Combined bridge deck slab structure and bridge

By combining the bridge deck structure, including the base plate, top plate, web, vertical partition plate, cross partition plate, U-shaped stiffener and shear connector, the problem of high fatigue cracking and reinforcement costs of bridge deck is solved, and the fatigue resistance is improved and cost reduction.

CN222119926UActive Publication Date: 2024-12-06SOUTHWEST JIAOTONG UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420678862.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-03
Publication Date
2024-12-06
Estimated Expiration
2034-04-03

AI Technical Summary

Technical Problem

Bridge deck panels are prone to fatigue cracking under the loading of reciprocating wheels, and traditional reinforcement methods are costly and difficult to promote and use.

Method used

The combined bridge deck structure is adopted, including the base plate, the top plate, the web, the vertical partition plate, the cross partition plate, the U-shaped stiffener, the shear connection and the steel mesh. The shear connection is welded, the shear reinforcement and steel mesh are arranged, and the shear reinforcement and steel mesh is arranged. Pour concrete, aligning it with U-shaped stiffener and shear joints to improve local stiffness and reduce stress amplitude.

Benefits of technology

It improves the fatigue resistance of the bridge deck, reduces the reinforcement cost, and achieves the strength and stiffness of the roof panel, without the need to use high-cost RPC concrete.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222119926U_ABST
    Figure CN222119926U_ABST
Patent Text Reader

Abstract

The utility model discloses a combined bridge deck structure, which relates to the technical field of buildings, comprises a bottom plate and a top plate, and is characterized in that a web plate is arranged between the bottom plate and the top plate, a longitudinal partition plate and a plurality of transverse partition plates are further arranged between the bottom plate and the top plate, the transverse partition plates are provided with over-welding holes, and the longitudinal partition plate and the transverse partition plates are welded through the over-welding holes. U-shaped stiffening ribs for supporting the bottom of the top plate and the top of the bottom plate are installed in the over-welding holes, shearing force connecting pieces aligned with the tops of the U-shaped stiffening ribs are arranged on the top of the top plate, grooves are formed in the shearing force connecting pieces, anti-shearing reinforcing steel bars are arranged in the grooves, and a reinforcing mesh and concrete are arranged on the top of the top plate. The utility model further discloses a bridge which is characterized in that a combined bridge deck slab structure is adopted. The combined bridge deck slab structure and the bridge have the advantages that local rigidity is improved, stress amplitude is reduced, fatigue performance is improved, strength and rigidity of the top plate are improved, reinforcing cost is low, and the combined bridge deck slab structure and the bridge are easy to popularize and use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction, in particular to a combined bridge deck structure and a bridge. Background Art

[0002] As the main component that participates in the overall stress of the bridge and directly bears the wheel load, the bridge deck is one of the most vulnerable parts of the bridge structure. Orthotropic steel bridge decks are widely used in various types of bridge structures due to their advantages such as light weight and high strength. However, under the action of reciprocating wheel loads, their welds often have high stress amplitudes and are prone to fatigue cracking.

[0003] At present, in the case where the top plate is prone to fatigue damage due to excessive stress amplitude, the conventional practice is to pour RPC (high-performance concrete, whose strength and stiffness are comparable to those of steel) on it, in order to enhance the strength and stiffness of the top plate. However, the cost of pouring RPC is high and it is difficult to promote its use.

[0004] Therefore, the prior art needs to be improved. Utility Model Content

[0005] The technical problem to be solved by the utility model is that the top plate is prone to cracking and the traditional reinforcement cost is high. The purpose is to provide a combined bridge deck structure and a bridge, which adopt corresponding technical means and have the beneficial effects of good fatigue resistance and low reinforcement cost.

[0006] The utility model is realized by the following technical solutions:

[0007] A composite bridge deck structure comprises a bottom plate and a top plate, a web plate is arranged between the bottom plate and the top plate, a longitudinal partition and a plurality of transverse partitions are also arranged between the bottom plate and the top plate, the transverse partition is provided with a through-welding hole, the through-welding hole is installed with a U-shaped stiffening rib supporting the bottom of the top plate and the top of the bottom plate, a shear connector aligned with the top of the U-shaped stiffening rib is arranged on the top of the top plate, the shear connector is provided with a groove, the groove is provided with shear-resistant steel bars, and a steel mesh and concrete are arranged on the top of the top plate.

[0008] In the above technical solution, shear connectors are welded on the top plate of the composite bridge deck structure, shear steel bars are placed in the grooves of the shear connectors, and steel mesh is arranged and concrete is poured on the top plate. U-shaped stiffening ribs are arranged inside the composite bridge deck structure, and the U-shaped stiffening ribs and the shear connectors are aligned to increase local stiffness, reduce stress amplitude, and achieve the purpose of improving fatigue performance.

[0009] Furthermore, in the present invention, the bottom plate, the top plate and the web are all provided with plate-type stiffening ribs.

[0010] Furthermore, in the present invention, the steel mesh comprises longitudinal steel bars and transverse steel bars, and the spacing between the longitudinal steel bars and the transverse steel bars is 100 mm.

[0011] Furthermore, in the utility model, the top of the shear connector has a plane for placing the transverse steel bars.

[0012] Furthermore, in the present invention, the shear connector is an integrally formed long strip structure.

[0013] Furthermore, in the present invention, the extension direction of the shear connector is parallel to the extension direction of the U-shaped stiffening rib.

[0014] Furthermore, in the present invention, the U-shaped stiffening rib adopts a single-sided V-shaped groove weld.

[0015] Furthermore, in the present invention, the above-mentioned shear connector includes an MCL type combination pin.

[0016] Furthermore, in the present invention, the lower portion of the MCL type combination pin adopts the CL type spiral curve, and the upper portion adopts the PZ type arc and curve.

[0017] A bridge comprises the above-mentioned combined bridge deck structure.

[0018] Compared with the prior art, the utility model has the following advantages and beneficial effects:

[0019] A shear connector is welded on the top plate of the composite bridge deck structure of the utility model, shear-resistant steel bars are placed in the grooves of the shear connector, and a steel mesh is arranged on the top plate and concrete is poured. A U-shaped stiffening rib is arranged inside the composite bridge deck structure, and the U-shaped stiffening rib and the shear connector are aligned to improve local stiffness, reduce stress amplitude, and achieve the purpose of improving fatigue performance.

[0020] The bridge of the utility model adopts a combined bridge deck structure, which improves the fatigue resistance of the bridge deck, can improve the strength and rigidity of the top plate without pouring RPC, has low reinforcement cost, and is easy to promote and use. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The drawings described herein are used to provide a further understanding of the embodiments of the present utility model, constitute a part of this application, and do not constitute a limitation of the embodiments of the present utility model. In the drawings:

[0022] Figure 1 A schematic diagram of a combined bridge deck structure provided by the utility model;

[0023] Figure 2 A schematic diagram of the structure of the U-shaped stiffening rib and the shear connector provided by the utility model;

[0024] Figure 3 A schematic diagram of the structure of the shear connector provided by the utility model;

[0025] Figure 4 This is a schematic diagram of the dimensions of the shear connector provided by the utility model.

[0026] Markings and corresponding parts names in the accompanying drawings: 1-top plate, 2-bottom plate, 3-web, 4-longitudinal partition, 5-transverse partition, 501-weld hole, 6-U-shaped stiffener, 7-shear connector, 701-groove, 702-plane, 8-shear steel bar, 9-steel mesh, 901-longitudinal steel bar, 902-transverse steel bar, 10-concrete, 11-plate stiffener. DETAILED DESCRIPTION

[0027] In order to make the purpose, technical solutions and advantages of the utility model more clearly understood, the utility model is further described in detail below in conjunction with embodiments and drawings. The schematic implementation manner of the utility model and its description are only used to explain the utility model and are not intended to limit the utility model.

[0028] The following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the present invention to be protected, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0029] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0030] In the description of the embodiments of the present invention, "multiple" means at least 2.

[0031] In the description of the embodiments of the present utility model, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.

[0032] Example 1

[0033] This embodiment provides a composite bridge deck structure, such as Figure 1-Figure 4As shown, the specific structure is as follows.

[0034] Combination Figure 1 As shown, the composite bridge deck structure of this embodiment is mainly composed of three parts: bottom plate 2, top plate 1, and web 3. The bottom plate 2 is located at the bottom, the top plate 1 is located at the top, and the web 3 is installed between the bottom plate 2 and the top plate 1. The bottom plate 2, the top plate 1, and the web 3 adopt a fully welded structure. During the processing, under the premise of ensuring the quality of the weld, a process with small welding deformation and small weld shrinkage should be selected. In order to increase the structural strength, a plurality of plate-type stiffening ribs 11 are installed on the bottom plate 2, the top plate 1, and the web 3, which have higher strength and longer service life.

[0035] Further, combined with Figure 1 and Figure 2 As shown, a longitudinal partition 4 and a plurality of transverse partitions 5 are installed between the bottom plate 2 and the top plate 1, and the longitudinal partition 4 and the transverse partition 5 are used to support the top plate 1. A row of arc-shaped through-welding holes 501 are opened on the top of the transverse partition 5, and a row of through-welding holes 501 are also opened on the bottom of the transverse partition 5, and a U-shaped stiffening rib 6 is fixedly installed at the position of each through-welding hole 501, and the opening of the top U-shaped stiffening rib 6 faces upward, and the opening of the bottom U-shaped stiffening rib 6 faces downward, respectively supporting the top plate 1 and the bottom plate 2.

[0036] It should be noted that the thickness of the top plate 1 is not less than 14mm to ensure the rigidity and local deformation resistance of the top plate. The upper width of the U-shaped stiffening rib 6 connected to the top plate 1 is 300mm and the height is 280mm. A single-sided V-shaped groove weld is used, and the penetration depth should be not less than 0.8 times the plate thickness. The plate spacing of the diaphragm 5 is not more than 4m, and a plate section is used.

[0037] In some implementations of this embodiment, Figure 2 and Figure 3 As shown, the cross section of the U-shaped stiffening rib 6 is U-shaped, and it extends along the longitudinal direction. The shear connector 7 is a long metal plate. The shear connector 7 is manufactured by one-piece molding, has no welds and other connecting seams, has high stability and strength, and has a long service life. The bottom of the shear connector 7 is welded to the top surface of the top plate 1, and the top surface of the top plate 1 and the shear connector 7 are perpendicular to each other. At the same time, the shear connector 7 and the top of the U-shaped stiffening rib 6 are vertically aligned, that is, a shear connector 7 is installed on the vertical plane of the connection position of the U-shaped stiffening rib 6 and the top plate 1, and the two shear connectors 7 are located directly above the U-shaped stiffening rib 6, and the extension direction of the shear connector 7 is parallel to the extension direction of the U-shaped stiffening rib 6. The structure is reasonable and the overall strength is higher, achieving the purpose of better anti-fatigue performance.

[0038] Further, combined with Figure 3As shown, a groove 701 is provided on the shear connector 7, and the grooves 701 of the plurality of shear connectors 7 are aligned in rows horizontally, so as to facilitate the placement of the shear reinforcement 8 in the groove 701, and the steel mesh 9 is installed after the shear reinforcement 8 is placed. Figure 2 As shown, the steel mesh 9 is composed of a plurality of longitudinal steel bars 901 and a plurality of transverse steel bars 902, the interval between two longitudinal steel bars 901 is 100 mm, and the interval between two transverse steel bars 902 is 100 mm. The top of the shear connector 7 is a plane 702. When installing the steel mesh 9, the transverse steel bars 902 are placed on the plane 702. After the steel mesh 9 is placed, the concrete 10 is poured.

[0039] It should be noted that, in some other embodiments, in order to further enhance the overall strength of the composite bridge deck structure, the concrete 10 may be ultra-high performance concrete (UHPC). Ultra-high performance concrete (UHPC) is a new type of cement-based composite material with ultra-high strength, ultra-high durability and high toughness. Its design is based on the maximum density stacking theory, with fine particles replacing coarse aggregates, and its constituent materials with different particle sizes form the most dense stacking in the best proportion. Ultra-high performance concrete has a uniform and dense microstructure, and its tensile strength, bending strength, shear strength, bonding strength, peak strain, etc. are far greater than ordinary concrete, and the addition of steel fibers significantly increases the toughness of UHPC.

[0040] In some implementations of this embodiment, Figure 3 and Figure 4 As shown, the shear connector 7 adopts the MCL type combination pin in the prior art. The MCL type combination pin has a thickness of 12 mm, a height of 40 mm, a longitudinal dimension of 100 mm, and a transverse spacing of 300 mm. The lower part of the MCL type combination pin adopts the CL type spiral curve, and the upper part adopts the PZ type arc and curve. The size data of each part of the MCL type combination pin is as shown in Figure 4 As shown, the overall fatigue resistance is good.

[0041] The working principle of this embodiment is as follows:

[0042] A shear connector 7 is welded on the top plate 1 of the composite bridge deck structure, and a shear steel bar 8 is placed in the groove 701 of the shear connector 7. At the same time, a steel mesh 9 and poured concrete 10 are arranged on the top plate 1. A U-shaped stiffening rib 6 is arranged inside the composite bridge deck structure, and the U-shaped stiffening rib 6 and the shear connector 7 are aligned to achieve the purpose of increasing local stiffness, reducing stress amplitude, and improving fatigue performance.

[0043] Example 2

[0044] The bridge of this embodiment adopts the combined bridge deck structure in Example 1. After the shear connector 7 is welded, the shear reinforcement 8 and the steel mesh 9 are placed, and then the ultra-high performance concrete (UHPC) is poured. When the strength of UHPC reaches the requirement, the cable construction is carried out. Since the UHPC has reached the strength requirement, the UHPC and the orthotropic steel bridge deck will participate in the force together. The axial pressure is applied to the combined bridge deck through the anchor end, and an effective prestress is formed in the UHPC, which effectively reduces the cracking problem of the UHPC tensile zone. And this method can effectively improve the stiffness of the combined bridge deck, improve the structural force, and extend the service life.

[0045] In summary, the utility model provides a composite bridge deck structure, including a bottom plate 2 and a top plate 1, a web plate 3 is arranged between the bottom plate 2 and the top plate 1, a longitudinal diaphragm 4 and a plurality of transverse diaphragms 5 are also arranged between the bottom plate 2 and the top plate 1, the transverse diaphragm 5 is provided with a through-welding hole 501, a U-shaped stiffening rib 6 supporting the bottom of the top plate 1 and the top of the bottom plate 2 is installed through the welding hole 501, a shear connector 7 aligned with the top of the U-shaped stiffening rib 6 is arranged on the top of the top plate 1, the shear connector 7 is provided with a groove 701, the groove 701 is provided with a shear steel bar 8, and a steel mesh 9 and concrete 10 are arranged on the top of the top plate 1. The bottom plate 2, the top plate 1 and the web plate 3 are all provided with plate-type stiffening ribs 11. The steel mesh 9 includes longitudinal steel bars 901 and transverse steel bars 902, and the spacing between the longitudinal steel bars 901 and the transverse steel bars 902 is 100 mm. The top of the shear connector 7 has a plane 702 for placing the transverse steel bars 902. The shear connector 7 is an integrally formed long strip structure. The extension direction of the shear connector 7 is parallel to the extension direction of the U-shaped stiffening rib 6. The U-shaped stiffening rib 6 adopts a single-sided V-shaped groove weld. The shear connector 7 includes an MCL-type combination pin. The lower part of the MCL-type combination pin follows the CL-type spiral curve, and the upper part adopts a PZ-type arc and curve. The utility model also provides a bridge, which includes the above-mentioned combined bridge deck structure. Therefore, the combined bridge deck structure and bridge provided by the utility model have the beneficial effects of increasing local stiffness, reducing stress amplitude, and improving fatigue performance, increasing the strength and stiffness of the top plate 1, and having a low reinforcement cost and easy to promote and use.

[0046] The specific implementation methods described above further illustrate the purpose, technical solutions and beneficial effects of the utility model in detail. It should be understood that the above description is only the specific implementation method of the utility model and is not used to limit the protection scope of the utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the utility model should be included in the protection scope of the utility model.

Claims

1. A composite bridge deck structure, comprising a bottom deck (2) and a top deck (1), characterized in that: A web (3) is arranged between the bottom plate (2) and the top plate (1), and a longitudinal partition (4) and a plurality of transverse partitions (5) are also arranged between the bottom plate (2) and the top plate (1), the transverse partition (5) is provided with a through-welding hole (501), and the through-welding hole (501) is installed with a U-shaped stiffening rib (6) supporting the bottom of the top plate (1) and the top of the bottom plate (2), and a shear connector (7) aligned with the top of the U-shaped stiffening rib (6) is arranged at the top of the top plate (1), and the shear connector (7) is provided with a groove (701), and the groove (701) is provided with a shear steel bar (8), and a steel mesh (9) and concrete (10) are arranged at the top of the top plate (1).

2. The composite bridge deck structure according to claim 1, characterized in that: The bottom plate (2), the top plate (1) and the web plate (3) are all provided with plate-type stiffening ribs (11).

3. The composite bridge deck structure according to claim 1, characterized in that: The steel mesh (9) comprises longitudinal steel bars (901) and transverse steel bars (902), and the spacing between the longitudinal steel bars (901) and the transverse steel bars (902) is 100 mm.

4. The composite bridge deck structure according to claim 3, characterized in that: The top of the shear connector (7) has a plane (702) for placing the transverse reinforcement (902).

5. The composite bridge deck structure according to claim 1, characterized in that: The shear connector (7) is an integrally formed long strip structure.

6. The composite bridge deck structure according to claim 5, characterized in that: The extension direction of the shear connector (7) is parallel to the extension direction of the U-shaped stiffening rib (6).

7. The composite bridge deck structure according to claim 1, characterized in that: The U-shaped stiffening rib (6) adopts a single-sided V-shaped groove weld.

8. The composite bridge deck structure according to claim 1, characterized in that: The shear connector (7) comprises an MCL type combined pin.

9. The composite bridge deck structure according to claim 8, characterized in that: The lower part of the MCL type combination pin adopts the CL type spiral curve, and the upper part adopts the PZ type arc and curve.

10. A bridge, characterized in that: Comprising the composite bridge deck structure as described in any one of claims 1-8.