Mine pressure monitoring device for coal face

By using the connection method between the T-shaped screw seat and the flange in the ore pressure monitoring device, the maintenance difficulties caused by screw breakage in the prior art are solved, and the effect of convenience of replacement is achieved, and the maintenanceability of the device is improved.

CN222124594UInactive Publication Date: 2024-12-06GUIZHOU DEANTAI TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420918976.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-29
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When the existing ore pressure monitoring device is too large, the screw is prone to eject or break, resulting in damage to the screw holes of the connecting seat, unable to be used again, and it is difficult to replace the screw.

Method used

A mine pressure monitoring device including a pressure measuring box, oil pipe and pressure gauge is designed, using the connection method of the T-shaped screw seat and the flange. The T-shaped screw seat is embedded in the connecting seat, and the front end of the oil pipe is integrated with the flange. , connected by screws to ensure easy replacement.

Benefits of technology

When the screw breaks, you only need to replace the T-shaped screw seat to avoid overall scrapping, and can be directly taken out and replaced regardless of the broken position, improving the maintainability of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222124594U_ABST
    Figure CN222124594U_ABST
Patent Text Reader

Abstract

The utility model discloses a mine pressure monitoring device for a coal face. The mine pressure monitoring device comprises a pressure measuring box, an oil pipe and a pressure gauge, a connecting seat is arranged on the peripheral wall of the pressure measuring box, an inserting hole is formed in the front end face of the connecting seat, and the inserting hole is connected to an oil cavity in the pressure measuring box through an oil through hole with a smaller diameter; a plurality of T-shaped grooves penetrating through the front end face are formed in the peripheral wall of the connecting base, and T-shaped screw bases are embedded in the T-shaped grooves; a flange plate is integrally welded on the oil pipe close to the front end, a pressure gauge is mounted at the rear end, a sealing gasket is mounted at the bottom of an inserting hole, the front end of the oil pipe is inserted into the inserting hole, and the flange plate is connected with a T-shaped screw seat through a screw. Due to the fact that the T-shaped screw seat is embedded, if the screw is fractured subsequently, only the T-shaped screw seat of the fractured screw needs to be replaced, and due to the fact that the front end face of the T-shaped screw seat is in direct contact with the flange plate, other limiting portions do not exist, no matter where the screw is fractured, the whole T-shaped screw seat can be directly taken out and replaced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of mine pressure monitoring equipment, in particular to a mine pressure monitoring device used for a coal mining working face. Background Art

[0002] Support pressure monitoring of fully mechanized top coal caving working face is one of the monitoring methods commonly used in modern mine roof management. Support pressure monitoring can help us understand: the pressure law during the mining process of the working face, providing a basis for the support of the working face; the basic law of surrounding rock deformation under the influence of mining, providing a basis for determining the support method and reasonable support parameters of the mining roadway under dynamic pressure conditions; the influence range of advanced mining and the peak area of ​​advanced support pressure, determining the advanced strengthening support distance of the working face roadway and the corresponding support technical measures.

[0003] At present, the mine pressure monitoring device used to monitor the support pressure mainly consists of a pressure measuring box, an oil pipe and a pressure gauge. The oil pipe is used to connect the pressure measuring box and the pressure gauge, so that the mine pressure fed back by the pressure measuring box is transmitted to the pressure gauge through hydraulic oil. The existing oil pipe is connected to the connecting seat of the pressure measuring box through a flange plate and a screw. The front end surface of the connecting seat is provided with a screw hole. The mine pressure changes greatly. Once the mine pressure is too large, the screw rod will often be pushed out. This will damage the internal thread of the screw hole of the connecting seat, so that it cannot be used again by replacing the screw rod. In addition, sometimes the screw rod breaks directly inside the screw hole, so it can only be scrapped as a whole. Utility Model Content

[0004] The technical problem to be solved by the utility model is to provide a mine pressure monitoring device for a coal mining working face, so as to solve the technical problem in the above-mentioned background technology.

[0005] In order to solve the above technical problems, the technical solution of the utility model is:

[0006] A mine pressure monitoring device for a coal mining face comprises a pressure measuring box, an oil pipe and a pressure gauge; a connecting seat is arranged on the peripheral wall of the pressure measuring box, a plug-in hole is arranged on the front end face of the connecting seat, and the plug-in hole is connected to the oil chamber inside the pressure measuring box through an oil through hole with a smaller diameter; a plurality of T-shaped grooves are arranged on the peripheral wall of the connecting seat penetrating to the front end face, and T-shaped screw seats are embedded in the T-shaped grooves; a flange is integrally welded on the front end of the oil pipe, a pressure gauge is installed on the rear end, a sealing gasket is installed on the bottom of the plug-in hole, the front end of the oil pipe is inserted into the plug-in hole, and the flange is connected to the T-shaped screw seat by a screw.

[0007] Further, the outer end surface of the T-shaped screw seat matches the weekend profile of the connecting seat.

[0008] Furthermore, the cross section of the connecting seat is circular, T-shaped grooves are opened at equal angles on its circumference, the outer end face of the T-shaped screw seat is an arc surface consistent with the outer diameter of the connecting seat, and the flange diameter is consistent with the outer diameter of the connecting seat.

[0009] The advantages of the utility model are:

[0010] Since the T-shaped screw seat of the utility model is embedded, if the mine pressure is too large and the screw is broken, it is only necessary to replace the T-shaped screw seat of the broken screw. Moreover, since the front end surface of the T-shaped screw seat is in direct contact with the flange plate and there are no other restrictive parts, no matter where the screw is broken, the T-shaped screw seat can be directly taken out and replaced as a whole. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a three-dimensional schematic diagram of the utility model;

[0012] Figure 2 This is a cross-sectional view of the utility model;

[0013] Figure 3 for Figure 2 A magnified schematic diagram of local A in FIG.

[0014] Figure 4 A three-dimensional schematic diagram of the connection seat;

[0015] Figure 5 It is a three-dimensional schematic diagram of a T-shaped screw seat.

[0016] In the figure, 1-pressure measuring box, 11-oil chamber, 2-connecting seat, 21-oil hole, 22-insertion hole, 23-T-slot, 3-T-screw seat, 4-oil pipe, 41-flange, 42-screw, 43-sealing gasket, 5-pressure gauge. DETAILED DESCRIPTION

[0017] The specific implementation methods of the present invention are further described below in conjunction with the accompanying drawings. It should be noted that the description of these implementation methods is used to help understand the present invention, but does not constitute a limitation of the present invention. In addition, the technical features involved in each implementation method of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0018] As shown in the figure:

[0019] A mine pressure monitoring device for a coal mining face comprises a pressure measuring box 1, an oil pipe 4 and a pressure gauge 5; a connecting seat 2 is arranged on the peripheral wall of the pressure measuring box 1, a plug-in hole 22 is provided on the front end face of the connecting seat 2, and the plug-in hole 22 is connected to the oil chamber 11 inside the pressure measuring box 1 through an oil through hole 21 with a smaller diameter; a plurality of T-shaped slots 23 are arranged on the peripheral wall of the connecting seat 2 and penetrate to the front end face, and T-shaped screw seats 3 are embedded in the T-shaped slots 23; a flange 41 is integrally welded on the front end of the oil pipe 4, a pressure gauge 5 is installed on the rear end, a sealing gasket 43 is installed at the bottom of the plug-in hole 22, the front end of the oil pipe 4 is inserted into the plug-in hole 22, and the flange 41 is connected to the T-shaped screw seat 3 by a screw.

[0020] The pressure measuring box 1, the oil pipe 4 and the pressure gauge 5 in the utility model are all prior arts. When the pressure measuring box 1 is subjected to pressure, pressure is generated on the hydraulic oil in the internal oil chamber 11. The pressure is transmitted to the pressure gauge 5 by the hydraulic oil through the communicating vessel principle, thereby achieving the purpose of monitoring the pressure. The usage method is consistent with the prior art, and only the connection method between the oil pipe 4 and the connecting seat 2 is changed.

[0021] When installing the utility model, the sealing gasket 43 is first installed, and then the oil pipe 4 is inserted, and then the T-shaped screw seat 3 is embedded in turn, and then the flange 41 is connected to the T-shaped screw seat 3 through the screw 42 to complete the connection. If the mine pressure is too large later and the screw is broken, it is only necessary to replace the T-shaped screw seat 3 of the broken screw, and because the front end surface of the T-shaped screw seat 3 is in direct contact with the flange 41, there is no other restrictive part, so no matter where the screw is broken, the T-shaped screw seat 3 can be directly taken out and replaced as a whole.

[0022] As an optimized solution, the outer end face of the T-shaped screw seat 3 matches the weekend contour of the connecting seat 2. The best situation is that the cross-section of the connecting seat 2 is circular, and the T-shaped grooves 23 are opened at equal angles on its circumference. The outer end face of the T-shaped screw seat 3 is an arc surface consistent with the outer diameter of the connecting seat 2, and the diameter of the flange 41 is consistent with the outer diameter of the connecting seat 2.

[0023] The embodiments of the present invention are described in detail above with reference to the accompanying drawings, but the present invention is not limited to the described embodiments. For those skilled in the art, various changes, modifications, substitutions and variations of these embodiments are made without departing from the principles and spirit of the present invention, and still fall within the scope of protection of the present invention.

Claims

1. A mine pressure monitoring device for a coal mining face, characterized in that: It includes a pressure measuring box, an oil pipe and a pressure gauge; a connecting seat is arranged on the peripheral wall of the pressure measuring box, a plug-in hole is arranged on the front end face of the connecting seat, and the plug-in hole is connected to the oil cavity inside the pressure measuring box through an oil through hole with a smaller diameter; a plurality of T-shaped grooves are arranged on the peripheral wall of the connecting seat penetrating to the front end face, and T-shaped screw seats are embedded in the T-shaped grooves; a flange is integrally welded on the front end of the oil pipe, a pressure gauge is installed on the rear end, a sealing gasket is installed on the bottom of the plug-in hole, the front end of the oil pipe is inserted into the plug-in hole, and the flange is connected to the T-shaped screw seat by a screw.

2. The mine pressure monitoring device for coal mining working face according to claim 1 is characterized in that: The outer end surface of the T-shaped screw seat matches the weekend profile of the connecting seat.

3. The mine pressure monitoring device for coal mining working face according to claim 2 is characterized in that: The cross section of the connecting seat is circular, and T-shaped grooves are opened at equal angles on its circumference. The outer end surface of the T-shaped screw seat is an arc surface consistent with the outer diameter of the connecting seat, and the diameter of the flange is consistent with the outer diameter of the connecting seat.