporting arm and the locking positioner are all made of stainless steel or metal materials.
