Discharging equipment and texturing system

By designing a cutting equipment for solar cell manufacturing, the function of silicon wafers being introduced from the flower basket to the quartz boat is realized, solving the risk and efficiency of silicon wafers being transported between high-temperature process equipment, and improving the transport efficiency.

CN222106640UActive Publication Date: 2024-12-03LAPLACE (WUXI) SEMICON TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202322931769.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-10-31
Publication Date
2024-12-03
Estimated Expiration
2033-10-31

AI Technical Summary

Technical Problem

During the solar cell manufacturing process, the frequent transport of silicon wafers between high-temperature process equipment leads to an increased risk of crushing. The cutting equipment of the existing fleece-making host cannot directly import the silicon wafers in the flower basket into the quartz boat, limiting the quartz boat's Transport function.

Method used

设计了一种下料设备,包括对接位、第一放置位、第二放置位、移位机构和加工件移动机构,通过对接位将制绒主机的出料端输出的第一承载件(花篮)转移到第一放置位,并利用加工件移动机构将硅片从花篮导入到第二承载件(石英舟)中,实现硅片的顺利转换和转运。

Benefits of technology

It effectively reduces the risk of silicon wafer crushing, improves the efficiency of silicon wafer transport between high-temperature process equipment, realizes the direct use of quartz boats, and reduces the complexity and time of process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222106640U_ABST
    Figure CN222106640U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of silicon wafer texturing technology, and discloses a blanking device and a texturing system. And the discharging equipment is used for transferring the machined part produced by the texturing main machine from the first bearing part to the second bearing part. The discharging equipment comprises a butt joint position, a first placing position, a second placing position, a shifting mechanism and a machined part moving mechanism. The butt joint position is used for being in butt joint with the discharging end of the texturing main machine; the first placing position is used for placing a first bearing piece; the second placing position is used for placing a second bearing piece; the shifting mechanism is used for transferring the first bearing piece output by the discharging end of the texturing main machine to the first placing position through the butt joint position; the machined part moving mechanism is used for moving the machined part of the first bearing part located at the first containing position out of the first bearing part and transferring the machined part to the second bearing part located at the second containing position. The blanking equipment can realize automatic blanking of the texturing main machine, and can guide the silicon wafer into the quartz boat from the basket after the texturing main machine, so that the silicon wafer can be directly transferred into other process main machines by using the quartz boat.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of silicon wafer texturing technology, in particular to a material feeding device and a texturing system. Background Art

[0002] Solar cells, also known as photovoltaic cells, are devices that use semiconductor materials such as silicon wafers to convert light energy into electrical energy. They have the advantages of being low carbon, environmentally friendly and pollution-free.

[0003] In the manufacturing process of solar cells, silicon wafers need to go through multiple processes before they can be formed into products. During this process, silicon wafers need to be transported between multiple devices. Usually, the transportation of silicon wafers between two process equipment generally relies on flower baskets. However, since flower baskets are generally made of plastic and are not resistant to high temperatures, in some high-temperature processes, the silicon wafers in the flower basket need to be introduced into a quartz boat, and the quartz boat carries the silicon wafers into the process equipment. After the processing is completed, the silicon wafers in the quartz boat need to be introduced into the flower basket again to be transported to the next process equipment. In this way, the entire process silicon wafer needs to be frequently switched between the flower basket and the quartz boat, which is time-consuming and labor-intensive, and will greatly increase the risk of silicon wafer breakage.

[0004] In order to reduce the risk of silicon wafer breakage, a method of using quartz boats to carry silicon wafers for transportation between process equipment has emerged, so that the quartz boats can directly enter multiple high-temperature process equipment, reducing the process of guiding the wafers from the flower basket to the quartz boat before entering the high-temperature process. Since the existing unloading equipment of the texturing host only moves the flower basket from the texturing host to the AGV trolley, it is not possible to guide the silicon wafers from the flower basket to the quartz boat, which makes it inconvenient to use the quartz boat to transport silicon wafers to other process hosts. Utility Model Content

[0005] According to one aspect of the utility model, an object is to provide a material unloading device.

[0006] Additional aspects and advantages of the present invention will be given in part in the following description, and in part will become apparent from the following description, or will be learned through the practice of the present invention.

[0007] The unloading equipment is used to transfer the workpiece produced by the velvet making main machine from the first carrier to the second carrier. The unloading equipment includes a docking position, a first placement position, a second placement position, a shifting mechanism and a workpiece moving mechanism. The docking position is used to dock the discharge end of the velvet making main machine; the first placement position is used to place the first carrier, which is used to carry the workpiece; the second placement position is used to place the second carrier, which is used to carry the workpiece; the shifting mechanism is used to transfer the first carrier output from the discharge end of the velvet making main machine to the first placement position through the docking position; the workpiece moving mechanism is used to move the workpiece in the first carrier located at the first placement position out of the first carrier, and transfer the moved workpiece to the second carrier located at the second placement position. Through the above-mentioned settings, the unloading equipment can receive the flower basket output by the velvet making main machine, and can guide the silicon wafers from the flower basket into the quartz boat, so as to directly use the quartz boat to transport the silicon wafers to other process main machines.

[0008] As an optional solution of the material unloading equipment provided by the utility model, the workpiece moving mechanism includes a first jacking device and a workpiece transfer device, the first jacking device is arranged at the first placement position, and can eject the workpiece in the first carrier, the workpiece transfer device can receive the workpiece ejected from the first carrier, and move the workpiece to the second placement position; the workpiece moving mechanism also includes a second jacking device, the second jacking device is arranged at the second placement position, and can receive the workpiece on the workpiece transfer device, and place the workpiece in the second carrier located at the second placement position. Through the above arrangement, the smooth conversion of the workpiece between the first carrier and the second carrier can be smoothly realized.

[0009] As an optional solution for the unloading equipment provided by the utility model, the workpiece transfer device includes a first gantry and an adsorption component. The first gantry spans the first placement position and the second placement position. The adsorption component can adsorb the workpiece that is ejected from the first carrier by the first jacking device. The adsorption component can move along the first gantry to transport the workpiece to the second jacking device. The use of the first gantry in the above technical solution can provide a guide for the transplantation of the workpiece, and the use of the adsorption component can reliably adsorb the workpiece, which can not only realize the removal of the workpiece, but also prevent the damage of the workpiece.

[0010] As an optional solution of the unloading equipment provided by the utility model, the unloading equipment also includes a stop position, which is used for parking the transport mechanism carrying the second carrier, and the unloading equipment also includes a moving mechanism, which is used to transport the second carrier carrying the workpiece to the stop position, or to move the second carrier to the second placement position. Through the above arrangement, the movement of the second carrier can be realized to realize the subsequent unloading or repeated reception of the workpiece by the second carrier.

[0011] As an optional solution of the unloading equipment provided by the utility model, the mobile mechanism includes a handling device and a moving device, the loading end of the moving device forms a second placement position, and the handling device can carry the second carrier between the moving device and the stop position. Through the handling device in the above technical solution, the mobility of the second carrier can be further improved.

[0012] As an optional solution for the unloading equipment provided by the utility model, the moving device includes a flipping device and a transplanting track, the flipping device can move along the transplanting track, and the flipping device is used to switch the second carrier between lying horizontally and standing vertically. Through the above arrangement, the lying state of the second carrier facilitates the insertion of the workpiece, and the vertical state of the second carrier facilitates the transportation of the workpiece. The state conversion of the second carrier is flexible, which improves the efficiency of switching the workpiece between the first carrier and the second carrier.

[0013] As an optional solution for the unloading equipment provided by the utility model, there are two second placement positions and two mobile devices; the two mobile devices are arranged side by side, and each of the loading ends of the mobile device forms a second placement position; the handling device spans the unloading ends of the two mobile devices, and the stop position is arranged between the unloading ends of the two mobile devices. By setting up two handling devices and the corresponding two second placement positions, the handling work of the second carrier can be carried out simultaneously, thereby improving the transfer efficiency of the second carrier.

[0014] As an optional solution of the unloading equipment provided by the utility model, the workpiece moving mechanism also includes a transfer device, the loading end of the transfer device is located downstream of the shifting mechanism, the unloading end of the transfer device is provided with a first placement position, and the transfer device can reciprocate to transport the first carrier. Through the above arrangement, the transfer device can continuously transport the first carrier, effectively improving efficiency.

[0015] As an optional solution of the material unloading device provided by the utility model, the docking position, the shifting mechanism, and the workpiece moving mechanism are arranged in sequence in the length direction of the material unloading device; the material unloading device also includes a material unloading mechanism, which is located on one side of the shifting mechanism in the width direction of the material unloading device, and the material unloading mechanism is used to receive the empty first bearing member transmitted by the shifting mechanism. Through the above arrangement, the empty and idle first bearing members can be properly recovered for easy reuse.

[0016] According to another aspect of the utility model, the purpose is to provide a texturing system, which includes a loading device, a texturing main machine and a unloading device of any one of the above schemes, wherein the loading device is connected to the loading end of the texturing main machine, and the unloading device is connected to the unloading end of the texturing main machine, so as to realize the unloading of the processed workpiece after texturing. Through the above arrangement, the processed workpiece after texturing by the texturing main machine can be transferred between the first carrier and the second carrier, and the second carrier can be used to directly carry the processed workpiece for subsequent processes.

[0017] Beneficial effects of the utility model:

[0018] The material unloading equipment provided by the utility model includes a docking position, a first placement position, a second placement position, a shifting mechanism and a workpiece moving mechanism. The docking position is used to dock the discharge end of the velvet making main machine, the first placement position is used to place the first carrier, and the first carrier is used to carry the workpiece; the second placement position is used to place the second carrier, and the second carrier is used to carry the workpiece. The shifting mechanism is used to transfer the first carrier output from the discharge end of the velvet making main machine to the first placement position through the docking position; the workpiece moving mechanism is used to move the workpiece in the first carrier located at the first placement position out of the first carrier, and transfer the moved-out workpiece to the second carrier located at the second placement position. In other words, the working process of the material unloading equipment is as follows: the shifting mechanism first moves the first carrier carrying the workpiece at the discharge end of the velvet making main machine to the first placement position, so that the workpiece moving mechanism can transfer the workpiece in the first carrier. The moving mechanism moves the empty first carrier to the second placement position, so as to receive the workpiece on the workpiece moving mechanism. After the workpiece is transferred to the first carrier, it is moved away by the moving mechanism. After the texturing main machine, the workpiece is introduced from the first carrier into the second carrier, so that the workpiece can be directly transferred to other process main machines using the second carrier. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a structural schematic diagram of the unloading equipment provided by the embodiment of the utility model;

[0020] Figure 2 It is a structural schematic diagram of the shifting mechanism provided in an embodiment of the utility model.

[0021] In the figure:

[0022] 10. Velvet making machine;

[0023] 100, docking position; 200, first placement position; 300, second placement position;

[0024] 400, shifting mechanism;

[0025] 500, unloading mechanism;

[0026] 600, workpiece moving mechanism; 610, first lifting device; 620, workpiece transferring device; 621, first door frame; 622, adsorption assembly; 630, second lifting device; 640, transfer device;

[0027] 700, moving mechanism; 710, handling device; 711, second door frame; 712, grabbing device; 720, transplanting track; 730, turning device;

[0028] 800, stop position;

[0029] 900. Install a base. DETAILED DESCRIPTION

[0030] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only the parts related to the present invention, rather than all structures, are shown in the accompanying drawings.

[0031] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0032] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0033] In the description of this embodiment, the terms "upper", "lower", "right", "left" and other directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplified operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation of the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.

[0034] Figure 1 The following is a schematic diagram showing the structure of the material feeding device provided by the embodiment of the utility model. Figure 1, this embodiment provides a material unloading device and a texturing system. The texturing system includes a loading device, a texturing main machine 10 and a material unloading device provided in this embodiment. The loading device is connected to the loading end of the texturing main machine 10, and the material unloading device is connected to the discharging end of the texturing main machine 10, so as to realize the unloading of the processed parts after texturing. The material unloading device is used to transfer the processed parts produced by the texturing main machine 10 from the first carrier to the second carrier. In this embodiment, the first carrier is a flower basket, and the second carrier is a quartz boat. "Unloading" means transferring the processed parts after texturing at the discharging end of the texturing main machine 10 from the flower basket to the quartz boat, and directly using the quartz boat as a transfer tool in subsequent processes.

[0035] Continue to refer to Figure 1 , the unloading equipment includes a docking position 100, a first placement position 200, a second placement position 300, a shifting mechanism 400, a workpiece moving mechanism 600, a moving mechanism 700 and a stop position 800. The unloading equipment also includes a frame, and the docking position 100 is arranged on one side of the frame and docked to the discharge end of the texturing main machine 10. The first placement position 200 is used to place the first carrier, and the first carrier is used to carry silicon wafers and other processed parts. The second placement position 300 is used to place the second carrier, and the second carrier is also used to carry the processed parts. The shifting mechanism 400 is used to transfer the first carrier output from the discharge end of the texturing main machine 10 to the first placement position 200 through the docking position 100. The workpiece moving mechanism 600 is used to move the workpiece in the first carrier located in the first placement position 200 out of the first carrier, and transfer the removed workpiece to the second carrier located in the second placement position 300. The moving mechanism 700 is used to transport the second carrier carrying the workpiece to the stop position 800, or to move an empty second carrier to the second placement position 300. The stop position 800 is used for parking the transport mechanism carrying the second carrier, and the transport mechanism can move relative to the device base 900 to drive onto the device base 900 or leave the device base 900.

[0036] Specifically, the material unloading device further comprises a device base 900. The device base 900 is connected to the material discharging end of the texturing main machine 10, and the frame is arranged on the device base 900. The shifting mechanism 400, the workpiece moving mechanism 600 and the quartz boat moving mechanism 700 are all arranged on the frame and arranged in sequence in the length direction of the material unloading device.

[0037] Optionally, in this embodiment, the shift mechanism 400 may select a combination of a mechanical arm and a mechanical gripper, the mechanical gripper is used to grab the first carrier, and the mechanical arm can be flexibly rotated 360° to achieve flexible transportation of the first carrier. The above-mentioned mechanical arm and mechanical gripper are both prior art, and their structures and principles are not described in detail in this embodiment.

[0038] More specifically, the workpiece moving mechanism 600 includes a first jacking device 610 and a workpiece transfer device 620. The first jacking device 610 is disposed at the first placement position 200, and can eject the workpiece in the first carrier, and the workpiece transfer device 620 can receive the workpiece ejected from the first carrier, and move the workpiece to the second placement position 300. The workpiece moving mechanism 600 also includes a second jacking device 630, which is disposed at the second placement position 300, and can receive the workpiece on the workpiece transfer device 620, and place the workpiece in the second carrier located at the second placement position 300. In this embodiment, the second jacking device 630 is controlled to be lifted and lowered by a cylinder. When the second jacking device 630 is in the jacking position, it can receive the workpiece on the workpiece transfer device 620; when the second jacking device 630 is in the lowering position, it can insert the workpiece into the second carrier.

[0039] More specifically, refer to Figure 2 The workpiece transfer device 620 includes a first portal frame 621 and an adsorption assembly 622. The first portal frame 621 spans the first placement position 200 and the second placement position 300. The adsorption assembly 622 can adsorb the workpiece that is ejected from the first carrier by the first jacking device 610, and the adsorption assembly 622 can move along the first portal frame 621 to transport the workpiece to the second jacking device 630. The first portal frame 621 can provide a guide for the transfer of the workpiece, and the adsorption assembly 622 can reliably adsorb the workpiece, which can not only realize the removal of the workpiece, but also prevent the workpiece from being damaged.

[0040] Continue to refer to Figure 1 , the workpiece moving mechanism 600 also includes a transfer device 640. The loading end of the transfer device 640 is located downstream of the shifting mechanism 400, and the unloading end of the transfer device 640 is provided with a first placement position 200, and the transfer device 640 can reciprocate the first carrier. The transfer device 640 can be retracted, and can transfer the unloaded first carrier after the workpiece is ejected to the grasping range of the shifting mechanism 400, and can also move the first carrier carrying the workpiece to the bottom of the first jacking device 610. In other words, the shifting mechanism 400 can place the first carrier carrying the workpiece at the end of the extended transfer device 640, and the transfer device 640 retracts to transfer the first carrier carrying the workpiece to the bottom of the first jacking device 610, that is, to transfer the first carrier to the first placement position 200. The transfer device 640 can select any structure in the prior art that can achieve retraction and drive the first carrier to move, and the present embodiment does not limit its specific structure and type.

[0041] Continue to refer to Figure 1The moving mechanism 700 includes a transport device 710 and a moving device. The loading end of the moving device forms a second placement position 300, and the transport device 710 can transport the second carrier between the moving device and the stop position 800. The moving device includes a flipping device 730 and a transplanting track 720, and the flipping device 730 can move along the transplanting track 720. The flipping device 730 is used to switch the second carrier between lying horizontally and standing upright.

[0042] Optionally, two second placement positions 300 are provided, and two mobile devices are provided. The two mobile devices are arranged side by side, and a second placement position 300 is formed at the loading end of each mobile device. The transport device 710 spans the unloading ends of the two mobile devices, and the stop position 800 is arranged between the unloading ends of the two mobile devices. The transport device 710 spans the unloading ends of the two mobile devices. Through the above arrangement, the two groups of mobile devices can work in coordination to achieve continuous unloading of the second carrier carrying the workpiece, thereby improving the unloading efficiency of the unloading equipment.

[0043] Specifically, the transport device 710 includes a second portal frame 711 and a gripping device 712. The length direction of the second portal frame 711 is consistent with the length direction of the first portal frame 621, and the second portal frame 711 is arranged parallel to and spaced from the first portal frame 621. The gripping device 712 is movably arranged on the second portal frame 711, and can move along the length direction of the second portal frame 711. The transfer track 720 is arranged between the second portal frame 711 and the first portal frame 621, and the second bearing member can be transferred between the first end of the second portal frame 711 and the second placement position 300. One end of the transfer track 720 is a loading and unloading end, and the loading and unloading end is close to the first end of the second portal frame 711, and the other end of the transfer track 720 is connected to the second placement position 300. The gripping device 712 can grab the unloaded second bearing member in the transport mechanism, and transfer the unloaded second bearing member to the loading and unloading end of the transfer track 720. The transfer track 720 can transfer the unloaded second carrier to the second placement position 300 to receive the workpiece, and can also transfer the second carrier carrying the workpiece to the loading and unloading end of the transfer track 720. At this time, the handling device 710 grabs the second carrier carrying the workpiece and moves it to the transportation mechanism.

[0044] More specifically, the flipping device 730 can move along the transfer track 720, and move between the loading and unloading ends of the transfer track 720 and the second placement position 300. The flipping device 730 is used to switch the second carrier between lying horizontally and standing vertically. When the second carrier is in a lying state, it can receive the workpiece on the second jacking device 630; when the second carrier is in an upright state, it is convenient for the gripping device 712 to grip it. The transport device 710 can transport the second carrier between the unloading end of the transfer track 720 and the transport mechanism. The flipping device 730 can adopt the equipment in the prior art that can fix the quartz boat and flip it, and its structure and principle are not described in detail in this embodiment.

[0045] Optionally, the transport mechanism can transport the unloaded second carrier to the loading end of the mobile mechanism 700, and can also move the second carrier carrying the workpiece to the downstream equipment. In this embodiment, the downstream equipment can be a diffusion device, etc., and its specific type is not limited in this embodiment. The transport mechanism can adopt an AGV trolley in the prior art.

[0046] Continue to refer to Figure 1 , the unloading device also includes an unloading mechanism 500. The unloading mechanism 500 is located on one side of the shift mechanism 400 in the width direction of the unloading device, and the unloading mechanism 500 is used to receive the empty first carrier transmitted by the shift mechanism 400. The mechanical arm of the shift mechanism 400 can place the first carrier on the unloading mechanism 500 by rotating. The unloading mechanism 500 includes a plurality of unloading tracks arranged parallel to each other and spaced apart. The unloading track includes a transfer belt and a rotating base plate, and the transfer belt can perform crawler motion relative to the rotating base plate. The rotating belt can support the first carrier and leave the device base 900 along the extension direction of the rotating base plate, so as to be able to move the empty first carrier out of the unloading device.

[0047] Obviously, the above embodiments of the present invention are merely examples for the purpose of clearly illustrating the present invention, and are not intended to limit the implementation methods of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the scope of protection of the present invention. It is not necessary and impossible to list all implementation methods here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention shall be included in the scope of protection of the claims of the present invention.

Claims

1. Unloading equipment, characterized in that: The material unloading device is used to transfer the workpiece produced by the texturing main machine (10) from the first carrier to the second carrier, and the material unloading device comprises: A docking position (100), the docking position (100) being used to dock with the discharge end of the texturing main machine (10); A first placement position (200) is used to place the first carrier, and the first carrier is used to carry the workpiece; A second placement position (300) is used to place the second carrier, and the second carrier is used to carry the workpiece; A shifting mechanism (400) is used to transfer the first carrier outputted from the discharge end of the texturing main machine (10) to the first placement position (200) through the docking position (100); The workpiece moving mechanism (600) is used to move the workpiece in the first carrier located at the first placement position (200) out of the first carrier, and transfer the moved workpiece to the second carrier located at the second placement position (300).

2. The material discharging equipment according to claim 1, characterized in that: The workpiece moving mechanism (600) comprises a first lifting device (610) and a workpiece transfer device (620), wherein the first lifting device (610) is arranged at the first placement position (200) and is capable of ejecting the workpiece in the first carrier, and the workpiece transfer device (620) is capable of receiving the workpiece ejected from the first carrier and moving the workpiece to the second placement position (300); The workpiece moving mechanism (600) further comprises a second lifting device (630), which is arranged at the second placement position (300) and is capable of receiving the workpiece on the workpiece transfer device (620) and placing the workpiece in a second carrier located at the second placement position (300).

3. The material discharging equipment according to claim 2, characterized in that: The workpiece transfer device (620) includes a first portal frame (621) and an adsorption assembly (622), wherein the first portal frame (621) spans the first placement position (200) and the second placement position (300), and the adsorption assembly (622) can adsorb the workpiece that is ejected from the first carrier by the first jacking device (610). The adsorption assembly (622) can also move along the first portal frame (621) to transport the workpiece to the second jacking device (630).

4. The material discharging equipment according to claim 1, characterized in that: The unloading equipment also includes a stop position (800), and the stop position (800) is used for parking a transportation mechanism carrying the second carrier. The unloading equipment also includes a moving mechanism (700), and the moving mechanism (700) is used to transport the second carrier carrying the workpiece to the stop position (800), or to move the second carrier to the second placement position (300).

5. The material discharging equipment according to claim 4, characterized in that: The moving mechanism (700) comprises a transport device (710) and a moving device, the loading end of the moving device forms the second placement position (300), and the transport device (710) is capable of transporting the second carrier between the moving device and the stop position (800).

6. The material discharging equipment according to claim 5, characterized in that: The moving device further comprises a flipping device (730) and a transplanting track (720); the flipping device (730) is capable of moving along the transplanting track (720); and the flipping device (730) is used to switch the second bearing member between lying horizontally and standing upright.

7. The material discharging equipment according to claim 5, characterized in that: There are two second placement positions (300) and two moving devices; the two moving devices are arranged side by side, and a second placement position (300) is formed at the loading end of each moving device; The transport device (710) spans across the unloading ends of the two moving devices, and the stop position (800) is arranged between the unloading ends of the two moving devices.

8. The material discharging equipment according to claim 1, characterized in that: The workpiece moving mechanism (600) further comprises a transfer device (640), the loading end of the transfer device (640) is located downstream of the shifting mechanism (400), the unloading end of the transfer device (640) is provided with the first placement position (200), and the transfer device (640) is capable of reciprocatingly transporting the first carrier.

9. The material discharging equipment according to claim 1, characterized in that: The docking position (100), the shifting mechanism (400) and the workpiece moving mechanism (600) are arranged in sequence in the length direction of the blanking equipment; The unloading equipment further comprises an unloading mechanism (500), wherein the unloading mechanism (500) is located on one side of the shifting mechanism (400) in the width direction of the unloading equipment, and the unloading mechanism (500) is used to receive the empty first carrier transmitted by the shifting mechanism (400).

10. The texturing system is characterized by: It comprises a loading device, a main texturing machine (10) and a unloading device as described in any one of claims 1 to 9, wherein the loading device is connected to the loading end of the main texturing machine (10), and the unloading device is connected to the unloading end of the main texturing machine (10), so as to realize unloading of processed parts after texturing.